CN205781420U - pipeline supporting device - Google Patents

pipeline supporting device Download PDF

Info

Publication number
CN205781420U
CN205781420U CN201620534413.2U CN201620534413U CN205781420U CN 205781420 U CN205781420 U CN 205781420U CN 201620534413 U CN201620534413 U CN 201620534413U CN 205781420 U CN205781420 U CN 205781420U
Authority
CN
China
Prior art keywords
pipeline
lifting screw
riser
support device
transverse slat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620534413.2U
Other languages
Chinese (zh)
Inventor
张洪礼
徐绍轩
陈超
刘媛英
马维成
庞太明
刘春萍
张妍
蒋卫光
张耀武
钱卫东
阚新栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201620534413.2U priority Critical patent/CN205781420U/en
Application granted granted Critical
Publication of CN205781420U publication Critical patent/CN205781420U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model provides a pipeline strutting arrangement, pipeline strutting arrangement includes: a support base (10); the lifting adjusting component (20), the first end setting of lifting adjusting component (20) is on supporting pedestal (10), and the second end of lifting adjusting component (20) is for the top-up end with the bottom complex of pipeline (40). The technical scheme of the utility model the problem that among the prior art cement buttress collapses and leads to cement buttress and steam injection pipeline to take place to break away from has been solved effectively.

