CN105692285A - Automatic reloading system - Google Patents
Automatic reloading system Download PDFInfo
- Publication number
- CN105692285A CN105692285A CN201610189213.2A CN201610189213A CN105692285A CN 105692285 A CN105692285 A CN 105692285A CN 201610189213 A CN201610189213 A CN 201610189213A CN 105692285 A CN105692285 A CN 105692285A
- Authority
- CN
- China
- Prior art keywords
- material conveyer
- guiding
- conveyer belts
- uncoiling
- conveyer belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H19/00—Changing the web roll
- B65H19/10—Changing the web roll in unwinding mechanisms or in connection with unwinding operations
- B65H19/18—Attaching, e.g. pasting, the replacement web to the expiring web
- B65H19/1805—Flying splicing, i.e. the expiring web moving during splicing contact
- B65H19/1826—Flying splicing, i.e. the expiring web moving during splicing contact taking place at a distance from the replacement roll
- B65H19/1836—Flying splicing, i.e. the expiring web moving during splicing contact taking place at a distance from the replacement roll the replacement web being accelerated or running prior to splicing contact
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2801/00—Application field
- B65H2801/93—Tyres
Abstract
The invention provides an automatic reloading system. After one roll of materials are used up, a host does not need to shut down, another roll of materials can be continuously supplied, intermittent running of the host is guaranteed, the overall forming efficiency is improved, the normal working time of the host is ensured, and the production efficiency is improved. The automatic reloading system comprises two sets of feeding structures corresponding to one host. When one of the two sets of feeding structures feeds materials to the host, the other set of feeding structure finishes feeding and discharging and is in a state that feeding is waited, and the two sets of feeding structures are switched with each other to finish continuous material supplying for the host.
Description
Technical field
The present invention relates to the technical field of the material of tyre building machine conveying, be specially a kind of refuelling system automatically。
Background technology
The material-uploading style of existing tyre building machine: after each roll of material is finished; workman changes a volume virgin material; in the process of reloading; main frame cannot run, need to shut down wait virgin material; the position that virgin material is transported to main frame from uncoiler through material conveying road is also required to time enough; and the volume that repeatedly more reloaded by needs in the working cycle, it makes the normal working hours of whole main frame short so that the inefficiency of whole production。
Summary of the invention
For the problems referred to above; the invention provides a kind of refuelling system automatically; it is after a roll of material is finished; main frame is without shutting down; another roll of material can supplying material continuously, it is ensured that the not intermittent duty of main frame, improves overall shaping efficiency; ensure that the normal working hours of main frame, improve production efficiency。
A kind of refuelling system automatically, it is characterized in that: it includes two groups of feeding structures, feeding structure described in two groups corresponds to a main frame, while one group of feed mechanism in feeding structure described in two groups carries out feeding to main frame, another group feeding structure is rapidly completed loading and unloading and feeding state is treated in entrance, and two groups of feeding structures have switched the continuous feeding to main frame mutually。
It is further characterized by it and specifically includes cutting device, pressing plate adsorbent equipment, two material conveyer belts, two guiding uncoiling structures, two material conveyer belt respectively material conveyer belts, No. two material conveyer belts, two guiding uncoiling mechanism respectively guiding uncoiling mechanisms, No. two guiding uncoiling mechanisms, the outfan of a described guiding uncoiling mechanism is connected to the input of a described material conveyer belt by guide roller, described cutting device is positioned at the output end position of the normal described material conveyer belt carrying material, the material conveying rear of described severing position is provided with rollgang, described rollgang be arranged above described pressing plate adsorbent equipment, described pressing plate adsorbent equipment is provided with guide frame, material is compressed when described pressing plate adsorbent equipment is used for cutting, and stub bar is removed outside machine, the outfan of described No. two guiding uncoiling mechanisms is connected to the input of described No. two material conveyer belts by guide roller, the outfan of described No. two material conveyer belts, connection securing member it is provided with between the outfan of a number material conveyer belt, described connection securing member is circumscribed with Power Drive Unit, the spacing in single direction is left between the outfan of described No. two material conveyer belts and cutting device under a number guiding non-state of reloading of uncoiling mechanism, No. one guiding uncoiling mechanism reload under state, described Power Drive Unit drives the outfan of described No. two material conveyer belts to be positioned at the severing position of described cutting device, material is delivered to cutting device place by a number material conveyer belt, carry out the stub bar severing of material, severing rear fender adsorbent equipment is by moving up and down, with sucker suction, stub bar is removed, bulk roll of material is by length severing application, until being finished;Afterwards under Power Drive Unit effect, the outfan of a number material conveyer belt, the outfan of No. two material conveyer belts does the motion in single direction simultaneously, until the outfan of No. two material conveyer belts is positioned at the severing position of described cutting device, No. two material conveyer belts carry out material conveying to main frame in the process that the uncoiling mechanism that leads manually reloads, between a number line and No. two lines, circulation carries out, uninterrupted feed, after No. two line materials are finished, switch to a line again through Power Drive Unit and carry out feed, it is after a roll of material is finished, main frame is without shutting down, another roll of material can supplying material continuously, ensure the not intermittent duty of main frame, improve overall shaping efficiency, ensure that the normal working hours of main frame, improve production efficiency。
A described material conveyer belt is positioned at the surface of described No. two material conveyer belts, difference in height is H, a described guiding uncoiling mechanism is positioned at the rear of described No. two guiding uncoiling mechanisms, the outfan of described No. two material conveyer belts, a material conveyer belt outfan between be provided with connection securing member, being circumscribed with of described fastening connection piece can the cylinder of vertical lift;
Described can the stroke that drive of vertical lift air cylinder driven be the height difference H of two material conveyer belts, it is ensured that when a material conveyer belt lacks material, No. two quick positions of material conveyer belt to the position of original material conveyer belts;
A described material conveyer belt, No. two material conveyer belts are arranged in parallel in same level, both level intervals are L, a described guiding uncoiling mechanism is positioned at the dead astern of the input of a described material conveyer belt, described No. two guiding uncoiling mechanisms are positioned at the dead astern of the input of described No. two material conveyer belts, a described material conveyer belt, it is provided with connecting rod between No. two material conveyer belts, a described material conveyer belt, the bottom of No. two material conveyer belts is provided with moving structure, the side of described No. two material conveyer belts is provided with level to driving cylinder, described level is installed in described No. two material conveyer belts to the outfan driving cylinder, described level is the level interval L of two material conveyer belts to driving the stroke that drives of cylinder, guarantee when a material conveyer belt lacks material, the position of No. two quick position of material conveyer belt extremely original material conveyer belts;
The bottom of a bearing of a described guiding uncoiling mechanism, No. two guiding uncoiling mechanisms and each self-corresponding guide roller is provided with moving structure, when number material conveyer belt, No. two material conveyer belt levels are to action, drive a bearing level of synchronization of a guiding uncoiling mechanism, No. two guiding uncoiling mechanisms and each self-corresponding guide rollers to movement, it is ensured that the straight line conveying of whole material;
Be provided with U-shaped storage cavity in the position of the input of described guiding uncoiling mechanism and corresponding material conveyer belt, it is simple to material transporting velocity and lead out speed asynchronous time material length adjustment。
After adopting technique scheme, it includes two groups of feeding structures, feeding structure described in two groups corresponds to a main frame, while one group of feed mechanism in feeding structure described in two groups carries out feeding to main frame, another group feeding structure is rapidly completed loading and unloading and feeding state is treated in entrance, two groups of feeding structures have switched the continuous feeding to main frame mutually, it is after a roll of material is finished, main frame is without shutting down, another roll of material can supplying material continuously, ensure the not intermittent duty of main frame, improve overall shaping efficiency, ensure that the normal working hours of main frame, improve production efficiency。
Accompanying drawing explanation
Fig. 1 is the front view layout structure schematic diagram of specific embodiments of the invention one;
Fig. 2 is plan view layout's structural representation of specific embodiments of the invention two;
In figure, the title corresponding to sequence number is as follows:
Cutting device 1, pressing plate adsorbent equipment 2,3, No. two material conveyer belts of a material conveyer belt 4, a guiding uncoiling mechanism 5, two guiding uncoiling mechanism 6, rollgang 7, connect securing member 8, U-shaped storage cavity 9, can the cylinder 10 of vertical lift, connecting rod 11, moving structure 12, level to drive cylinder 13。
Detailed description of the invention
A kind of refuelling system automatically, see Fig. 1, Fig. 2: it includes two groups of feeding structures, feeding structure described in two groups corresponds to a main frame, while one group of feed mechanism in feeding structure described in two groups carries out feeding to main frame, another group feeding structure is rapidly completed loading and unloading and feeding state is treated in entrance, and two groups of feeding structures have switched the continuous feeding to main frame mutually。
It specifically includes cutting device 1, pressing plate adsorbent equipment 2, two material conveyer belts, two guiding uncoiling structures, two material conveyer belt respectively material conveyer belts 3, No. two material conveyer belts 4, two guiding uncoiling mechanism respectively guiding uncoiling mechanisms 5, No. two guiding uncoiling mechanisms 6, the outfan of a number guiding uncoiling mechanism 5 is connected to the input of a material conveyer belt 3 by guide roller, cutting device 1 is positioned at the output end position of the normal material conveyer belt 3 carrying material, the material conveying rear of severing position 1 is provided with rollgang 7, rollgang 7 be arranged above pressing plate adsorbent equipment 2, pressing plate adsorbent equipment 2 is provided with guide frame, material is compressed when pressing plate adsorbent equipment 2 is used for cutting, and stub bar is removed outside machine, the outfan of No. two guiding uncoiling mechanisms 6 is connected to the input of No. two material conveyer belts 4 by guide roller, the outfan of No. two material conveyer belts 4, connection securing member it is provided with between the outfan of a number material conveyer belt 3, connect securing member 8 and be circumscribed with Power Drive Unit, the spacing in single direction is left between the outfan of number guiding uncoiling mechanism 5 lower No. two material conveyer belts 4 of non-state of reloading and cutting device, No. one guiding uncoiling mechanism 5 reload under state, Power Drive Unit drives the outfan of No. two material conveyer belts 4 to be positioned at the severing position of cutting device 1, it is provided with U-shaped storage cavity 9 in the position of the input of guiding uncoiling mechanism and corresponding material conveyer belt, be easy to material transporting velocity and lead out speed asynchronous time material length adjustment。
Specific embodiment one, see that Fig. 1: number material conveyer belt 3 is positioned at the surface of No. two material conveyer belts 4, difference in height is H, a number guiding uncoiling mechanism 5 is positioned at the rear of No. two guiding uncoiling mechanisms 6, the outfan of No. two material conveyer belts 4, a material conveyer belt 3 outfan between be provided with connection securing member 8, being circumscribed with of fastening connection piece 8 can the cylinder 10 of vertical lift;
Can the stroke that drives that drives of vertical lift cylinder 10 be the height difference H of two material conveyer belts, it is ensured that when a material conveyer belt 3 lacks material, the position of No. two quick position of material conveyer belt 4 extremely original material conveyer belts 3。
Specific embodiment two, see Fig. 2: number material conveyer belt 3, No. two material conveyer belts 4 are arranged in parallel in same level, both level intervals are L, a number guiding uncoiling mechanism 5 is positioned at the dead astern of input of a material conveyer belt 3, No. two guiding uncoiling mechanisms 6 are positioned at the dead astern of input of No. two material conveyer belts 4, a number material conveyer belt 3, it is provided with connecting rod 11 between No. two material conveyer belts 4, a number material conveyer belt 3, the bottom of No. two material conveyer belts 4 is provided with moving structure 12, the side of No. two material conveyer belts 4 is provided with level to driving cylinder 13, level is installed in the sidepiece of No. two material conveyer belts 4 to the outfan driving cylinder 13, level is the level interval L of two material conveyer belts to driving the stroke that drives of cylinder 13, guarantee when a material conveyer belt 3 lacks material, the position of No. two quick position of material conveyer belt 4 extremely original material conveyer belts;
The bottom of a bearing of number guiding uncoiling mechanism 5, a two guiding uncoiling mechanism 6 and each self-corresponding guide roller is provided with moving structure 12, when 3, No. two material conveyer belt 4 levels of a number material conveyer belt are to action, drive a bearing level of synchronization of guiding uncoiling mechanism 5, a two guiding uncoiling mechanism 6 and each self-corresponding guide roller to movement, it is ensured that the straight line conveying of whole material。
Above specific embodiments of the invention are described in detail, but content has been only the preferred embodiment of the invention, it is impossible to be considered the practical range for limiting the invention。All equalizations made according to the invention application range change and improvement etc., all should still belong within the patent covering scope of the present invention。
Claims (7)
1. an automatic refuelling system, it is characterized in that: it includes two groups of feeding structures, feeding structure described in two groups corresponds to a main frame, while one group of feed mechanism in feeding structure described in two groups carries out feeding to main frame, another group feeding structure completes loading and unloading and feeding state is treated in entrance, and two groups of feeding structures have switched the continuous feeding to main frame mutually。
2. a kind of refuelling system automatically as claimed in claim 1, it is characterized in that: it includes cutting device, pressing plate adsorbent equipment, two material conveyer belts, two guiding uncoiling structures, two material conveyer belt respectively material conveyer belts, No. two material conveyer belts, two guiding uncoiling mechanism respectively guiding uncoiling mechanisms, No. two guiding uncoiling mechanisms, the outfan of a described guiding uncoiling mechanism is connected to the input of a described material conveyer belt by guide roller, described cutting device is positioned at the output end position of the normal described material conveyer belt carrying material, the material conveying rear of described severing position is provided with rollgang, described rollgang be arranged above described pressing plate adsorbent equipment, described pressing plate adsorbent equipment is provided with guide frame, material is compressed when described pressing plate adsorbent equipment is used for cutting, and stub bar is removed outside machine, the outfan of described No. two guiding uncoiling mechanisms is connected to the input of described No. two material conveyer belts by guide roller, the outfan of described No. two material conveyer belts, connection securing member it is provided with between the outfan of a number material conveyer belt, described connection securing member is circumscribed with Power Drive Unit, the spacing in single direction is left between the outfan of described No. two material conveyer belts and cutting device under a number guiding non-state of reloading of uncoiling mechanism, No. one guiding uncoiling mechanism reload under state, described Power Drive Unit drives the outfan of described No. two material conveyer belts to be positioned at the severing position of described cutting device。
3. a kind of refuelling system automatically as claimed in claim 2, it is characterized in that: a described material conveyer belt is positioned at the surface of described No. two material conveyer belts, difference in height is H, a described guiding uncoiling mechanism is positioned at the rear of described No. two guiding uncoiling mechanisms, the outfan of described No. two material conveyer belts, a material conveyer belt outfan between be provided with connection securing member, being circumscribed with of described fastening connection piece can the cylinder of vertical lift。
4. refuelling system automatically as claimed in claim 3 a kind of, it is characterised in that: described can the height difference H that stroke be driven to be two material conveyer belts of vertical lift air cylinder driven。
5. a kind of refuelling system automatically as claimed in claim 2, it is characterized in that: a described material conveyer belt, No. two material conveyer belts are arranged in parallel in same level, both level intervals are L, a described guiding uncoiling mechanism is positioned at the dead astern of the input of a described material conveyer belt, described No. two guiding uncoiling mechanisms are positioned at the dead astern of the input of described No. two material conveyer belts, a described material conveyer belt, it is provided with connecting rod between No. two material conveyer belts, a described material conveyer belt, the bottom of No. two material conveyer belts is provided with moving structure, the side of described No. two material conveyer belts is provided with level to driving cylinder, described level is installed in described No. two material conveyer belts to the outfan driving cylinder, described level is the level interval L of two material conveyer belts to driving the stroke that drives of cylinder。
6. a kind of refuelling system automatically as claimed in claim 5, it is characterized in that: the bottom of a bearing of a described guiding uncoiling mechanism, No. two guiding uncoiling mechanisms and each self-corresponding guide roller is provided with moving structure, when number material conveyer belt, No. two material conveyer belt levels are to action, drive a bearing level of synchronization of a guiding uncoiling mechanism, No. two guiding uncoiling mechanisms and each self-corresponding guide rollers to movement。
7. a kind of refuelling system automatically as claimed in claim 2, it is characterised in that: it is provided with U-shaped storage cavity in the position of the input of described guiding uncoiling mechanism and corresponding material conveyer belt。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610189213.2A CN105692285A (en) | 2016-03-30 | 2016-03-30 | Automatic reloading system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610189213.2A CN105692285A (en) | 2016-03-30 | 2016-03-30 | Automatic reloading system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105692285A true CN105692285A (en) | 2016-06-22 |
Family
ID=56231840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610189213.2A Pending CN105692285A (en) | 2016-03-30 | 2016-03-30 | Automatic reloading system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105692285A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110815889A (en) * | 2018-08-08 | 2020-02-21 | 住友橡胶工业株式会社 | Transport system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2090234A (en) * | 1980-12-30 | 1982-07-07 | Vmi Epe Holland | Guiding cut strips along roller centreline during tyre formation |
JPS6083827A (en) * | 1983-10-17 | 1985-05-13 | Mitsubishi Heavy Ind Ltd | Apparatus for controlling wind-up of raw rubber sheet |
JPH02196623A (en) * | 1989-01-26 | 1990-08-03 | Toyo Tire & Rubber Co Ltd | Automatic sheet feeder |
CN101734501A (en) * | 2009-11-17 | 2010-06-16 | 华瀚科技有限公司 | Device and method for continuously feeding strip coils |
CN104528433A (en) * | 2014-12-30 | 2015-04-22 | 桂林中昊力创机电科技有限公司 | Double-station automatic winding machine for tire cord fabric |
CN205526882U (en) * | 2016-03-30 | 2016-08-31 | 萨驰华辰机械(苏州)有限公司 | Automatic system of reloading |
-
2016
- 2016-03-30 CN CN201610189213.2A patent/CN105692285A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2090234A (en) * | 1980-12-30 | 1982-07-07 | Vmi Epe Holland | Guiding cut strips along roller centreline during tyre formation |
JPS6083827A (en) * | 1983-10-17 | 1985-05-13 | Mitsubishi Heavy Ind Ltd | Apparatus for controlling wind-up of raw rubber sheet |
JPH02196623A (en) * | 1989-01-26 | 1990-08-03 | Toyo Tire & Rubber Co Ltd | Automatic sheet feeder |
CN101734501A (en) * | 2009-11-17 | 2010-06-16 | 华瀚科技有限公司 | Device and method for continuously feeding strip coils |
CN104528433A (en) * | 2014-12-30 | 2015-04-22 | 桂林中昊力创机电科技有限公司 | Double-station automatic winding machine for tire cord fabric |
CN205526882U (en) * | 2016-03-30 | 2016-08-31 | 萨驰华辰机械(苏州)有限公司 | Automatic system of reloading |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110815889A (en) * | 2018-08-08 | 2020-02-21 | 住友橡胶工业株式会社 | Transport system |
CN110815889B (en) * | 2018-08-08 | 2023-05-26 | 住友橡胶工业株式会社 | Transport system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205949697U (en) | Automatic draw apparatus for producing to steel pipe | |
CN101214670B (en) | Wainscot machine | |
CN103716995A (en) | Novel stiffening plate laminating machine | |
CN104084857B (en) | Adobe four sides grinding attachment | |
CN107824993B (en) | Full-automatic numerical control feeding system for laser pipe cutting machine | |
CN105109983A (en) | Long pipe material sequencing and feeding machine and sequencing and feeding method | |
CN206470280U (en) | Biochemical Analyzer guideway transit system | |
CN201959914U (en) | Slurry scraping machine for surface coating of EPS (expanded polystyrene) line member | |
CN203632971U (en) | Novel reinforcing plate laminating machine | |
CN104294482A (en) | Single-needle quilting machine | |
CN105819232A (en) | Automatic stacking device and stacking method thereof | |
CN208915537U (en) | A kind of wet tissue finished product packing arranging-in-row device | |
CN207932573U (en) | A kind of automatic lane change conveyer of paper product | |
CN105692285A (en) | Automatic reloading system | |
CN204325699U (en) | A kind of single-needle quilter | |
CN203682482U (en) | Linear type conveying and distributing machine | |
CN104157597B (en) | A kind of automatic rib cutting system adjustable section pay-off | |
CN205526882U (en) | Automatic system of reloading | |
CN201415866Y (en) | Vibrating feeding machine | |
CN208183249U (en) | A kind of self-feeding flat seam machine | |
CN107470914B (en) | A kind of processing unit (plant) of steel plate | |
CN205634205U (en) | Automatic stacking device | |
CN210965968U (en) | Sorting and conveying equipment | |
CN209079282U (en) | Feeding device | |
CN107470454B (en) | A kind of material processing unit (plant) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160622 |
|
RJ01 | Rejection of invention patent application after publication |