CN105678508A - Project complete period management man-machine interaction system - Google Patents
Project complete period management man-machine interaction system Download PDFInfo
- Publication number
- CN105678508A CN105678508A CN201511026817.7A CN201511026817A CN105678508A CN 105678508 A CN105678508 A CN 105678508A CN 201511026817 A CN201511026817 A CN 201511026817A CN 105678508 A CN105678508 A CN 105678508A
- Authority
- CN
- China
- Prior art keywords
- project
- trajectory diagram
- module
- complete period
- node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a project complete period management man-machine interaction system. The project complete period management man-machine interaction system includes a foreground client and a background database server which are connected, wherein the background database server includes a complete period trajectory diagram template module and a project phase file storage module; the complete period trajectory diagram template module is used for storing complete period trajectory diagram templates with different commercial activities; the project phase file storage module is used for storing the related files of each phase of each project; the foreground client includes a trajectory diagram calling module, a node modifying module and a trajectory diagram display module; the trajectory diagram calling module is used for calling the complete period trajectory diagram template module; the node modifying module is used for receiving the node modifying information for the trajectory diagram, and storing the node modifying information in the project phase file storage module; and the trajectory diagram display module is used for displaying the corresponding trajectory diagram according to the trajectory diagram called by the trajectory diagram calling module and the node modifying information. Compared with the prior art, the project complete period management man-machine interaction system can improve the project management rate and can realize controllable cost and high turnover.
Description
Technical field
The present invention relates to project information management technical field, especially relate to a kind of project complete period management man-machine interactive system.
Background technology
Cycle management is the effective means solving building field knowledge reuse and improved efficiency. But, the complexity of building industry engineering project, technique and production procedure are nonstandard, provisional, unit of taking part in building's quantity of project team is big, project is layouted, and region is wide, dynamic repository data volume is huge and the problem such as a large amount of non-type external transaction business processings determines the difficulty of cycle management and promotes the importance of cycle management ability.
The cycle management solution of current industry is also many, but the effect played is obviously big not enough, and limitation is in the following aspects:
One is that database capability is inadequate. The cycle management platform of project cannot create 6D relational database, and this is difficult to meet project core business and fine-grained management demand. Existing Engineering Project Mgmt System ERP generally can only achieve two or three dimensions, and the corresponding relation of data cannot accurately describe, and has significantly limited to the application of data, also can the accuracy of impact analysis result and value.
Two be platform location is project level and enterprise-level, rather than industry-level, it is impossible to solve the cycle management problem between enterprise, can not solve the Research on Interactive Problem between enterprise and authorities. PIP (Project Information Portal), OA and ERP, all there is same situation, these systems emphasize security of system, confidentiality very much, be difficult to extend to enterprise external, and the substantial amounts of work of construction unit and commercial affairs need outside team and enterprise collaborative to complete. The data that substantial amounts of enterprise need to declare to relevant industrial department, even if being formed in internal system, again need to make a report on, i.e. so-called substantial amounts of information island in other system. The elimination of isolated island to have the thinking of renewal.
Three is the effect that can not give full play to the masses and grass roots expert. The only safety of emphasis system, and the productivity that play is not bigger. Create and in dynamic building process in knowledge base, it does not have the large-scale cooperative platform of specialty, the accumulation of professional standing and experience data is had difficulty in taking a step.
Four be the technology mode of cycle management and business model advanced not, Value creation is inconspicuous. Excessively relying on traditional ERP (OA) technology is when previous more serious Construction Industry Information mistaken ideas, manufacturing ERP experience is taken turns in the superfine informationalized practice of qualification at this and is shown at the unconformable serious conditions of building industry, the particularity of building industry is described or relatively larger.
As-Is analysis according to Large Real Estate enterprise, building trade major part company is all collectivized operation, and collaborative construction is also had substantial amounts of demand by many branch company, the business of subsidiary's diversification. Project cycle management has very big ample scope for abilities in the planning of project, management and sale. The project of Foreign Architecture company more than 90% all adopts software to be managed, and is then less than 10% in China. Several years ago, Building Trade in China is skyrocketed through, but increase efficiency is not high, and harmful competition is serious, and profit margin is relatively low. For the sound development of industry, industry development is necessary to go slowly, and future will be answered the lifting of emphasis on development quality and the lifting etc. of profit margin by building enterprise.
Summary of the invention
Defect that the purpose of the present invention is contemplated to overcome above-mentioned prior art to exist and a kind of project complete period management man-machine interactive system is provided.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of project complete period management man-machine interactive system, including the foreground client being connected and background data base server, described background data base server includes:
Complete period trajectory diagram formwork module, for storing the complete period trajectory diagram template of different industry situation type,
Project stage file storage module, for storing the associated documents in each project each stage;
Described foreground client includes:
Trajectory diagram calling module, is used for calling described complete period trajectory diagram formwork module,
Node modified module, revises information for receiving the node for described trajectory diagram, and is saved in project stage file storage module,
Trajectory diagram display module, for the trajectory diagram called according to described trajectory diagram calling module and described node amendment information, shows corresponding trajectory diagram.
In described project stage file storage module, the associated documents correspondence of a project preserves to a file.
Described node modified module includes:
Node level dispensing unit, for configuring the grade of each node in current project,
Node state dispensing unit, for the state of the node amendment information configuration node according to user's input, and is sent to trajectory diagram display module,
Files passe unit, uploads and preserves for node amendment information user inputted to project stage file storage module.
Described node amendment information includes node initial conditions file, node outputting result file and node member's configuration information.
The state of described node includes completion status, state of exceeding the time limit, current state and unfinished state.
Described foreground client also includes:
New template generation module, for generating new complete period trajectory diagram template according to the last turn figure shown in trajectory diagram display module, preserves to complete period trajectory diagram formwork module.
Described foreground client includes multiple, and multiple foreground client and background data base server adopt all on-line online interaction mode to carry out data interaction.
Cipher mode transmission is adopted when described foreground client and background data base server carry out data transmission or file transmits.
Described foreground client includes desktop computer, portable machine, PDA, mobile phone, Set Top Box or NC.
Compared with prior art, the method have the advantages that
(1) present invention carries out the management of project complete period based on complete period trajectory diagram, according to project characteristic, the data such as the task of project, file, drawing, cost is carried out unified management, makes workflow simplicity understand, improves project work efficiency.
(2) each stage file of each project is stored by the present invention, facilitates the later stage to search data, also prepares for project warehouse-in simultaneously.
(3) present invention storage has the complete period trajectory diagram template of multiple different industry situation type, user can conveniently quote the template of same type and carry out trajectory diagram, the information such as the design of outstanding project, facade it are referred between projects, thus realizing cost turnover controlled, high, the purpose of the quick copy between project.
(4) present invention is provided with node modified module, user is according to respective project characteristic, can adjusted iterm trajectory diagram flexibly, thus forming project characteristic track, reach the purpose progressively changed in quality for product manufacturing from selling point, allow electronization, networking scheme adapt with real working situation, so can be substantially reduced Learning in Information cost and implement general plan.
(5) present invention is provided with new template generation module, can carry out the generation of new template according to final trajectory diagram, it is possible to make template more accurately, properer corporate identity.
(6) present invention carries out the management of project complete period by trajectory diagram, a set of effective, safe means of communication can be realized, make interpersonal, good communication can be reached between department and department, support information sharing and Work-flow control simultaneously, connect each relevant individual and department, so as to cooperate to complete common project and target.
(7) present invention passes through integration and the cross-application of data, reduces Data duplication input, reduces error, excavates effective information.
(8) foreground client of the present invention can be the different terminal applies equipment such as desktop computer, portable machine, PDA, mobile phone, Set Top Box, NC, it may be achieved the continued support to distinct device Yu sight.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail. The present embodiment is carried out premised on technical solution of the present invention, gives detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
As shown in Figure 1, the present embodiment provides a kind of project complete period management man-machine interactive system, including the foreground client 1 being connected and background data base server 2, wherein, background data base server 2 includes complete period trajectory diagram formwork module 21 and project stage file storage module 22, complete period trajectory diagram formwork module 21 is for storing the complete period trajectory diagram template of different industry situation type, and project stage file storage module 22 is for storing the associated documents in each project each stage; Foreground client 1 includes trajectory diagram calling module 11, node modified module 12 and trajectory diagram display module 13, trajectory diagram calling module 11 is used for calling complete period trajectory diagram formwork module, node modified module 12 revises information for receiving the node for trajectory diagram, and it is saved in project stage file storage module, trajectory diagram display module 13, for the trajectory diagram called according to trajectory diagram calling module and node amendment information, shows corresponding trajectory diagram.
When setting up project, application trajectory diagram template, adjust trajectory diagram according to project reality and (each node time cycle can be adjusted, but only weak control point can be skipped), thus forming the trajectory diagram with this project characteristic, allow user shorten the time of conventional operation method, and improve efficiency, also can provide comprehensive data for end item warehouse-in simultaneously. In project stage file storage module 22, the associated documents correspondence of a project preserves to a file.
Node modified module 12 includes: node level dispensing unit 121, for configuring the grade of each node in current project; Node state dispensing unit 122, the state of the node amendment information configuration node for inputting according to user, and it is sent to trajectory diagram display module, node amendment information includes node initial conditions file, node outputting result file and node member's configuration information etc., and the state of node includes completion status, state of exceeding the time limit, current state and unfinished state; Files passe unit 123, uploads and preserves for node amendment information user inputted to project stage file storage module.
In another embodiment of the present invention, foreground client 1 also includes new template generation module 14, for generating new complete period trajectory diagram template according to the last turn figure shown in trajectory diagram display module 13, preserves to complete period trajectory diagram formwork module 21.
Foreground client 1 includes multiple, and multiple foreground client and background data base server adopt all on-line online interaction mode to carry out data interaction, it is to avoid the data that off line business causes are inaccurate, not real-time.
Cipher mode transmission is adopted when foreground client 1 and background data base server 2 carry out data transmission or file transmits, wherein, sensitive data and critical data (SHA-256) algorithm for encryption, file transmission carries out (MAC) verification, it is ensured that the reliability of data transmission.
Foreground client 1 includes the multiple terminal application apparatus such as desktop computer, portable machine, PDA, mobile phone, Set Top Box or NC, it is achieved the continued support to distinct device Yu sight. The collaborative support realized different business application scenario such as mobile office, strange land offices, support the different terminal applies equipment such as desktop computer, portable machine, PDA, mobile phone, Set Top Box, NC, consider networking modes as different in LAN, broadband internet etc., the plurality of devices occupation modes such as many people multimachine, mobile office, strange land office, the interim mode handled official business, will allow these application apparatus and environment reach to work in coordination with.
The key technical indexes when management of above-mentioned project complete period man-machine interactive system uses includes:
1. data base adopts MYSQL database server;
2. file system adopts mogilefs distributed file system;
3. search engine adopts solr distributed full-text search system;
4. core system, WebServer, gateway interface, data scrubbing service arrangement is in (SuSE) Linux OS;
5. system adopts all on-line online interaction mode, it is to avoid the data that off line business causes are inaccurate, not real-time;
6. sensitive data and critical data (SHA-256) algorithm for encryption, file transmission carries out (MAC) verification, it is ensured that the reliability of data transmission.
Claims (9)
1. a project complete period management man-machine interactive system, including the foreground client being connected and background data base server, it is characterised in that described background data base server includes:
Complete period trajectory diagram formwork module, for storing the complete period trajectory diagram template of different industry situation type,
Project stage file storage module, for storing the associated documents in each project each stage;
Described foreground client includes:
Trajectory diagram calling module, is used for calling described complete period trajectory diagram formwork module,
Node modified module, revises information for receiving the node for described trajectory diagram, and is saved in project stage file storage module,
Trajectory diagram display module, for the trajectory diagram called according to described trajectory diagram calling module and described node amendment information, shows corresponding trajectory diagram.
2. project complete period according to claim 1 management man-machine interactive system, it is characterised in that in described project stage file storage module, the associated documents correspondence of a project preserves to a file.
3. project complete period according to claim 1 management man-machine interactive system, it is characterised in that described node modified module includes:
Node level dispensing unit, for configuring the grade of each node in current project,
Node state dispensing unit, for the state of the node amendment information configuration node according to user's input, and is sent to trajectory diagram display module,
Files passe unit, uploads and preserves for node amendment information user inputted to project stage file storage module.
4. the project complete period management man-machine interactive system according to claim 1 or 3, it is characterised in that described node amendment information includes node initial conditions file, node outputting result file and node member's configuration information.
5. project complete period according to claim 3 management man-machine interactive system, it is characterised in that the state of described node includes completion status, state of exceeding the time limit, current state and unfinished state.
6. project complete period according to claim 1 management man-machine interactive system, it is characterised in that described foreground client also includes:
New template generation module, for generating new complete period trajectory diagram template according to the last turn figure shown in trajectory diagram display module, preserves to complete period trajectory diagram formwork module.
7. project complete period according to claim 1 management man-machine interactive system, it is characterised in that described foreground client includes multiple, multiple foreground client and background data base server adopt all on-line online interaction mode to carry out data interaction.
8. the project complete period management man-machine interactive system according to claim 1 or 7, it is characterised in that adopt cipher mode transmission when described foreground client and background data base server carry out data transmission or file transmits.
9. the project complete period management man-machine interactive system according to claim 1 or 7, it is characterised in that described foreground client includes desktop computer, portable machine, PDA, mobile phone, Set Top Box or NC.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511026817.7A CN105678508A (en) | 2015-12-31 | 2015-12-31 | Project complete period management man-machine interaction system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511026817.7A CN105678508A (en) | 2015-12-31 | 2015-12-31 | Project complete period management man-machine interaction system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105678508A true CN105678508A (en) | 2016-06-15 |
Family
ID=56298295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511026817.7A Pending CN105678508A (en) | 2015-12-31 | 2015-12-31 | Project complete period management man-machine interaction system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105678508A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108846649A (en) * | 2018-07-28 | 2018-11-20 | 万翼科技有限公司 | Update method, server and the computer readable storage medium of node state |
CN110086828A (en) * | 2019-05-14 | 2019-08-02 | 长讯通信服务有限公司 | The communication engineering project life cycle credible management method based on webpage cloud service |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6120550A (en) * | 1996-10-28 | 2000-09-19 | Altera Corporation | Design file templates for implementation of logic designs |
CN101206570A (en) * | 2006-12-21 | 2008-06-25 | 国际商业机器公司 | Generating templates of nodes to structure content objects and steps to process the content objects |
CN103645908A (en) * | 2013-12-29 | 2014-03-19 | 中国科学院软件研究所 | Full life circle development achievement system of intemetware |
-
2015
- 2015-12-31 CN CN201511026817.7A patent/CN105678508A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6120550A (en) * | 1996-10-28 | 2000-09-19 | Altera Corporation | Design file templates for implementation of logic designs |
CN101206570A (en) * | 2006-12-21 | 2008-06-25 | 国际商业机器公司 | Generating templates of nodes to structure content objects and steps to process the content objects |
CN103645908A (en) * | 2013-12-29 | 2014-03-19 | 中国科学院软件研究所 | Full life circle development achievement system of intemetware |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108846649A (en) * | 2018-07-28 | 2018-11-20 | 万翼科技有限公司 | Update method, server and the computer readable storage medium of node state |
CN110086828A (en) * | 2019-05-14 | 2019-08-02 | 长讯通信服务有限公司 | The communication engineering project life cycle credible management method based on webpage cloud service |
CN110086828B (en) * | 2019-05-14 | 2021-09-21 | 长讯通信服务有限公司 | Communication engineering project life cycle credible management method based on webpage cloud service |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9679038B2 (en) | Systems and methods for construction field management and operations with building information modeling | |
CN112184177B (en) | Project supervision method, equipment and storage medium | |
CN104794609A (en) | Instant communication system capable of supporting enterprise cooperative office | |
TW202111618A (en) | Production scheduling system and method | |
CN107146074A (en) | Work order task cooperation processing method, device and computer-readable recording medium | |
CN111445218A (en) | BIM-based project progress management method, device, equipment and storage medium | |
CN111988404B (en) | Intelligent production and operation integrated digital platform | |
Du | Research on engineering project management method based on BIM technology | |
CN107909342A (en) | A kind of project management and Engineering Project Audit integral system | |
Haedicke et al. | In a DOD Environment: Hughes Aircraft Sets the Standard for | |
CN103019650A (en) | Business coordination processing method and business coordination processing device | |
CN113128846B (en) | BIM-based full life cycle management method for large-scale steel structure building engineering | |
CN105678508A (en) | Project complete period management man-machine interaction system | |
Teck et al. | Exploring challenges of the fourth industrial revolution | |
Bennett et al. | Construction health and safety, BIM and cloud technology: Proper integration can drive benefits for all stakeholders | |
CN103455879A (en) | Workflow model level-to-level management method and system and process modeling system | |
US20220277268A1 (en) | Project management apparatus, project management method, and recording medium | |
CN106357510A (en) | Interaction system and method for enterprise management data | |
CN109919517B (en) | Power station equipment maintenance welding operation flow control method | |
CN111178695B (en) | Dynamic coordination operation method for block chain enabled workshop | |
CN114662888A (en) | Job management method, job management apparatus, electronic device, and storage medium | |
CN110472103B (en) | Construction business form management method, system, storage medium and electronic terminal | |
CN109426947B (en) | Enterprise information interaction system based on tree-shaped virtual node network | |
Martynov et al. | Methodology for modeling optimal enterprise architecture in the application to the strategy of socio-economic development of energy enterprises of the Republic of Bashkortostan | |
CN203301527U (en) | Cloud server-based building information modeling (BIM) collaborative design device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160615 |