Description

Pipeline support device
Technical field
This utility model relates to equipments for oil extraction technical field, in particular to a kind of pipeline support device.
Background technology
At present, steam injection pipeline is the medium connecting injection boiler with oil well, is also the passage of vapor transport.Pipeline is by resistance to height Temperature steel manufacture, outer layer covers heat insulation foam and iron sheet." " type support, support and ground cement buttress it is welded with below pipeline It is connected, reaches to support pipeline and the purpose of regulation steam injection pipeline height.Prevent from erecting pipeline stress to damage.
Finding after long-term produced on-site, there is many undesirable factors, has a strong impact on daily in current cement buttress Produce, be primarily present some problem following:
1, cement buttress easily collapses
At the multiple-way valve of 50 meters, control station, two cement buttresses collapse, and occur bottom steam injection pipeline without support situation.Through dividing Analysis is learnt, cement buttress is on ground, and the erosion of wind and rain causes surface collapse below cement buttress, causes buttress to collapse, Lose supporting role.
2, " " type support easily separates with cement buttress
" " type support only fits tightly with cement buttress, there is no other connection measures, causes once buttress to sink, " " type support is just separated with cement buttress, causes steam injection pipeline to be lost and supports protection, the fracture of pipeline whipping easily occurs, from And lead to great production accident.
Often taking the most prefabricated new cement buttress for solving the problems referred to above scene, cement buttress originally does scraps place Reason, had both created waste, processes problem the most not in time, and potential safety hazard is the biggest.
Utility model content
Main purpose of the present utility model is to provide a kind of pipeline support device, to solve cement buttress in prior art Cave in and cause cement buttress and the problem of steam injection pipeline generation disengaging.
To achieve these goals, this utility model provides a kind of pipeline support device, including: support pedestal;Lifting Adjusting part, the first end of lift adjustment assembly is arranged on support pedestal, and the second end of lift adjustment assembly is and pipeline The jacking end that bottom coordinates.
Further, lift adjustment assembly includes: bearing, and bearing is arranged on support pedestal;Lifting screw, lifting screw Vertically height adjustable saves land and is arranged on bearing, and one end away from support pedestal of lifting screw forms jacking end, rises The formation operating side, one end near support pedestal of fall screw rod.
Further, lift adjustment assembly also includes bearing plate, bearing plate be arranged on lifting screw away from support pedestal One end on.
Further, bearing include the first riser being oppositely arranged and the second riser and be connected to the first riser and second stand The first transverse slat between plate, the upper surface interval of the first transverse slat and support pedestal arranges and accommodates space to be formed, lifting screw Stretch in receiving space through the first transverse slat near the one end supporting pedestal.
Further, pipeline support device also includes line holder, and line holder is connected to the bottom of pipeline, bearing plate with Line holder coordinates.
Further, line holder includes the 3rd riser being oppositely arranged and the 4th riser and is connected to the 3rd riser and The second transverse slat between four risers, the 3rd riser and the 4th riser are connected to the bottom of pipeline, the second transverse slat and the first transverse slat patch Close and arrange.
Further, lift adjustment assembly also includes that the first locking nut, the first locking nut are set on lifting screw And it is positioned at the side away from support pedestal of the first transverse slat.
Further, lift adjustment assembly also includes that the second locking nut, the second locking nut are set on lifting screw And it is positioned at the side near support pedestal of the first transverse slat.
Further, lifting screw is multiple, and multiple lifting screws interval is arranged.
Further, one end near support pedestal of lifting screw is provided with operating head.
Application the technical solution of the utility model, pipeline support device includes: support pedestal and lift adjustment assembly, when propping up When support group seat collapses, continuation is coordinated to support pipeline, effectively by the height of regulation lift adjustment assembly with the bottom of pipeline Solve and prior art supports pedestal send out to cave in and cause supporting the technical problem that pedestal and pipeline occur to depart from, effectively protect Card pipeline is constantly in the state of support, it is ensured that production safety.
Accompanying drawing explanation
The Figure of description of the part constituting the application is used for providing being further appreciated by of the present utility model, this practicality Novel schematic description and description is used for explaining this utility model, is not intended that improper restriction of the present utility model. In the accompanying drawings:
Fig. 1 shows the schematic front view of the embodiment according to pipeline support device of the present utility model;And
Fig. 2 shows the schematic side view of the pipeline support device of Fig. 1.
Wherein, above-mentioned accompanying drawing includes the following drawings labelling:
10, pedestal is supported;20, lift adjustment assembly;21, bearing;211, the first riser;212, the second riser;213, One transverse slat;22, lifting screw;23, bearing plate;24, the first locking nut;25, the second locking nut;30, line holder;31、 3rd riser;32, the 4th riser;33, the second transverse slat;40, pipeline.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases Combination mutually.Describe this utility model below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
As depicted in figs. 1 and 2, the pipeline support device of the present embodiment includes: support pedestal 10 and lift adjustment assembly 20, First end of lift adjustment assembly 20 is arranged on support pedestal 10, and the second end of lift adjustment assembly 20 is and the end of pipeline 40 The jacking end that portion coordinates.
The pipeline support device of application the present embodiment, pipeline support device includes: support pedestal 10 and lift adjustment assembly 20, when supporting pedestal 10 and collapsing, coordinate continuation by the height of regulation lift adjustment assembly 20 with the bottom of pipeline 40 Support pipeline 40, efficiently solve in prior art support pedestal 10 cave in cause support pedestal 10 depart from pipeline Technical problem, effectively ensure that pipeline is constantly in the state of support, it is ensured that production safety.
Preferably, lift adjustment assembly 20 includes: bearing 21 and lifting screw 22, and bearing 21 is arranged on support pedestal 10 On, lifting screw 22 vertically height adjustable saves land and is arranged on bearing 21, lifting screw 22 away from support pedestal 10 One end formed jacking end, lifting screw 22 near support pedestal 10 formation operating side, one end.Occur when supporting pedestal 10 When collapsing, bottom jacking end up being moved with pipeline by screwing lifting screw 22 coordinates, and efficiently solves existing In technology, support pedestal 10 caves in and causes supporting the technical problem that pedestal 10 departs from pipeline generation, effectively guarantee pipeline one Directly it is in the state of support, it is ensured that production safety.Said structure is simple, manufactures simplicity, regulation simplicity, reduces the labor of operator Fatigue resistance.
In order to prevent pipeline from getting off from the end landing of lifting screw, lift adjustment assembly 20 also includes bearing plate 23, holds Weight plate 23 is arranged on one end away from support pedestal 10 of lifting screw 22.Bearing plate 23 can increase the contact surface with pipeline Long-pending, when pipeline is moved, it is ensured that bearing plate 23 and pipeline are permanently connected to, and are effectively prevented pipeline from lifting screw 22 The situation of upper landing.
Bearing 21 includes the first riser 211 being oppositely arranged and the second riser 212 and is connected to the first riser 211 and second The first transverse slat 213 between riser 212, the upper surface interval of the first transverse slat 213 and support pedestal 10 arranges to form receiving empty Between, stretching in receiving space through the first transverse slat 213 near the one end supporting pedestal 10 of lifting screw 22.Regulation lifting screw Time, only need operator to rotate the operating side of lifting screw with instrument, lifting screw relative to the first transverse slat 213 along vertically side To moving up, and then abut with the bottom of pipeline.The simple in construction of bearing, easy to process, with low cost.
In order to increase the contact area of bearing plate and pipeline, pipeline support device also includes line holder 30, line holder 30 bottoms being connected to pipeline 40, bearing plate 23 coordinates with line holder 30.When pipeline is moved, line holder 30 is therewith Mobile, owing to line holder 30 and bearing plate are plane-plane contacts, it is possible to ensure that line holder 30 is permanently connected to bearing plate, effectively Prevent the situation of pipeline generation landing.
Preferably, line holder 30 includes the 3rd riser 31 being oppositely arranged and the 4th riser 32 and is connected to the 3rd riser 31 and the 4th the second transverse slats 33 between riser 32, the 3rd riser 31 and the 4th riser 32 be connected to the bottom of pipeline 40, and second Transverse slat 33 and the laminating of the first transverse slat 213 are arranged.3rd riser 31 coordinates respectively at the relative both sides of pipeline with the 4th riser 32, Line holder 30 plays the effect supporting pipeline.
In order to prevent the lifting screw situation that in the vertical direction is moved when abutting line holder, lift adjustment group Part 20 also includes that the first locking nut 24, the first locking nut 24 are set on lifting screw 22 and are positioned at the first transverse slat 213 Away from the side supporting pedestal 10.First locking nut 24 plays the effect of locking, is effectively prevented lifting screw and is abutting pipe The situation that during line bracket, in the vertical direction is moved, it is ensured that lift adjustment assembly contacts with line holder always, effectively Ensure that pipeline is constantly in the state of support, it is ensured that production safety.Lift adjustment assembly 20 also includes the second locking nut 25, the Two locking nuts 25 are set on lifting screw 22 and are positioned at the side near support pedestal 10 of the first transverse slat 213.
In order to ensure the stability of pipeline support device, lifting screw 22 is multiple, and multiple lifting screws 22 interval is arranged. Multiple lifting screws support pipeline jointly, improve the stability of pipeline.
One end near support pedestal 10 of lifting screw 22 is provided with operating head.It is to say, lifting screw 22 and behaviour Becoming bolt as capitiform, bolt arrangement is simple, easy to use, with low cost.
Preferably, supporting pedestal 10 is cement buttress.
From the foregoing, steam injection pipeline cement buttress of the prior art often causes cement buttress to depart from because of the erosion of wind and rain Pipeline, has buried potential safety hazard during production run.For the problems referred to above, devise adjustable moving supporting construction, make Cement buttress originally is applied, and has saved cost, can be adjusted the height of cement buttress within the specific limits again, Comparatively speaking process problem is swift in response, and cost is relatively low.The pipeline support device of the application is applicable to the laying pipe of every profession and trade Line, provides secure support for pipeline.The pipeline support device of the application easily departs from the same of this difficult problem of pipeline solving buttress Time, also achieving the controllability of buttress height, the regular maintenance for pipeline is provided convenience with troubleshooting.
Adjustable moving supporting construction is the core of the application, and it includes bearing, screw rod, nut and bearing plate, application The principle that screw rod stretches is to reach to control the purpose of support height.Specifically, above screw rod, weld a bearing plate, with steam injection pipeline On " " type support contact, play support steam injection pipeline effect.Nut plays the effect of locking, and operating head is in order to regulate The height of screw rod, it is regular hexagon, it is simple to spanner rotates regulation.Bearing serves as the base of adjustable moving supporting construction, Play the effect strengthening support steadiness.
The appearance of adjustable moving supporting construction, solves cement buttress and easily departs from a difficult problem for steam injection pipeline, is saving Cost, avoid waste while, improve the timeliness of process problem, make worker at the production line can locate in time after potential safety hazard finding Reason, it is to avoid the generation of accident.
Another big characteristic retractility of adjustable moving supporting construction, makes the height of buttress achieve scalable, its Feature convenient to operate greatly reduces the working strength of worker at the production line, substantially increases the cyclic utilization rate of cement buttress.
Adjustable moving supporting construction is tried out in production scene, simple and quick, can arbitrarily regulate steam injection pipe The height of line buttress, solves the problem that steam injection pipeline buttress cannot realize Height Adjustable and easy disengaging steam injection pipeline.
As can be seen from the above description, this utility model the above embodiments achieve following technique effect:
1, achieve the recycling of steam injection pipeline buttress, cost efficiency has been implemented to crucial point;
2, achieve the Height Adjustable of steam injection pipeline buttress, enhance its cyclic utilization rate.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this For the technical staff in field, this utility model can have various modifications and variations.All in spirit of the present utility model and principle Within, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (10)

