CN105667727A CN201610122661.0A CN201610122661A CN105667727A CN 105667727 A CN105667727 A CN 105667727A CN 201610122661 A CN201610122661 A CN 201610122661A CN 105667727 A CN105667727 A CN 105667727A
Authority
CN
China
Prior art keywords
tube
immersed
towing
immersed tube
tugboat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610122661.0A
Other languages
English (en)
Other versions
CN105667727B (zh
Inventor
彭再勇
何毅
刘敏
杨春勃
汪现伟
董小龙
郭小龙
胡朝贵
李俊跃
孔祥远
姚远
罗苍宁
李贤龙
董军
高昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201610122661.0A priority Critical patent/CN105667727B/zh
Publication of CN105667727A publication Critical patent/CN105667727A/zh
Application granted granted Critical
Publication of CN105667727B publication Critical patent/CN105667727B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/66Tugs
    • B63B35/68Tugs for towing

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

一种沉管法隧道管节浮运船舶编队方法,沉管管节浮运拖带船舶选用全回转拖轮,其中一部分拖轮在沉管管节侧边旁拖,另外一部分拖轮在沉管管节管首或管尾吊拖;所述旁拖拖轮的螺旋桨须突出沉管管节端头。本发明的船舶编队在管节横断面迎流或纵断面迎流时均可以有效的抵抗较大的水流力,在较大流速条件下,能够确保沉管管节浮运工安全顺利进行,大大增加了沉管管节浮运窗口期;拖航编队总宽度小,可以通过狭窄的航道及桥梁通航孔;控制性能好,可以在转弯半径较小的航道中进行沉管管节浮运。

Description

一种沉管法隧道管节浮运船舶编队方法
技术领域
本发明涉及一种沉管法隧道管节浮运船舶编队方法,属于沉管法隧道管节浮运领域。
背景技术
沉管法隧道施工包括管节预制、出坞、浮运、沉放安装、管内施工等工序,其中管节浮运明显受施工区域的水流速度、浮运距离、航道水深及宽度、水上构筑物分布情况影响。目前国内施工的沉管法隧道有以下特点:大部分位于沿海地区,其施工水域的明显特征为日潮、半日潮特征,即存在流速缓慢的平潮期,其施工要求的水文条件窗口期有足够的保证;大部分沉管法隧道管节预制干坞采用轴线干坞或轴侧干坞,管节浮运距离短;需要进行长距离管节浮运的沉管法隧道工程,其航道通常有着良好的宽度及水深条件。而在内河流域进行长距离沉管法隧道管节浮运施工时,可出现以下工况:枯水期时水位低、流速慢,洪水期时水位高、流速快,与管节浮运要求的高水位、低流速存在矛盾,施工要求的水文条件窗口期无法保证;航道满足管节浮运的宽度受水位影响,水位低、流速低时航道狭窄;管节浮运区域存在较多的桥梁,航道宽度受桥梁通航孔宽度影响。
现有技术中,在较大流速、狭窄航道进行需通过桥梁通航孔的长距离沉管法隧道管节浮运的施工方法尚属空白。
发明内容
本发明的目的是针对现有技术中存在的技术问题,提出一种沉管法隧道管节浮运船舶编队方法,能够在较大流速、狭窄航道、存在桥梁通航孔等不利因素下进行长距离管节浮运,并保证浮运的稳定性及安全性。
本发明所述一种沉管法隧道管节浮运船舶编队方法为:沉管管节浮运拖带船舶选用全回转拖轮,其中一部分拖轮在沉管管节侧边旁拖,另外一部分拖轮在沉管管节管首或管尾吊拖;所述旁拖拖轮的螺旋桨须突出沉管管节端头。
一、当沉管管节垂直水流方向前进时:旁拖拖轮主要提供水流抵抗力,吊拖拖轮提供沉管管节前进动力,并辅助提供水流抵抗力。
二、当沉管管节平行水流方向前进时:沉管管节管头吊拖拖轮提供管节前进动力并控制前进方向,沉管管节管尾吊拖拖轮提供水流抵抗力,旁拖拖轮视实际情况提供前进动力或水流抵抗力并辅助控制前进方向。
三、当沉管管节平行水流方向前进,并通过桥梁通航孔时:沉管管节管头吊拖拖轮提供沉管管节前进的主要动力;沉管管节管头吊拖拖轮及旁拖拖轮共同控制前进方向;沉管管节管尾吊拖拖轮调整拖缆长度为一长一短,向内靠拢以减少编队总宽度,提供水流抵抗力。
优选的,所述拖轮数量为5艘,当沉管管节垂直水流方向前进时,其中1艘在沉管管节管头吊拖,2艘在沉管管节管尾吊拖,2艘旁拖;当沉管管节垂直水流方向前进时及过桥梁通航孔时:其中1艘在沉管管节管头吊拖,2艘在上游沉管管节管侧吊拖,2艘在下游沉管管节管侧旁拖。
优选的,所述拖轮为4000HP全回转拖轮,正拖力、倒拖力、正顶力均不小于400kN,侧推力、侧拉力均不小于200kN。
本发明的有益效果是:本发明的船舶编队在管节横断面迎流或纵断面迎流时均可以有效的抵抗较大的水流力,在较大流速条件下,能够确保沉管管节浮运工安全顺利进行,大大增加了沉管管节浮运窗口期;拖航编队总宽度小,可以通过狭窄的航道及桥梁通航孔;控制性能好,可以在转弯半径较小的航道中进行沉管管节浮运。
附图说明
图1是本发明沉管管节拖带方向与水流方向垂直时的船舶编队示意图;
图2是本发明沉管管节拖带方向与水流方向一致时的船舶编队示意图;
图3是本发明沉管管节拖带通过桥梁通航孔时的船舶编队示意图;
其中:1为拖轮;2为沉管管节;3为沉管管节拖带方向;4为水流方向;5为桥墩。
具体实施方式
下面结合实例及附图对本发明的具体实施方式进行详细描述。
实例:对于水下尺寸为115m长×8.3m高×30m宽的沉管管节,其纵断面面积A=115×8.3=954.5㎡、横断面面积B=8.3×30=249㎡,在水密度ρ=1t/m3、水流速度V=0.8m/s、宽度70m的浮运航道中拖带,当沉管管节纵断面迎流时(水流方向垂直于拖带方向),受到的近似水流力F=ρV2A=611kN;当沉管管节横断面迎流时(水流方向平行于拖带方向),受到的近似水流力F=ρV2B=159kN;航道中最窄桥梁通航孔宽度为60m;拖轮选用5艘4000HP全回转拖轮。
如图1所示,当沉管管节2的拖带方向3与水流方向4基本垂直时:拖轮1之一位于沉管管头吊拖,船头朝向沉管管节,采用倒拖方式,主要提供沉管管节前进动力,并主要负责调整沉管管节前进方向;拖轮1之二、拖轮1之三位于沉管管节下游侧旁拖,拖轮与沉管管节连接时,船头朝向沉管管节中部,船尾螺旋桨位置超出沉管管节端部,可避免拖轮用车时应水流冲击沉管管节而影响效率,主要提供水流抵抗力,并负责调整沉管管节的侧向偏移;拖轮1之四、拖轮1之五位于沉管管节上游侧吊拖,船头朝向沉管管节,船体与水流方向4基本同向,主要提供水流抵抗力,辅助提供沉管管节前进动力。
工况b)如图2所示,当沉管管节2的拖带方向3与水流方向4基本相同时:拖轮1之一位于沉管管头吊拖,船头朝向沉管管节,采用倒拖方式,主要提供沉管管节前进动力,并主要负责调整沉管管节前进方向;拖轮1之二、拖轮1之三位于沉管管节下游侧旁拖,拖轮与沉管管节连接时,船头朝向沉管管节中部,船尾螺旋桨位置超出沉管管节端部,可避免拖轮用车时应水流冲击沉管管节而影响效率,主要负责调整沉管管节的侧向偏移,并根据实际水流情况输出动力,流速大时提供水流抵抗力,流速小时提供沉管管节前进动力;拖轮1之四、拖轮1之五位于沉管管节管尾吊拖,船头朝向沉管管节,船体与水流方向4基本同向,主要负责尾部系留,避免沉管管节前进速度过快,并辅助调整沉管管节前进方向。
工况c)如图3所示,当沉管管节2拖带通过桥梁通航孔时:拖轮1之一位于沉管管头吊拖,船头朝向管节,采用倒拖方式,主要提供沉管管节前进动力,并主要负责调整沉管管节前进方向;拖轮1之二、拖轮1之三位于沉管管节下游侧旁拖,拖轮与沉管管节连接时,船头朝向沉管管节中部,船尾螺旋桨位置超出沉管管节端部,可避免拖轮用车时应水流冲击沉管管节而影响效率,主要负责调整沉管管节的侧向偏移,并根据实际水流情况输出动力,流速大时提供水流抵抗力,流速小时提供沉管管节前进动力;拖轮1之四、拖轮1之五位于沉管管节管尾吊拖,船头朝向沉管管节,船体与沉管管节浮运方向3基本同向,主要负责尾部系留,避免沉管管节前进速度过快,两船在通过桥梁通航孔时略微向中靠拢,由于两船带缆长度一长一短,可避免相互碰撞。
虽然上面已经根据附图描述了本发明的实例,但是本领域技术人员可以理解,在不脱离本发明范围和精神的情况下,可以对本发明作出各种不同的修改和变化。因此,应该理解上述的实施例不是限制,而是某个方面的举例说明。

Claims (3)

1.一种沉管法隧道管节浮运船舶编队方法,其特征在于:沉管管节浮运拖带船舶选用全回转拖轮,其中一部分拖轮在沉管管节侧边旁拖,另外一部分拖轮在沉管管节管首或管尾吊拖;所述旁拖拖轮的螺旋桨须突出沉管管节端头;
(1)当沉管管节垂直水流方向前进时:旁拖拖轮主要提供水流抵抗力,吊拖拖轮提供沉管管节前进动力,并辅助提供水流抵抗力;
(2)当沉管管节平行水流方向前进时:沉管管节管头吊拖拖轮提供管节前进动力并控制前进方向,沉管管节管尾吊拖拖轮提供水流抵抗力,旁拖拖轮视实际情况提供前进动力或水流抵抗力并辅助控制前进方向;
(3)当沉管管节平行水流方向前进,并通过桥梁通航孔时:沉管管节管头吊拖拖轮提供沉管管节前进的主要动力;沉管管节管头吊拖拖轮及旁拖拖轮共同控制前进方向;沉管管节管尾吊拖拖轮调整拖缆长度为一长一短,向内靠拢以减少编队总宽度,提供水流抵抗力。
2.根据权利要求1所述一种沉管法隧道管节浮运船舶编队方法,其特征在于:所述拖轮数量为5艘,当沉管管节垂直水流方向前进时,其中1艘在沉管管节管头吊拖,2艘在沉管管节管尾吊拖,2艘旁拖;当沉管管节垂直水流方向前进时及过桥梁通航孔时:其中1艘在沉管管节管头吊拖,2艘在上游沉管管节管侧吊拖,2艘在下游沉管管节管侧旁拖。
3.根据权利要求1所述一种沉管法隧道管节浮运船舶编队方法,其特征在于:所述拖轮为4000HP全回转拖轮,正拖力、倒拖力、正顶力均不小于400kN,侧推力、侧拉力均不小于200kN。
CN201610122661.0A 2016-03-04 2016-03-04 一种沉管法隧道管节浮运船舶编队方法 Expired - Fee Related CN105667727B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610122661.0A CN105667727B (zh) 2016-03-04 2016-03-04 一种沉管法隧道管节浮运船舶编队方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610122661.0A CN105667727B (zh) 2016-03-04 2016-03-04 一种沉管法隧道管节浮运船舶编队方法

Publications (2)

Publication Number Publication Date
CN105667727A true CN105667727A (zh) 2016-06-15
CN105667727B CN105667727B (zh) 2017-09-12

Family

ID=56306745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610122661.0A Expired - Fee Related CN105667727B (zh) 2016-03-04 2016-03-04 一种沉管法隧道管节浮运船舶编队方法

Country Status (1)

Country Link
CN (1) CN105667727B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106516021A (zh) * 2016-11-17 2017-03-22 中交第航务工程局有限公司 一种自航式水下隧道沉管运载安装一体船
CN112000097A (zh) * 2020-08-17 2020-11-27 上海交通大学 一种港区无人拖航作业的拖船集群自适应控制方法
CN112323715A (zh) * 2020-11-09 2021-02-05 交通运输部广州打捞局 一种管节运输方法
CN112728211A (zh) * 2020-12-23 2021-04-30 中交第三航务工程局有限公司 一种污水海域排海管的溜放下水、海上拖运就位施工方法
CN114466788A (zh) * 2019-10-07 2022-05-10 川崎重工业株式会社 船舶操纵支持系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003028639A (ja) * 2001-07-12 2003-01-29 Taisei Corp 沈埋函の位置表示システム
CN1884723A (zh) * 2006-06-12 2006-12-27 中铁隧道勘测设计院有限公司 一种采用移动干坞预制沉管隧道管段的施工方法
CN103790171A (zh) * 2014-01-26 2014-05-14 广州中国科学院工业技术研究院 一种预制式沉箱及其安装方法
CN104164885A (zh) * 2014-08-06 2014-11-26 中国海洋石油总公司 一种沉箱的拖航方法
CN104631481A (zh) * 2014-12-26 2015-05-20 中铁大桥局集团有限公司 一种沉井用系泊定位装置及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003028639A (ja) * 2001-07-12 2003-01-29 Taisei Corp 沈埋函の位置表示システム
CN1884723A (zh) * 2006-06-12 2006-12-27 中铁隧道勘测设计院有限公司 一种采用移动干坞预制沉管隧道管段的施工方法
CN103790171A (zh) * 2014-01-26 2014-05-14 广州中国科学院工业技术研究院 一种预制式沉箱及其安装方法
CN104164885A (zh) * 2014-08-06 2014-11-26 中国海洋石油总公司 一种沉箱的拖航方法
CN104631481A (zh) * 2014-12-26 2015-05-20 中铁大桥局集团有限公司 一种沉井用系泊定位装置及其施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
孟民强: "沉管法隧道管段浮运施工工艺", 《建造与修理》 *
王朝辉: "内河沉管隧道浮运沉放施工技术", 《施工技术》 *
邓建林: "沈家门港海底沉管隧道浮运、沉放施工控制技术", 《隧道建设》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106516021A (zh) * 2016-11-17 2017-03-22 中交第航务工程局有限公司 一种自航式水下隧道沉管运载安装一体船
CN114466788A (zh) * 2019-10-07 2022-05-10 川崎重工业株式会社 船舶操纵支持系统
CN114466788B (zh) * 2019-10-07 2024-05-28 川崎重工业株式会社 船舶操纵支持系统
CN112000097A (zh) * 2020-08-17 2020-11-27 上海交通大学 一种港区无人拖航作业的拖船集群自适应控制方法
CN112000097B (zh) * 2020-08-17 2022-05-27 上海交通大学 一种港区无人拖航作业的拖船集群自适应控制方法
CN112323715A (zh) * 2020-11-09 2021-02-05 交通运输部广州打捞局 一种管节运输方法
CN112728211A (zh) * 2020-12-23 2021-04-30 中交第三航务工程局有限公司 一种污水海域排海管的溜放下水、海上拖运就位施工方法
CN112728211B (zh) * 2020-12-23 2022-04-22 中交第三航务工程局有限公司 一种污水海域排海管的溜放下水、海上拖运就位施工方法

Also Published As

Publication number Publication date
CN105667727B (zh) 2017-09-12

Similar Documents

Publication Publication Date Title
CN105667727A (zh) 一种沉管法隧道管节浮运船舶编队方法
CN103889836A (zh) 用于水流管理的船头水动力导流管
CN203358816U (zh) 一种渔船码头泊位系统
DK2704946T3 (en) tugboat
Abramowicz-Gerigk et al. An innovative steering system for a river push barge operated in environmentally sensitive areas
ITRM20120287A1 (it) Scafo perfezionato di un rimorchiatore e rimorchiatore comprendente detto scafo perfezionato.
CN213267801U (zh) 折线型停泊段的船闸引航道
US8727822B2 (en) Selectable destination underwater towed cable ferry system and guidance mechanism
Yoo et al. An experimental study on the maneuvering characteristics of a twin propeller/twin rudder ship during berthing and unberthing
CN205203296U (zh) 防溃堤、溃坝封堵船
CN201559806U (zh) 一种应用于船台下水中的弧形滑道
CN105416505A (zh) 弓箭型水线的低阻穿浪船艏
AU2016282067B2 (en) Improving surf conditions
US3550550A (en) Ocean-going barge
Gruzling et al. The development and application of high efficiency nozzles and rudders
RU2488512C1 (ru) Модульно-интегральный барже-буксирный состав
Pawelski et al. Factors affecting safety of handling ultra large container vessels in Port of Gdańsk
Kray Supership effect on waterway depth and alignments
Hovilainen et al. Next Generation to Break the Ice-The Oblique Icebreaker
Schofield The Speed of Ships in Restricted Navigable Waterways
Xingtao et al. Countermeasures for safe navigation of large ships in restricted water
Kornacki et al. Analysis of the Influence of Current on the Manoeuvres of the Turning of the Ship on the Ports Turning-Basins
JP2022181243A (ja) 貫流溝を有するプッシャ・バージ船
Paulauskas et al. Ships entry into floating docks with tugs assistance
Sudbury Controlled Depth Submerged Barge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Zhijun

Inventor after: Gao Kun

Inventor after: Zhang Yi

Inventor after: Liu Chunbiao

Inventor after: Zhao Yong

Inventor after: Wang Xianwei

Inventor after: Dong Jun

Inventor after: Peng Zaiyong

Inventor after: Cui Yuguo

Inventor after: Xing Yonghui

Inventor after: Wu Zuzhang

Inventor after: Chen Wang

Inventor after: Guo Xiaolong

Inventor after: Li Guojiang

Inventor after: Liu Min

Inventor before: Peng Zaiyong

Inventor before: Kong Xiangyuan

Inventor before: Yao Yuan

Inventor before: Luo Cangning

Inventor before: Li Xianlong

Inventor before: Dong Jun

Inventor before: Gao Kun

Inventor before: He Yi

Inventor before: Liu Min

Inventor before: Yang Chunbo

Inventor before: Wang Xianwei

Inventor before: Dong Xiaolong

Inventor before: Guo Xiaolong

Inventor before: Hu Chaogui

Inventor before: Li Junyue

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170912

Termination date: 20210304

CF01 Termination of patent right due to non-payment of annual fee