CN105672584B - A kind of ancient building covers back of the body roof construction method with mat - Google Patents

A kind of ancient building covers back of the body roof construction method with mat Download PDF

Info

Publication number
CN105672584B
CN105672584B CN201610041753.6A CN201610041753A CN105672584B CN 105672584 B CN105672584 B CN 105672584B CN 201610041753 A CN201610041753 A CN 201610041753A CN 105672584 B CN105672584 B CN 105672584B
Authority
CN
China
Prior art keywords
mat
ash
hemp
covered
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610041753.6A
Other languages
Chinese (zh)
Other versions
CN105672584A (en
Inventor
吕红医
杨晓林
李建东
唐丽
刘哲
姚珊珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201610041753.6A priority Critical patent/CN105672584B/en
Publication of CN105672584A publication Critical patent/CN105672584A/en
Application granted granted Critical
Publication of CN105672584B publication Critical patent/CN105672584B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D7/00Roof covering exclusively consisting of sealing masses applied in situ; Gravelling of flat roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

Back of the body roof construction method is covered with mat the present invention relates to ancient building, can effectively solve to ancient building cover with mat the back of the body roofing it is efficient, cost is low, ensure repairing quality the problem of, method be cover with mat the back of the body roofing base treatment, residual mortar and dust including removing sheathing tile or roof boarding layer surface, hook patter ash;Prepare hemp-fibred plaster:The weight ratio of lime and hemp cut is 92 95% ︰ 5 8%;Smear backplate ash:One layer of hemp-fibred plaster is smeared on the roof boarding or sheathing tile on roof, then carries out covering the mud back of the body with mat;Cover the mud back of the body with mat:Covered with mat on backplate ash and smear 2~3 layers of mud back of the body, make to cover with mat that mud backing layer is closely knit, drying is parched;Cover moon the lime back of the body and a steel gray back of the body with mat:Elbowing, viscous fiber crops, dry in the air the ash back of the body.Efficiency of construction of the present invention is high, expense is low, cover back of the body roofing with mat to be tightly combined, firmly, roof heat insulation water resistance is good, and roofing is smooth, the gradient is straight, perception effect is good, each position carries out unified planning according to examination row's result, it is to avoid causes waste without accurate dimension during cutting, reduces loss, non-environmental-pollution, economic and social benefit is huge.

Description

A kind of ancient building covers back of the body roof construction method with mat
Technical field
The present invention relates to building, particularly a kind of ancient building covers back of the body roof construction method with mat.
Background technology
China is an ancient civilized country, and ancient building is numerous, and ancient building covers back of the body roofing with mat due to its unique construction technology and skill Art, current n and building in the style of the ancients construction in be widely popularized, but due to ancient building roofing cover with mat the back of the body building technology, Technique lacks scientific quantification with material mixture ratio and analyzed, and is spread construction method and construction technology among traditional craftsman more, builds skill Art and material mixture ratio, work progress etc. are gradually forgotten for people, do not unify the construction method of science.
The method that construction relies primarily on practical experience now and oral teaching inspires true understanding, lack of standardization, it is difficult to construct, construction quality is obtained not To guarantee, and costly, the time is long, therefore, how to cover that back of the body roofing is efficient, cost is low with mat to ancient building, it is ensured that repairing quality is The technical problem of building field urgent need to resolve.
The content of the invention
For above-mentioned situation, to overcome the defect of prior art, the purpose of the present invention is just to provide a kind of ancient building and covers the back of the body with mat Roof construction method, can effectively solve to ancient building cover with mat the back of the body roofing it is efficient, cost is low, ensure repairing quality the problem of.
The technical scheme that the present invention is solved is realized by following steps:
Cover the base treatment of back of the body roofing with mat, including remove sheathing tile or the residual mortar and dust of roof boarding layer surface, hook patter ash; Prepare hemp-fibred plaster:The weight ratio of lime and hemp cut is 92-95% ︰ 5-8%;Smear backplate ash:One is smeared on the roof boarding or sheathing tile on roof Layer hemp-fibred plaster, then carry out covering the mud back of the body with mat;Cover the mud back of the body with mat:Covered with mat on backplate ash and smear 2~3 layers of mud back of the body, it is closely knit to make to cover with mat mud backing layer, dries dry Thoroughly;Cover moon the lime back of the body and a steel gray back of the body with mat:Elbowing, viscous fiber crops, dry in the air the ash back of the body.
Efficiency of construction of the present invention is high, and expense is low, covers back of the body roofing with mat and is tightly combined, firmly, roof heat insulation water resistance is good, roofing The smooth, gradient is straight, and perception effect is good, and each position carries out unified planning according to examination row's result, it is to avoid without accurate dimension during cutting Cause to waste, reduce loss, non-environmental-pollution, economic and social benefit is huge.
Brief description of the drawings
Fig. 1 is process chart of the invention.
Embodiment
The embodiment of the present invention is elaborated below in conjunction with accompanying drawing.
As shown in Figure 1, the present invention is in specific implementation, and flow is:Basic unit checks and accepts and cleaning --- smearing backplate ash --- point Layer covers the mud back of the body with mat(Cover the mud back of the body, the back of the body that dries in the air with mat, clap the back of the body)--- the grey back of the body is covered in layering with mat(Cover with mat the back of the body of the plastering-bat back of the body-elbowing, viscous fiber crops-bundle back of the body- Dry in the air the back of the body)--- cover the inspection of back of the body roofing with mat, mend and smear --- roofing is cleared up, and is specifically realized by following steps:
1st, the base treatment of back of the body roofing is covered with mat:
(1), the residual mortar and dust of sheathing tile or roof boarding layer surface are removed, and to being carried out at roofing protruding parts and honeycomb Cleaning;
(2), hook patter ash:It is more than 5mm gap between wood sheathing, it is real to hook flat wiping with ash;When gap is excessive, first nail is mended Batten hooks smear again;
2nd, hemp-fibred plaster is prepared:Suede length is not less than to 80cm hemp cut, is drenched, run through 1 hour with clear water, then bullet pine shakes loose simultaneously Remove impurity, then mixed and stirred with lime together with mix, during the percentage by weight of lime and hemp cut is 92-95% ︰ 5-8%, hemp cut Hemp cut suede accounts for more than 50%;
3rd, backplate ash is smeared:Smear one layer of hemp-fibred plaster on the roof boarding or sheathing tile on roof, 1~2cm of thickness dries in the air to seventy percent dry, then The mud back of the body is covered in progress with mat;
4th, the mud back of the body is covered with mat:Covered with mat on backplate ash and smear 2~3 layers of mud back of the body, 3cm is not to be exceeded in thickness, prevent from making because the mud back of the body is too thick Into cracking;Every layer of mud back of the body is dried after having covered with mat in outdoor environment to doing very likely, then is sprinkled blue or green slurry in mud back and clapped the back of the body, claps the back of the body many In 3 times, make to cover with mat that mud backing layer is closely knit, drying is parched;
Described blue or green slurry is to stir into pulpous state by steel gray add water, and crosses the wide sieve series no more than 0.2cm of mesh into steel gray is bulk It is steel gray, add water elimination lime-ash before use;In use, blue or green slurry should supplement clear water in time, steel gray one should be supplemented afterwards twice being watered It is secondary, it is ensured that quality;
5th, a moon lime back of the body is covered with mat:
1)Cover with mat drying the mud back of covering with mat that parches and smear the bluish white ash of the big hemp cut of layer 2-4,3cm is not to be exceeded per thickness degree, prevents Because ash the back of the body it is too thick and caused by ftracture;
2)1 layer is often covered with mat, has dried in the air to seventy percent dry, rolled 8-10 times with rolling son and catching up with repeatedly;
3)The ash back of the body is covered with mat when smearing to last layer, and hemp cut is clapped on surface, claps hemp cut using soft hemp cut suede, makes hemp cut suede point Cloth is even close, sprinkles blue or green slurry and catches up with and roll, hemp cut suede is rubbed in fact to the marrow, and every square metre of ash back of the body is overall to be patted more than 10 times;
6th, the steel gray back of the body is covered with mat:
1)After month lime back of the body fully dries, cover with mat and smear the steel gray back of the body, 3cm is not to be exceeded in ash back of the body thickness, prevent because ash carry on the back it is too thick and Cause cracking;
2)The steel gray back of the body dries in the air to seventy percent dry, is rolled more than 5 times with rolling son and firmly catching up with repeatedly;
3)Catch up with to roll every time and all should first brush blue or green slurry, green grass or young crops slurry is with the scleroma of the ash back of the body by thick thinning;
7th, elbowing, viscous fiber crops:
When the hemp-fibred plaster back of the body is done to eighty per cant, in the viscous numb elbowing of grey back, with top end in the waddy of semi-cylindrical in grey back Many circular shallow nests are got, one group of cripple 5 is constituted and fiber crops are glued between plum blossom-shaped cripple, every group of cripple, and watt-hour handle watt to be educated is turned over It is layered under tile plaster;
8th, dry in the air the ash back of the body:
1)Ash the back of the body covered with mat after must carry out the back of the body that dries in the air, dry in the air it is unlucky should avoid being exposed to the sun and drenching with rain, black should be used during hot weather construction Netted puggaree, which integrally screens to cover with mat, smears the rear ash back of the body, prevents face checking;
2)The cracking of unlucky discovery of drying in the air should again be mended and smeared, and benefit pounds into ditch with hand hammer before smearing, mend hemp-fibred plaster to grey back gauge Face is no longer cracking, final to realize the reparation for covering back of the body roofing with mat to ancient building.
The present invention in force, carry on the back or the steel gray back of the body should use and sprinkle slurry ash for described covering with mat, must not use lime cream by moon lime;
The ash back of the body cannot be greater than 3cm per thickness, during more than 3cm, it is necessary to which layering, which is covered with mat, smears, and last layer is necessary for the steel gray back of the body and done Method.
There must be sufficient hemp cut in the ash back of the body, hemp cut consumption should not be less than the 5% of lime(Weight ratio), hemp cut should before mix Dismantle it is scattered, mix should be sufficiently stirred for carry out, untill hemp cut is uniform.
The ash back of the body is covered with mat when smearing to last layer, preferably at surface " bat hemp cut ", and the hemp cut suede of jewelry, expensive clothing and other valuables should be used by clapping hemp cut.Hemp cut suede Must be distributed even close, catch up with and rolls when sprinkling blue or green slurry, make hemp cut suede rub it is real to the marrow.
Except backplate ash is outer, every layer of ash, which is carried on the back fully to catch up with, to be rolled, seventy percent dry later catching up with roll should use it is small roll son, must not use Plasterer's trowel.Last layer is caught up with to roll to be counted later from the ash back of the body seventy percent is dry, should not be less than 5 times.Blue or green slurry all should first be brushed every time, green grass or young crops slurry can be with The scleroma of the ash back of the body is by thick thinning.Using the ash back of the body as the Hui Beiding of direct waterproof layer, it should firmly catch up with and roll in good time.The number of times rolled is caught up with also should Increase, should be degree to be rolled to the basic scleroma of the ash back of the body.
Before tiling last all over the ash back of the body covered with mat after must dry in the air the back of the body, the cracking for discovery behind of drying in the air must be mended again to be smeared, and benefit is smeared Preceding that ditch is pounded into hand hammer, benefit could start to educate the back of the body when confirming no longer to ftracture after smearing.
It is excessive that roofing covers back side product with mat, it is impossible to when once having covered with mat, it is necessary to stays docking raft " oblique raft ", and raft width is not less than 20cm。
Cover the steel gray back of the body with mat(Admixture is hemp-fibred plaster, because hemp-fibred plaster material with it is watt identical, can more reduce and a watt cracking is caused by contraction Phenomenon)It is placed in be used as on sheathing tile and roof boarding layer and covers backing layer with mat.
Smear backplate ash and use bluish white hemp-fibred plaster, cover the mud back of the body with mat using hemp cut mud or sliding straw mud, cover the ash back of the body with mat and use big hemp-fibred plaster or big Month lime, incorporation perlite, sliding straw or hemp cut suede, plaster are 100 ︰ 20 with perlite, sliding straw or hemp cut suede weight ratio.
Construction science of the present invention, can effectively control each construction link so that whole to cover back of the body roof waterproof, moisture effect with mat It is good, it is easy to which that guarantee covers covering with mat for roofing of the back of the body with mat and smears quality, it can ensure that the ash back of the body, the mud back of the body cover the security smeared, fastness with mat, covering with mat after having constructed Carry on the back roofing splicing compact, each layer covers backing layer combination with mat tightly, and the slope of roof is smooth, roof waterproof, high insulating effect, the sight after shaping Feel quality good, be conducive to normalized construction, operating efficiency is improved, it is ensured that repairing quality, while being easy to quality examination afterwards and control System.
The present invention achieves very satisfied advantageous effects, through priority in Henan Yingyang City oil mill through trying out on the spot Village Qin Shi old houses maintenance engineering, Henan Yingyang City Soviet Union's stockaded village's local-style dwelling houses maintenance engineering and Zhengzhou City Henan Province Shangjie District historical village In the roofing construction of Fang Ding villages buildings renovation engineering.Its construction quality reaches Specification Design requirement.Wherein Henan Yingyang Qin Shi is old The condition of construction of residence maintenance engineering is as follows:
Henan Yingyang City oil mill village Qin Shi old houses maintenance engineering includes the room of falling seat, thing wing-room, principal rooms and thing railway carriage or compartment building With hall building, for lift beam type timber structure and the wooden mixed structure of brick, roofing is to cover back of the body roofing with mat, the ㎡ of roofing area 2500, in 2014 3 The moon goes into operation, and in April, 2015 is completed.
Material and equipment:
Material
The materials such as loess, lime, the steel gray and hemp cut of use press design requirement
Hemp cut should check one by one, have and go mouldy or the defect ware etc. of " hemp cut egg " should not allow to use.
Other materials
Sequence number Title material Specification The key technical indexes
1 Loess The ㎜ of 16 ㎜~20 sievings Lam
2 Sliding straw mud Mud:Wheat straw=100:20(Volume ratio)
3 Hemp cut mud Mud:Hemp cut=100:6(Weight ratio)
5 Mix plaster Ash:Loess=3:7
6 Green grass or young crops slurry Ratio of mud example is according to design requirement The ㎜ of 0.2 ㎜≤particle≤0.5
Equipment
Constructed, be controlled in construction in strict accordance with construction process using the inventive method in work progress.Apply Man-hour carries out basic unit according to construction requirement and checked and each construction link quality control, and the roofing mud back of the body, each layer of the ash back of the body are tightly combined, room The face gradient is smooth, connects smooth, smooth at raft.
Supervisor, construction unit and historical relic authorities carry out an acceptance inspection to the engineering jointly, unanimously think that the engineering is covered with mat Back of the body roofing is tightly combined, lines are smooth, and roofing perception works well.The engineering passes through Henan Cultural Relics Bureau of Shanxi Province organizes expert mirror It is fixed to check and accept, comply fully with《Ancient building builds Project quality inspection standard》CJJ70-96 requirement, relevant test result is such as Under:
Construction tolerance should meet following table regulation
Project Tolerance The method of inspection
Mud backing layer is thick + 10 ㎜, -10 ㎜ Checked with chi
Month lime back of the body is thick + 10 ㎜, -10 ㎜ Checked with chi
The steel gray back of the body is thick + 10 ㎜, -10 ㎜ Checked with chi
Dry in the air back of the body humidity + 10%, -10% Hygrometer
Crack down on the abduction depth + 10 ㎜, -10 ㎜ Checked with chi
Oblique raft width + 50 ㎜, -50 ㎜ Checked with chi
Working procedure is controlled
Cover with mat and smear roofing, to accomplish planned progress in order, every layer of roofing is covered with mat to smear and once completed as far as possible.Roofing is covered the back side with mat and accumulated Greatly, it is impossible to when once having covered with mat, it is necessary to stay docking raft " oblique raft ", and raft width be not less than 20 ㎝
Cover the steel gray back of the body with mat and need to be segmented to cover with mat and smear, should not smear too wide every time, then start " bat hemp cut ".In order to which hemp cut is uniformly beaten in In the ash back of the body, operator should take slurry bucket on the other hand, on the other hand by trowel, and green grass or young crops slurry sprinkles grey back again after should stopping through the trowel back side.It is throwed Green grass or young crops slurry is caught up with plasterer's trowel rolls the grey back of the body.The number of times rolled is caught up with no less than " three slurries three roll ", untill drying.
Safety measure
Strict implement safety in production laws and regulations, regulations and construction safety check criteria, specification.
Roofing construction will have enough operating surfaces, and protective scaffold, safety devices are strictly set up by specification, are equipped with. Because tile roofing has certain gradient, the security protection articles for use such as operating personnel must put on skidproof boots, fasten seat belts.
Construction equipment, material are properly stacked, and forbid to leave object downwards.
Transport of materials and lifting are responsible for by special messenger, forbid high-altitude throwing to prevent to operate against regulations.
Job site temporary electricity need to meet JGJ46-2005《Job site temporary electricity technical specification of security》It is required that, apply Work electrical equipment is responsible for dismounting by special electrician, and cutting mechanics special messenger uses keeping.
Carry out the control that dangerous matter sources are recognized, distinguish and evaluated with adverse environmental factors.
Environmental practice
It should be noted that when lime white is with blue or green slurry configuration, screening and raise the amplitude of spreading, it is to avoid dust pollution.
The ash back of the body, which is covered with mat, every time smears end, should check that the dirt in grey back is stain in cleaning in time, both ensure that roofing is attractive in appearance, again might be used Residue is avoided to influence next staged construction quality.
The materials such as hemp-fibred plaster, blue or green slurry should be responsible for by special messenger, forbid stacking everywhere, prevent environmental pollution.
Leftover pieces and waste residue clear up bunch in time, are uniformly processed.
Ancient building covers back of the body roof construction method with mat, successively in Henan Yingyang City oil mill village Qin Shi old houses maintenance engineering, He Nanxing The roofing of Yang Shi Soviet Union's stockaded village's local-style dwelling houses maintenance engineerings and Zhengzhou City Henan Province Shangjie District historical village Fang Ding villages buildings renovation engineering Construction.Its construction quality reaches Specification Design requirement.By taking the Qin Shi old house maintenance engineerings of Henan Yingyang as an example, condition of construction is as follows:
Henan Yingyang City oil mill village Qin Shi old houses maintenance engineering includes the room of falling seat, thing wing-room, principal rooms and thing railway carriage or compartment building With hall building, for lift beam type timber structure and the wooden mixed structure of brick, roofing is to cover back of the body roofing with mat, the ㎡ of roofing area 2500, in 2014 3 The moon goes into operation, and in April, 2015 is completed.
The present invention is controlled in work progress in strict accordance with construction process.During construction basic unit is carried out according to construction requirement Check and each construction link quality control, the roofing mud back of the body, each layer of the ash back of the body are tightly combined, and the slope of roof is smooth, connects smooth, light at raft It is sliding.
Supervisor, construction unit and historical relic authorities carry out an acceptance inspection to the engineering jointly, unanimously think that the engineering is covered with mat Back of the body roofing is tightly combined, lines are smooth, and roofing perception works well.The engineering passes through Henan Cultural Relics Bureau of Shanxi Province organizes expert mirror It is fixed to check and accept.
It is demonstrated experimentally that speed of application is fast, expense is saved, efficiency of construction is improved, construction period shortens 1/2, and saving is repaired into This more than 20 ten thousand yuan, and efficiently solve cover with mat the back of the body roofing repair it is lack of standardization, it is impossible to effectively realize scientific construction and management technology Problem, in a word:
Construction method of the present invention, the mud back of the body, each layer of the ash back of the body, which are covered with mat, smears roofing layer overlap joint closely, firmly, insulation, water resistance Well, the slope of roof is smoothed out, and is tightly combined with a watt part, perception works well;Each position carries out unified planning according to examination row's result, Avoid roofing cover with mat when smearing without accurate dimension cause waste, reduce loss.Cover back of the body roof construction method with mat and be efficiently applied to ancient building, Gu In the maintenance of local-style dwelling houses and building in the style of the ancients design, for the succession of the non-material cultural heritages such as traditional construction technique and Planting Techniques, Have far-reaching significance, economic and social benefit is huge.

Claims (3)

1. a kind of ancient building covers back of the body roof construction method with mat, it is characterised in that realized by following steps:
First, the base treatment of back of the body roofing is covered with mat:
1), the residual mortar and dust of sheathing tile or roof boarding layer surface are removed, and to being cleared up at roofing protruding parts and honeycomb;
2), hook patter ash:It is more than 5mm gap between wood sheathing, it is real to hook flat wiping with ash;When gap is excessive, first nail mends batten Hook and smear again;
2nd, hemp-fibred plaster is prepared:Suede length is not less than to 80cm hemp cut, is drenched, run through 1 hour with clear water, then bullet pine shakes loose and removed Decontamination, then mixed and stirred with lime together with mix, the weight ratio of lime and hemp cut is:Hemp cut suede is accounted in 92-95 ︰ 5-8, hemp cut More than 50%;
3rd, backplate ash is smeared:Smear one layer of hemp-fibred plaster on the roof boarding or sheathing tile on roof, 1~2cm of thickness dries in the air to seventy percent dry, then carry out Cover the mud back of the body with mat;
4th, the mud back of the body is covered with mat:Covered with mat on backplate ash and smear 2~3 layers of mud back of the body, 3cm is not to be exceeded in thickness, prevent because the mud back of the body is too thick and caused by open Split;Every layer of mud back of the body is dried after having covered with mat in outdoor environment to doing very likely, then is sprinkled blue or green slurry in mud back and clapped the back of the body, is clapped the back of the body and is no less than 3 Time, make to cover with mat that mud backing layer is closely knit, drying is parched;
Described blue or green slurry is to stir into pulpous state by steel gray add water, and crosses the wide sieve series no more than 0.2cm of mesh into the steel gray green grass or young crops for bulk Add water elimination lime-ash before ash, use;In use, blue or green slurry should supplement clear water in time, be watered should supplement afterwards twice it is steel gray once, protect Demonstrate,prove quality;
5th, a moon lime back of the body is covered with mat:
1)The mud back parched in drying, which is covered with mat, smears the bluish white ash of the big hemp cut of layer 2-4, and 3cm is not to be exceeded per thickness degree, prevents because of the ash back of the body It is too thick and cause cracking;
2)1 layer is often covered with mat, has dried in the air to seventy percent dry, rolled 8-10 times with rolling son and catching up with repeatedly;
3)The ash back of the body is covered with mat when smearing to last layer, and hemp cut is clapped on surface, claps hemp cut using soft hemp cut suede, makes the distribution of hemp cut suede even It is close, sprinkle blue or green slurry and catch up with and roll, hemp cut suede is rubbed in fact to the marrow, every square metre of ash back of the body is overall to be patted more than 10 times;
6th, the steel gray back of the body is covered with mat:
1)After month lime back of the body fully dries, cover with mat and smear the steel gray back of the body, 3cm is not to be exceeded in ash back of the body thickness, prevent because ash carry on the back it is too thick and caused by Cracking;
2)The steel gray back of the body dries in the air to seventy percent dry, is rolled more than 5 times with rolling son and firmly catching up with repeatedly;
3)Catch up with to roll every time and all should first brush blue or green slurry, green grass or young crops slurry is with the scleroma of the ash back of the body by thick thinning;
7th, elbowing, viscous fiber crops:
When the hemp-fibred plaster back of the body is done to eighty per cant, in the viscous numb elbowing of grey back, got with top end in the waddy of semi-cylindrical in grey back Many circular shallow nests, one group of cripple 5 is constituted and fiber crops is glued between plum blossom-shaped cripple, every group of cripple, and watt-hour handle watt to be educated, which is turned over, to be layered on On under tile plaster;
8th, dry in the air the ash back of the body:
1)Ash the back of the body covered with mat after must carry out the back of the body that dries in the air, dry in the air it is unlucky should avoid being exposed to the sun and drenching with rain, during hot weather construction should use black it is netted Puggaree, which integrally screens to cover with mat, smears the rear ash back of the body, prevents face checking;
2)The cracking of unlucky discovery of drying in the air should again be mended and smeared, and benefit pounds into ditch with hand hammer before smearing, and mend hemp-fibred plaster to grey backside surface not It is cracking again, it is final to realize the reparation for covering back of the body roofing with mat to ancient building.
2. ancient building according to claim 1 covers back of the body roof construction method with mat, it is characterised in that described step two lime with The weight ratio of hemp cut is lime 94%, hemp cut 6%.
3. ancient building according to claim 1 covers back of the body roof construction method with mat, it is characterised in that carry on the back roofing area mistake when covering with mat Greatly, it is impossible to once covered with mat, it is necessary to stay docking raft " oblique raft ", and raft width be not less than 20cm.
CN201610041753.6A 2016-01-21 2016-01-21 A kind of ancient building covers back of the body roof construction method with mat Active CN105672584B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610041753.6A CN105672584B (en) 2016-01-21 2016-01-21 A kind of ancient building covers back of the body roof construction method with mat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610041753.6A CN105672584B (en) 2016-01-21 2016-01-21 A kind of ancient building covers back of the body roof construction method with mat

Publications (2)

Publication Number Publication Date
CN105672584A CN105672584A (en) 2016-06-15
CN105672584B true CN105672584B (en) 2017-10-13

Family

ID=56302147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610041753.6A Active CN105672584B (en) 2016-01-21 2016-01-21 A kind of ancient building covers back of the body roof construction method with mat

Country Status (1)

Country Link
CN (1) CN105672584B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836846A (en) * 2017-04-11 2017-06-13 广州智弘建筑物检测与鉴定技术有限公司 The semicircular tile roofing construction technique that a kind of use grass roots ash is renovated
CN110158867A (en) * 2018-02-08 2019-08-23 河南工业大学 A kind of ancient building covers backing layer surface construction method with mat

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2938567A1 (en) * 2008-11-20 2010-05-21 Borgne Philippe Le Photovoltaic panel i.e. solar panel, fixation method for horizontal roof of e.g. new building, involves mounting fixation unit of panel on upper surface of elements of insulation layer of horizontal roof of building by reversible adhesion
CN201649461U (en) * 2010-03-24 2010-11-24 陕西建工集团第七建筑工程有限公司 Tile laying structure of hipped pavilion roof tiles for pseudo-classic building
CN202767383U (en) * 2012-08-10 2013-03-06 江苏建筑职业技术学院 Construction waste roof thermal preservation layer
CN103046698B (en) * 2012-12-29 2015-02-25 陕西省第三建筑工程公司 Method of crack resistance and seepage prevention for concrete roof eave edging in archaized architectures

Also Published As

Publication number Publication date
CN105672584A (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN101994399B (en) Method for repairing leaked coiled-material water-proof roof
CN101565997A (en) Construction method for large-area irregular floor tile
CN101363269A (en) Construction method of plastering-free concrete structure wall putty
CN103046709A (en) Building construction method of inner wall surface
CN109797920B (en) Indoor decoration construction method
CN105399389A (en) Building inner wall whitewashing gypsum and process flow thereof
CN105672584B (en) A kind of ancient building covers back of the body roof construction method with mat
CN110284715A (en) Modified extruded polystyrene board keeps the temperature resilient cushion floor anticracking construction method
CN110821198A (en) High-rise building external wall thermal insulation mortar falling prevention method
CN101105076A (en) On site antistatic terrazzo ground construction method
CN108412075A (en) A kind of construction method improving exterior-wall heat insulation lacquer quality
CN110616861B (en) Thermal power plant concrete structure modification construction method
CN117090418A (en) Ancient building and archaized building decoration and fitment process
KR100943296B1 (en) Method for preventing concrete wall from seepage by using inorganic permeable waterproofing composite
CN105625642B (en) A kind of ancient building tile roofing construction method
CN109853888A (en) A kind of historical building plucking wall surface construction technology
KR20230115106A (en) Waterproof construction method using eco-friendly inorganic high-elasticity waterproofing agent
CN111576788A (en) Construction method for ground leveling
CN211645779U (en) Durable flexible structure for treating waterproof sealing layer of high-speed railway foundation
CN113417417A (en) Old-imitation red brick veneer structure and construction process thereof
CN106948553B (en) Accessible roof pattern patch block construction method
Maurenbrecher et al. Repointing Mortars for Older Masonry Buildings–Site Considerations
CN209025491U (en) Box type house transformed from waste containers
CN108503265A (en) It is a kind of for the expansion cement slurry of roof mending-leakage and the construction method of roof anti-leak
CN115217332A (en) Construction method of LHB foamed cement external wall insulation board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 450001 Zhengzhou science and Technology Development Zone, Henan, No. 100 science Avenue

Patentee after: Zhengzhou University

Address before: 450001 science avenue of Zhengzhou high tech Development Zone, Zhengzhou, Henan Province, No.

Patentee before: Zhengzhou University