一种混凝土墙体内预埋电缆管的封堵结构 Download PDFInfo
- Publication number
- CN105697886B CN105697886B CN201410678430.9A CN201410678430A CN105697886B CN 105697886 B CN105697886 B CN 105697886B CN 201410678430 A CN201410678430 A CN 201410678430A CN 105697886 B CN105697886 B CN 105697886B
- Authority
- CN
- China
- Prior art keywords
- concrete walls
- cable tube
- layer
- casing
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003467 diminishing effect Effects 0.000 claims abstract description 5
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 9
- 229910052802 copper Inorganic materials 0.000 claims description 9
- 239000010949 copper Substances 0.000 claims description 9
- 239000003822 epoxy resin Substances 0.000 claims description 5
- 229920000647 polyepoxide Polymers 0.000 claims description 5
- 239000004744 fabric Substances 0.000 claims description 4
- 239000003292 glue Substances 0.000 claims description 4
- 239000004927 clay Substances 0.000 claims 1
- 230000009466 transformation Effects 0.000 abstract description 12
- 239000000020 Nitrocellulose Substances 0.000 abstract description 7
- 229920001220 nitrocellulos Polymers 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008521 reorganization Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
本发明涉及一种封堵结构,尤其涉及一种混凝土墙体内预埋电缆管的封堵结构。其预埋混凝土墙内的套管外部适配位置设有止水翼环;所述的套管内纵向穿过电缆管;该电缆管与所述套管之间空隙的中部及两端分别填充有防火棉层和防火胶泥层;防火胶泥层探出所述的套管,且探出套管部分呈逐渐缩小的锥形。本发明结构简单、合理,易于施工操作,且成本低廉,为每个变电站、变电箱防堵每年可节省资金近10万元,具有较好经济效益和社会效益。
Description
技术领域
本发明涉及一种封堵结构,尤其涉及一种混凝土墙体内预埋电缆管的封堵结构。
背景技术
目前,新建和改扩建的10kV及以下变电站、变电箱很多,由于高、低压电缆进出变电站、箱需穿保护套管,经常造成变电站、变电箱内部由于施工中防水措施不到位造成进水问题。发生漏水后只能采用水泵吸水和人工排水排入地下管网里,工作量很大,浪费人力物力。另外,由于防水管堵施工质量不高,每年雨季来临时雨水经常进入变电站、变电箱内部形成积水,对运行安全造成威胁,不利于变电站、变电箱安全运行。
发明内容
本发明是针对上述问题提出的,目的就是提供一种避免变电站、变电箱内部形成积水,提高变电站、变电箱运行可靠率,且成本低廉的一种墙内预埋电缆管的封堵结构。
本发明的目的是通过如下的技术方案实现的:
一种混凝土墙内预埋电缆管的封堵结构,其在于预埋混凝土墙内的套管外部适配位置设有止水翼环;所述的套管内纵向穿过电缆管;该电缆管与所述套管之间空隙的中部及两端分别填充有防火棉层和防火胶泥层;防火胶泥层探出所述的套管,且探出套管部分呈逐渐缩小的锥形。
所述的锥形部分还从里到外包裹有环氧树脂层和防水胶布层。
所述的防火棉层至少填充到所述套管总长的2/4。
所述的防火棉层可用油麻丝层替代。
所述套管的两端探出混凝土墙至少50cm。
所述的套管为铜套管。
所述的止水翼环为外圈与内孔同心的片状圆。
由于采用上述技术方案,使得本发明与现有技术相比具有如下有益效果:
本发明解决了变电站、变电箱内部漏水和积水问题,避免和消除了因变电站、变电箱内部漏水和积水冻胀而损坏变电站、变电箱基础,从而引起安全事故的发生。有效地提高了变电站、变电箱运行可靠率。本发明结构简单、合理,易于施工操作,且成本低廉,为每个变电站、变电箱防堵每年可节省资金近10万元,具有较好经济效益和社会效益。
