CN105692496A - Support device and method for large-scale transformer - Google Patents

Support device and method for large-scale transformer Download PDF

Info

Publication number
CN105692496A
CN105692496A CN201610284865.4A CN201610284865A CN105692496A CN 105692496 A CN105692496 A CN 105692496A CN 201610284865 A CN201610284865 A CN 201610284865A CN 105692496 A CN105692496 A CN 105692496A
Authority
CN
China
Prior art keywords
sleeve
leading screw
screw
support arrangement
power transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610284865.4A
Other languages
Chinese (zh)
Inventor
陈圣芳
潘兴德
代红亮
韩桂莲
王汝强
梁赛
周莉
王成新
赵勇
陈胜喜
肖炳秀
刘宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenshang Power Supply Co Of State Grid Shandong Electric Power Co
State Grid Corp of China SGCC
Original Assignee
Wenshang Power Supply Co Of State Grid Shandong Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenshang Power Supply Co Of State Grid Shandong Electric Power Co, State Grid Corp of China SGCC filed Critical Wenshang Power Supply Co Of State Grid Shandong Electric Power Co
Priority to CN201610284865.4A priority Critical patent/CN105692496A/en
Publication of CN105692496A publication Critical patent/CN105692496A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/10Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks
    • B66F7/12Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by mechanical jacks
    • B66F7/14Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by mechanical jacks screw operated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/28Constructional details, e.g. end stops, pivoting supporting members, sliding runners adjustable to load dimensions

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a support device and method for a large-scale transformer. The support device comprises a sleeve and a lead screw, wherein a threaded hole is formed in the sleeve; the lead screw is arranged in the sleeve via the threaded hole; at least one opening, in which a screwing rod can penetrate, is formed in the upper section of the lead screw, and is parallel to the upper surface of the lead screw; a flat plate connected with the sleeve is arranged on the lower surface of the sleeve, so as to form an L-shaped structure. As the lead screw and the sleeve are combined to replace a jack, not only is the use cost low, but also the problem of high effectiveness losing possibility of the jack can be solved, the service life of the support device is prolonged, and the use is convenient; due to the arrangement of the flat plate, the L-shaped structure of the flat plate and the sleeve is more stable as the support device is usually arranged on an edge of the transformer for supporting, and the condition of unbalanced stress on the transformer caused by skewing of the support device can be avoided effectively.

