CN105703475B CN201610104823.8A CN201610104823A CN105703475B CN 105703475 B CN105703475 B CN 105703475B CN 201610104823 A CN201610104823 A CN 201610104823A CN 105703475 B CN105703475 B CN 105703475B
Authority
CN
China
Prior art keywords
atm device
power supply
atm
module
supply system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610104823.8A
Other languages
Chinese (zh)
Other versions
CN105703475A (en
Inventor
吴胜楠
熊飞
陈明宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdian Yuntong Financial Electronic Co Ltd
Original Assignee
Guangdian Yuntong Financial Electronic Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdian Yuntong Financial Electronic Co Ltd filed Critical Guangdian Yuntong Financial Electronic Co Ltd
Priority to CN201610104823.8A priority Critical patent/CN105703475B/en
Publication of CN105703475A publication Critical patent/CN105703475A/en
Priority to PCT/CN2017/070872 priority patent/WO2017143878A1/en
Application granted granted Critical
Publication of CN105703475B publication Critical patent/CN105703475B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems

Abstract

The embodiment of the invention discloses a kind of atm device ceaseless intelligent method of supplying power to, for solving the problems, such as that existing UPS power supply system causes electricity to waste atm device mean allocation electricity and power-on time.The method comprise the steps that obtaining the remaining total electricity of the UPS power supply system after city is electrically disconnected;Obtain the pre-set priority of all atm devices in the UPS power supply system;The electricity accounting of every atm device distribution is determined according to the pre-set priority of all atm devices;Obtaining that every atm device is corresponding according to the remaining total electricity and the electricity accounting can power supply amount;According to atm device described in every can power supply amount estimate it is corresponding can power-on time;Control the UPS power supply system to during city is electrically disconnected the actual power time be more than it is described can the atm device of power-on time shut down.The embodiment of the present invention also provides a kind of atm device ceaseless intelligent power supply system.

Description

A kind of atm device ceaseless intelligent method of supplying power to and system
Technical field
The present invention relates to atm device field more particularly to a kind of atm device ceaseless intelligent method of supplying power to and systems.
Background technique
It is general to prevent atm device abnormal power-down to the damage of equipment hardware device bring and to the missing of transaction record Logical atm device installs UPS (Uninterruptible Power System/Uninterruptible Power additional Supply), a UPS is generally installed inside an ATM additional, equipment power supply mode is UPS connection alternating current, atm device connection Alternating current is inputed to UPS by UPS, by supplying electricity to atm device again after UPS pressure stabilizing, can be maintained about 15 minutes after alternating current power-off. ATM to miniaturization, is limited to ATM volumetric constraint, the UPS volume installed additional inside ATM machine is limited, also limits so at present UPS battery amount of capacity.
Only a few UPS uses centralized power supply system at present, i.e. a UPS is more atm device power supplies, this UPS power supply System is all mean allocation electricity and power-on time to different loads equipment, cannot flexibly be set to different loads, different priorities Standby flexible configuration electricity and power-on time, cause the waste of electricity.
Summary of the invention
The embodiment of the invention provides a kind of atm device ceaseless intelligent method of supplying power to and systems, are able to solve existing UPS The problem of power supply system causes electricity to waste atm device mean allocation electricity and power-on time.
A kind of atm device ceaseless intelligent method of supplying power to provided in an embodiment of the present invention is applied to UPS power supply system, packet It includes:
After city is electrically disconnected, the remaining total electricity of the UPS power supply system is obtained;
Obtain the pre-set priority of all atm devices in the UPS power supply system;
The electricity accounting of every atm device distribution is determined according to the pre-set priority of all atm devices;
Obtaining that every atm device is corresponding according to the remaining total electricity and the electricity accounting can power supply amount;
According to atm device described in every can power supply amount estimate it is corresponding can power-on time;
Control the UPS power supply system to during city is electrically disconnected the actual power time be more than it is described can power-on time Atm device shuts down.
Optionally, the pre-set priority is precalculated to obtain by following steps:
The first weighted value corresponding with the device type is obtained according to the device type of the atm device;
The second weighted value is obtained according to the frequency of use of the atm device, frequency of use is higher, corresponding second weighted value It is bigger;
Third weighted value is obtained according to the failure rate of the atm device, failure rate is higher, and corresponding third adds Weight is smaller;
The condition grading of the atm device is obtained, the condition grading is the atm device according on the atm device The module status of EM equipment module scores to obtain;
Institute is obtained according to first weighted value, second weighted value, the third weighted value and the condition grading State the pre-set priority of atm device.
Optionally, the method also includes:
Whether the module status of EM equipment module changes on the atm device that periodic test does not shut down, if so, Recalculate the pre-set priority of the changed atm device not shut down of module status.
Optionally, the method also includes:
Behind city power recovery, the atm device being shut down during city is electrically disconnected is waken up.
Optionally, it is described according to atm device described in every can power supply amount estimate it is corresponding can power-on time include:
Obtain the unit time electricity consumption of every atm device;
According to atm device described in every can power supply amount and the unit time electricity consumption be calculated it is corresponding for The electric time;
The method also includes: the atm device is periodically updated according to the daily monitoring data of the UPS power supply system Unit time electricity consumption.
A kind of atm device ceaseless intelligent power supply system provided in an embodiment of the present invention, including UPS power supply system, are also wrapped It includes:
Remaining total electricity obtains module, for obtaining the remaining total electricity of the UPS power supply system after city is electrically disconnected;
Priority obtains module, for obtaining the pre-set priority of all atm devices in the UPS power supply system;
Electricity accounting determining module, for determining every atm device point according to the pre-set priority of all atm devices The electricity accounting matched;
For electricity quantity module, for obtaining every atm device according to the remaining total electricity and the electricity accounting It is corresponding can power supply amount;
Can power-on time estimate module, for according to atm device described in every can power supply amount estimate it is corresponding for The electric time;
Shut down control module, for control the UPS power supply system to during city is electrically disconnected the actual power time it is super Cross it is described can the atm device of power-on time shut down.
Optionally, the pre-set priority with lower module by precalculating to obtain:
First weighting block, for obtaining corresponding with the device type according to the device type of the atm device One weighted value;
Second weighting block, for obtaining the second weighted value according to the frequency of use of the atm device, frequency of use is got over Height, corresponding second weighted value are bigger;
Third weighting block, for obtaining third weighted value, failure rate according to the failure rate of the atm device Higher, corresponding third weighted value is smaller;
Scoring obtains module, and for obtaining the condition grading of the atm device, the condition grading is the atm device It scores to obtain according to the module status of EM equipment module on the atm device;
Priority computation module, for according to first weighted value, second weighted value, the third weighted value and The condition grading obtains the pre-set priority of the atm device.
Optionally, the atm device ceaseless intelligent power supply system further include:
Status checking module, the module status of EM equipment module is on the atm device not shut down for periodic test It is no to change;
Priority recalculates module, for recalculating mould when the inspection result of the status checking module, which is, is The pre-set priority of the changed atm device not shut down of bulk state.
Optionally, the atm device ceaseless intelligent power supply system further include:
Wake-up module, for waking up the atm device being shut down during city is electrically disconnected behind city power recovery.
Optionally, it is described can power-on time estimate module and include:
Unit used electricity amount acquiring unit, for obtaining the unit time electricity consumption of every atm device;
Can power time calculating unit, for according to atm device described in every can power supply amount and the unit time Electricity consumption be calculated it is corresponding can power-on time;
The atm device ceaseless intelligent power supply system further include: unit used electricity amount update module, for according to The daily monitoring data of UPS power supply system periodically updates the unit time electricity consumption of the atm device.
As can be seen from the above technical solutions, the embodiment of the present invention has the advantage that
In the embodiment of the present invention, after city is electrically disconnected, the remaining total electricity of the UPS power supply system is obtained;Then, it obtains The pre-set priority of all atm devices in the UPS power supply system;Then, it is determined according to the pre-set priority of all atm devices The electricity accounting of every atm device distribution;Every ATM is obtained according to the remaining total electricity and the electricity accounting Equipment is corresponding can power supply amount;According to atm device described in every can power supply amount estimate it is corresponding can power-on time;Most Afterwards, control the UPS power supply system to during city is electrically disconnected the actual power time be more than it is described can the ATM of power-on time set It is standby to shut down.In embodiments of the present invention, which can be atm device intelligent power supply according to pre-set priority, It ensure that the high atm device of priority obtains more power-on times, avoid electricity waste.
Detailed description of the invention
Fig. 1 is a kind of atm device ceaseless intelligent method of supplying power to one embodiment flow chart in the embodiment of the present invention;
Fig. 2 is another embodiment flow chart of a kind of atm device ceaseless intelligent method of supplying power in the embodiment of the present invention;
Fig. 3 is a kind of atm device ceaseless intelligent power supply system one embodiment structure chart in the embodiment of the present invention;
Fig. 4 is a kind of another example structure figure of atm device ceaseless intelligent power supply system in the embodiment of the present invention;
Fig. 5 is the next system of application scenarios that atm device ceaseless intelligent method of supplying power to is applied in the embodiment of the present invention Structural schematic diagram;
Fig. 6 is in the embodiment of the present invention using system interaction under the application scenarios of atm device ceaseless intelligent method of supplying power to Timing diagram.
Specific embodiment
The embodiment of the invention provides a kind of atm device ceaseless intelligent method of supplying power to and systems, for solving existing UPS The problem of power supply system causes electricity to waste atm device mean allocation electricity and power-on time.
In order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below in conjunction with the present invention Attached drawing in embodiment, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that disclosed below Embodiment be only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiments of the present invention, this field Those of ordinary skill's all other embodiment obtained without making creative work, belongs to protection of the present invention Range.
Referring to Fig. 1, a kind of atm device ceaseless intelligent method of supplying power to one embodiment includes: in the embodiment of the present invention
101, after city is electrically disconnected, the remaining total electricity of the UPS power supply system is obtained;
After city is electrically disconnected, the remaining total electricity of the available UPS power supply system.
102, the pre-set priority of all atm devices in the UPS power supply system is obtained;
In addition, the pre-set priority of all atm devices in the UPS power supply system can also be obtained after city is electrically disconnected.
103, the electricity accounting of every atm device distribution is determined according to the pre-set priority of all atm devices;
It, can be according to all atm devices on obtaining the UPS power supply system after the pre-set priority of all atm devices Pre-set priority determine every atm device distribution electricity accounting.
104, obtaining that every atm device is corresponding according to the residue total electricity and the electricity accounting can power supply amount;
Obtain the UPS power supply system remaining total electricity and determine every atm device distribution electricity accounting it Afterwards, can obtain that every atm device is corresponding according to the residue total electricity and the electricity accounting can power supply amount.
105, according to every atm device can power supply amount estimate it is corresponding can power-on time;
Obtained according to the residue total electricity and the electricity accounting every atm device it is corresponding can after power supply amount, Can according to every atm device can power supply amount estimate it is corresponding can power-on time.
106, control the UPS power supply system to during city is electrically disconnected the actual power time be more than that this can power-on time Atm device shuts down.
According to every atm device can power supply amount estimate and corresponding can control the UPS after power-on time Power supply system to during city is electrically disconnected the actual power time be more than this can the atm device of power-on time shut down.
In the present embodiment, after city is electrically disconnected, the remaining total electricity of the UPS power supply system is obtained;Then, the UPS is obtained The pre-set priority of all atm devices in power supply system;Then, determine that every is somebody's turn to do according to the pre-set priority of all atm devices The electricity accounting of atm device distribution;According to the residue total electricity and the electricity accounting obtain every atm device it is corresponding for Power consumption;According to every atm device can power supply amount estimate it is corresponding can power-on time;Finally, controlling UPS power supply system During the city Tong Dui is electrically disconnected the actual power time be more than this can the atm device of power-on time shut down.In the present embodiment In, which can be atm device intelligent power supply according to pre-set priority, ensure that the high atm device of priority obtains To more power-on times, electricity waste is avoided.
For ease of understanding, one of embodiment of the present invention atm device ceaseless intelligent method of supplying power to is carried out below detailed Thin description, referring to Fig. 2, a kind of another embodiment of atm device ceaseless intelligent method of supplying power to includes: in the embodiment of the present invention
201, after city is electrically disconnected, the remaining total electricity of the UPS power supply system is obtained;
After city is electrically disconnected, the remaining total electricity of the available UPS power supply system.It is understood that disconnected in alternating current After opening, the energy storage device of UPS power supply system is generally stored with certain stand-by electric energy, and in order to realize intelligent power supply, first choice is obtained The remaining total electricity of the UPS power supply system.
202, the pre-set priority of all atm devices in the UPS power supply system is obtained;
After city is electrically disconnected, the pre-set priority of all atm devices in the available UPS power supply system.Wherein, UPS The quantity of movable atm device in power supply system, which can be monitored, to be learnt, for example, after city is electrically disconnected, it can be by UPS power supply system Control host send message to the atm device for participating in monitoring, atm device, which receives, gives message sink confirmation after message, according to The secondary movable atm device quantity for currently participating in monitoring in UPS power supply system.
It should be noted that the pre-set priority of atm device is precalculated to obtain by following steps:
The first weighted value corresponding with the device type is obtained according to the device type of the atm device;
The second weighted value is obtained according to the frequency of use of the atm device, frequency of use is higher, and corresponding second weighted value is got over Greatly;
Third weighted value is obtained according to the failure rate of the atm device, failure rate is higher, corresponding third weighting It is worth smaller;
The condition grading of the atm device is obtained, which is the atm device according to EM equipment module on the atm device Module status score to obtain;
The atm device is obtained according to first weighted value, second weighted value, the third weighted value and the condition grading Pre-set priority.
It is understood that the module status of each EM equipment module is different, corresponding state for atm device It scores also different.For example, the cash box of atm device is full, then the corresponding scoring of module status of " cash box " EM equipment module can be with It is -50, if cash box is sky, the corresponding scoring of module status of " cash box " EM equipment module can be 50, pass through disparate modules shape The scoring of state can carry out dynamic adjustment to the priority of atm device.This is held, cash box is full, then scores -50, and cash box is empty, then comments Divide 50, can allow UPS power supply system is preferably the atm device power supply for having and receiving deposit business, to guarantee the reality of basic business It is existing.
203, the electricity accounting of every atm device distribution is determined according to the pre-set priority of all atm devices;
It, can be according to all atm devices on obtaining the UPS power supply system after the pre-set priority of all atm devices Pre-set priority determine every atm device distribution electricity accounting.It should be noted that pre-set priority and electricity accounting The electricity accounting of direct proportionality, that is, the atm device that pre-set priority is higher, distribution is bigger, conversely, default preferential The lower atm device of grade, the electricity accounting of distribution are smaller.
It is assumed that there is 3 equipment at present, A (withdrawal equipment), B (withdrawal equipment), C (single withdrawal equipment) are corresponding Pre-set priority are as follows: A:10, B:7, C:3, then their electricity accounting is then 10:7:3.
204, obtaining that every atm device is corresponding according to the residue total electricity and the electricity accounting can power supply amount;
It, can be with after the electricity accounting for determining the distribution of every atm device according to the pre-set priority of all atm devices Obtaining that every atm device is corresponding according to the residue total electricity and the electricity accounting can power supply amount.
It accepts and illustrates in above-mentioned steps 203, it is assumed that the remaining total electricity of UPS power supply system is 5000, in order to avoid certain sets Standby power consumption such as increases at the bursty states suddenly, can reserve the 10% of remaining total electricity as retention capacity, then distribute to A equipment Electricity is (5000*90%) * 10/ (10+7+3)=2250, and the total electricity for distributing to B device is (5000*90%) * 7/ (10+7+ 3) total electricity for=1575, distributing to C equipment is (5000*90%) * 3/ (10+7+3)=675.
205, the unit time electricity consumption of every atm device is obtained;
It can be after power supply amount, when the unit of available every atm device obtaining that every atm device is corresponding Between electricity consumption.It is understood that the unit time electricity consumption of every atm device can be pre-stored in UPS power supply system, It can calculate and get from the daily monitoring data of UPS power supply system.In addition, due to increasing with duration of service, power consumption It may change, it is therefore desirable to which the unit time electricity consumption of each equipment of real-time update, specifically, can be powered according to the UPS is The daily monitoring data of system periodically updates the unit time electricity consumption of the atm device.
206, according to every atm device can power supply amount and the unit time electricity consumption be calculated it is corresponding for The electric time;
It, can powering according to every atm device after the unit time electricity consumption for obtaining every atm device Electricity and the unit time electricity consumption be calculated it is corresponding can power-on time.
It accepts and illustrates in above-mentioned steps 204, it is assumed that A equipment unit time electricity consumption is 500, the electricity consumption of B device unit time Amount be 500, C equipment unit time electricity consumption is 300, then A equipment estimate can power-on time be 2250/500=4.5 hours, B Equipment estimate can power-on time be 1575/500=3.15 hour, C equipment estimate can power-on time be 675/300=2.25 Hour.
207, control the UPS power supply system to during city is electrically disconnected the actual power time be more than that this can power-on time Atm device shuts down;
The UPS power supply system can be can control to electrically disconnected in city after power-on time obtain every atm device During the actual power time be more than this can the atm device of power-on time shut down.It is understood that city it is electrically disconnected it Afterwards, UPS power supply system only provides the electric power of " can the power-on time " duration for atm device, when can power-on time be finished after, will be right Corresponding atm device carries out power-off operation.
208, whether the module status of EM equipment module changes on the atm device that periodic test does not shut down, if so, 209 are thened follow the steps, if it is not, then operating according to normal flow;
It is the atm device that periodic test does not shut down in the atm device power supply process not shut down in the UPS power supply system Whether the module status of upper EM equipment module changes, if so, 209 are thened follow the steps, if it is not, then operating according to normal flow. It is understood that the module status of EM equipment module influences the pre-set priority of the atm device on atm device, it is therefore desirable to real When check atm device module status whether change, in order to dynamically update the pre-set priority of atm device.
209, the pre-set priority of the changed atm device not shut down of module status is recalculated;
When checking that the module status for learning EM equipment module on the atm device not shut down changes, can recalculate It is described similarly in the pre-set priority of the changed atm device not shut down of module status, calculation method and step 202, this Place repeats no more.
210, behind city power recovery, the atm device being shut down during city is electrically disconnected is waken up.
Behind city power recovery, the atm device to shut down before in order to save electricity is waken up, guarantees the site ATM Into normal service state, provides and sufficient amount of service atm device.
For ease of understanding, described embodiment according to fig. 2, below with a practical application scene to the embodiment of the present invention One of atm device ceaseless intelligent method of supplying power to be described:
It should be noted that controlling host, long-range monitoring host computer in this application scene by UPS and being mounted on atm device Interior ATM control unit executes the atm device ceaseless intelligent method of supplying power to jointly, please refers to Fig. 5 and Fig. 6:
The application scenarios include: a long-range control host machine, UPS control host, one or more network UPS, more Platform ATM self-service device.By the monitoring to network UPS state, in conjunction with making for each ATM self-service device for being connected to network UPS With priority, each ATM self-service device amount of being powered and power-on time smart allocation are controlled.
As shown in figure 5, UPS control host installs UPS control unit, charge and discharge, switching on and shutting down etc. for controlling network UPS Operation.ATM control unit on atm device equally can control the control unit on host with UPS and interact.When being located at UPS controls the UPS control unit on host and finds that city is electrically disconnected, can be to all additions when UPS battery state of charge changes The ATM control unit of monitoring sends associated change event, informs that the ATM control unit on ATM host can pass through dependent event It decides whether to carry out own switch machine.
For UPS control unit and remote monitoring unit on the host of UPS control simultaneously there is also linkage, remote monitoring unit is logical It crosses and identifies each self-service device type, equipment charge priority is ranked up and (is ranked up by each element weighted value, as site has More same categories of device then each module status of the selected equipment from database most it is normal that) the corresponding power-on time of adaptation.
When detecting alternating current power-off, when long-range monitoring host computer distributes to the electricity consumption of each equipment by priority data calculating Between, and successively distribute the time reach when notify the ATM control unit in each equipment to shut down, when city power recovery power supply and When UPS electricity restores normal level, long-range monitoring host computer again wakes up the equipment shut down, so as to reach reasonable employment The effect of ups power.And the current UPS state of charge of administrator and each self-service device are notified by modes such as short message, Email Operating status can more timely solve the problems, such as the normal use for guaranteeing equipment.
Main working process is as shown in Figure 6:
Scene one: alternating current power-off.
1, UPS controls the control unit discovery alternating current on host and has disconnected, and is just changed to UPS battery power supply.
2, UPS controls the control unit on host in time to the ATM for each atm device for being connected to network UPS, and control is single Remote monitoring unit on first and long-range monitoring host computer sends message, informs that present equipment is powered by UPS.
3, after remote monitoring unit receives the message, the state of each module on query facility, according to equipment charge priority Rule determines the priority of each atm device.
4, remote supervisor can by calculating distribution power supply amount and can power-on time successively Request Priority from as low as High equipment closes certain operation service or shutdown.
Scene two: city power recovery.
1, behind city power recovery, UPS control unit is equally notified that remote monitoring unit.
2, remote monitoring unit again wakes up the equipment being turned off.
Scene three: UPS is concentrated in charging process.
1, during UPS centrally connected power supply, the ATM control unit in each equipment is also inspecting periodically respective module status Whether change, if there is module status changes, proactive notification remote monitoring unit.
2, the priority of current device is recalculated by monitoring unit.
The judgement of priority: this system can be to different type priority facility, same equipment different function operator precedence grade Judged.Final priority is calculated by the weighted value of each reference value when judgement, rule is as follows:
Different type priority facility weighted value is different: withdrawal equipment > mono- withdrawal equipment > self-help charger > self-service is looked into Inquiry machine > ...;
Weighted value is successively reduced by frequency of use height.Frequency of use can be by remote monitoring unit from daily monitoring data It obtains (frequency of use and average service time).
Type is identical, the identical equipment of frequency of use, and the low priority weighted value of equipment failure rate is high.Failure rate can It is obtained from daily monitoring data by remote monitoring unit.
4, for same equipment, for the device service time for guaranteeing the longer time, also EM equipment module is carried out simultaneously Priority divides.According to the importance of different function, module used in non-principal function is shielded, these modules are adjusted to section Power mode.
A kind of atm device ceaseless intelligent method of supplying power to is essentially described above, it below will be uninterrupted to a kind of atm device Intelligent power supply system is described in detail, referring to Fig. 3, a kind of atm device ceaseless intelligent power supply system in the embodiment of the present invention System one embodiment include:
Remaining total electricity obtains module 301, for obtaining the remaining total electricity of the UPS power supply system after city is electrically disconnected;
Priority obtains module 302, for obtaining the pre-set priority of all atm devices in the UPS power supply system;
Electricity accounting determining module 303, for determining every atm device according to the pre-set priority of all atm devices The electricity accounting of distribution;
It is corresponding for obtaining every atm device with the electricity accounting according to the residue total electricity for electricity quantity module 304 Can power supply amount;
Can power-on time estimate module 305, for according to every atm device can power supply amount estimate it is corresponding for The electric time;
Shut down control module 306, for control the UPS power supply system to during city is electrically disconnected the actual power time it is super Cross this can the atm device of power-on time shut down.
In the present embodiment, after city is electrically disconnected, remaining total electricity obtains the residue that module 301 obtains the UPS power supply system Total electricity;Then, priority obtains the pre-set priority that module 302 obtains all atm devices in the UPS power supply system;Electricity Accounting determining module 303 determines the electricity accounting of every atm device distribution according to the pre-set priority of all atm devices;It connects , the corresponding electricity of powering of every atm device is obtained according to the residue total electricity and the electricity accounting for electricity quantity module 304 Amount;Can power-on time estimate module 305 according to every atm device can power supply amount estimate it is corresponding can power-on time;Most Afterwards, shutdown control module 306 control the UPS power supply system to during city is electrically disconnected the actual power time be more than this can power The atm device of time shuts down.In the present embodiment, which can be atm device intelligence according to pre-set priority It can power, ensure that the high atm device of priority obtains more power-on times, avoid electricity waste.
For ease of understanding, one of embodiment of the present invention atm device ceaseless intelligent power supply system is carried out below detailed Thin description, referring to Fig. 4, a kind of another embodiment of atm device ceaseless intelligent power supply system includes: in the embodiment of the present invention
Remaining total electricity obtains module 401, for obtaining the remaining total electricity of the UPS power supply system after city is electrically disconnected;
Priority obtains module 402, for obtaining the pre-set priority of all atm devices in the UPS power supply system;
Electricity accounting determining module 403, for determining every atm device according to the pre-set priority of all atm devices The electricity accounting of distribution;
It is corresponding for obtaining every atm device with the electricity accounting according to the residue total electricity for electricity quantity module 404 Can power supply amount;
Can power-on time estimate module 405, for according to every atm device can power supply amount estimate it is corresponding for The electric time;
Shut down control module 406, for control the UPS power supply system to during city is electrically disconnected the actual power time it is super Cross this can the atm device of power-on time shut down.
In the present embodiment, which can be by precalculating to obtain with lower module:
First weighting block 407 obtains corresponding with the device type first for the device type according to the atm device Weighted value;
Second weighting block 408 obtains the second weighted value for the frequency of use according to the atm device, and frequency of use is got over Height, corresponding second weighted value are bigger;
Third weighting block 409 obtains third weighted value, mean failure rate for the failure rate according to the atm device Rate is higher, and corresponding third weighted value is smaller;
Scoring obtain module 410, for obtaining the condition grading of the atm device, the condition grading be the atm device according to The module status of EM equipment module scores to obtain on the atm device;
Priority computation module 411 is used for according to first weighted value, second weighted value, the third weighted value and is somebody's turn to do Condition grading obtains the pre-set priority of the atm device.
In the present embodiment, which can also include:
Status checking module 412, the module status of EM equipment module is on the atm device not shut down for periodic test It is no to change;
Priority recalculates module 413, for recalculating mould when the inspection result of the status checking module, which is, is The pre-set priority of the changed atm device not shut down of bulk state.
In the present embodiment, which can also include:
Wake-up module 414, for waking up the atm device being shut down during city is electrically disconnected behind city power recovery.
In the present embodiment, this can power-on time estimate module 405 and may include:
Unit used electricity amount acquiring unit 4051, for obtaining the unit time electricity consumption of every atm device;
Can power time calculating unit 4052, for according to every atm device can power supply amount and the unit time Electricity consumption be calculated it is corresponding can power-on time;
The atm device ceaseless intelligent power supply system can also include: unit used electricity amount update module 415, be used for basis The daily monitoring data of the UPS power supply system periodically updates the unit time electricity consumption of the atm device.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description, The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In several embodiments provided herein, it should be understood that disclosed system, device and method can be with It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit It divides, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components It can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, it is shown or The mutual coupling, direct-coupling or communication connection discussed can be through some interfaces, the indirect coupling of device or unit It closes or communicates to connect, can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or the network equipment etc.) executes the complete of each embodiment the method for the present invention Portion or part steps.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can store journey The medium of sequence code.
The above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although referring to before Stating embodiment, invention is explained in detail, those skilled in the art should understand that: it still can be to preceding Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these It modifies or replaces, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (8)

1. a kind of atm device ceaseless intelligent method of supplying power to is applied to UPS power supply system characterized by comprising
After city is electrically disconnected, the remaining total electricity of the UPS power supply system is obtained;
Obtain the pre-set priority of all atm devices in the UPS power supply system;
The electricity accounting of every atm device distribution is determined according to the pre-set priority of all atm devices;
Obtaining that every atm device is corresponding according to the remaining total electricity and the electricity accounting can power supply amount;
According to atm device described in every can power supply amount estimate it is corresponding can power-on time;
Control the UPS power supply system to during city is electrically disconnected the actual power time be more than it is described can power-on time ATM Equipment is shut down;
The pre-set priority is precalculated to obtain by following steps:
The first weighted value corresponding with the device type is obtained according to the device type of the atm device;
The second weighted value is obtained according to the frequency of use of the atm device, frequency of use is higher, and corresponding second weighted value is got over Greatly;
Third weighted value is obtained according to the failure rate of the atm device, failure rate is higher, corresponding third weighted value It is smaller;
The condition grading of the atm device is obtained, the condition grading is the atm device according to equipment on the atm device The module status of module scores to obtain;
The ATM is obtained according to first weighted value, second weighted value, the third weighted value and the condition grading The pre-set priority of equipment.
2. the method according to claim 1, wherein the method also includes:
Whether the module status of EM equipment module changes on the atm device that periodic test does not shut down, if so, again The pre-set priority of the changed atm device not shut down of computing module state.
3. method according to any one of claim 1 to 2, which is characterized in that the method also includes:
Behind city power recovery, the atm device being shut down during city is electrically disconnected is waken up.
4. method according to any one of claim 1 to 2, which is characterized in that described according to atm device described in every Can power supply amount estimate it is corresponding can power-on time include:
Obtain the unit time electricity consumption of every atm device;
According to atm device described in every can power supply amount and the unit time electricity consumption corresponding power is calculated when Between;
The method also includes: the list of the atm device is periodically updated according to the daily monitoring data of the UPS power supply system Position time electricity consumption.
5. a kind of atm device ceaseless intelligent power supply system, including UPS power supply system, which is characterized in that further include:
Remaining total electricity obtains module, for obtaining the remaining total electricity of the UPS power supply system after city is electrically disconnected;
Priority obtains module, for obtaining the pre-set priority of all atm devices in the UPS power supply system;
Electricity accounting determining module, for determining every atm device distribution according to the pre-set priority of all atm devices Electricity accounting;
It is corresponding for obtaining every atm device according to the remaining total electricity and the electricity accounting for electricity quantity module Can power supply amount;
Can power-on time estimate module, for according to atm device described in every can power supply amount estimate corresponding power when Between;
Shut down control module, for control the UPS power supply system to during city is electrically disconnected the actual power time be more than institute State can the atm device of power-on time shut down;
The pre-set priority with lower module by precalculating to obtain:
First weighting block adds for obtaining corresponding with the device type first according to the device type of the atm device Weight;
Second weighting block, for obtaining the second weighted value according to the frequency of use of the atm device, frequency of use is higher, right The second weighted value answered is bigger;
Third weighting block, for obtaining third weighted value according to the failure rate of the atm device, failure rate is got over Height, corresponding third weighted value are smaller;
Scoring obtains module, for obtaining the condition grading of the atm device, the condition grading be the atm device according to The module status of EM equipment module scores to obtain on the atm device;
Priority computation module, for according to first weighted value, second weighted value, the third weighted value and described Condition grading obtains the pre-set priority of the atm device.
6. atm device ceaseless intelligent power supply system according to claim 5, which is characterized in that the atm device not between Disconnected intelligent power supply system further include:
Status checking module, whether the module status of EM equipment module is sent out on the atm device not shut down for periodic test It is raw to change;
Priority recalculates module, for recalculating module shape when the inspection result of the status checking module, which is, is The pre-set priority of the changed atm device not shut down of state.
7. the atm device ceaseless intelligent power supply system according to any one of claim 5 to 6, which is characterized in that described Atm device ceaseless intelligent power supply system further include:
Wake-up module, for waking up the atm device being shut down during city is electrically disconnected behind city power recovery.
8. the atm device ceaseless intelligent power supply system according to any one of claim 5 to 6, which is characterized in that described Can power-on time estimate module and include:
Unit used electricity amount acquiring unit, for obtaining the unit time electricity consumption of every atm device;
Can power time calculating unit, for according to atm device described in every can power supply amount and the unit time electricity consumption Amount be calculated it is corresponding can power-on time;
The atm device ceaseless intelligent power supply system further include: unit used electricity amount update module, for being supplied according to the UPS The daily monitoring data of electric system periodically updates the unit time electricity consumption of the atm device.
CN201610104823.8A 2016-02-25 2016-02-25 A kind of atm device ceaseless intelligent method of supplying power to and system Active CN105703475B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610104823.8A CN105703475B (en) 2016-02-25 2016-02-25 A kind of atm device ceaseless intelligent method of supplying power to and system
PCT/CN2017/070872 WO2017143878A1 (en) 2016-02-25 2017-01-11 Method and system for intelligent uninterruptible power supply for atm device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610104823.8A CN105703475B (en) 2016-02-25 2016-02-25 A kind of atm device ceaseless intelligent method of supplying power to and system

Publications (2)

Publication Number Publication Date
CN105703475A CN105703475A (en) 2016-06-22
CN105703475B true CN105703475B (en) 2019-01-25

Family

ID=56223105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610104823.8A Active CN105703475B (en) 2016-02-25 2016-02-25 A kind of atm device ceaseless intelligent method of supplying power to and system

Country Status (2)

Country Link
CN (1) CN105703475B (en)
WO (1) WO2017143878A1 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105703475B (en) * 2016-02-25 2019-01-25 广州广电运通金融电子股份有限公司 A kind of atm device ceaseless intelligent method of supplying power to and system
CN106648018A (en) * 2016-12-13 2017-05-10 曙光信息产业(北京)有限公司 UPS power-supply method and device for cluster
CN108345374B (en) * 2018-02-01 2021-10-22 联想(北京)有限公司 Power supply method and power supply system
CN110323823A (en) * 2018-03-28 2019-10-11 广州道动新能源有限公司 The control method and device of power-supply system
CN110323824A (en) * 2018-03-28 2019-10-11 广州道动新能源有限公司 Control method, device, computer equipment and the storage medium of power-supply system
CN110503785A (en) * 2018-05-16 2019-11-26 山东新北洋信息技术股份有限公司 Fault handling method, fault treating apparatus and financial self-service equipment
CN108988467B (en) * 2018-08-01 2020-11-20 珠海格力电器股份有限公司 Power utilization strategy generation method and device
CN110266098B (en) * 2019-05-30 2020-11-10 浙江联海美膳电子商务有限公司 Power supply management method of food vending machine
CN111277043A (en) * 2020-03-18 2020-06-12 浩云科技股份有限公司 Power supply time-sharing control
CN111463891A (en) * 2020-04-14 2020-07-28 珠海格力电器股份有限公司 Power failure emergency method and device, electronic equipment and computer readable medium
CN113867191A (en) * 2021-09-08 2021-12-31 浪潮金融信息技术有限公司 Intelligent power control system, method and medium for terminal equipment
CN115877254B (en) * 2023-03-03 2023-05-05 樊氏科技发展股份有限公司 Online self-checking system for UPS running state

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101188360A (en) * 2006-11-17 2008-05-28 中达电通股份有限公司 UPS power central power supply system and its method
CN203745813U (en) * 2013-12-30 2014-07-30 中国农业银行股份有限公司温州分行 UPS segmented output controller
CN104184612A (en) * 2014-07-30 2014-12-03 华为技术有限公司 Power supply fault processing method and device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101707380B (en) * 2008-07-21 2012-05-30 北京星网锐捷网络技术有限公司 Method, device and system for configuring power supply system
JP5336918B2 (en) * 2009-04-23 2013-11-06 パナソニック株式会社 Power supply system
JP5618511B2 (en) * 2009-09-08 2014-11-05 株式会社東芝 Integrated monitoring and control system for smart grid and micro grid
JP2014036470A (en) * 2012-08-07 2014-02-24 Nippon Telegr & Teleph Corp <Ntt> Quality-categorized power supply system
CN103472775A (en) * 2013-08-23 2013-12-25 苏州工业园区安电电子有限公司 Power supply system and power supply method
CN105703475B (en) * 2016-02-25 2019-01-25 广州广电运通金融电子股份有限公司 A kind of atm device ceaseless intelligent method of supplying power to and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101188360A (en) * 2006-11-17 2008-05-28 中达电通股份有限公司 UPS power central power supply system and its method
CN203745813U (en) * 2013-12-30 2014-07-30 中国农业银行股份有限公司温州分行 UPS segmented output controller
CN104184612A (en) * 2014-07-30 2014-12-03 华为技术有限公司 Power supply fault processing method and device

Also Published As

Publication number Publication date
WO2017143878A1 (en) 2017-08-31
CN105703475A (en) 2016-06-22

Similar Documents

Publication Publication Date Title
CN105703475B (en) A kind of atm device ceaseless intelligent method of supplying power to and system
EP1733579B1 (en) Adaptive power management for a node of a mobile telecommunications network
KR101206362B1 (en) Battery Energy Storage System
EP2795762B1 (en) System and method of smart energy storage in a ups
CN102709961B (en) Charge/discharge determining device and method
AU2021202731B2 (en) Method for managing charging and discharging of parallel-connected battery pack, electronic device, and electrical system
CN102918747A (en) Rack-based uninterruptible power supply
US11949273B2 (en) Method for managing charging and discharging of parallel-connected battery pack, electronic device, and electrical system
US20160111880A1 (en) Power controller, power control method, and power control system
US11404877B2 (en) Hierarchical power control system
US11239665B2 (en) Grid-edge controllers for uninterruptible power supplies and methods of operating the same
CN114421586A (en) Data center power supply system, power supply control method and device and data center
JP2002315228A (en) Power supply apparatus
KR20190130415A (en) Power Management System
JP2016116428A (en) Autonomous operation system for distributed power source
CN110544933B (en) Control method and device of distributed direct current power supply system
JP2018023282A (en) Electric power management device, electric power management system, and electric power management method
CN111740437A (en) Management method, device and circuit of energy storage system, electronic equipment and storage medium
US20100312411A1 (en) Ac consumption controller, method of managing ac power consumption and a battery plant employing the same
CN108988371A (en) Energy management-control method, device, storage medium and the system of user side energy-storage system
CN111555434B (en) Model selection method and device for UPS system of power station replacement and storage medium
CN108304059A (en) A kind of computer abnormal power-down auto shutdown system and method
CN216489877U (en) Data center power supply system and data center
JPWO2014027462A1 (en) Energy management device and control method of energy management device
CN112918291B (en) Battery charging station and battery management method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant