CN105689234A - Paint spraying process - Google Patents

Paint spraying process Download PDF

Info

Publication number
CN105689234A
CN105689234A CN201410705925.6A CN201410705925A CN105689234A CN 105689234 A CN105689234 A CN 105689234A CN 201410705925 A CN201410705925 A CN 201410705925A CN 105689234 A CN105689234 A CN 105689234A
Authority
CN
China
Prior art keywords
product
paint
treatment
qualified
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410705925.6A
Other languages
Chinese (zh)
Inventor
李仁荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Banan District Renrong Machinery Factory
Original Assignee
Chongqing Banan District Renrong Machinery Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Banan District Renrong Machinery Factory filed Critical Chongqing Banan District Renrong Machinery Factory
Priority to CN201410705925.6A priority Critical patent/CN105689234A/en
Publication of CN105689234A publication Critical patent/CN105689234A/en
Pending legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a paint spraying process. The paint spraying process is characterized by comprising the following steps of firstly, pretreatment before paint spraying, wherein firstly, degreasing treatment, secondly, water processing, thirdly, surface conditioning treatment, fourthly, parkerizing, fifthly, cleaning treatment after parkerizing, sixthly, water blowing drying treatment, seventhly, puttying and polishing treatment and eighthly, shielding treatment are included; and secondly, pain spraying treatment, wherein firstly, performing primer spraying treatment, secondly, performing drying treatment, thirdly, performing SK sealant bonding, fourthly, performing water leakage testing and treatment, fifthly, performing colored paint and varnish spraying treatment, sixthly, performing baking treatment and seventhly, pushing workpieces on a paint spraying frame into a drying box when the temperature in the drying box is cooled to the room temperature during discharging, checking whether the oil paint surfaces are qualified or not, whether the surfaces have exposure, sagging, particles, pinholes and other unhealthy phenomena or not, placing the qualified products on the assigned position in order, partitioning products through packaging paperboards and conducting rework treatment on bad products are included. By the adoption of the paint spraying process, working procedure arrangement is reasonable and coordinated, the rejection rate can be lowered effectively, and the product quality is high.

Description

A kind of lacquer spraying technique
Technical field
The present invention relates to lacquer spraying technique。
Background technology
There is processing step phenomenon inharmonious, irrational in existing lacquer spraying technique, produces sometimes to repeat to process or excess processes, have a strong impact on product quality, and percent defective is higher, require higher to employee's operant skill, cause product cost higher。
Additionally existing lacquer spraying technique processing step is tediously long, and the distribution of each operation exists many irrational places。
Summary of the invention
In order to realize the purpose of the present invention, the present invention provides the lacquer spraying technique that a kind of procedure arrangement is reasonable, coordinate。
For solving above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of lacquer spraying technique, comprises the steps:
1) pre-treatment before, spraying paint
To checking qualified product block pattern row pattern in cleaning basket, it is ensured that exist between each of product and clean gap, surface is existed and carries out grinding process than the more serious place rubber paper got rusty。
01) ungrease treatment, qualified product is lifted up in ferrum defat or aluminum degreasing bath together with cleaning basket, product is totally immersed in groove, require that the concentration in ferrum degreasing bath is 10-20%, temperature is 35-45 degree Celsius, and degreasing time is 10-20 minute, and the concentration in aluminum degreasing bath is 6-10%, temperature is room temperature-45 degrees Celsius, and degreasing time is 2-5 minute。
02) washing processes, the product having be carried out ungrease treatment is put in rinsing bowl together with cleaning basket, product is totally immersed in clear water, suitably rock, action is not easily excessive, requiring that the overfall of rinsing bowl must be always on, water is cleaned in periodic replacement, it is ensured that the water quality in rinse bath meets washing requirement simultaneously。
03) table mediates reason, is put in table tune groove together with cleaning basket by the product having be carried out washing process, it is desirable to product is totally immersed in groove, requires that table adjusts the pH value in groove to be 7-9 simultaneously, and temperature is under room temperature, and the time is 10-20 minute。
04) bonderizing, the product mixed up by table is immersed in Phosphating Slot, product-free exposes in atmosphere, requiring that the total acid in Phosphating Slot is 22-28%, free acid concentration is 08-1.4%, and promoter concentration is 6-8%, product surface is made can fully to enter phosphatization, after phosphatization completes, whether detection phosphating coat is qualified, it is desirable to phosphating coat can guarantee that the salt spray test of 2 hours, and phosphatization thickness is at 3 6um。
05) cleaning treatment after phosphatization, immerses the product after bonderizing in rinse bath and washes, and requires rinse bath periodic replacement clear water, it is ensured that the water quality in rinse bath meets cleaning requirement, it is necessary to twice cleaning simultaneously。
06) blow water drying and processing, cleaned for phosphatization product is sling together with cleaning basket, be placed in appointment position, with high pressure air rifle, the cleaning water in product cavity blown。The product blowing water process being put into baking oven and carries out drying and processing, temperature controls within 180 degrees Celsius, makes the moisture in product fully dry。
07) drape over one's shoulders putty grinding process, after product phosphatization drying and processing, irregular surface is draped over one's shoulders putty and processes, it is ensured that product surface flatness, after draping over one's shoulders putty, it is carried out grinding process。
08) shielding processing, tests to the product after draping over one's shoulders putty polishing, confirms that whether product is qualified。The surface need not spray paint drawing requirement and stud, the screw thread of nut is protected with special adhesive tape。
2) spraying paint process, to checking qualified product block pattern row pattern in the support that sprays paint, prepare to spray paint process。
01) primer spray processes, and is hung in paint spraying frame by qualified product, notes the mutual collision prevented between product。Allotment priming paint, it is desirable to 91061 priming paint: BT110 all-purpose diluent: the ratio of Z92711 firming agent is 100:240:180, is filtered deployed priming paint processing the particle taken out in paint。Priming paint is connected with spray gun, process that product is sprayed paint, it is desirable to spray paint and want uniformly, it is ensured that base coat thickness is more than 40 μ。
02) drying and processing, to the product drying and processing having carried out prime treatment, it is desirable to the drying temperature of epoxy primer is 70 degrees Celsius, and the time is about 60 minutes, and alloy priming paint can carry out in natural environment, it is not necessary to oven for drying processes。
03) SK fluid sealant is broken, according to drawing requirement, inner chamber and all gaps of periphery in frame product are required for breaking fluid sealant, require that the fluid sealant on every gap is beaten in the same size, simultaneously before fluid sealant is but without dry solidification, with suds on finger-dipping, fluid sealant troweling is sliding or floating, it is ensured that glue is close to above gap, and gluing needs to dry after completing。
04) leaking test processes, the inner chamber of electrical appliance kit product needs to leak test, it is desirable to the intracavity at electrical appliance kit fills clear water, shelves more than two hours, anhydrous drain to other intracavity of side be considered as qualified, otherwise need again to play the process of SK fluid sealant。
05) color spray paint and varnish treated, checks that whether product is qualified, is hung in paint spraying frame by qualified product, notes the mutual collision prevented between product。Technological parameter allotment paint according to paint and varnish, is filtered deployed priming paint processing the particle taken out in paint。Paint is connected with spray gun, adjusts the temperature in spray room, humidity, process that product is sprayed paint。Requirement is sprayed paint and is wanted uniformly, it is ensured that base coat thickness is more than 40 μ, and surface is without bad phenomenon such as obvious drain spray and particles。
06) baking processes, and pushes in baking oven by the workpiece having sprayed finish paint together with paint spraying frame, adjusts baking oven according to the Flue curing parameter of paint。The stoving of the paint temperature of requirement Ral7024 is 60 degrees Celsius, and baking time is 60 minutes, and the stoving of the paint temperature of Ral9018 is 60 degrees Celsius, and baking time is 40 minutes。
07) blanking is when the temperature in baking oven is cooled to room temperature, by the workpiece cart baking oven on paint spraying frame, check that whether painted surface quality is qualified, surface with or without show-through, sagging, granule, the bad phenomenon such as pin hole, certified products being neatly placed in appointment position, separates with packing board between product, bad product need to be done over again process。
Procedure arrangement of the present invention is reasonable, coordination, it is possible to be effectively reduced percent defective and product quality is high。
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described:
A kind of lacquer spraying technique, comprises the steps:
1) pre-treatment before, spraying paint
To checking qualified product block pattern row pattern in cleaning basket, it is ensured that exist between each of product and clean gap, surface is existed and carries out grinding process than the more serious place rubber paper got rusty。
01) ungrease treatment, qualified product is lifted up in ferrum defat or aluminum degreasing bath together with cleaning basket, product is totally immersed in groove, require that the concentration in ferrum degreasing bath is 10-20%, temperature is 35-45 degree Celsius, and degreasing time is 10-20 minute, and the concentration in aluminum degreasing bath is 6-10%, temperature is room temperature-45 degrees Celsius, and degreasing time is 2-5 minute。
02) washing processes, the product having be carried out ungrease treatment is put in rinsing bowl together with cleaning basket, product is totally immersed in clear water, suitably rock, action is not easily excessive, requiring that the overfall of rinsing bowl must be always on, water is cleaned in periodic replacement, it is ensured that the water quality in rinse bath meets washing requirement simultaneously。
03) table mediates reason, is put in table tune groove together with cleaning basket by the product having be carried out washing process, it is desirable to product is totally immersed in groove, requires that table adjusts the pH value in groove to be 7-9 simultaneously, and temperature is under room temperature, and the time is 10-20 minute。
04) bonderizing, the product mixed up by table is immersed in Phosphating Slot, product-free exposes in atmosphere, requiring that the total acid in Phosphating Slot is 22-28%, free acid concentration is 08-1.4%, and promoter concentration is 6-8%, product surface is made can fully to enter phosphatization, after phosphatization completes, whether detection phosphating coat is qualified, it is desirable to phosphating coat can guarantee that the salt spray test of 2 hours, and phosphatization thickness is at 3 6um。
05) cleaning treatment after phosphatization, immerses the product after bonderizing in rinse bath and washes, and requires rinse bath periodic replacement clear water, it is ensured that the water quality in rinse bath meets cleaning requirement, it is necessary to twice cleaning simultaneously。
06) blow water drying and processing, cleaned for phosphatization product is sling together with cleaning basket, be placed in appointment position, with high pressure air rifle, the cleaning water in product cavity blown。The product blowing water process being put into baking oven and carries out drying and processing, temperature controls within 180 degrees Celsius, makes the moisture in product fully dry。
07) drape over one's shoulders putty grinding process, after product phosphatization drying and processing, irregular surface is draped over one's shoulders putty and processes, it is ensured that product surface flatness, after draping over one's shoulders putty, it is carried out grinding process。
08) shielding processing, tests to the product after draping over one's shoulders putty polishing, confirms that whether product is qualified。The surface need not spray paint drawing requirement and stud, the screw thread of nut is protected with special adhesive tape。
2) spraying paint process, to checking qualified product block pattern row pattern in the support that sprays paint, prepare to spray paint process。
01) primer spray processes, and is hung in paint spraying frame by qualified product, notes the mutual collision prevented between product。Allotment priming paint, it is desirable to 91061 priming paint: BT110 all-purpose diluent: the ratio of Z92711 firming agent is 100:240:180, is filtered deployed priming paint processing the particle taken out in paint。Priming paint is connected with spray gun, process that product is sprayed paint, it is desirable to spray paint and want uniformly, it is ensured that base coat thickness is more than 40 μ。
02) drying and processing, to the product drying and processing having carried out prime treatment, it is desirable to the drying temperature of epoxy primer is 70 degrees Celsius, and the time is about 60 minutes, and alloy priming paint can carry out in natural environment, it is not necessary to oven for drying processes。
03) SK fluid sealant is broken, according to drawing requirement, inner chamber and all gaps of periphery in frame product are required for breaking fluid sealant, require that the fluid sealant on every gap is beaten in the same size, simultaneously before fluid sealant is but without dry solidification, with suds on finger-dipping, fluid sealant troweling is sliding or floating, it is ensured that glue is close to above gap, and gluing needs to dry after completing。
04) leaking test processes, the inner chamber of electrical appliance kit product needs to leak test, it is desirable to the intracavity at electrical appliance kit fills clear water, shelves more than two hours, anhydrous drain to other intracavity of side be considered as qualified, otherwise need again to play the process of SK fluid sealant。
05) color spray paint and varnish treated, checks that whether product is qualified, is hung in paint spraying frame by qualified product, notes the mutual collision prevented between product。Technological parameter allotment paint according to paint and varnish, is filtered deployed priming paint processing the particle taken out in paint。Paint is connected with spray gun, adjusts the temperature in spray room, humidity, process that product is sprayed paint。Requirement is sprayed paint and is wanted uniformly, it is ensured that base coat thickness is more than 40 μ, and surface is without bad phenomenon such as obvious drain spray and particles。
06) baking processes, and pushes in baking oven by the workpiece having sprayed finish paint together with paint spraying frame, adjusts baking oven according to the Flue curing parameter of paint。The stoving of the paint temperature of requirement Ral7024 is 60 degrees Celsius, and baking time is 60 minutes, and the stoving of the paint temperature of Ral9018 is 60 degrees Celsius, and baking time is 40 minutes。
07) blanking is when the temperature in baking oven is cooled to room temperature, by the workpiece cart baking oven on paint spraying frame, check that whether painted surface quality is qualified, surface with or without show-through, sagging, granule, the bad phenomenon such as pin hole, certified products being neatly placed in appointment position, separates with packing board between product, bad product need to be done over again process。

Claims (1)

1. a lacquer spraying technique, is characterized in that: comprise the steps:
1) pre-treatment before, spraying paint
To checking qualified product block pattern row pattern in cleaning basket, it is ensured that exist between each of product and clean gap, surface is existed and carries out grinding process than the more serious place rubber paper got rusty;
01) ungrease treatment, qualified product is lifted up in ferrum defat or aluminum degreasing bath together with cleaning basket, product is totally immersed in groove, require that the concentration in ferrum degreasing bath is 10-20%, temperature is 35-45 degree Celsius, and degreasing time is 10-20 minute, and the concentration in aluminum degreasing bath is 6-10%, temperature is room temperature-45 degrees Celsius, and degreasing time is 2-5 minute;
02) washing processes, the product having be carried out ungrease treatment is put in rinsing bowl together with cleaning basket, product is totally immersed in clear water, suitably rock, action is not easily excessive, requiring that the overfall of rinsing bowl must be always on, water is cleaned in periodic replacement, it is ensured that the water quality in rinse bath meets washing requirement simultaneously;
03) table mediates reason, is put in table tune groove together with cleaning basket by the product having be carried out washing process, it is desirable to product is totally immersed in groove, requires that table adjusts the pH value in groove to be 7-9 simultaneously, and temperature is under room temperature, and the time is 10-20 minute;
04) bonderizing, the product mixed up by table is immersed in Phosphating Slot, product-free exposes in atmosphere, requiring that the total acid in Phosphating Slot is 22-28%, free acid concentration is 08-1.4%, and promoter concentration is 6-8%, product surface is made can fully to enter phosphatization, after phosphatization completes, whether detection phosphating coat is qualified, it is desirable to phosphating coat can guarantee that the salt spray test of 2 hours, and phosphatization thickness is at 3 6um;
05) cleaning treatment after phosphatization, immerses the product after bonderizing in rinse bath and washes, and requires rinse bath periodic replacement clear water, it is ensured that the water quality in rinse bath meets cleaning requirement, it is necessary to twice cleaning simultaneously;
06) blow water drying and processing, cleaned for phosphatization product is sling together with cleaning basket, be placed in appointment position, with high pressure air rifle, the cleaning water in product cavity blown;The product blowing water process being put into baking oven and carries out drying and processing, temperature controls within 180 degrees Celsius, makes the moisture in product fully dry;
07) drape over one's shoulders putty grinding process, after product phosphatization drying and processing, irregular surface is draped over one's shoulders putty and processes, it is ensured that product surface flatness, after draping over one's shoulders putty, it is carried out grinding process;
08) shielding processing, tests to the product after draping over one's shoulders putty polishing, confirms that whether product is qualified;The surface need not spray paint drawing requirement and stud, the screw thread of nut is protected with special adhesive tape;
2) spraying paint process, to checking qualified product block pattern row pattern in the support that sprays paint, prepare to spray paint process;
01) primer spray processes, and is hung in paint spraying frame by qualified product, notes the mutual collision prevented between product;Allotment priming paint, it is desirable to 91061 priming paint: BT110 all-purpose diluent: the ratio of Z92711 firming agent is 100:240:180, is filtered deployed priming paint processing the particle taken out in paint;Priming paint is connected with spray gun, process that product is sprayed paint, it is desirable to spray paint and want uniformly, it is ensured that base coat thickness is more than 40 μ;
02) drying and processing, to the product drying and processing having carried out prime treatment, it is desirable to the drying temperature of epoxy primer is 70 degrees Celsius, and the time is about 60 minutes, and alloy priming paint can carry out in natural environment, it is not necessary to oven for drying processes;
03) SK fluid sealant is broken, according to drawing requirement, inner chamber and all gaps of periphery in frame product are required for breaking fluid sealant, require that the fluid sealant on every gap is beaten in the same size, simultaneously before fluid sealant is but without dry solidification, with suds on finger-dipping, fluid sealant troweling is sliding or floating, it is ensured that glue is close to above gap, and gluing needs to dry after completing;
04) leaking test processes, the inner chamber of electrical appliance kit product needs to leak test, it is desirable to the intracavity at electrical appliance kit fills clear water, shelves more than two hours, anhydrous drain to other intracavity of side be considered as qualified, otherwise need again to play the process of SK fluid sealant;
05) color spray paint and varnish treated, checks that whether product is qualified, is hung in paint spraying frame by qualified product, notes the mutual collision prevented between product;Technological parameter allotment paint according to paint and varnish, is filtered deployed priming paint processing the particle taken out in paint;Paint is connected with spray gun, adjusts the temperature in spray room, humidity, process that product is sprayed paint;Requirement is sprayed paint and is wanted uniformly, it is ensured that base coat thickness is more than 40 μ, and surface is without bad phenomenon such as obvious drain spray and particles;
06) baking processes, and pushes in baking oven by the workpiece having sprayed finish paint together with paint spraying frame, adjusts baking oven according to the Flue curing parameter of paint;The stoving of the paint temperature of requirement Ral7024 is 60 degrees Celsius, and baking time is 60 minutes, and the stoving of the paint temperature of Ral9018 is 60 degrees Celsius, and baking time is 40 minutes;
07) blanking is when the temperature in baking oven is cooled to room temperature, by the workpiece cart baking oven on paint spraying frame, check that whether painted surface quality is qualified, surface with or without show-through, sagging, granule, the bad phenomenon such as pin hole, certified products being neatly placed in appointment position, separates with packing board between product, bad product need to be done over again process。
CN201410705925.6A 2014-11-28 2014-11-28 Paint spraying process Pending CN105689234A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410705925.6A CN105689234A (en) 2014-11-28 2014-11-28 Paint spraying process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410705925.6A CN105689234A (en) 2014-11-28 2014-11-28 Paint spraying process

Publications (1)

Publication Number Publication Date
CN105689234A true CN105689234A (en) 2016-06-22

Family

ID=56230379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410705925.6A Pending CN105689234A (en) 2014-11-28 2014-11-28 Paint spraying process

Country Status (1)

Country Link
CN (1) CN105689234A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106903036A (en) * 2017-01-04 2017-06-30 繁昌县易能科技有限责任公司 A kind of lacquer spraying technique of power distribution cabinet plate
CN107497647A (en) * 2017-07-19 2017-12-22 安徽登冠新能源电动车科技有限公司 The processing method of the shell spray painting of electric car
CN108031634A (en) * 2017-11-30 2018-05-15 安徽雷萨重工机械有限公司 A kind of sheet metal pretreatment to the coating method
CN108144823A (en) * 2017-12-27 2018-06-12 重庆市华阳光学仪器有限公司 A kind of telescope shell lacquer spraying technique
CN112439664A (en) * 2020-11-18 2021-03-05 江西朝阳机械有限公司 Fireproof door coating process
CN113248230A (en) * 2021-06-01 2021-08-13 江苏蓝圈新材料股份有限公司 Production process of magnesium outer board wall

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106903036A (en) * 2017-01-04 2017-06-30 繁昌县易能科技有限责任公司 A kind of lacquer spraying technique of power distribution cabinet plate
CN107497647A (en) * 2017-07-19 2017-12-22 安徽登冠新能源电动车科技有限公司 The processing method of the shell spray painting of electric car
CN108031634A (en) * 2017-11-30 2018-05-15 安徽雷萨重工机械有限公司 A kind of sheet metal pretreatment to the coating method
CN108144823A (en) * 2017-12-27 2018-06-12 重庆市华阳光学仪器有限公司 A kind of telescope shell lacquer spraying technique
CN108144823B (en) * 2017-12-27 2021-02-02 重庆市华阳光学仪器有限公司 Telescope shell paint spraying process
CN112439664A (en) * 2020-11-18 2021-03-05 江西朝阳机械有限公司 Fireproof door coating process
CN113248230A (en) * 2021-06-01 2021-08-13 江苏蓝圈新材料股份有限公司 Production process of magnesium outer board wall

Similar Documents

Publication Publication Date Title
CN105689234A (en) Paint spraying process
CN105964510A (en) Varnish-baking surface coating technology
CN104475314A (en) Car painting method
CN107199168A (en) A kind of handware baking finish process method
CN104399627A (en) Multi-dimensional arm-type paint sprayer
CN103966600B (en) A kind of closed automatic pre-treatment production line balance technique
CN106076779A (en) A kind of wood furniture production technology
AU2010401A (en) Method for producing coated metal surfaces and the use of said metal surfaces
CN106313418A (en) Injection molding processing technology for rear bumper mask
CN104275293A (en) Paint-spraying treatment process of electric vehicle metal plate
CN102936944A (en) Construction method of exterior wall coating decorative finish
KR20170082611A (en) Method of coating alloy wheels
CN105935655A (en) Paint spraying process of subway cab door
CN105327843A (en) Assembly line production process for pretreatment and plastic spraying of metal surface
CN109280953A (en) A kind of CS9 fore sub frame electrophoresis process
CN104525454A (en) Spraying technology
CN102615033B (en) Construction method for making imitated wood grains on metal workpiece by aid of baking paint for metal
CN106216158A (en) A kind of environmental-protecting and high-efficient type paint spraying apparatus
CN104058600A (en) Glass ware gold-plating technology
WO2019126956A1 (en) Decorative paint and spray painting method therefor
CN112893060A (en) Top cover surface electrostatic spraying process
CN105797935A (en) Paint spraying processing method for flexible finish paint of transparent coating of bottom coating cover
CN110773405A (en) Organic coating method for ship interior decoration material
CN206444802U (en) Engine finishing system
CN104998806A (en) Process for conducting surface coating treatment through water flow

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160622