Description

Support device and method for high-power transformer
Technical field
The present invention relates to the setting of switch board, be particularly used for the support device and method of high-power transformer。
Background technology
High-power transformer weighs more than 20 ton, this transformator is generally arranged on outdoor device base, but the growth along with the time of operation, transformator needs to return factory's overhaul or passage and move, carry, when transport, high-power transformer generally adopts jack pair transformator to be supported, so because of the structural design of the weight of transformator with jack itself, jack pad assembly inner plunger seals and easily lost efficacy, jack pad assembly is caused to be susceptible to damage, cause supporting seat shorter for service life, often changing jack, use cost is high;It addition, because the structure of jack itself is vertical, is susceptible to when supporting, and top lifting surface area is less, cause transformator to be subject to force unbalance, support instability, it is easy to deposit or in transportation at transformator, transformator is caused and collides with。
It is therefore desirable to have transformator is supported by an a kind of new support arrangement。
Summary of the invention
For the problems referred to above, in order to solve the deficiencies in the prior art, spy arranges a kind of simple in construction, can make the support device and method for high-power transformer of transformator stress balance。
A scheme provided by the invention is: for a support arrangement of high-power transformer, including sleeve and leading screw, it is installed with screw in sleeve or is provided with screw in sleeve over top, screwed hole it is provided with in sleeve, leading screw is located in sleeve by screwed hole bottom screw, is provided with at least one at the top of leading screw for tightening the perforate that bar penetrates, and perforate is parallel to leading screw upper surface, lower surface at sleeve is provided with the flat board with sleeve connection so that sleeve and plate shaped l-shaped structure。
Further, described flat board is provided with the groove for bolt or screw traverse, because when transformator supports, support baseboard is usually apertured, at this moment by arranging bolt or screw traverse gap realization fixing flat board so that stability of strutting system is further enhanced。
Further, described sleeve and described flat board are structure as a whole。
The using method of the described support arrangement for high-power transformer, specifically comprises the following steps that
1) bottom of leading screw is placed in sleeve, multiple sleeves with leading screw are placed in the place estimating to support transformator;
2) for avoiding sliding, bolt or screw is adopted to fix flat board through the groove on flat board;
3) adopt and tighten bar and the height of leading screw is adjusted through perforate。
The invention adopt another scheme that: for a support arrangement of high-power transformer, including sleeve and leading screw, it is installed with screw in sleeve or is provided with screw in sleeve over top, when above screw is located at sleeve, can screw be fixed on the supporting seat of transformer bottom, screwed hole it is provided with in sleeve, leading screw is located in sleeve by screwed hole bottom screw, at least one it is provided with for tightening the perforate that bar penetrates at the top of leading screw, perforate is parallel to leading screw upper surface, the lower surface of sleeve is gripper shoe, the diameter being sized larger than sleeve of gripper shoe, at least two support columns being obliquely installed it are provided with between gripper shoe and sleeve, gripper shoe has multiple groove, the setting of gripper shoe and support column is again based on the stress consideration of a support arrangement, when bottom support lifting surface area is bigger, support effect is better, but consider the weight of a support arrangement, gripper shoe is preferably circular configuration。
Further, described groove be shaped as annular。
Further, the lower surface on the top of leading screw, gripper shoe is respectively equipped with rubber blanket with insulation, and in addition for increasing friction force, the top of leading screw can arrange decorative pattern。
Further, for the insulation effect of a support arrangement, paint is scribbled on the surface of described sleeve。
Further, described support plate removably connects with leading screw top, when the somewhere bearing height that transformator needs is lower than its elsewhere, it is possible to is dismantled by a support plate, further increases the altitude mixture control of a support arrangement;Certainly, prop up support plate to be structure as a whole with leading screw。
The using method of the described support arrangement for high-power transformer, specifically comprises the following steps that
1) bottom of leading screw is placed in sleeve, multiple sleeves with leading screw are placed in the place estimating to support transformator;
2) for avoiding sliding, bolt or screw is adopted to fix gripper shoe through the groove in gripper shoe;
3) adopt and tighten bar and the height of leading screw is adjusted through perforate。
Further, multiple sleeves with leading screw divide arranged in rows, and the sleeve of adjacent row shifts to install, and often row's sleeve is arranged according to annular。
The invention has the beneficial effects as follows:
1, replacing jack by leading screw and sleeve combination, not only use cost is cheap, simultaneously, it is to avoid jack seals the problem easily lost efficacy, and extends the service life of a support arrangement, simple and convenient。
2, by the setting of flat board so that flat board and sleeve shaped l-shaped structure, because mostly a support arrangement is to be supported on the edge of transformator, L-type structure supports more stable, and effectively prevent that to prop up support arrangement crooked and cause the situation of transformator discontinuity equalization。
3, by the setting of gripper shoe and support column, and then the rigidity of whole support arrangement and the stability of support are improved。
4, it is located at the top of leading screw by a support plate, increases the lifting surface area on leading screw top, extend the service life of a support arrangement further。
Accompanying drawing explanation
Fig. 1 is the front view of the embodiment of the present invention 1;
Fig. 2 is the front view of the embodiment of the present invention 2;
Fig. 3 is the bottom schematic view of the embodiment of the present invention 1 middle plateform and sleeve;
Fig. 4 is the support arrangement front view in the embodiment of the present invention 2 with a support plate;
Fig. 5 is the support arrangement front view in the embodiment of the present invention 1 with a support plate;
In figure: 1 flat board, 2 perforates, 3 sleeves, 4 leading screws, 5 grooves, 6 support plates, 7 support columns, 8 gripper shoes。
Detailed description of the invention
Below in conjunction with Figure of description and specific embodiment, the invention will be further described:
Embodiment 1
As shown in figures 1 and 3, a support arrangement for high-power transformer, including the sleeve 3 being vertically arranged and leading screw 4, it is installed with screw in sleeve 3 or is provided with screw in sleeve 3 over top, it is provided with screwed hole in sleeve 3, leading screw 4 is located in sleeve 3 by screwed hole bottom screw, the top of leading screw 4 is provided with a support plate 6, it can be circular or square for propping up support plate 6, preferably circular, for improving the stress on leading screw 4 top, extend the service life of a support arrangement, furthermore, prop up support plate 6 to be connected with leading screw 4 top side detachable, can be that the top propping up support plate 6 is provided with groove, screw thread is had to coordinate with leading screw 4 top in groove, at least one perforate 2 penetrated for tightening bar it is provided with at the top of leading screw 4, perforate 2 is parallel to leading screw 4 upper surface, lower surface at sleeve 3 is provided with the flat board 1 being connected with sleeve 3, sleeve 3 and flat board 1 is made to form L-type structure, because mostly a support arrangement is to be supported on the edge of transformator, L-type structure supports more stable, and effectively prevent the situation causing transformator discontinuity equalization because a support arrangement is crooked;Because sleeve 3 top interior is provided with the screw coordinated with leading screw 4, screw is fixed, and adjusting screw 4 realizes the adjustment of bearing height, or, in order to easily manufactured, it is possible to screw to be located at the top of sleeve 3 Fixed Nut, the equally possible adjustment realizing leading screw 4 height。
Further, described flat board 1 is provided with the groove 5 for bolt or screw traverse, because when transformator supports, the support baseboard (being located at the bottom of a support arrangement) of transformator is usually apertured, at this moment by arranging bolt or screw traverse gap realization fixing flat board so that stability of strutting system is further enhanced。
Further, described sleeve 3 and described flat board 1 are structure as a whole, described groove 5 be shaped as annular。
Further, rubber blanket it is provided with on the top of leading screw 4 with insulation。
Further, for the insulation effect of a support arrangement, paint is scribbled on the surface of described sleeve 3。
Furthermore, described support plate removably connects with leading screw top, when the somewhere bearing height that transformator needs is lower than its elsewhere, it is possible to is dismantled by a support plate 6, further increases the altitude mixture control of a support arrangement;Certainly, prop up support plate 6 to be structure as a whole with leading screw 4。
The using method of the described support arrangement for high-power transformer, specifically comprises the following steps that
1) bottom of leading screw 4 is placed in sleeve 3, multiple sleeves 3 with leading screw 4 are placed in the place estimating to support transformator;
2) for avoiding sliding, bolt or screw is adopted to fix flat board 1 through the groove 5 on flat board 1 with support baseboard;
3) adopt and tighten bar and the height of leading screw 4 is adjusted through perforate 2。
Wherein, multiple 3 points of arranged in rows of sleeve with leading screw 4, the sleeve 3 of adjacent row shifts to install, and often row's sleeve 3 is arranged according to annular。
Embodiment 2
As shown in Figure 2, a support arrangement for high-power transformer, including sleeve 3 and leading screw 4, it is provided with screwed hole in sleeve 3, leading screw 4 is located in sleeve by screwed hole bottom screw, at least one perforate 2 penetrated for tightening bar it is provided with at the top of leading screw 4, perforate 2 is parallel to leading screw upper surface, the lower surface of sleeve 3 is gripper shoe 8, the diameter being sized larger than sleeve 3 of gripper shoe 8, at least two support columns being obliquely installed 7 it are provided with between gripper shoe 8 and sleeve 3, support column 7 two ends respectively with gripper shoe 8, sleeve 3 connects, gripper shoe 8 has multiple groove, the setting of gripper shoe 8 and support column 7 is again based on the stress consideration of a support arrangement, when bottom support lifting surface area is bigger, support effect is better, but consider the weight of a support arrangement, gripper shoe 8 preferably circular configuration, as shown in Figure 4。
Further, described groove be shaped as annular。
Further, in order to improve the safety of use, the outside of sleeve 3 is brushed with the paint lower surface on the top of leading screw 4, gripper shoe 8 and is respectively equipped with rubber blanket with insulation。
Furthermore, described support plate 6 removably connects with leading screw 4 top, when the somewhere bearing height that transformator needs is lower than its elsewhere, it is possible to is dismantled by a support plate 6, further increases the altitude mixture control of a support arrangement;Certainly, prop up support plate 6 to be structure as a whole with leading screw 4。
The using method of the described support arrangement for high-power transformer, specifically comprises the following steps that
1) bottom of leading screw 4 is placed in sleeve 3, multiple sleeves 3 with leading screw 4 are placed in the place estimating to support transformator;
2) for avoiding sliding, bolt or screw is adopted to fix gripper shoe 8 through the groove on flat board 1 and support baseboard;
3) adopt and tighten bar and the height of leading screw 4 is adjusted through perforate 2。
Wherein, in order to improve the stability of support, multiple 3 points of arranged in rows of sleeve with leading screw 4, the sleeve 3 of adjacent row shifts to install, and often row's sleeve 3 is arranged according to annular。
The foregoing is only presently preferred embodiments of the present invention; be not whole embodiments of the present invention, not in order to limit the present invention, all within the spirit and principles in the present invention; any amendment of being made, equivalent replacement, improvement etc., should be included within protection scope of the present invention。
Except technical characteristic described in description, all the other technical characteristics are those skilled in the art's known technology, and in order to highlight the innovative characteristics of the present invention, above-mentioned technical characteristic does not repeat them here。