1. a pipeline support device, it is characterised in that including:
Support pedestal (10);
Lift adjustment assembly (20), the first end of described lift adjustment assembly (20) is arranged on described support pedestal (10), institute The second end stating lift adjustment assembly (20) is the jacking end that the bottom with pipeline (40) coordinates.
Pipeline support device the most according to claim 1, it is characterised in that described lift adjustment assembly (20) including:
Bearing (21), described bearing (21) is arranged on described support pedestal (10);
Lifting screw (22), described lifting screw (22) vertically height adjustable saves land and is arranged on described bearing (21), One end away from described support pedestal (10) of described lifting screw (22) forms described jacking end, described lifting screw (22) Formation operating side, one end near described support pedestal (10).
Pipeline support device the most according to claim 2, it is characterised in that described lift adjustment assembly (20) also includes holding Weight plate (23), described bearing plate (23) is arranged on one end away from described support pedestal (10) of described lifting screw (22).
Pipeline support device the most according to claim 3, it is characterised in that described bearing (21) includes be oppositely arranged One riser (211) and the second riser (212) and be connected between described first riser (211) and described second riser (212) First transverse slat (213), the upper surface interval of described first transverse slat (213) and described support pedestal (10) arranges and accommodates sky to be formed Between, one end of the close described support pedestal (10) of described lifting screw (22) is stretched into described through described first transverse slat (213) Accommodate in space.
Pipeline support device the most according to claim 4, it is characterised in that described pipeline support device also includes that pipeline props up Frame (30), described line holder (30) is connected to the bottom of described pipeline (40), described bearing plate (23) and described line holder (30) coordinate.
Pipeline support device the most according to claim 5, it is characterised in that described line holder (30) includes being oppositely arranged The 3rd riser (31) and the 4th riser (32) and be connected between described 3rd riser (31) and described 4th riser (32) Second transverse slat (33), described 3rd riser (31) and described 4th riser (32) are connected to the bottom of described pipeline (40), described Second transverse slat (33) is arranged with the laminating of described first transverse slat (213).
Pipeline support device the most according to claim 4, it is characterised in that described lift adjustment assembly (20) also includes One locking nut (24), described first locking nut (24) is set in described lifting screw (22) and above and is positioned at described first transverse slat (213) the side away from described support pedestal (10).
Pipeline support device the most according to claim 4, it is characterised in that described lift adjustment assembly (20) also includes Two locking nuts (25), described second locking nut (25) is set in described lifting screw (22) and above and is positioned at described first transverse slat (213) side of close described support pedestal (10).
Pipeline support device the most according to claim 2, it is characterised in that described lifting screw (22) is multiple, multiple Described lifting screw (22) interval is arranged.
Pipeline support device the most according to claim 2, it is characterised in that described lifting screw (22) close described The one end supporting pedestal (10) is provided with operating head.
CN201620534413.2U 2016-06-02 2016-06-02 pipeline supporting device Active CN205781420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620534413.2U CN205781420U (en) 2016-06-02 2016-06-02 pipeline supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620534413.2U CN205781420U (en) 2016-06-02 2016-06-02 pipeline supporting device

Publications (1)

Publication Number Publication Date
CN205781420U true CN205781420U (en) 2016-12-07

Family

ID=58136456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620534413.2U Active CN205781420U (en) 2016-06-02 2016-06-02 pipeline supporting device

Country Status (1)

Country Link
CN (1) CN205781420U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316088A (en) * 2018-03-04 2018-07-24 张光裕 Movable intersecting roads of paddling
CN113236213A (en) * 2021-06-17 2021-08-10 克拉玛依胜利高原机械有限公司 Discrete layout movable steam injection device and steam injection process thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316088A (en) * 2018-03-04 2018-07-24 张光裕 Movable intersecting roads of paddling
CN108316088B (en) * 2018-03-04 2020-08-04 张光裕 Movable wading cross road
CN113236213A (en) * 2021-06-17 2021-08-10 克拉玛依胜利高原机械有限公司 Discrete layout movable steam injection device and steam injection process thereof

Similar Documents

Publication Publication Date Title
CN203321060U (en) Rod centering device
CN205781420U (en) pipeline supporting device
CN204443344U (en) A kind of flowerpot retaining device for urban landscaping engineering
CN206769520U (en) A kind of firm formula power network supporting construction
CN204238570U (en) The spiral adjuster of absolute altitude of frame ball node is installed
CN204112698U (en) A kind of scaffold base of adjustable angle for building
CN204920263U (en) But height-adjusting's guardrail
CN203081321U (en) Mechanical device capable of being used for carrying out ceiling drilling operations on ground
CN206971702U (en) A kind of climbing frame with slide-in type protection network
CN203761710U (en) Equipment cabinet shock-proof base adjustable bracket
CN205591504U (en) Stair railing installs auxiliary device
CN206477573U (en) A kind of concrete blinding is adjustable to be shored
CN109958148A (en) The levelling method of cold box foundation bottom plate centering
CN205816464U (en) Straightener roller box maintenance elevation adjusting device
CN204524754U (en) Foundation bolt fixed apparatus adjusting device
CN207034390U (en) A kind of pipeline construction support meanss
CN203845569U (en) Well head line laying device
CN203201479U (en) Electric device for performing ceiling drilling operation from ground
CN203441936U (en) Foundation bolt waterproof anti-corrosion construction structure for installing device outdoors and in waterish room
CN204357094U (en) The scaffold that a kind of novel high is adjustable and easy to use
CN204810209U (en) Photovoltaic support
CN204081319U (en) Aluminium alloy glass breast board
CN203346922U (en) Foundation adjusting device of transmission tower of goaf
CN204517190U (en) A kind of power distribution cabinet support base
CN204152174U (en) A kind of scaffold being convenient to dismounting and expansion

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant