CN105653422A - Sustainable asset management system - Google Patents

Sustainable asset management system Download PDF

Info

Publication number
CN105653422A
CN105653422A CN201510977743.9A CN201510977743A CN105653422A CN 105653422 A CN105653422 A CN 105653422A CN 201510977743 A CN201510977743 A CN 201510977743A CN 105653422 A CN105653422 A CN 105653422A
Authority
CN
China
Prior art keywords
data
database
asset allocation
allocation database
stored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510977743.9A
Other languages
Chinese (zh)
Inventor
王双佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Antuo Software Technology Co Ltd
Original Assignee
Beijing Antuo Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Antuo Software Technology Co Ltd filed Critical Beijing Antuo Software Technology Co Ltd
Priority to CN201510977743.9A priority Critical patent/CN105653422A/en
Publication of CN105653422A publication Critical patent/CN105653422A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3003Monitoring arrangements specially adapted to the computing system or computing system component being monitored
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/34Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
    • G06F11/3466Performance evaluation by tracing or monitoring
    • G06F11/3476Data logging

Abstract

The invention discloses a sustainable asset management system. The sustainable asset management system comprises a classification configuration device, an asset authorization device, an extended display device, an information acquisition device, a standing book management device and a statistical analysis device, wherein the classification configuration device is used for dividing the obtained IT asset information according to a configuration strategy and sustainably storing the IT asset information into a uniform asset configuration database; the asset authorization device is used for confirming the obtained IT asset information and authorizing to sustainably storing the confirmed information into the uniform asset configuration database; the extended display device is used for graphically displaying the obtained IT asset information so as to form layered display of the IT asset information and sustainably storing the graphic information into the uniform asset configuration database; and the information acquisition device is used for acquiring and recognizing the IT asset information according to a data processing strategy and sustainably storing the recognized information into the uniform asset configuration database. According to the system disclosed in the invention, full life circle management can be realized and an integral IT equipment standing book can be established.

Description

The persistence asset management system
Technical field
The present invention relates to a kind of resource and safeguard system architecture, particularly relate to and safeguard system architecture between the operating period of a kind of hardware resource and software resource.
Background technology
Informatization develops rapidly and causes equipment in network and class of business various, IT (business) system is also more and more tightr to the degree of dependence of software and hardware resources, any fluctuation of various resource in business system, all can directly have influence in normally the carrying out of every business. The major cause of resource fluctuations is caused to comprise:
1, equipment is various, and distribution is wide, cannot carry out unifying effective management, and fault removal efficiency is low; Plant asset management, to IT equipment from networking, use, patrol and examine, safeguard, change, logout, the aspect such as scrap and cannot carry out comprehensive accurate supervision.
2, shortcoming is to the configuration management of business system and system service software, and safety control is poor; Shortcoming software resource management, lacks unified management to the software resource of existing common software, business system.
3, fault entirety cannot be located timely and accurately and control network and running situation; Lack comprehensive monitoring management, IT infrastructure global monitoring cannot be realized, the healthy running status of whole IT system and corresponding alarm cannot be grasped in real time.
4, affect by controling mechanism, lack unified fortune dimension application process entrance, process progress queries interface, can not be that IT managerial personnel and IT client access provide unique interface, the integrated of business flow process and Service Management base frame cannot be promoted.
Above deficiency, causes the maintenance to core business system only to focus on result, is short of the management and control to process. For business system, business flow process, the software and hardware resources of business procedure fragment, business association all can not effectively be supervised and coordinate so that system maintenance level falls behind, and cannot adapt to the fast development of business system.
In prior art, the business flow process of business system is made up of business flow process usually, business flow process by the usability of program fragments being correlated with and support corresponding hardware resource and software resource form, the business flow process coordination software resource that usability of program fragments is formed and hardware resource complete various control process by the strategy of necessity, realize business objective. Hardware resource can be subdivided into dissimilar and different topological framework unit or parts, and software resource can store the forms such as proprietary protocol, strategy storehouse, function storehouse, agreement framework and type storehouse based on database and embody. In the process of business flow process, by the utilization of these resources and allotment being carried out synchronous or that continue coordination, control and monitoring, in each case it is possible to form the enclosed structure with positively effect, ensure the Effec-tive Function of business system.
Summary of the invention
It is an object of the invention to provide a kind of persistence asset management system, the business system asset management level backwardness solving existing information technology cannot the technical problem of management and control to business system whole process.
The persistence asset management system of the present invention, comprise classification configurations device, assets appraise and decide device, expansion demonstration device, information collecting device, account management devices and statistical study device, wherein:
Classification configurations device, for being divided by collocation strategy by the IT assets information of acquisition, continues stored in unified Asset Allocation database;
Assets appraise and decide device, for confirming, the IT assets information of acquisition are appraised and decided confirmation, appraise and decide confirmation and continue stored in unified Asset Allocation database;
Expansion demonstration device, for the IT assets information that graphic software platform obtains, forms the level display of IT assets information, and figure information continues stored in unified Asset Allocation database;
Information collecting device, for gathering IT assets information by data processing policy and identify, the information identified is continued stored in unified Asset Allocation database;
Account management devices, for pressing the concrete utilization ratio of data processing policy record IT assets, by concrete utilization ratio data persistence stored in unified Asset Allocation database;
Statistical study device, forms statistical table for IT assets information is pressed data processing policy, and statistical table continues stored in unified Asset Allocation database.
Unified Asset Allocation database, for providing collocation strategy and data processing policy, continues all kinds of resource data that preservation event is relevant, receives the request of data of linked database.
Described classification configurations device comprises configuration sorter, connects structure filtration unit, installs structure filtration unit, operating structure filtration unit, comprises structure filtration unit, deployment architecture filtration unit, backup structure filtration unit and the first data fetch device, wherein:
Configuration sorter, for obtaining corresponding classification policy, reads IT device data, and after equipment is formed grouped data, continues stored in corresponding unified Asset Allocation database;
Connect structure filtration unit, for obtaining corresponding classification policy, read IT device data, and after equipment retrieval is connected structured data, continue stored in corresponding unified Asset Allocation database;
Structure filtration unit is installed, for obtaining corresponding classification policy, reads IT device data, and after structured data is installed in equipment retrieval, continue stored in corresponding unified Asset Allocation database;
Operating structure filtration unit, for obtaining corresponding classification policy, reads IT device data, and after equipment is retrieved operating structure data, continues stored in corresponding unified Asset Allocation database;
Comprise structure filtration unit, for obtaining corresponding classification policy, read IT device data, and after equipment retrieval is comprised structured data, continue stored in corresponding unified Asset Allocation database;
Deployment architecture filtration unit, for obtaining corresponding classification policy, reads IT device data, and after equipment retrieval is disposed structured data, continues stored in corresponding unified Asset Allocation database;
Backup structure filtration unit, for obtaining corresponding classification policy, reads IT device data, and to, after equipment retrieval backup structured data, continuing stored in corresponding unified Asset Allocation database;
First data fetch device, for reading the format IT device data of input, Formatting Output.
Described assets are appraised and decided device and are comprised assets core and increase treatment unit, assets and examine and make cuts treatment unit and the first data read-write equipment, wherein:
Assets core increases treatment unit, for reading the IT asset of equipments data of corresponding unified Asset Allocation database, carries out incremental markings and after confirmation, writes corresponding unified Asset Allocation database;
Assets are examined and made cuts treatment unit, for reading the IT asset of equipments data of corresponding unified Asset Allocation database, carrying out successively decreases mark and after confirming, the corresponding unified Asset Allocation database of write;
First data read-write equipment, for forming read-write operation with corresponding unified Asset Allocation database.
Described expansion demonstration device comprises graphical treatment device, objectification treatment unit and the 2nd data read-write equipment, wherein:
Graphical treatment device, for by IT asset of equipments graphical data, forming graphic element, after being converted to display data, the corresponding unified Asset Allocation database of write;
Objectification treatment unit, after graphic element is formed associated data, the corresponding unified Asset Allocation database of write;
2nd data read-write equipment, for forming read-write operation with corresponding unified Asset Allocation database.
Described information collecting device comprises a yard shape signal conditioning package, abnormity signal conditioning package and the 2nd data fetch device, wherein:
Code shape signal conditioning package, for obtaining corresponding coding pattern strategy, readout code graphic data, after forming intension data, continues stored in corresponding unified Asset Allocation database;
Abnormity signal conditioning package, for obtaining corresponding coding strategy, readout code graphic data, after forming intension data, continues stored in corresponding unified Asset Allocation database;
2nd data fetch device, for reading the format IT device data of input, Formatting Output.
Described account management devices comprises use signal conditioning package, equipment signal conditioning package and the 3rd data fetch device, wherein:
Use signal conditioning package, for obtaining corresponding IT device data, after mark uses data, continue stored in corresponding unified Asset Allocation database;
Equipment signal conditioning package, for obtaining corresponding IT device data, after mark frequency data, continues stored in corresponding unified Asset Allocation database;
3rd data fetch device, for reading the format IT device data of input, Formatting Output.
Described statistical study device comprises report form processing device, report form showing device and the 3rd data read-write equipment, wherein:
Report form processing device, for reading the IT asset of equipments data of corresponding unified Asset Allocation database, after forming form data, continues stored in corresponding unified Asset Allocation database;
Report form showing device, for reading report generation strategy, after form data are formed form, continues stored in corresponding unified Asset Allocation database;
3rd data read-write equipment, for forming read-write operation with corresponding unified Asset Allocation database.
The persistence asset management system of the present invention, carries out lifecycle management to IT equipment, from networking, use, patrol and examine, safeguard, change, logout, scraps Life cycle and manages, sets up complete IT Unit account of plant.
Accompanying drawing explanation
Fig. 1 is the structural representation of IT system operation management system of the present invention;
Fig. 2 is the structural representation of the monitoring management system of IT system operation management system of the present invention;
Fig. 3 is the structural representation of the host monitor device of the monitoring management system of the present invention;
Fig. 4 is the structural representation of the application monitoring device of the monitoring management system of the present invention;
Fig. 5 is the structural representation of the fault warning device of the monitoring management system of the present invention;
Fig. 6 is the structural representation of the network monitoring apparatus of the monitoring management system of the present invention;
Fig. 7 is the structural representation of the environmental monitoring installation of the monitoring management system of the present invention;
Fig. 8 is the structural representation of the automatic discovery device of the monitoring management system of the present invention;
Fig. 9 is the structure schematic diagram of the asset management system of IT system operation management system of the present invention;
Figure 10 is the structural representation of the classification configurations device of the asset management system of the present invention;
Figure 11 is the structural representation that the assets of the asset management system of the present invention appraise and decide device;
Figure 12 is the structural representation of the expansion demonstration device of the asset management system of the present invention;
Figure 13 is the structural representation of the information collecting device of the asset management system of the present invention;
Figure 14 is the structural representation of the account management devices of the asset management system of the present invention;
Figure 15 is the structural representation of the statistical study device of the asset management system of the present invention;
Figure 16 is the structural representation of the process management system of IT system operation management system of the present invention;
Figure 17 is the structural representation of the event management devices of the process management system of the present invention;
Figure 18 is the structural representation of the Management of Change MOC device of the process management system of the present invention;
Figure 19 is the structural representation of the plan target device of the process management system of the present invention;
Figure 20 is the structural representation of the problem management devices of the process management system of the present invention;
Figure 21 is the structural representation of the distribution management device of the process management system of the present invention;
Figure 22 is the structural representation of the knowledge base management devices of the process management system of the present invention;
Figure 23 is the structural representation of the safety control system of IT system operation management system of the present invention;
Figure 24 is the structural representation of the Security alert device of the safety control system of the present invention;
Figure 25 is the structural representation of the access control apparatus of the safety control system of the present invention;
Figure 26 is the structural representation of the log management apparatus of the safety control system of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail.
As shown in Figure 1, the present embodiment comprises monitoring management system 001, the asset management system 002, process management system 003 and safety control system 004, wherein:
Monitoring management system 001, for the software processes performance in system, calculation resources, storage resources, networked communication resource and environmental resources are carried out Real-Time Monitoring, according to monitoring policy and warning strategies, grade alarm is set, the total amount change of respective resources in real-time monitoring system, by associated databases obtains control data or control strategy, by the duration data of acquisition stored in associated databases;
The asset management system 002, for the hardware resource composition in system and software resource composition are carried out location and statistics in real time, gather the number change data of resource composition and the change in location data of resource composition, gather the using state data of resource composition, the graphical interactive controlling of formative dynamics and statistical study, by associated databases obtains control data or control strategy, by the duration data of acquisition stored in associated databases;
Process management system 003, business model for system being provided arranges parallel monitoring node and Controlling vertex, business flow process obtains and controls state accordingly, complete corresponding control process, carry out the scheduling of business flow process, by associated databases obtains control data or control strategy, by the duration data of acquisition stored in associated databases, associated databases forms the accumulation data of respective streams process control and model modification;
Safety control system 004, business flow process for system being provided provides unified safety control process, the authentication grade of differentiation is provided by unified authentication interface, the action scope of service control flow process, the state of record business flow process, certification and the action scope data of business flow process are obtained, by the state of the business flow process of acquisition stored in associated databases by associated databases.
IT system operation management system in the present embodiment, it is possible to IT equipment is carried out lifecycle management, from networking, use, patrol and examine, safeguard, change, logout, scraps Life cycle and manages, set up complete IT Unit account of plant. According to business model, carry out the definition of stdn in advance, form the production plan of standard, by unified safety program, thus realize the stdn of IT assets/device fabrication operation. Fortune dimension process operates in strict accordance with pre-defined stdn flow process, realizes managerial personnel to the monitoring of fortune dimension business working process by unified workflow monitoring platform. By the presetting of resource, rationally dispatch, accomplish to guarantee that the various resources required for transporting dimension process are prepared and rational allocation in advance, thus ensure carrying out smoothly of fortune dimension process.
As shown in Figure 2, the monitoring management system 001 of the present embodiment comprises host monitor device 011, application data base monitoring device 012, fault warning device 013, network monitoring apparatus 014, environmental monitoring installation 015 and automatically finds device 016, wherein:
Host monitor device 011, for the performance state according to all kinds of main frame of monitoring strategies continuous collecting or server, continues stored in corresponding monitor database 017;
Application data base monitoring device 012, for the database performance state formed according to each business flow process of monitoring strategies continuous collecting, continues stored in corresponding monitor database 017;
Fault warning device 013, for exceeding the alarm state of all kinds of metrics-thresholds according to monitoring strategies continuous collecting, continues stored in corresponding monitor database 017;
Network monitoring apparatus 014, for the performance state according to monitoring strategies continuous collecting various types of communication link, continues stored in corresponding monitor database 017;
Environmental monitoring installation 015, for the environment state according to all kinds of machine room of monitoring strategies continuous collecting or rack, continues stored in corresponding monitor database 017;
Automatically find device 016, for the formation change state according to monitoring strategies continuous collecting system, continue stored in corresponding monitor database 017.
The system index granulating that the software and hardware composition of business system is formed by the monitoring management system 001 of the present embodiment, forms monitoring unit and the monitoring type of diversity, is the basis for estimation on the control and management offer basis of business flow process.
Monitor database 017, for providing monitoring strategies, continues all kinds of monitor datas that preservation event is relevant, receives the request of data of linked database.
As shown in Figure 3, host monitor device 011 comprises treater resource feedback assembly 111, disk resource feedback assembly 112, memory source feedback assembly 113, system journal feedback assembly 114 and first Object Request Broker's device 115, wherein:
Treater resource feedback assembly 111, for obtaining corresponding monitoring strategies, by object proxy requests treater resource state, continues stored in corresponding monitor database 017 after Acquisition Processor resource state;
Disk resource feedback assembly 112, for obtaining corresponding monitoring strategies, by object proxy requests disk resource state, continues stored in corresponding monitor database 017 after gathering disk resource state;
Memory source feedback assembly 113, for obtaining corresponding monitoring strategies, by object proxy requests internal memory or cache resources state, continues stored in corresponding monitor database 017 after gathering correspondence memory resource state;
System journal feedback assembly 114, for obtaining corresponding monitoring strategies, by object proxy requests operating-system resources state, continues stored in corresponding monitor database 017 after acquisition operations system resource state;
First Object Request Broker's device 115, for obtaining corresponding Object Request Broker example, forms the object accesses passage between correspondence system.
As shown in Figure 4, application data base monitoring device 012 comprises database file system feedback assembly 121, storage space of database feedback assembly 122, table space rate of utilization feedback assembly 123, database log space feedback assembly 124, database configuration feedback assembly 125, Database lock resource feedback assembly 126, database process feedback assembly 127, database process memory feedback device 128 and the 2nd Object Request Broker's device 129, wherein:
Database file system feedback assembly 121, for obtaining corresponding monitoring strategies, by object proxy requests application data base resource state, continues stored in corresponding monitor database 017 after acquisition applications database resource state;
Storage space of database feedback assembly 122, obtains corresponding monitoring strategies, by object proxy requests application data base storage space resource state, continues stored in corresponding monitor database 017 after acquisition applications database storage space state;
Table space rate of utilization feedback assembly 123, obtains corresponding monitoring strategies, by object proxy requests application data base table space resource state, continues stored in corresponding monitor database 017 after acquisition applications database table space resources state;
Database log space feedback assembly 124, obtains corresponding monitoring strategies, by object proxy requests application data base log space resource state, continues stored in corresponding monitor database 017 after acquisition applications database log space resource state;
Database configuration feedback assembly 125, obtains corresponding monitoring strategies, by object proxy requests application data base resource allocation state, continues stored in corresponding monitor database 017 after acquisition applications database configuration resource state;
Database lock resource feedback assembly 126, obtains corresponding monitoring strategies, locks resource state by object proxy requests application data base, continues stored in corresponding monitor database 017 after acquisition applications Database lock resource state;
Database process feedback assembly 127, obtains corresponding monitoring strategies, by object proxy requests application data base process resource state, continues stored in corresponding monitor database 017 after acquisition applications database process resource state;
Database process memory feedback device 128, obtains corresponding monitoring strategies, by object proxy requests application data base proceeding internal memory resource state, continues stored in corresponding monitor database 017 after acquisition applications database process memory source state;
2nd Object Request Broker's device 129, for obtaining corresponding Object Request Broker example, forms the object accesses passage between correspondence system.
As shown in Figure 5, fault warning device 013 comprises general fault feedback device 131, catastrophe failure feedback assembly 132, system fault feedback assembly 133 and the 3rd Object Request Broker's device 134, wherein:
General fault feedback device 131, for obtaining corresponding monitoring strategies, by the senior application alarm state in object proxy requests heterogeneous system, continues stored in corresponding monitor database 017 after gathering senior application alarm state; Senior application alarm state normally system process triggers;
Catastrophe failure feedback assembly 132, for obtaining corresponding monitoring strategies, by the rudimentary application alarm state in object proxy requests heterogeneous system, continues stored in corresponding monitor database 017 after gathering rudimentary application alarm state; Rudimentary application alarm state normally hardware trigger;
System fault feedback assembly 133, for obtaining corresponding monitoring strategies, by the system bottom alarm state in object proxy requests heterogeneous system, continues stored in corresponding monitor database 017 after acquisition system bottom alarm state;
3rd Object Request Broker's device 134, for obtaining corresponding Object Request Broker example, forms the object accesses passage between correspondence system.
As shown in Figure 6, network monitoring apparatus 014 comprises network topology feedback assembly 141, network management information feedback assembly 142, equipment performance feedback assembly 143, event filtration feedback assembly 144, threshold value control feedback assembly 145, in real time performance feedback assembly 146, fast localization of fault feedback assembly 147, third party's integrated information feedback assembly 148 and SNMP agent device 149, wherein:
Network topology feedback assembly 141, for obtaining corresponding monitoring strategies, by snmp protocol, sets up response passage with the network equipment, after collection network topology data, continues stored in corresponding monitor database 017;
Network management information feedback assembly 142, for obtaining corresponding monitoring strategies, by snmp protocol, sets up response passage with the network equipment, after gathering network management configuration information, continues stored in corresponding monitor database 017;
Equipment performance feedback assembly 143, for obtaining corresponding monitoring strategies, by snmp protocol, sets up response passage with the network equipment, after gathering device performance data, continues stored in corresponding monitor database 017;
Event filters feedback assembly 144, for obtaining corresponding monitoring strategies, by snmp protocol, sets up response passage with the network equipment, after gathering formulation event data, continues stored in corresponding monitor database 017;
Threshold value control feedback assembly 145, for obtaining corresponding monitoring strategies, by snmp protocol, sets up response passage with the network equipment, after formulating threshold data, continues stored in corresponding monitor database 017;
Real-time performance feedback assembly 146, for obtaining corresponding monitoring strategies, by snmp protocol, sets up response passage with the network equipment, after gathering real-time performance data, continues stored in corresponding monitor database 017;
Quick localization of fault feedback assembly 147, for obtaining corresponding monitoring strategies, by snmp protocol, sets up response passage with the network equipment, after gathering fault data, continues stored in corresponding monitor database 017;
Third party's integrated information feedback assembly 148, for obtaining corresponding monitoring strategies, by snmp protocol, sets up response passage with the network equipment, after collection network topology data, continues stored in corresponding monitor database 017;
SNMP agent device 149, for obtaining corresponding MIB data, forms the object accesses link of corresponding equipment room.
As shown in Figure 7, environmental monitoring installation 015 comprises machine room humiture feedback assembly 151, air-conditioning air-supply feedback assembly 152, rack feedback assembly 153, the feedback assembly 154 that leaks, cigarette sense feedback assembly 155, working power feedback assembly 156, city's electricity power supply feedback assembly 157, video monitoring feedback assembly 158 and gateway apparatus 159, wherein:
Machine room humiture feedback assembly 151, for obtaining corresponding monitoring strategies, utilizes the port access link of webmaster, after gathering machine room humiture data, continues stored in corresponding monitor database 017;
Air-conditioning air-supply feedback assembly 152, for obtaining corresponding monitoring strategies, utilizes the port access link of webmaster, after gathering machine room air-conditioning air volume data, continues stored in corresponding monitor database 017;
Rack feedback assembly 153, for obtaining corresponding monitoring strategies, utilizes the port access link of webmaster, after gathering rack closed form state signal, continues stored in corresponding monitor database 017;
Leak feedback assembly 154, for obtaining corresponding monitoring strategies, utilizes the port access link of webmaster, after gathering machine room surface water bit data, continues stored in corresponding monitor database 017;
Cigarette sense feedback assembly 155, for obtaining corresponding monitoring strategies, utilizes the port access link of webmaster, after gathering machine room air particles concentration data, continues stored in corresponding monitor database 017;
Working power feedback assembly 156, for obtaining corresponding monitoring strategies, utilizes the port access link of webmaster, after gathering rack direct supply data, continues stored in corresponding monitor database 017;
City's electricity power supply feedback assembly 157, for obtaining corresponding monitoring strategies, utilizes the port access link of webmaster, after gathering machine room AC power data, continues stored in corresponding monitor database 017;
Video monitoring feedback assembly 158, for obtaining corresponding monitoring strategies, utilizes the port access link of webmaster, after gathering machine room vision signal, continues stored in corresponding monitor database 017;
Gateway apparatus 159, for obtaining corresponding network management data, forms the port access link of corresponding equipment room.
As shown in Figure 8, automatically find that device 016 comprises IP feedback assembly 161, RMON feedback assembly 162, SNMP feedback assembly 163 and communication adaptation device 164, wherein:
IP feedback assembly 161, for obtaining corresponding monitoring strategies, utilizes port access link, completes IP scanning, after gathering software and hardware resources delta data, continues stored in corresponding monitor database 017;
RMON feedback assembly 162, for obtaining corresponding monitoring strategies, utilizes port access link, completes to enrich network element scanning, after gathering software and hardware resources delta data, continues stored in corresponding monitor database 017;
SNMP feedback assembly 163, for obtaining corresponding monitoring strategies, utilizes port access link, completes the scanning of rudimentary network element, after gathering software and hardware resources delta data, continues stored in corresponding monitor database 017;
Communication adaptation device 164, for obtaining corresponding network management data, forms the port access link of corresponding equipment room.
In the present embodiment, the collection of monitoring information can be highly integrated, forms the monitoring information page, forms the alarm collection of illustrative plates of linkage, automatically starts corresponding advanced processes flow process, reduces artificial monitoring error.
As shown in Figure 9, the asset management system 002 of the present embodiment comprises classification configurations device 021, assets appraise and decide device 022, expand demonstration device 023, information collecting device 024, account management devices 025 and statistical study device 026, wherein:
Classification configurations device 021, for being divided by collocation strategy by the IT assets information of acquisition, continues stored in unified Asset Allocation database 027;
Assets appraise and decide device 022, for confirming, the IT assets information of acquisition are appraised and decided confirmation, appraise and decide confirmation and continue stored in unified Asset Allocation database 027;
Expansion demonstration device 023, for the IT assets information that graphic software platform obtains, forms the level display of IT assets information, and figure information continues stored in unified Asset Allocation database 027;
Information collecting device 024, for gathering IT assets information by data processing policy and identify, the information identified is continued stored in unified Asset Allocation database 027;
Account management devices 025, for pressing the concrete utilization ratio of data processing policy record IT assets, by concrete utilization ratio data persistence stored in unified Asset Allocation database 027;
Statistical study device 026, forms statistical table for IT assets information is pressed data processing policy, and statistical table continues stored in unified Asset Allocation database 027.
The asset management system 002 of the present embodiment is by the hardware carrier of business system and software carrier minimum unit, form IT plant asset management data, store and upgrade data and the information of all IT Asset Allocations, as the core data of the inquiry in the management of event in Business Stream thread management, problem management and Management of Change MOC, diagnosis and record.
Unified Asset Allocation database 027, for providing collocation strategy and data processing policy, continues all kinds of resource data that preservation event is relevant, receives the request of data of linked database.
As shown in Figure 10, classification configurations device 021 comprises configuration sorter 211, connects structure filtration unit 212, installs structure filtration unit 213, operating structure filtration unit 214, comprises structure filtration unit 215, deployment architecture filtration unit 216, backup structure filtration unit 217 and the first data fetch device 218, wherein:
Configuration sorter 211, for obtaining corresponding classification policy, reads IT device data, and after equipment is formed grouped data, continues stored in corresponding unified Asset Allocation database 027;
Connect structure filtration unit 212, for obtaining corresponding classification policy, read IT device data, and after equipment retrieval is connected structured data, continue stored in corresponding unified Asset Allocation database 027;
Structure filtration unit 213 is installed, for obtaining corresponding classification policy, reads IT device data, and after structured data is installed in equipment retrieval, continue stored in corresponding unified Asset Allocation database 027;
Operating structure filtration unit 214, for obtaining corresponding classification policy, reads IT device data, and after equipment is retrieved operating structure data, continues stored in corresponding unified Asset Allocation database 027;
Comprise structure filtration unit 215, for obtaining corresponding classification policy, read IT device data, and after equipment retrieval is comprised structured data, continue stored in corresponding unified Asset Allocation database 027;
Deployment architecture filtration unit 216, for obtaining corresponding classification policy, reads IT device data, and after equipment retrieval is disposed structured data, continues stored in corresponding unified Asset Allocation database 027;
Backup structure filtration unit 217, for obtaining corresponding classification policy, reads IT device data, and to, after equipment retrieval backup structured data, continuing stored in corresponding unified Asset Allocation database 027;
First data fetch device 218, for reading the format IT device data of input, Formatting Output.
As shown in figure 11, assets are appraised and decided device 022 and are comprised assets core and increase treatment unit 221, assets and examine and make cuts treatment unit 222 and the first data read-write equipment 223, wherein:
Assets core increases treatment unit 221, for reading the IT asset of equipments data of corresponding unified Asset Allocation database 027, carries out incremental markings and after confirmation, writes corresponding unified Asset Allocation database 027;
Assets are examined and made cuts treatment unit 222, for reading the IT asset of equipments data of corresponding unified Asset Allocation database 027, carrying out successively decreases mark and after confirming, the corresponding unified Asset Allocation database 027 of write;
First data read-write equipment 223, for forming read-write operation with corresponding unified Asset Allocation database 027.
As shown in figure 12, expansion demonstration device 023 comprises graphical treatment device 231, objectification treatment unit 232 and the 2nd data read-write equipment 233, wherein:
Graphical treatment device 231, for by IT asset of equipments graphical data, forming graphic element, after being converted to display data, the corresponding unified Asset Allocation database 027 of write;
Objectification treatment unit 232, after graphic element is formed associated data, the corresponding unified Asset Allocation database 027 of write;
2nd data read-write equipment 233, for forming read-write operation with corresponding unified Asset Allocation database 027.
As shown in figure 13, information collecting device 024 comprises a yard shape signal conditioning package 241, abnormity signal conditioning package 242 and the 2nd data fetch device 243, wherein:
Code shape signal conditioning package 241, for obtaining corresponding coding pattern strategy, readout code graphic data, after forming intension data, continues stored in corresponding unified Asset Allocation database 027;
Abnormity signal conditioning package 242, for obtaining corresponding coding strategy, readout code graphic data, after forming intension data, continues stored in corresponding unified Asset Allocation database 027;
2nd data fetch device 243, for reading the format IT device data of input, Formatting Output.
As shown in figure 14, account management devices 025 comprises use signal conditioning package 251, equipment signal conditioning package 252 and the 3rd data fetch device 253, wherein:
Use signal conditioning package 251, for obtaining corresponding IT device data, after mark uses data, continue stored in corresponding unified Asset Allocation database 027;
Equipment signal conditioning package 252, for obtaining corresponding IT device data, after mark frequency data, continues stored in corresponding unified Asset Allocation database 027;
3rd data fetch device 253, for reading the format IT device data of input, Formatting Output.
As shown in figure 15, statistical study device 026 comprises report form processing device 261, report form showing device 262 and the 3rd data read-write equipment 263, wherein:
Report form processing device 261, for reading the IT asset of equipments data of corresponding unified Asset Allocation database 027, after forming form data, continues stored in corresponding unified Asset Allocation database 027;
Report form showing device 262, for reading report generation strategy, after form data are formed form, continues stored in corresponding unified Asset Allocation database 027;
3rd data read-write equipment 263, for forming read-write operation with corresponding unified Asset Allocation database 027.
Asset management is taking IT Asset Allocation management database (CMDB) as core. Configuration management database (CMDB) is a data acquisition, stores data and the information of all Asset Allocations.
Configuration management database also for event management, problem management, Management of Change MOC provide inquiry, diagnosis, record basis. IT Asset Allocation project (CI) comprise production environment needs be managed software, hardware, document, personnel etc.
Detailed IT Asset Allocation data as shown in the table can be formed:
Detailed IT Asset Allocation data as shown in the table can be formed:
As shown in figure 16, the process management system 003 of the present embodiment comprises event management devices 031, Management of Change MOC device 032, plan target device 033, problem management devices 034, distribution management device 035, knowledge base management devices 036, wherein:
Event management devices 031, for being divided into respective handling grade by the event zone in business flow process, recording processing data and event field data according to event is preferentially tactful, by data persistence stored in corresponding flow process supporting database 037;
Management of Change MOC device 032, for according to stdn strategy, changing event flow process, test event flow process, forms corresponding configuration data, continues event flow process and configuration data stored in corresponding flow process supporting database 037;
Plan target device 033, for preferentially tactful in preset business flow performing or issue according to event, continues feedback data stored in corresponding flow process supporting database 037;
Problem management devices 034, for forming problem simulation process according to event field data, trail-and-error, it is provided that the reference process that event solves, by simulation process and result data persistence stored in corresponding flow process supporting database 037;
Distribution management device 035, for according to publishing policy, issuing stable usability of program fragments, business event, business flow process, by each difference in version data persistence stored in corresponding flow process supporting database 037;
Knowledge base management devices 036, for according to conclusion strategy, the findings data in business flow process being formed technology subject data, continues technology subject data stored in corresponding flow process supporting database 037.
Business flow process is effectively divided into business step by the process management system 003 of the present embodiment, the core data of the inquiry in corresponding basis for estimation and event management, problem management and Management of Change MOC, diagnosis and record is had to combine, form the quantification state parameter of each step, by the adaptation of state parameter, optimize business procedure, evade, solving error. Treating processes and the database of the management of whole flow process are combined closely, and directly do not contact with outside data, are conducive to the stalwartness of lifting system and also go out the handiness optimized.
Flow process supporting database 037, for providing data processing policy, continues all kinds of process findings data that preservation event is relevant, receives the request of data of linked database.
As shown in figure 17, event management devices 031 comprises network event classification treatment unit 311, safe event correlation filtration unit 312, applies for that event task divides transmitting apparatus 313 and the first data forwarding device 314, wherein:
Network event classification treatment unit 311, for obtaining corresponding event classification strategy, type, the grade of Mk system event and utilize resource, form event identification data, and event identification data is forwarded corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Safe event correlation filtration unit 312, for obtaining corresponding event classification strategy, mark type, the grade of safe event and utilize resource, form event identification data, and event identification data is forwarded corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Application event task divides transmitting apparatus 313, for obtaining corresponding event classification strategy, mark type, the grade of customer incident and utilize resource, form event identification data, and event identification data is forwarded corresponding flow process supporting database 037 and stores, forward aftertreatment device;
First data forwarding device 314, for the Forward-reques according to treatment unit to aftertreatment device or corresponding flow process supporting database 037 forwarding data.
As shown in figure 18, Management of Change MOC device 032 comprises change evaluation treatment unit 321, change security strategy treatment unit 322, demand change treatment unit 323, software test treatment unit 324, software defect location treatment unit 325, configuration change treatment unit 326 and the 3rd data forwarding device 327, wherein:
Change evaluation treatment unit 321, for obtaining corresponding assessment strategy, problem data are assessed, form the program layout data for problem data, and program layout data is forwarded corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Change security strategy treatment unit 322, for according to program layout data and corresponding security strategy, adjusting the safe procedures data of safe event, and safe procedures data are forwarded corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Demand changes treatment unit 323, for according to program layout data, safe procedures data and business strategy, forming business flow process, and business flow process forwards corresponding flow process supporting database 037 and stores, forwards aftertreatment device;
Software test treatment unit 324, for obtaining corresponding business strategy, carries out emulation test, forms emulation data, and emulation data forward corresponding flow process supporting database 037 and stores, forward aftertreatment device the business flow process formed;
Software defect location treatment unit 325, for obtaining corresponding business strategy, by emulating the software defective data of data validation business flow process, and forwards software defective data corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Treatment unit 326 is changed in configuration, for obtaining corresponding business strategy, according to software defective data adaptation service flow process, is formed and revises configuration data, and correction configuration data forwards corresponding flow process supporting database 037 and stores, forwards aftertreatment device;
3rd data forwarding device 327, for the Forward-reques according to treatment unit to aftertreatment device or corresponding flow process supporting database 037 forwarding data.
As shown in figure 19, plan target device 033 comprises between axle treatment unit 331 task time, task priority processing device 333 and the 4th data forwarding device 334 in priority processing device 332, task, wherein:
Task time axle treatment unit 331, for obtaining corresponding planning strategy, determine that task is ranked time interval, forms uniform task order data in conjunction with business flow process, task order data forward corresponding flow process supporting database 037 store, forward aftertreatment device;
Priority processing device 332 between task, for obtaining corresponding planning strategy, according to business flow process resource utilization, between adjustment task, task order data are forwarded corresponding flow process supporting database 037 and store by order data, forward aftertreatment device;
Priority processing device 333 in task, for obtaining corresponding planning strategy, according to business flow process resource utilization, regulates order data in task, task order data forwards corresponding flow process supporting database 037 and stores, forward aftertreatment device;
4th data forwarding device 334, for the Forward-reques according to treatment unit to aftertreatment device or corresponding flow process supporting database 037 forwarding data.
As shown in figure 20, problem management devices 034 comprises initiatively issue handling device 341, safety problem treatment unit 342, software Bug Tracking treatment unit 343 and the 2nd data forwarding device 344, wherein:
Initiatively issue handling device 341, for receiving corresponding system problem code, the knowledge base fragment obtaining coupling forms system answer data; For receiving corresponding system problem code, form system problem data, answer data or problem data are forwarded corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Safety problem treatment unit 342, for receiving corresponding safety problem code, the knowledge base fragment obtaining coupling forms follow-up safe procedures data; For receiving corresponding safety problem code, form safety problem data, safe procedures data or safety problem data are forwarded corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Software Bug Tracking treatment unit 343, for receiving corresponding user's problem code, the knowledge base fragment obtaining coupling forms subsequent user flow data; For receiving corresponding user's problem code, form user's problem data, user's flow data or user's problem data are forwarded corresponding flow process supporting database 037 and stores, forward aftertreatment device;
2nd data forwarding device 344, for the Forward-reques according to treatment unit to aftertreatment device or corresponding flow process supporting database 037 forwarding data.
As shown in figure 21, distribution management device 035 comprises pre-release processing device 351, signature release processing device 352, upgrades release processing device 353 and the 5th data forwarding device 354, wherein:
Pre-release processing device 351, for obtaining corresponding publishing policy, forms the complete routine of the security certificate of business flow process distributing data encapsulation, complete routine data encapsulation forwards corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Signature release processing device 352, for obtaining corresponding publishing policy, carries out the complete routine of business flow process security certificate and forms authorization data, authorization data forwards corresponding flow process supporting database 037 and stores, forward aftertreatment device;
Upgrade release processing device 353, for obtaining corresponding publishing policy, the usability of program fragments of business flow process is carried out security certificate, form distributing data encapsulation, corresponding for the distributing data encapsulate forwarded of usability of program fragments flow process supporting database 037 is stored, forwards aftertreatment device;
5th data forwarding device 354, for the Forward-reques according to treatment unit to aftertreatment device or corresponding flow process supporting database 037 forwarding data.
As shown in figure 22, knowledge base management devices 036 comprises software arrangements knowledge base 361, riskless asset knowledge base 362, terminal wealth knowledge base 363 and the 6th data forwarding device 364, wherein:
Software arrangements knowledge base 361, for obtaining corresponding problem code, it is provided that corresponding software arrangements strategy, configuration data, receive the more new data corresponding with problem code, continues to store stored in corresponding flow process supporting database 037, forwards aftertreatment device;
Riskless asset knowledge base 362, for obtaining corresponding problem code, it is provided that corresponding software security strategy, security configuration data, receive the renewal secure data corresponding with problem code, continue to store stored in corresponding flow process supporting database 037, forward aftertreatment device;
Terminal wealth knowledge base 363, for obtaining corresponding problem code, it is provided that corresponding Hardware configuration strategy, hardware configuration data, receive the renewal hardware data corresponding with problem code, continue to store stored in corresponding flow process supporting database 037, forward aftertreatment device;
6th data forwarding device 364, for the Forward-reques according to treatment unit to aftertreatment device or corresponding flow process supporting database 037 forwarding data.
In the present embodiment, the main function of event management process is the event (comprising user to submit application event at information desk, automatically monitor event) solving appearance as early as possible, keeps the stability of business support system.
Event management is mainly passive copes with contingencies and fault, and after Failure elimination, business are recovered, event management should terminate. As being further analyzed, find out fault underlying causes and basic solution, prevented the generation again of similar fault by the preventive measure of the request of changing, alternative or suggestion, answer starting problem management process.
The method unified by standard and step manage, control all to produce to change to IT assets, strengthening risk assessment, the process that record changes examination & approval and implements.
Issuing management is the management process being imported actual production environment by a group by the change after testing authentication, and these change the change relating to software version.
Issue the issue request that the change that the range of management managed is operational support system IT production environment is initiated.
Realize the routine maintenance work to IT personnel and carry out unified management.
The formulation periodically planned and execution, according to routine maintenance working experience, make the production plan of week property in advance; Remind to related personnel when production plan arrives the execution time.
The formulation of provisional operation and execution, it is necessary to when responsible official processes, notify related personnel.
The execution of normative operation plan, needs during formulation by examination & approval; Responsible official is needed to confirm after complete.
The record of execution process, as the foundation of historic records inquiry.
In whole fortune dimension process, the accumulation of knowledge precipitation, passes on most important, it is possible to effectively avoids same event being repeated fortune dimension and causes Organizational Knowledge Loss Caused due to flow of personnel.
As shown in figure 23, the safety control system 004 of the present embodiment comprises Security alert device 041, access control apparatus 042 and log management apparatus 043, wherein:
Security alert device 041, for providing otherness level authentication approach, according to application level adaptation or in conjunction with certification approach, is the security intensity that corresponding business provides corresponding, continues corresponding security intensity stored in corresponding security information database 047;
Access control apparatus 042, for carrying out control of authority according to security strategy to resource that is dissimilar in business flow process or level, by control of authority data persistence stored in corresponding security information database 047;
Log management apparatus 043, for the operation of the associated rights in register system, business flow process, continues stored in corresponding security information database 047;
The safety control system 004 of the present embodiment, the business flow process that system provides provides unified safety control process, and the flow process entrance of uniform service end, service terminal, custodian and client, ensures that unified business flow process and Service Management flow process are harmonious.
Security information database 047, for providing the security strategy of system certification and safe information, service control flow process is action scope, safe information and safe state end to end, and continues to preserve, and receives the request of data of linked database.
As shown in figure 24, Security alert device 041 comprises digital certificate treatment unit 411, concerning security matters strategy treatment unit 412, user name encryption processing apparatus 413 and the 7th data forwarding device 414, wherein:
Digital certificate treatment unit 411, for obtaining corresponding security strategy, forms the program encapsulation of digital certificate, and encapsulation of data continues stored in security information database 047;
Concerning security matters strategy treatment unit 412, for obtaining corresponding security strategy, forms the program encapsulation of privately owned certificate, and encapsulation of data continues stored in security information database 047;
User name encryption processing apparatus 413, for obtaining corresponding security strategy, forms the encryption encapsulation of authentication data, and encapsulation of data continues stored in security information database 047;
7th data forwarding device 414, for the Forward-reques according to treatment unit to aftertreatment device or corresponding security information database 047 forwarding data.
As shown in figure 25, access control apparatus 042 comprises input/output port control device 421, terminal interaction control device 422, network system software control device 423 and data exchange interface 424, wherein:
Input/output port control device 421, for obtaining corresponding security strategy and business resource, the control data forming corresponding hardware resource forwards, and control data continues stored in security information database 047;
Terminal interaction control device 422, for obtaining corresponding security strategy and business resource, the control data forming corresponding software resource forwards, and control data continues stored in security information database 047;
Network system software control device 423, for obtaining corresponding security strategy and business resource, the business System Control Data forming corresponding service flow process forwards, and control data continues stored in security information database 047;
Data exchange interface 424, for the Forward-reques according to treatment unit to aftertreatment device forwarding data.
As shown in figure 26, log management apparatus 043 comprises fault log management devices 431, safe log management apparatus 432, business diary management devices 433 and the 8th data forwarding device 434, wherein:
Fault log management devices 431, for obtaining corresponding security strategy, filter faults information, forms fault log data, and daily record data continues stored in security information database 047;
Safe log management apparatus 432, for obtaining corresponding security strategy, filter authentication, cross the border, action scope information, form safe daily record data, daily record data continue stored in security information database 047;
Business diary management devices 433, for obtaining corresponding security strategy, filters business flow process and initiates termination message, form traffic log data, and daily record data continues stored in security information database 047;
8th data forwarding device 434, for the Forward-reques according to treatment unit to aftertreatment device or corresponding security information database 047 forwarding data.
The present embodiment is that IT managerial personnel and IT client access provide unique interface, promotes the integrated of business flow process and Service Management base frame, and the contact between coordination service object and IT department, unified fortune ties up application process entrance. Comprise following mainly integrated:
System user application, change password application, input/output port, applying digital certificate, cancel, classified information security of system Developing Tactics application, Web vector graphic and refitting system application, access, refitting, logout, network changes, application installed by software etc., process progress queries, user and operation maintenance personnel communication.
Based on above-described embodiment, it is possible to set up data channel and the service interface of IT environmental monitoring and whole operation management platform, it is achieved the complete covering of fortune dimension business.
Unification user and single sign-on, according to application Integrating platform business norms, carry out unified management to user and authority, intra vires, and other systems that online access is mutually integrated, it is achieved single-sign-on.
Information acquisition and asset data are shared, and to automatic discovery and the information acquisition of IT resource, also as the Data Source of assets, information sharing, sets up the corresponding relation between monitoring equipment and Asset Allocation item.
IT environmental monitoring alarm, operation troubles or the forewarning index integrative display individual notice information part on door, is linked by work order, automatic startup event flow process.
The monitoring information page is integrated, and user is in the process of asset management or operation management, it is possible to directly checks the monitor in real time page of relevant IT resource, is convenient to user to the accurate assurance of practical business.
The above; it is only the present invention's preferably embodiment, but protection scope of the present invention is not limited thereto, any it is familiar with those skilled in the art in the technical scope that the present invention discloses; the change that can expect easily or replacement, all should be encompassed within protection scope of the present invention. Therefore, protection scope of the present invention should be as the criterion with the protection domain of claim book.

Claims (7)

1. the persistence asset management system, comprise classification configurations device (021), assets appraise and decide device (022), expand demonstration device (023), information collecting device (024), account management devices (025) and statistical study device (026), wherein:
Classification configurations device (021), for being divided by collocation strategy by the IT assets information of acquisition, continues stored in unified Asset Allocation database (027);
Assets appraise and decide device (022), for confirming, the IT assets information of acquisition are appraised and decided confirmation, appraise and decide confirmation and continue stored in unified Asset Allocation database (027);
Expansion demonstration device (023), for the IT assets information that graphic software platform obtains, forms the level display of IT assets information, and figure information continues stored in unified Asset Allocation database (027);
Information collecting device (024), for gathering IT assets information by data processing policy and identify, the information identified is continued stored in unified Asset Allocation database (027);
Account management devices (025), for pressing the concrete utilization ratio of data processing policy record IT assets, by concrete utilization ratio data persistence stored in unified Asset Allocation database (027);
Statistical study device (026), forms statistical table for IT assets information is pressed data processing policy, and statistical table continues stored in unified Asset Allocation database (027).
Unified Asset Allocation database (027), for providing collocation strategy and data processing policy, continues all kinds of resource data that preservation event is relevant, receives the request of data of linked database.
2. the persistence asset management system as claimed in claim 1, it is characterized in that: described classification configurations device (021) comprises configuration sorter (211), connects structure filtration unit (212), installs structure filtration unit (213), operating structure filtration unit (214), comprise structure filtration unit (215), deployment architecture filtration unit (216), backup structure filtration unit (217) and the first data fetch device (218), wherein:
Configuration sorter (211), for obtaining corresponding classification policy, reads IT device data, and after equipment is formed grouped data, continues stored in corresponding unified Asset Allocation database (027);
Connect structure filtration unit (212), for obtaining corresponding classification policy, read IT device data, and after equipment retrieval is connected structured data, continue stored in corresponding unified Asset Allocation database (027);
Structure filtration unit (213) is installed, for obtaining corresponding classification policy, reads IT device data, and after structured data is installed in equipment retrieval, continue stored in corresponding unified Asset Allocation database (027);
Operating structure filtration unit (214), for obtaining corresponding classification policy, reads IT device data, and after equipment is retrieved operating structure data, continues stored in corresponding unified Asset Allocation database (027);
Comprise structure filtration unit (215), for obtaining corresponding classification policy, read IT device data, and after equipment retrieval is comprised structured data, continue stored in corresponding unified Asset Allocation database (027);
Deployment architecture filtration unit (216), for obtaining corresponding classification policy, reads IT device data, and after equipment retrieval is disposed structured data, continues stored in corresponding unified Asset Allocation database (027);
Backup structure filtration unit (217), for obtaining corresponding classification policy, reads IT device data, and to, after equipment retrieval backup structured data, continuing stored in corresponding unified Asset Allocation database (027);
First data fetch device (218), for reading the format IT device data of input, Formatting Output.
3. the persistence asset management system as claimed in claim 2, it is characterized in that: described assets are appraised and decided device (022) and comprised that assets core increases treatment unit (221), assets are examined and made cuts treatment unit (222) and the first data read-write equipment (223), wherein:
Assets core increases treatment unit (221), for reading the IT asset of equipments data of corresponding unified Asset Allocation database (027), carries out incremental markings and after confirmation, writes corresponding unified Asset Allocation database (027);
Assets are examined and made cuts treatment unit (222), for reading the IT asset of equipments data of corresponding unified Asset Allocation database (027), carrying out successively decreases mark and after confirming, the corresponding unified Asset Allocation database (027) of write;
First data read-write equipment (223), for forming read-write operation with corresponding unified Asset Allocation database (027).
4. the persistence asset management system as claimed in claim 3, it is characterized in that: described expansion demonstration device (023) comprises graphical treatment device (231), objectification treatment unit (232) and the 2nd data read-write equipment (233), wherein:
Graphical treatment device (231), for by IT asset of equipments graphical data, forming graphic element, after being converted to display data, the corresponding unified Asset Allocation database (027) of write;
Objectification treatment unit (232), after graphic element is formed associated data, the corresponding unified Asset Allocation database (027) of write;
2nd data read-write equipment (233), for forming read-write operation with corresponding unified Asset Allocation database (027).
5. the persistence asset management system as claimed in claim 4, it is characterized in that: described information collecting device (024) comprises a yard shape signal conditioning package (241), abnormity signal conditioning package (242) and the 2nd data fetch device (243), wherein:
Code shape signal conditioning package (241), for obtaining corresponding coding pattern strategy, readout code graphic data, after forming intension data, continues stored in corresponding unified Asset Allocation database (027);
Abnormity signal conditioning package (242), for obtaining corresponding coding strategy, readout code graphic data, after forming intension data, continues stored in corresponding unified Asset Allocation database (027);
2nd data fetch device (243), for reading the format IT device data of input, Formatting Output.
6. the persistence asset management system as claimed in claim 5, it is characterized in that: described account management devices (025) comprises use signal conditioning package (251), equipment signal conditioning package (252) and the 3rd data fetch device (253), wherein:
Use signal conditioning package (251), for obtaining corresponding IT device data, after mark uses data, continue stored in corresponding unified Asset Allocation database (027);
Equipment signal conditioning package (252), for obtaining corresponding IT device data, after mark frequency data, continues stored in corresponding unified Asset Allocation database (027);
3rd data fetch device (253), for reading the format IT device data of input, Formatting Output.
7. the persistence asset management system as claimed in claim 6, it is characterized in that: described statistical study device (026) comprises report form processing device (261), report form showing device (262) and the 3rd data read-write equipment (263), wherein:
Report form processing device (261), for reading the IT asset of equipments data of corresponding unified Asset Allocation database (027), after forming form data, continues stored in corresponding unified Asset Allocation database (027);
Report form showing device (262), for reading report generation strategy, after form data are formed form, continues stored in corresponding unified Asset Allocation database (027);
3rd data read-write equipment (263), for forming read-write operation with corresponding unified Asset Allocation database (027).
CN201510977743.9A 2015-12-23 2015-12-23 Sustainable asset management system Pending CN105653422A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510977743.9A CN105653422A (en) 2015-12-23 2015-12-23 Sustainable asset management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510977743.9A CN105653422A (en) 2015-12-23 2015-12-23 Sustainable asset management system

Publications (1)

Publication Number Publication Date
CN105653422A true CN105653422A (en) 2016-06-08

Family

ID=56476677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510977743.9A Pending CN105653422A (en) 2015-12-23 2015-12-23 Sustainable asset management system

Country Status (1)

Country Link
CN (1) CN105653422A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107104950A (en) * 2017-03-29 2017-08-29 宁夏灵智科技有限公司 Data acquisition, analysis encryption method and system in a kind of smart home

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030028269A1 (en) * 2000-02-29 2003-02-06 Bob Spriggs Industrial plant asset management system: apparatus and method
CN103377410A (en) * 2012-04-28 2013-10-30 国民技术股份有限公司 IT asset management unit, IT asset management system and IT asset management method
CN103400240A (en) * 2013-08-19 2013-11-20 国家电网公司 Fixed asset check device
CN103888287A (en) * 2013-12-18 2014-06-25 北京首都国际机场股份有限公司 Information system integrated operation and maintenance monitoring service early warning platform and realization method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030028269A1 (en) * 2000-02-29 2003-02-06 Bob Spriggs Industrial plant asset management system: apparatus and method
CN103377410A (en) * 2012-04-28 2013-10-30 国民技术股份有限公司 IT asset management unit, IT asset management system and IT asset management method
CN103400240A (en) * 2013-08-19 2013-11-20 国家电网公司 Fixed asset check device
CN103888287A (en) * 2013-12-18 2014-06-25 北京首都国际机场股份有限公司 Information system integrated operation and maintenance monitoring service early warning platform and realization method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余健: "电力企业IT资产管理系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107104950A (en) * 2017-03-29 2017-08-29 宁夏灵智科技有限公司 Data acquisition, analysis encryption method and system in a kind of smart home

Similar Documents

Publication Publication Date Title
CN105631522A (en) IT system operation and maintenance management system
CN105553733A (en) Resource monitoring and management system
CN105389675A (en) Business process management system
CN105450660A (en) Business resource security control system
US9967168B2 (en) Remote real-time monitoring system based on cloud computing
JP5921531B2 (en) Malicious attack detection and analysis
RU2446610C2 (en) Stream-oriented setup for working in amr/ami-service networks
CN103325153B (en) A kind of method for inspecting and cruising inspection system
JP5616330B2 (en) Method and system for managing a power grid
JP5932668B2 (en) Utility grid command filter system
CN110428135A (en) A kind of pipe gallery equipment condition monitoring management system
CN107925612A (en) Network monitoring system, network monitoring method and program
CN108763957A (en) A kind of safety auditing system of database, method and server
CN109525614A (en) Industrial cloud operational system
CN111158983A (en) Integrated operation and maintenance management system
CN105025112A (en) Remote monitoring system for air conditioning equipment and control method thereof
CN103593804A (en) Electric power information communication scheduling and monitoring platform
CN103746823A (en) Resource management and operation system
CN105262210A (en) System and method for analysis and early warning of substation network security
CN108010154A (en) Method and system for routing inspection of urban suburban pipe network
CN106921526A (en) Intelligent campus network O&M system
CN104331766A (en) Automatic health management based integrated service system
US20070179683A1 (en) Emissions Management System
CN103150783B (en) Based on the implementation method of the environment protection digital collector of label
CN114357473A (en) Virtual power plant aggregation and distributed regulation and control system and method based on block chain

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20190326

AD01 Patent right deemed abandoned