Claims (10)

1. for a support arrangement of high-power transformer, it is characterized in that, including sleeve and leading screw, being installed with screw in sleeve or be provided with screw in sleeve over top, being provided with screwed hole in sleeve, leading screw is located in sleeve by screwed hole bottom screw, epimere at leading screw is provided with at least one for tightening the perforate that bar penetrates, perforate is parallel to leading screw upper surface, and the lower surface at sleeve is provided with the flat board with sleeve connection so that sleeve and plate shaped l-shaped structure。
2. the support arrangement for high-power transformer as claimed in claim 1, it is characterised in that be provided with the groove for bolt or screw traverse on described flat board。
3. the support arrangement for high-power transformer as claimed in claim 1 or 2, it is characterised in that described sleeve and described flat board are structure as a whole。
4. the using method of the support arrangement for high-power transformer as according to any one of claim 1-3, it is characterised in that specifically comprise the following steps that
1) bottom of leading screw is placed in sleeve, multiple sleeves with leading screw are placed in the place estimating to support transformator;
2) for avoiding sliding, bolt or screw is adopted to fix flat board through the groove on flat board;
3) adopt and tighten bar and the height of leading screw is adjusted through perforate。
5. for a support arrangement of high-power transformer, it is characterized in that, including sleeve and leading screw, it is installed with screw in sleeve or is provided with screw in sleeve over top, screwed hole it is provided with in sleeve, leading screw is located in sleeve by screwed hole bottom screw, epimere at leading screw is provided with at least one for tightening the perforate that bar penetrates, perforate is parallel to leading screw upper surface, the lower surface of sleeve is gripper shoe, the diameter being sized larger than sleeve of gripper shoe, is provided with at least two support columns being obliquely installed between gripper shoe and sleeve, and gripper shoe has multiple groove。
6. the support arrangement for high-power transformer as described in claim 2 or 5, it is characterised in that described groove be shaped as annular。
7. the support arrangement for high-power transformer as claimed in claim 5, it is characterised in that the lower surface on the top of leading screw, gripper shoe is respectively equipped with rubber blanket with insulation。
8. the support arrangement for high-power transformer as described in claim 1 or 5, it is characterised in that scribble paint on the surface of described sleeve。
9. the using method of the support arrangement for high-power transformer as according to any one of claim 5 or 7, it is characterised in that specifically comprise the following steps that
1) bottom of leading screw is placed in sleeve, multiple sleeves with leading screw are placed in the place estimating to support transformator;
2) for avoiding sliding, bolt or screw is adopted to fix gripper shoe through the groove in gripper shoe;
3) adopt and tighten bar and the height of leading screw is adjusted through perforate。
10. using method as claimed in claim 9, it is characterised in that multiple sleeves with leading screw divide arranged in rows, and the sleeve of adjacent row shifts to install, often row's sleeve is arranged according to annular。
CN201610284865.4A 2016-04-29 2016-04-29 Support device and method for large-scale transformer Pending CN105692496A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610284865.4A CN105692496A (en) 2016-04-29 2016-04-29 Support device and method for large-scale transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610284865.4A CN105692496A (en) 2016-04-29 2016-04-29 Support device and method for large-scale transformer

Publications (1)

Publication Number Publication Date
CN105692496A true CN105692496A (en) 2016-06-22

Family

ID=56216791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610284865.4A Pending CN105692496A (en) 2016-04-29 2016-04-29 Support device and method for large-scale transformer

Country Status (1)

Country Link
CN (1) CN105692496A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2479121Y (en) * 2001-05-16 2002-02-27 上海惠亚铝合金制品有限公司 Carriage of elevated floor with vernier device
CN2883304Y (en) * 2005-11-01 2007-03-28 甘肃省机械科学研究院 Fast manual bearing device
CN101158621A (en) * 2007-11-20 2008-04-09 大庆石油管理局 Engines three-dimensional adjustable permanent support rack
KR20090005365U (en) * 2007-11-30 2009-06-03 김병걸 Assistance lift for vehicle maintanance
DE202011101036U1 (en) * 2011-05-24 2011-07-25 Eickhoff Maschinenfabrik Gmbh Height adjustable heavy duty support
CN102408084A (en) * 2010-09-21 2012-04-11 张海健 Improved lifting platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2479121Y (en) * 2001-05-16 2002-02-27 上海惠亚铝合金制品有限公司 Carriage of elevated floor with vernier device
CN2883304Y (en) * 2005-11-01 2007-03-28 甘肃省机械科学研究院 Fast manual bearing device
CN101158621A (en) * 2007-11-20 2008-04-09 大庆石油管理局 Engines three-dimensional adjustable permanent support rack
KR20090005365U (en) * 2007-11-30 2009-06-03 김병걸 Assistance lift for vehicle maintanance
CN102408084A (en) * 2010-09-21 2012-04-11 张海健 Improved lifting platform
DE202011101036U1 (en) * 2011-05-24 2011-07-25 Eickhoff Maschinenfabrik Gmbh Height adjustable heavy duty support

Similar Documents

Publication Publication Date Title
CN207260360U (en) A kind of Anti-seismic building structure
CN205743670U (en) A kind of Telescopic herringbone ladder
CN106382281A (en) Countertop fixing structure
CN204850358U (en) Height -adjustable's lift ground plate structure
CN219035200U (en) Stable cylinder support with protective structure
CN105692496A (en) Support device and method for large-scale transformer
CN103883855B (en) Wall hanging components
CN205838450U (en) Support means for high-power transformer
CN203860787U (en) Novel connection support foot
CN204849218U (en) Shock attenuation spinning rack
CN203557139U (en) Steel supporting frame with lifting structure
CN214037665U (en) Theodolite supporting device for building planning and design
CN205781420U (en) pipeline supporting device
CN105976982A (en) Supporting apparatus and use method for large transformer
CN211693777U (en) Gas pipe subsides compensation structure
CN104234401B (en) A kind of construction of lift well operation frame
CN204881129U (en) Freeze -drying sheet layer interval adjustable freeze dryer
CN204213577U (en) Wall hanging components
CN203828434U (en) Panel furniture and height regulation leg thereof
CN215225578U (en) Vibration-proof type wood dining table
CN205745931U (en) Adjustable foot assembly
CN205892466U (en) Escalator assists strutting arrangement
CN205640166U (en) Supporting arrangement is shelved to adjustable equipment
CN204059213U (en) Protecting net upright post suspension column connecting structure
CN202706633U (en) Inclination adjusting device for transformer rack on rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160622