CN105695299B - Aromatic Chinese spirit fermentation pit and its method of construction - Google Patents

Aromatic Chinese spirit fermentation pit and its method of construction Download PDF

Info

Publication number
CN105695299B
CN105695299B CN201610262709.8A CN201610262709A CN105695299B CN 105695299 B CN105695299 B CN 105695299B CN 201610262709 A CN201610262709 A CN 201610262709A CN 105695299 B CN105695299 B CN 105695299B
Authority
CN
China
Prior art keywords
pit
wall brick
floor tile
cellar
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610262709.8A
Other languages
Chinese (zh)
Other versions
CN105695299A (en
Inventor
周琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610262709.8A priority Critical patent/CN105695299B/en
Publication of CN105695299A publication Critical patent/CN105695299A/en
Application granted granted Critical
Publication of CN105695299B publication Critical patent/CN105695299B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12LPITCHING OR DEPITCHING MACHINES; CELLAR TOOLS
    • C12L11/00Cellar tools
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Genetics & Genomics (AREA)
  • Mechanical Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Zoology (AREA)
  • Residential Or Office Buildings (AREA)
  • Building Environments (AREA)
  • Distillation Of Fermentation Liquor, Processing Of Alcohols, Vinegar And Beer (AREA)

Abstract

The purpose of the present invention is to propose to a kind of aromatic Chinese spirit fermentation pit and its method of construction, damage when this kind of aromatic Chinese spirit fermentation pit can reduce grain to pit mud, to improve pit brewing function stability and base liquor quality.The concrete structure of the present invention is as follows:The cellar for storing things bottom of pit is equipped with hard floor tile, and the Jiao Bi of pit is fixed with hard wall brick, and the floor tile and wall brick are fired by pit mud;Floor tile is uniformly provided with open-topped pit;Hollow cavity is equipped in the wall brick, the top of the cavity is equipped with the opening towards direction in the middle part of pit;It is loaded with pit mud in the pit and cavity;The floor tile is equipped with the floor tile air hole communicated with cellar for storing things bottom in the side of pit;The wall brick is equipped with the wall brick air hole communicated with Jiao Bi above cavity, and the bottom end of the wall brick air hole is connected to the top of cavity, and wall brick air hole is gradually tilted to the directions Jiao Bi from the bottom to top.

Description

Aromatic Chinese spirit fermentation pit and its method of construction
Technical field
The invention belongs to technique for making wine fields, and in particular to arrive aromatic Chinese spirit fermentation pit and its method of construction.
Background technology
The production technology characteristic of aromatic Chinese spirit is " mud stores solid state fermentation, continuous poor dispensing, mixed-steaming and mixed-heating ", and pit mud is production In essential important element, various type, Various Functions, the microbial bacteria group for being beneficial to wine brewing are grown in pit mud, These microorganisms can utilize the vinasse in pit to generate a large amount of fragrance matter, and ingredient in rich liquor improves base liquor quality.
Now in order to reduce labor intensity, improve production efficiency, generally set using driving a vehicle, embracing the machineries such as bucket when playing grain It is standby, it so in operation, is easy to pick up the pit mud of pit bottom together with poor unstrained spirits, not only results in vinosity exception when steaming wine, Influence the quality of wine influences subsequent wine brewing so that pit mud is constantly reduced.
A kind of means of defence of pit mud of the disclosure of the invention of Patent No. 201210183916.6, uses in pit bottom The mode of bamboo cane is laid with side wall can the taste of bamboo cane be brought into poor unstrained spirits to the damage of pit mud, this mode when having avoided grain In, it also can more or less influence the taste and grade of wine.
Invention content
The purpose of the present invention is to propose to a kind of aromatic Chinese spirit fermentation pit and its method of construction, this kind of aromatic Chinese spirit hairs Damage when ferment pit can reduce grain to pit mud, to improve pit brewing function stability and base liquor quality.
The structure of the aromatic Chinese spirit fermentation pit of the present invention is as follows:The cellar for storing things bottom of pit is equipped with hard floor tile, pit Jiao Bi is fixed with hard wall brick, and the floor tile and wall brick are fired by pit mud;The floor tile is uniformly provided with open-topped Pit;Hollow cavity is equipped in the wall brick, the top of the cavity is equipped with the opening towards direction in the middle part of pit;The pit And pit mud is loaded in cavity;The floor tile is equipped with the floor tile air hole communicated with cellar for storing things bottom, the floor tile in the side of pit Air hole is made of the tilting section of the vertical section of lower section and top, and the top of the tilting section and the top of pit connect;Pit The inclined direction of tilting section in all floor tiles that bottom is laid with is consistent;The wall brick is equipped with above cavity and communicates with Jiao Bi The bottom end of wall brick air hole, the wall brick air hole is connected to the top of cavity, and wall brick air hole is from the bottom to top gradually to cellar for storing things Wall direction tilts.
The method of construction of above-mentioned aromatic Chinese spirit fermentation pit includes the following steps:
A:Take part pit mud first, pit mud is fired into floor tile and wall brick;
B:The cellar for storing things bottom rake of pit is loose and smooth, floor tile is laid on to cellar for storing things bottom surface successively, and tap floor tile, so that floor tile It is contacted closely with cellar for storing things bottom, and the part pit mud at cellar for storing things bottom is made to enter floor tile air hole, cellar for storing things is then piled in the pit of floor tile Mud;
C:The Jiao Bi rakes of pit is loose and smooth, wall brick is laid on to cellar for storing things wall surface successively, and tap wall brick, so that wall brick It is contacted with Jiao Bi closely, and the part pit mud of Jiao Bi is made to enter wall brick air hole, cellar for storing things is then piled in the cavity of wall brick Mud.
The fermentation of above-mentioned aromatic Chinese spirit fermentation pit and pit mud preventing principle are as follows:
When fermentation, vinasse can be contacted with loaded on the pit mud in pit and cavity, and the part microbes in pit mud enter Into vinasse, a large amount of fragrance matter is generated, improves the quality of wine;The pit mud stored in bottom can be by floor tile air hole and pit Pit mud contact, store wall in pit mud can be contacted with the pit mud in cavity by wall brick air hole, cellar for storing things bottom, store wall in micro- life Object is contacted with the earth, can obtain the supply of air, ensure cellar for storing things bottom, Jiao Bi pit mud in microbial survival, to for pit, Microorganism in the pit mud of cavity, which is formed, endlessly to be supplemented, and ensures the stabilization of the micropopulation in the pit mud of pit, cavity Property.By using pit for many years to verify:Micropopulation in pit, cavity and the micropopulation basic one in cellar for storing things bottom, cellar for storing things wall It causes, to which the quality of white wine be effectively ensured.Wall brick air hole is gradually tilted to the directions Jiao Bi from the bottom to top, is conducive to Jiao Bi's Pit mud adds in cavity.
When playing grain, is contacted with floor tile, wall brick even if embracing the mechanical equipments such as bucket, will not take away and be contained in pit, cavity In pit mud, to protect pit mud.When playing grain, the direction of propulsion for embracing bucket should be with the inclined direction of the tilting section in floor tile Unanimously, to reduce the damage to floor tile.
Further, it is the connective stability of guarantee wall brick and Jiao Bi, the back side of the wall brick is equipped with and one bodily form of wall brick At wall nail, when being laid with wall brick, by wall nail be inserted into store wall in.
Further, the wall brick, floor tile thickness be 5~8 centimetres, wall brick, floor tile thickness it is excessively high can influence store bottom, The probability contacted between the pit mud of Jiao Bi and the pit mud in pit, cavity, and the too thin hardness that can influence wall brick, floor tile of thickness, It reduces the service life.
The hard floor tile and wall brick that the present invention is fired using pit mud build pit, and are provided with and deposit on floor tile and wall brick The space of pit mud is put, while being provided with corresponding air hole, so that the micropopulation of the pit mud in floor tile and wall brick is stablized, is subtracted Damage when having lacked grain to pit mud, and ensure that the stability of white wine quality.
Description of the drawings
Fig. 1 is the structural schematic diagram of floor tile in the present invention(It is not loaded into pit mud).
Fig. 2 is the structural schematic diagram of wall brick in the present invention(It is not loaded into pit mud).
Fig. 3 is the part-structure schematic diagram of the pit of the present invention(It is not loaded into pit mud).
Attached drawing indicates:1, floor tile;11, pit;12, vertical section;13, tilting section;2, wall brick;21, wall is followed closely;22, cavity; 23, wall brick air hole;24, it is open;3, bottom is stored;4, Jiao Bi.
Specific implementation mode
Below against attached drawing, by the description to embodiment, for example involved to the specific implementation mode of the present invention is each Mutual alignment and connection relation, the effect of each section and operation principle between the shape of component, construction, each section etc. are made into one The detailed description of step.
Embodiment 1:
As shown, the structure of the aromatic Chinese spirit fermentation pit of the present embodiment is as follows:The cellar for storing things bottom 3 of pit is equipped with hard The cellar for storing things wall 4 of floor tile 1, pit is fixed with hard wall brick 2, and the floor tile 1 and wall brick 2 are fired by pit mud;The floor tile 1 is equal It is even to be equipped with open-topped pit 11;The back side of the wall brick 2 is equipped with the wall nail 21 being integrally formed with wall brick 2, is equipped in wall brick 2 The top of hollow cavity 22, the cavity 22 is equipped with towards direction in the middle part of pit(That is the front of wall brick 2)Opening 24;It is described recessed It is loaded with pit mud in hole 11 and cavity 22;The floor tile 1 is equipped with the floor tile communicated with cellar for storing things bottom 3 in the side of pit 11 and breathes freely Hole, the floor tile air hole are made of the tilting section 13 of the vertical section 12 of lower section and top, the top of the tilting section 13 with it is recessed The top connection in hole 11;The inclined direction of tilting section 13 in all floor tiles 1 that pit bottom is laid with is consistent;The wall brick 2 exists 22 top of cavity is equipped with the wall brick air hole 23 communicated with cellar for storing things wall 4, the top of the bottom end and cavity 22 of the wall brick air hole 23 Connection, and wall brick air hole 23 is gradually tilted to cellar for storing things 4 direction of wall from the bottom to top.
Wall brick 2, floor tile 1 thickness be 5~8 centimetres, wall brick 2, floor tile 1 thickness it is excessively high can influence store bottom 3, cellar for storing things wall 4 The probability contacted between pit mud and the pit mud in pit 11, cavity 22, and the too thin hardness that can influence wall brick 2, floor tile 1 of thickness, It reduces the service life.
The method of construction of above-mentioned aromatic Chinese spirit fermentation pit includes the following steps:
A:Take part pit mud first, pit mud is fired into floor tile 1 and wall brick 2;
B:Pine and smooth is harrowed at the cellar for storing things bottom 3 of pit, floor tile 1 is laid on to cellar for storing things 3 surface of bottom successively, and taps floor tile 1, so that Floor tile 1 contacts closely with cellar for storing things bottom 3, and the part pit mud at cellar for storing things bottom 3 is made to enter floor tile air hole, then in the pit of floor tile 1 Pit mud is piled in 11;
C:The cellar for storing things wall 4 of pit is harrowed into pine and smooth, wall brick 2 is laid on to cellar for storing things wall 4 surface successively, and wall nail 21 is inserted into It stores in wall 4, taps wall brick 2, so that wall brick 2 contacts closely with cellar for storing things wall 4, and it is saturating so that the part pit mud of cellar for storing things wall 4 enters wall brick Then stomata 23 piles pit mud in the cavity 22 of wall brick 2.
The fermentation of above-mentioned aromatic Chinese spirit fermentation pit and pit mud preventing principle are as follows:
When fermentation, vinasse can be contacted with loaded on the pit mud in pit 11 and cavity 22, and the part microbes in pit mud It enters in vinasse, generates a large amount of fragrance matter, improve the quality of wine;Store bottom 3 in pit mud can by floor tile air hole with Pit mud contact in pit 11, the pit mud stored in wall 4 can be contacted by wall brick air hole 23 with the pit mud in cavity 22, at cellar for storing things bottom 3, the microorganism stored in wall 4 contacts with the earth, can obtain the supply of air, ensure cellar for storing things bottom 3, cellar for storing things wall 4 pit mud in micro- life Object is survived, and is endlessly supplemented to which the microorganism in the pit mud for pit 11, cavity 22 is formed, is ensured pit 11, cavity The stability of micropopulation in 22 pit mud.By using pit for many years to verify:Micropopulation in pit 11, cavity 22 It is almost the same with the micropopulation in cellar for storing things bottom 3, cellar for storing things wall 4, to which the quality of white wine be effectively ensured.Wall brick air hole 23 by down toward On gradually tilted to cellar for storing things wall 4 direction, the pit mud for being conducive to store wall 4 adds in cavity 22.
Rise grain when, even if embrace bucket etc. mechanical equipments contacted with floor tile 1, wall brick 2, will not take away be contained in pit 11, Pit mud in cavity 22, to protect pit mud.When playing grain, the direction of propulsion for embracing bucket should be with the tilting section 13 in floor tile Inclined direction is consistent, to reduce the damage to floor tile 1.

Claims (4)

1. a kind of aromatic Chinese spirit fermentation pit, it is characterised in that the cellar for storing things bottom of the pit is equipped with hard floor tile, the Jiao Bi of pit It is fixed with hard wall brick, the floor tile and wall brick are fired by pit mud;The floor tile is uniformly provided with open-topped pit; Hollow cavity is equipped in the wall brick, the top of the cavity is equipped with the opening towards direction in the middle part of pit;The pit and chamber It is loaded with pit mud in vivo;The floor tile is equipped with the floor tile air hole communicated with cellar for storing things bottom in the side of pit, and the floor tile is ventilative Hole is made of the tilting section of the vertical section of lower section and top, and the top of the tilting section and the top of pit connect;Pit bottom The inclined direction of tilting section in all floor tiles being laid with is consistent;The wall brick is equipped with the wall brick communicated with Jiao Bi above cavity The bottom end of air hole, the wall brick air hole is connected to the top of cavity, and wall brick air hole is from the bottom to top gradually to the side Jiao Bi To inclination.
2. aromatic Chinese spirit fermentation pit according to claim 1, it is characterised in that the back side of the wall brick is equipped with and wall The integrally formed wall nail of brick.
3. aromatic Chinese spirit fermentation pit according to claim 1, it is characterised in that the wall brick, floor tile thickness be 5 ~8 centimetres.
4. the method for construction of aromatic Chinese spirit fermentation pit according to claim 1, it is characterised in that include the following steps:
A:Take part pit mud first, pit mud is fired into floor tile and wall brick;
B:The cellar for storing things bottom rake of pit is loose and smooth, floor tile is laid on to cellar for storing things bottom surface successively, and tap floor tile, so that floor tile and cellar for storing things Bottom contact is close, and the part pit mud at cellar for storing things bottom is made to enter floor tile air hole, then piles pit mud in the pit of floor tile;
C:The Jiao Bi rakes of pit is loose and smooth, wall brick is laid on to cellar for storing things wall surface successively, and tap wall brick, so that wall brick and cellar for storing things Wall contact is close, and the part pit mud of Jiao Bi is made to enter wall brick air hole, then piles pit mud in the cavity of wall brick.
CN201610262709.8A 2016-04-26 2016-04-26 Aromatic Chinese spirit fermentation pit and its method of construction Expired - Fee Related CN105695299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610262709.8A CN105695299B (en) 2016-04-26 2016-04-26 Aromatic Chinese spirit fermentation pit and its method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610262709.8A CN105695299B (en) 2016-04-26 2016-04-26 Aromatic Chinese spirit fermentation pit and its method of construction

Publications (2)

Publication Number Publication Date
CN105695299A CN105695299A (en) 2016-06-22
CN105695299B true CN105695299B (en) 2018-10-30

Family

ID=56217499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610262709.8A Expired - Fee Related CN105695299B (en) 2016-04-26 2016-04-26 Aromatic Chinese spirit fermentation pit and its method of construction

Country Status (1)

Country Link
CN (1) CN105695299B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110734825B (en) * 2019-10-15 2023-03-28 四川省食品发酵工业研究设计院 Inclined pit hanging box for strong aromatic white spirit pit and pit hanging mud method
CN110724612A (en) * 2019-10-15 2020-01-24 四川省食品发酵工业研究设计院 Pit hanging box and pit hanging mud hanging method for strong aromatic white spirit pit
CN110684638A (en) * 2019-10-15 2020-01-14 四川省食品发酵工业研究设计院 Pit hanging box for strong fragrance type liquor pit and pit hanging mud method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201924004U (en) * 2011-01-27 2011-08-10 泸州品创科技有限公司 Strong-aromatic Chinese spirit fermentation container
CN103789192A (en) * 2014-02-21 2014-05-14 于敬岩 Underground fermentation mud cellar for blending-free flavor liquor
CN204752676U (en) * 2015-06-18 2015-11-11 泸州品创科技有限公司 Three -dimensional cellar for storing things pond sealed fermentation device
CN204999892U (en) * 2015-09-02 2016-01-27 泸州灵湖泥裹科技有限公司 Remove wine cellar
CN205710698U (en) * 2016-04-26 2016-11-23 周琦 Aromatic Chinese spirit fermentation pit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201924004U (en) * 2011-01-27 2011-08-10 泸州品创科技有限公司 Strong-aromatic Chinese spirit fermentation container
CN103789192A (en) * 2014-02-21 2014-05-14 于敬岩 Underground fermentation mud cellar for blending-free flavor liquor
CN204752676U (en) * 2015-06-18 2015-11-11 泸州品创科技有限公司 Three -dimensional cellar for storing things pond sealed fermentation device
CN204999892U (en) * 2015-09-02 2016-01-27 泸州灵湖泥裹科技有限公司 Remove wine cellar
CN205710698U (en) * 2016-04-26 2016-11-23 周琦 Aromatic Chinese spirit fermentation pit

Also Published As

Publication number Publication date
CN105695299A (en) 2016-06-22

Similar Documents

Publication Publication Date Title
CN105695299B (en) Aromatic Chinese spirit fermentation pit and its method of construction
ES2525343T3 (en) Saccharomyces cerevisiae strain and its use for the production of alcoholic beverages
US6978580B1 (en) Solid core concrete block and method of making a concrete block retaining wall
CN205710698U (en) Aromatic Chinese spirit fermentation pit
CN201499829U (en) Aluminium alloy profile for combined cabinet
CN101525567B (en) Method for moistening grains to reduce tannin content in brewing raw grain sorghum
CN202246638U (en) Great-aroma Daqu liquor fermenting cellar pool
García et al. Effects of using mixed wine yeast cultures in the production of Chardonnay wines
CN107109318A (en) Container for fermenting and storing the liquid such as grape wine
CN204551490U (en) A kind of suspension type reinforced concrete fortifield village purlin
CN102766566A (en) White spirit brewing pit and moisturizing method thereof
CN202744531U (en) White spirit brewing fermentation pit
CN103710213A (en) Method for increasing contact surface areas of fermented grains and pit mud by using pit mud trays
CN107751451A (en) Ventilation grid microcirculation fermenting case
CN201414314Y (en) Vertical greening module
MY196717A (en) Fermentation tank with side ports and method of operation
CN206244770U (en) Brewing cellar pool
CN206410428U (en) A kind of wine frame
CN202337778U (en) Korean-pine flooring pit
CN105385539A (en) Fermentation method for Maotai-flavor baijiu
CN203639447U (en) Pit mud tray capable of increasing contact surface of fermented grains and pit mud
CN109370861A (en) A kind of white wine is buried to store sth. in a cellar method
CN211596251U (en) A multi-functional stone brick for garden construction
CN204850030U (en) Rainwater retaining module
CN209674849U (en) A kind of ejector rod shaft bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181030

Termination date: 20190426