CN105710488A - Welding process - Google Patents

Welding process Download PDF

Info

Publication number
CN105710488A
CN105710488A CN201410719125.XA CN201410719125A CN105710488A CN 105710488 A CN105710488 A CN 105710488A CN 201410719125 A CN201410719125 A CN 201410719125A CN 105710488 A CN105710488 A CN 105710488A
Authority
CN
China
Prior art keywords
welding
weld
tab
groove
reconditioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410719125.XA
Other languages
Chinese (zh)
Inventor
车海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Yegao Furniture Co Ltd
Original Assignee
Chongqing Yegao Furniture Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yegao Furniture Co Ltd filed Critical Chongqing Yegao Furniture Co Ltd
Priority to CN201410719125.XA priority Critical patent/CN105710488A/en
Publication of CN105710488A publication Critical patent/CN105710488A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a welding process. The welding process includes the following steps that (1) quality requirements for the surface of a weld groove and assembling are provided; (2) the weld groove is machined through a flame cutting method; (4) when the assembling interval between an overlap joint and a T-shaped corner connector is more than 1 mm or the assembling interval of pipe T, K and Y shaped connectors is more than 1.5 mm, the size of a weld leg for welding is at least equal to the sum of the design size of the weld leg and the interval; but when the assembling interval of the T-shaped corner connectors is more than 5 mm, overlaying is carried out at the end of a plate in advance, and the end is polished flat or welding is carried out on the interval after overlaying filling; (7.1) continuous welding is carried out during multi-layer welding of thick plates, welding slag and surface splash should be cleaned up in time after welding of each weld pass is completed, and welding can be carried out again after found defects affecting welding quality are overcome; and (7.2) when a bottom layer weld pass of the groove adopts a welding rod manual electric-arc welding mode, a welding rod not larger than phi 4 mm is suitable for being used for welding, the minimum size of a bottom layer root weld pass should be proper, but the maximum thickness can not exceed 6 mm. The welding process is reasonable in procedure and low in manufacturing cost.

Description

A kind of welding procedure
Technical field
The present invention relates to a kind of welding procedure.
Background technology
Existing welding procedure exists that procedure arrangement is unreasonable, operation is various, and technological parameter selects unreasonable, and the collocation of each technological parameter is unreasonable and operator's skill requirement is higher so that production cost is higher, product quality is on the low side, yield rate is not high.
Summary of the invention
Because the drawbacks described above of prior art, the technical problem to be solved be to provide a kind of operation rationally, the welding procedure of low cost of manufacture.
For achieving the above object, the invention provides
A kind of welding procedure, comprises the steps:
1), weld groove surface and assembling quality should meet the following requirements:
2), bevel for welding flame cutting method is processed;Quality of cut face should meet the respective specified of national standard ZBJ-59002.3 " thermal cutting, gas cutting quality and dimensional discrepancy ";When truncation is 1~3mm, answer reconditioning smooth;When truncation is more than 3mm, applies the diameter hydrogen controlled electrode repair welding less than 3.2mm, and reconditioning is smooth;
3), before welding, welder should check the assembling of welding position and the quality of removing surface, as undesirable, and can welding after answering reconditioning repair welding qualified;Various welding method bevel for welding assembly clearances all must not exceed 3mm except having penetration requirement;When groove assembly clearance exceedes tolerance regulation, or both sides built-up welding unilateral at groove, reconditioning comply with requirement, but when groove assembly clearance exceedes relatively lamella thickness 2 times or during more than 20mm, application heap soldering method does not increase component length and reduces assembly clearance;
4), l.5mm lap joint and T-shaped corner joint assembly clearance when exceeding more than 1mm or tubing T, K, connection wye assembly clearance, and the Size of welds of welding at least should be design Size of welds+gap;But when T-shaped corner joint assembly clearance is more than 5mm, should in advance plate end built-up welding and reconditioning is smooth or in gap built-up welding fill up after welding;
5), weld job environment should meet claimed below:
5.1) weld job district wind speed when manual electric arc welding more than 8m/s, gas shielded arc welding and flux cored wire arc welding more than 2m/s time, wind-proof shed should be set or take other draught exclusion devices;When there are draught or aerator in weld job district in atelier, also should set abat-vent by defined above;
5.2) relative humidity in weld job district cannot be greater than 90%;
5.3) when weldment surface moisture or when having snow and ice cover, heating should be taked to dry dehumidifying measure;
5.4), when weld job district ambient temperature is lower than 0 DEG C, Member Welding district all directions more than or equal to twice steel plate thickness and should be not less than the mother metal within the scope of l00mm, be heated to after more than 20 DEG C can welding, and in welding process, be all not lower than this temperature;
6), run-on tab, end tab, backing plate should meet the following requirements:
6.1) forbid bearing dynamic load and need to sparking, striking or assembling-welding fixtures on the mother metal beyond Fatigue Check member welding joints;
6.2) should sparking, striking on the mother metal beyond weld seam;
6.3) T junction, geneva cross, corner joint and banjo fixing butt jointing main weld two ends, run-on tab and end tab must be configured, its material should be identical with by weldering mother metal, and groove type should be identical with by welding line, prohibits the use of the material of other materials to serve as run-on tab and end tab;
6.4) SMAW and gas shielded arc welding weld seam are drawn length and be should be greater than 25mm;Its run-on tab and end tab width should be greater than 50mm, and length is preferably 1.5 times of thickness of slab and is not less than 30mm, and thickness should be not less than 6mm;
6.5), after having welded, application flame cutting removes run-on tab and end tab, and reconditioning is smooth;Not handy hammering falls run-on tab and end tab;
6.6) welding material used by should be identical with formal welding;Tack welding weld seam should have identical prescription with final weld seam;The tack welding of steel sleeve should weld in joint bevel, and tack welding throat depth is no more than the 2/3 of design throat depth, and tack welding fusion length is preferably greater than 40mm, and spacing is preferably 500~600mm, and should fill up arc crater;Tack welding preheating temperature should be higher than that formal welding preheating temperature;When tack welding weld seam has pore or crackle, it is necessary to reweld after removing;
7), the welding of multilayer welding should meet the following requirements:
7.1) answering continuous sequence during slab multilayer welding, each pass weld should clear up welding slag and surface splash after completing in time, it has been found that when affecting the defect of welding quality, can weld after should removing again;Sequential welding termination process should control weld zone mother metal temperature, make the upper and lower limit of interlayer temperature meet technical papers requirement;Meeting the situation interrupting welding, should take suitable after heat, Insulation, again again preheat during welding, temperature should be higher than that and initially preheats temperature;
7.2) groove bottom welding bead adopts the welding rod welding that the appropriate to the occasion use of welding rod manual electric arc welding is not more than φ 4mm, and the minimum dimension of bottom root pass should be suitable for, but maximum gauge is not to be exceeded 6mm.
The invention has the beneficial effects as follows: operation of the present invention is reasonable, low cost of manufacture, each parameter collocation reasonable coordination, it is possible to be effectively improved product quality and production efficiency.
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described:
A kind of welding procedure, comprises the steps:
1), weld groove surface and assembling quality should meet the following requirements:
2), bevel for welding flame cutting method is processed;Quality of cut face should meet the respective specified of national standard ZBJ-59002.3 " thermal cutting, gas cutting quality and dimensional discrepancy ";When truncation is 1~3mm, answer reconditioning smooth;When truncation is more than 3mm, applies the diameter hydrogen controlled electrode repair welding less than 3.2mm, and reconditioning is smooth;
3), before welding, welder should check the assembling of welding position and the quality of removing surface, as undesirable, and can welding after answering reconditioning repair welding qualified;Various welding method bevel for welding assembly clearances all must not exceed 3mm except having penetration requirement;When groove assembly clearance exceedes tolerance regulation, or both sides built-up welding unilateral at groove, reconditioning comply with requirement, but when groove assembly clearance exceedes relatively lamella thickness 2 times or during more than 20mm, application heap soldering method does not increase component length and reduces assembly clearance;
4), l.5mm lap joint and T-shaped corner joint assembly clearance when exceeding more than 1mm or tubing T, K, connection wye assembly clearance, and the Size of welds of welding at least should be design Size of welds+gap;But when T-shaped corner joint assembly clearance is more than 5mm, should in advance plate end built-up welding and reconditioning is smooth or in gap built-up welding fill up after welding;
5), weld job environment should meet claimed below:
5.1) weld job district wind speed when manual electric arc welding more than 8m/s, gas shielded arc welding and flux cored wire arc welding more than 2m/s time, wind-proof shed should be set or take other draught exclusion devices;When there are draught or aerator in weld job district in atelier, also should set abat-vent by defined above;
5.2) relative humidity in weld job district cannot be greater than 90%;
5.3) when weldment surface moisture or when having snow and ice cover, heating should be taked to dry dehumidifying measure;
5.4), when weld job district ambient temperature is lower than 0 DEG C, Member Welding district all directions more than or equal to twice steel plate thickness and should be not less than the mother metal within the scope of l00mm, be heated to after more than 20 DEG C can welding, and in welding process, be all not lower than this temperature;
6), run-on tab, end tab, backing plate should meet the following requirements:
6.1) forbid bearing dynamic load and need to sparking, striking or assembling-welding fixtures on the mother metal beyond Fatigue Check member welding joints;
6.2) should sparking, striking on the mother metal beyond weld seam;
6.3) T junction, geneva cross, corner joint and banjo fixing butt jointing main weld two ends, run-on tab and end tab must be configured, its material should be identical with by weldering mother metal, and groove type should be identical with by welding line, prohibits the use of the material of other materials to serve as run-on tab and end tab;
6.4) SMAW and gas shielded arc welding weld seam are drawn length and be should be greater than 25mm;Its run-on tab and end tab width should be greater than 50mm, and length is preferably 1.5 times of thickness of slab and is not less than 30mm, and thickness should be not less than 6mm;
6.5), after having welded, application flame cutting removes run-on tab and end tab, and reconditioning is smooth;Not handy hammering falls run-on tab and end tab;
6.6) welding material used by should be identical with formal welding;Tack welding weld seam should have identical prescription with final weld seam;The tack welding of steel sleeve should weld in joint bevel, and tack welding throat depth is no more than the 2/3 of design throat depth, and tack welding fusion length is preferably greater than 40mm, and spacing is preferably 500~600mm, and should fill up arc crater;Tack welding preheating temperature should be higher than that formal welding preheating temperature;When tack welding weld seam has pore or crackle, it is necessary to reweld after removing;
7), the welding of multilayer welding should meet the following requirements:
7.1) answering continuous sequence during slab multilayer welding, each pass weld should clear up welding slag and surface splash after completing in time, it has been found that when affecting the defect of welding quality, can weld after should removing again;Sequential welding termination process should control weld zone mother metal temperature, make the upper and lower limit of interlayer temperature meet technical papers requirement;Meeting the situation interrupting welding, should take suitable after heat, Insulation, again again preheat during welding, temperature should be higher than that and initially preheats temperature;
7.2) groove bottom welding bead adopts the welding rod welding that the appropriate to the occasion use of welding rod manual electric arc welding is not more than φ 4mm, and the minimum dimension of bottom root pass should be suitable for, but maximum gauge is not to be exceeded 6mm.

Claims (1)

1. a welding procedure, is characterized in that: comprise the steps:
1), weld groove surface and assembling quality should meet the following requirements:
2), bevel for welding flame cutting method is processed;Quality of cut face should meet the respective specified of national standard ZBJ-59002.3 " thermal cutting, gas cutting quality and dimensional discrepancy ";When truncation is 1~3mm, answer reconditioning smooth;When truncation is more than 3mm, applies the diameter hydrogen controlled electrode repair welding less than 3.2mm, and reconditioning is smooth;
3), before welding, welder should check the assembling of welding position and the quality of removing surface, as undesirable, and can welding after answering reconditioning repair welding qualified;Various welding method bevel for welding assembly clearances all must not exceed 3mm except having penetration requirement;When groove assembly clearance exceedes tolerance regulation, or both sides built-up welding unilateral at groove, reconditioning comply with requirement, but when groove assembly clearance exceedes relatively lamella thickness 2 times or during more than 20mm, application heap soldering method does not increase component length and reduces assembly clearance;
4), l.5mm lap joint and T-shaped corner joint assembly clearance when exceeding more than 1mm or tubing T, K, connection wye assembly clearance, and the Size of welds of welding at least should be design Size of welds+gap;But when T-shaped corner joint assembly clearance is more than 5mm, should in advance plate end built-up welding and reconditioning is smooth or in gap built-up welding fill up after welding;
5), weld job environment should meet claimed below:
5.1) weld job district wind speed when manual electric arc welding more than 8m/s, gas shielded arc welding and flux cored wire arc welding more than 2m/s time, wind-proof shed should be set or take other draught exclusion devices;When there are draught or aerator in weld job district in atelier, also should set abat-vent by defined above;
5.2) relative humidity in weld job district cannot be greater than 90%;
5.3) when weldment surface moisture or when having snow and ice cover, heating should be taked to dry dehumidifying measure;
5.4), when weld job district ambient temperature is lower than 0 DEG C, Member Welding district all directions more than or equal to twice steel plate thickness and should be not less than the mother metal within the scope of l00mm, be heated to after more than 20 DEG C can welding, and in welding process, be all not lower than this temperature;
6), run-on tab, end tab, backing plate should meet the following requirements:
6.1) forbid bearing dynamic load and need to sparking, striking or assembling-welding fixtures on the mother metal beyond Fatigue Check member welding joints;
6.2) should sparking, striking on the mother metal beyond weld seam;
6.3) T junction, geneva cross, corner joint and banjo fixing butt jointing main weld two ends, run-on tab and end tab must be configured, its material should be identical with by weldering mother metal, and groove type should be identical with by welding line, prohibits the use of the material of other materials to serve as run-on tab and end tab;
6.4) SMAW and gas shielded arc welding weld seam are drawn length and be should be greater than 25mm;Its run-on tab and end tab width should be greater than 50mm, and length is preferably 1.5 times of thickness of slab and is not less than 30mm, and thickness should be not less than 6mm;
6.5), after having welded, application flame cutting removes run-on tab and end tab, and reconditioning is smooth;Not handy hammering falls run-on tab and end tab;
6.6) welding material used by should be identical with formal welding;Tack welding weld seam should have identical prescription with final weld seam;The tack welding of steel sleeve should weld in joint bevel, and tack welding throat depth is no more than the 2/3 of design throat depth, and tack welding fusion length is preferably greater than 40mm, and spacing is preferably 500~600mm, and should fill up arc crater;Tack welding preheating temperature should be higher than that formal welding preheating temperature;When tack welding weld seam has pore or crackle, it is necessary to reweld after removing;
7), the welding of multilayer welding should meet the following requirements:
7.1) answering continuous sequence during slab multilayer welding, each pass weld should clear up welding slag and surface splash after completing in time, it has been found that when affecting the defect of welding quality, can weld after should removing again;Sequential welding termination process should control weld zone mother metal temperature, make the upper and lower limit of interlayer temperature meet technical papers requirement;Meeting the situation interrupting welding, should take suitable after heat, Insulation, again again preheat during welding, temperature should be higher than that and initially preheats temperature;
7.2) groove bottom welding bead adopts the welding rod welding that the appropriate to the occasion use of welding rod manual electric arc welding is not more than φ 4mm, and the minimum dimension of bottom root pass should be suitable for, but maximum gauge is not to be exceeded 6mm.
CN201410719125.XA 2014-12-03 2014-12-03 Welding process Pending CN105710488A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410719125.XA CN105710488A (en) 2014-12-03 2014-12-03 Welding process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410719125.XA CN105710488A (en) 2014-12-03 2014-12-03 Welding process

Publications (1)

Publication Number Publication Date
CN105710488A true CN105710488A (en) 2016-06-29

Family

ID=56146074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410719125.XA Pending CN105710488A (en) 2014-12-03 2014-12-03 Welding process

Country Status (1)

Country Link
CN (1) CN105710488A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108857218A (en) * 2018-07-09 2018-11-23 福建省马尾造船股份有限公司 A kind of connection method of the connection supplementary structure and jointed metal plate of jointed metal plate
CN110280869A (en) * 2019-06-28 2019-09-27 沈阳富创精密设备有限公司 A kind of solar energy steel plate plated film cavity welding technique
CN115026379A (en) * 2022-07-03 2022-09-09 新疆八钢佳域工业材料有限公司 Welding process of water tank type water-cooled furnace mouth of steel-making converter
CN117428361A (en) * 2023-12-08 2024-01-23 上海核工程研究设计院股份有限公司 Method for improving welding seam quality of structural module member of nuclear grade pressure equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108857218A (en) * 2018-07-09 2018-11-23 福建省马尾造船股份有限公司 A kind of connection method of the connection supplementary structure and jointed metal plate of jointed metal plate
CN110280869A (en) * 2019-06-28 2019-09-27 沈阳富创精密设备有限公司 A kind of solar energy steel plate plated film cavity welding technique
CN115026379A (en) * 2022-07-03 2022-09-09 新疆八钢佳域工业材料有限公司 Welding process of water tank type water-cooled furnace mouth of steel-making converter
CN117428361A (en) * 2023-12-08 2024-01-23 上海核工程研究设计院股份有限公司 Method for improving welding seam quality of structural module member of nuclear grade pressure equipment

Similar Documents

Publication Publication Date Title
CN105127566B (en) The complete penetraction and fusion in welding welding method of big thickness carbon steel stainless steel clad plate
WO2018176696A1 (en) Vertical butt joint welding method for thick plates
CN101239422A (en) Small bevel angle full-automatic CO2 gas shielded welding and automatic submerged arc welding combined welding technique
CN107598340B (en) Method for welding T-shaped joint of large thick plate
CN102896399B (en) Super-narrow-gap electric arc welding device for butting steel rails
CN108971710A (en) A kind of connection processing technology of tube-tube plate
CN105710488A (en) Welding process
CN105750705A (en) Heat-resisting steel pipe welding technology
CN102294545B (en) Laser penetration welding seam formation control method for Hass alloy conductive roller
CN110253118B (en) Welding method for 917 steel plate and aluminum-titanium steel composite material
CN102039472A (en) Tailor welding method of thick aluminium alloy plate
CN106903401A (en) Obliquity buried arc welding method
CN104339066A (en) Medium-plate butt seam welding component and welding method based on ceramic arc-striking backings
CN105312742A (en) Welding technology
CN105710497A (en) Splicing technology of H-shaped steel
CN101569953A (en) Technique for welding angle steel with penetration weld non-standard specification
CN103406644A (en) Submerged-arc welding process for longitudinal seam and circular seam welding of pipe sections
CN103817416A (en) One-step molding submerged arc welding method for steel sheet docking
CN105583499A (en) Full-automatic welding method for metal powder-cored wire pipeline girth welding joints
CN105983761A (en) High-strength steel welding process
JP6025620B2 (en) Submerged arc welding method, method of manufacturing steel pipe using the submerged arc welding method, welded joint, and steel pipe having the welded joint
CN107570874A (en) Laser-arc hybrid welding process
CN105728894A (en) Welding process for dome-roof storage tank
CN204234946U (en) Based on the cut deal butt seam welding connected components of ceramic striking liner
CN105345230A (en) Argon arc brazing method for patch welding brazing seams of rotor connecting ring of shielding motor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160629

WD01 Invention patent application deemed withdrawn after publication