附图说明
图1是为本发明的结构示意图。
图中:混凝土墙1,防火棉层2,电缆管3,套管4,止水翼环5,环氧树脂层和防水胶布层6,防火胶泥层7。
具体实施方式
下面结合具体实施例对本发明进行进一步的详细说明,但本发明的保护范围不受具体的实施例所限制,以权利要求书为准,另外,以不违背本发明技术方案的前提下,对本发明所做的本领域普通技术人员容易实现的任何改动或改变都能落入本发明的权利要求范围之内。
实施例1
如图1、所示的本发明一种混凝土墙内预埋套管的封堵结构,其预埋混凝土墙1内的铜套管4外部适配位置设有止水翼环5;所述的止水翼环5为外圈与内孔同心的片状圆,所述铜套管4的两端探出混凝土墙50cm。铜套管4内纵向穿过电缆管3;该电缆管3与所述铜套管4之间空隙的中部及两端分别填充有防火棉层2和防火胶泥层7;防火棉层2填充到所述铜套管4总长的2/4。防火胶泥层7探出所述的铜套管4,且探出铜套管4部分呈逐渐缩小的锥形。锥形部分还从里到外包裹有环氧树脂层和防水胶布层6。
实施例2
本发明一种混凝土墙内预埋电缆管的封堵结构,其预埋混凝土墙1内的套管4外部适配位置设有止水翼环5;所述的止水翼环5为外圈与内孔同心的片状圆,所述套管4的两端探出混凝土墙100cm。套管4内纵向穿过电缆管3;该电缆管3与所述套管4之间空隙的中部及两端分别填充有油麻丝层2和防火胶泥层7;油麻丝层2填充到所述套管4总长的2/4。防火胶泥层7探出所述的套管4,且探出套管4部分呈逐渐缩小的锥形。锥形部分还从里到外包裹有环氧树脂层和防水胶布层6。
本发明结构简单、合理,实用性强,效果好,利于推广应用。
Claims (3)
1.一种混凝土墙内预埋电缆管的封堵结构,预埋混凝土墙(1)内的套管(4)外部适配位置设有止水翼环(5),所述的套管(4)内纵向穿过电缆管(3),其特征在于结构如下:该电缆管(3)与所述套管(4)之间空隙的中部及两端分别填充有油麻丝层(2)和防火胶泥层(7);防火胶泥层(7)探出所述的套管(4),且探出套管(4)部分呈逐渐缩小的锥形,所述的锥形还从里到外包裹有环氧树脂层和防水胶布层(6),所述的油麻丝层(2)至少填充到所述套管(4)总长的2/4,所述套管(4)的两端探出混凝土墙至少50cm。
2.根据权利要求1所述的一种混凝土墙内预埋电缆管的封堵结构,其特征在于所述的套管(4)为铜套管。
3.根据权利要求1所述的一种混凝土墙内预埋电缆管的封堵结构,其特征在于所述的止水翼环(5)为外圈与内孔同心的片状圆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410678430.9A CN105697886B (zh) | 2014-11-24 | 2014-11-24 | 一种混凝土墙体内预埋电缆管的封堵结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410678430.9A CN105697886B (zh) | 2014-11-24 | 2014-11-24 | 一种混凝土墙体内预埋电缆管的封堵结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105697886A CN105697886A (zh) | 2016-06-22 |
CN105697886B true CN105697886B (zh) | 2018-07-20 |
Family
ID=56941260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410678430.9A Active CN105697886B (zh) | 2014-11-24 | 2014-11-24 | 一种混凝土墙体内预埋电缆管的封堵结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105697886B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208636A (zh) * | 2017-07-05 | 2019-01-15 | 五冶集团上海有限公司 | 一种用于地下输电管线穿墙的防渗管道及其施工方法 |
CN107143701A (zh) * | 2017-07-07 | 2017-09-08 | 上海民防建筑研究设计院有限公司 | 一种防水穿墙套管 |
CN109449846A (zh) * | 2018-11-26 | 2019-03-08 | 浙江亚厦装饰股份有限公司 | 一种室内布线系统及组装方式 |
CN114479005A (zh) * | 2022-03-30 | 2022-05-13 | 思创智汇(广州)科技有限公司 | 一种高分子流态电缆管沟封堵树脂 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200952607Y (zh) * | 2006-08-11 | 2007-09-26 | 胡国南 | 一种冷热绝缘贯通件 |
CN201129552Y (zh) * | 2007-11-26 | 2008-10-08 | 何杨 | 可二次封堵的电缆耐火密封贯穿装置 |
CN201149984Y (zh) * | 2007-12-28 | 2008-11-12 | 中电电气集团有限公司 | 电缆孔密封封堵结构 |
CN201731178U (zh) * | 2010-07-02 | 2011-02-02 | 松原市明悟节能设备有限公司 | 刚性防水套管 |
CN202580323U (zh) * | 2012-05-03 | 2012-12-05 | 北京天麟汇通设备安装工程有限公司 | 一种双侧柔性防水套管 |
CN204267894U (zh) * | 2014-11-24 | 2015-04-15 | 国网辽宁省电力有限公司丹东供电公司 | 一种混凝土墙体内预埋电缆管的封堵结构 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120228868A1 (en) * | 2009-10-19 | 2012-09-13 | Trevor Lucey | Fireproof bulkhead penetration |
-
2014
- 2014-11-24 CN CN201410678430.9A patent/CN105697886B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200952607Y (zh) * | 2006-08-11 | 2007-09-26 | 胡国南 | 一种冷热绝缘贯通件 |
CN201129552Y (zh) * | 2007-11-26 | 2008-10-08 | 何杨 | 可二次封堵的电缆耐火密封贯穿装置 |
CN201149984Y (zh) * | 2007-12-28 | 2008-11-12 | 中电电气集团有限公司 | 电缆孔密封封堵结构 |
CN201731178U (zh) * | 2010-07-02 | 2011-02-02 | 松原市明悟节能设备有限公司 | 刚性防水套管 |
CN202580323U (zh) * | 2012-05-03 | 2012-12-05 | 北京天麟汇通设备安装工程有限公司 | 一种双侧柔性防水套管 |
CN204267894U (zh) * | 2014-11-24 | 2015-04-15 | 国网辽宁省电力有限公司丹东供电公司 | 一种混凝土墙体内预埋电缆管的封堵结构 |
Also Published As
Publication number | Publication date |
---|---|
CN105697886A (zh) | 2016-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105697886B (zh) | 一种混凝土墙体内预埋电缆管的封堵结构 | |
CN202559540U (zh) | 用于外墙对拉螺栓孔的防水封堵结构 | |
CN204004816U (zh) | 一种直埋供热管道穿墙防水装置 | |
CN204267894U (zh) | 一种混凝土墙体内预埋电缆管的封堵结构 | |
CN205670671U (zh) | 电缆密封防水组件 | |
CN204300520U (zh) | 一种电缆穿墙套管结构 | |
CN204225486U (zh) | 一种混凝土楼板内预埋管道的封堵结构 | |
CN103822027A (zh) | 一种电缆孔洞封堵装置 | |
CN204481450U (zh) | 地下综合管廊用线材防水组件 | |
CN204083520U (zh) | 管道贯穿混凝土楼面防水结构 | |
CN207364528U (zh) | 一种高层建筑排水系统用降噪消能pvc管件 | |
CN203546602U (zh) | 用于梁混凝土浇筑过程中的预应力波纹管保护装置 | |
CN203365745U (zh) | 一种新型防水帽式电力光缆接续盒 | |
CN204919787U (zh) | 一种市政工程用排水管道装置 | |
CN104213628B (zh) | 用于地下管涵工程的顶进装置 | |
CN204357123U (zh) | 一种新型止水螺栓 | |
CN102163829B (zh) | 一种全封闭的地埋电缆分支箱 | |
CN202954851U (zh) | 墙体泄压排水装置 | |
CN203813309U (zh) | 一种电缆检修除水装置 | |
CN206806965U (zh) | 一种新型高分子电缆封堵密封系统 | |
CN206859244U (zh) | 一种防水沉管隧道连接接头 | |
CN202090599U (zh) | 组合式止水螺杆 | |
CN208058153U (zh) | 一种带有夹层结构的输水管组合套件 | |
CN203947839U (zh) | 水泥杆加固防腐装置 | |
CN201478771U (zh) | 一种电缆管道的密封装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |