CN105649643A - Pipe pusher and method for handling problem that pipe pusher cannot enter soil smoothly during construction - Google Patents

Pipe pusher and method for handling problem that pipe pusher cannot enter soil smoothly during construction Download PDF

Info

Publication number
CN105649643A
CN105649643A CN201511030123.0A CN201511030123A CN105649643A CN 105649643 A CN105649643 A CN 105649643A CN 201511030123 A CN201511030123 A CN 201511030123A CN 105649643 A CN105649643 A CN 105649643A
Authority
CN
China
Prior art keywords
enter
soil
kou
push
bench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511030123.0A
Other languages
Chinese (zh)
Other versions
CN105649643B (en
Inventor
夏天
陈强
秦雨春
严国仙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI MUNICIPAL CONSTRUCTION Co Ltd
Original Assignee
SHANGHAI MUNICIPAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI MUNICIPAL CONSTRUCTION Co Ltd filed Critical SHANGHAI MUNICIPAL CONSTRUCTION Co Ltd
Priority to CN201511030123.0A priority Critical patent/CN105649643B/en
Publication of CN105649643A publication Critical patent/CN105649643A/en
Application granted granted Critical
Publication of CN105649643B publication Critical patent/CN105649643B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1006Making by using boring or cutting machines with rotary cutting tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a pipe pusher and a method for handling the problem that the pipe pusher cannot enter soil smoothly during construction. The pipe pusher comprises a pusher head, a pusher body, a cutter disc and a mud water bin, wherein the cutter disc is installed at the front end of the pusher head, and the mud water bin is installed in the pusher body. The cutter disc comprises a spindle installation hole, first soil inlets and second soil inlets, wherein the spindle installation hole is located in the position of the central axis of the cutter disc; the first soil inlets are evenly distributed in the portions, close to the outer edge, of the cutter disc; and the second soil inlets and the first soil inlets are formed in a staggered mode in the circumferential direction. The second soil inlets are distributed in a radial mode with the spindle installation hole as the center. The second soil inlets close to the spindle installation hole are a plurality of rectangular holes which are evenly arranged, and the second soil inlets away from the spindle installation hole are special-shaped holes. According to the pipe pusher and the method for handling the problem that the pipe pusher cannot enter soil smoothly, by improving the structure of the pipe pusher, the problem that the pipe pusher cannot enter soil smoothly during construction is solved, and the effect that construction is conducted normally can be guaranteed.

Description

A kind of push-bench and construction are met into native not smooth processing method
Technical field
The present invention relates to the realm of building construction, particularly relate to and a kind of push-bench and construction are met into native not smooth processing method.
Background technology
Jacking construction is a kind of excavation or few piping laying construction technology excavated. Jacking construction is exactly the top power produced by means of push-bench in working pit, overcomes the frictional force of pipeline and surrounding soil, is headed in soil by the gradient of design by pipeline. Adopting this technology to construct, the impact of surrounding is less, and construction site is little, and noise is little, therefore applies more and more extensive.
In Specific construction process, push-bench operation would ordinarily be encountered into native not smooth situation, namely enters soil amount few, and the situation that mud volume is few can bring following difficulty to construction:
1. push pipe positive pressure is uprushed, and top power becomes big, and energy resource consumption is serious;
2. soil layer degree of compaction becomes big, causes Cutting tool electric current to become big, causes that push pipe cannot continue jacking, affect construction speed.
And the problems referred to above are not had good solution by prior art, therefore, how to provide a kind of to can solve the problem that jacking construction enters and the push-bench of the smooth problem of soil and construction are met into the not smooth processing method of soil, be those skilled in the art's technical problems urgently to be resolved hurrily.
Summary of the invention
The present invention provides and meets into native not smooth processing method in a kind of push-bench and construction, to solve above-mentioned technical problem.
For solving above-mentioned technical problem, the present invention provides a kind of push-bench, including head, fuselage, it is installed on the Cutting tool of head front end, and it is installed on the muddy water storehouse in described fuselage, described Cutting tool includes: be positioned at the spindle mounting hole at axis place, Tu Kou is entered near outer edge equally distributed first, enter soil mouth staggered second in the circumferential with described first and enter Tu Kou, described second to enter Tu Kou be radial centered by described spindle mounting hole, and described second enter Tu Kou near the rectangular opening that described spindle mounting hole place is multiple uniform arrangement, it is profiled holes away from described spindle mounting hole place.
It is preferred that described first to enter Tu Kou be 3 groups, often group 2 row, described second to enter Tu Kou be also 3 groups, is alternately disposed at every two group first and enters between soil mouth.
It is preferred that the side frames of described profiled holes is provided with the steel plate that some thickness is 2cm.
It is preferred that described muddy water storehouse is connected with sludge out pipe, in described sludge out pipe, it is provided with remove obstacles bar and giant.
Present invention also offers in a kind of construction and meet into native not smooth processing method, adopt push-bench as above to carry out jacking construction.
It is preferred that also include opening manhole cover before carrying out jacking construction, confirm the step of clay bin situation.
It is preferred that described in open manhole cover before be additionally included in Handpiece Location and make a call to 2 mouthfuls of deep-wells, water level is dropped to the step at below head 2m place.
It is preferred that also include geology before carrying out jacking construction to survey step in detail.
It is preferred that the method that described geology is surveyed in detail is: hole with 20 meters for interval in 200 meters of regions between head to received well, and detection of fetching earth.
Compared with prior art, push-bench provided by the invention and construction are met into native not smooth processing method, described push-bench includes head, fuselage, it is installed on the Cutting tool of head front end, and it is installed on the muddy water storehouse in described fuselage, described Cutting tool includes: be positioned at the spindle mounting hole at axis place, Tu Kou is entered near outer edge equally distributed first, enter soil mouth staggered second in the circumferential with described first and enter Tu Kou, described second to enter Tu Kou be radial centered by described spindle mounting hole, and described second enter Tu Kou near the rectangular opening that described spindle mounting hole place is multiple uniform arrangement, it is profiled holes away from described spindle mounting hole place. the present invention, by the transformation to push-bench structure, solves and enters the problem that soil is not smooth in construction, it can be ensured that construction is normally carried out.
Accompanying drawing explanation
Fig. 1 be the embodiment of the invention push-bench in the front view of Cutting tool;
Fig. 2 be the embodiment of the invention processing method in the floor map of 2 mouthfuls of deep-wells.
In figure: 10-head, 20-fuselage, 30-Cutting tool, 31-spindle mounting hole, 32-first enter Tu Kou, 33-rectangular opening, 34-profiled holes, 35-steel plate, 40-active well, 50-received well, 60-deep-well.
Detailed description of the invention
Understandable for enabling the above-mentioned purpose of the present invention, feature and advantage to become apparent from, below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail. It should be noted that, accompanying drawing of the present invention all adopts the form of simplification and all uses non-ratio accurately, only in order to convenience, the purpose aiding in illustrating the embodiment of the present invention lucidly.
Push-bench provided by the invention, as shown in Figure 1-2, including head 10, fuselage 20, it is installed on the Cutting tool 30 of head 10 front end, and it is installed on the muddy water storehouse (not shown) in described fuselage 20, described Cutting tool 30 includes: be positioned at the spindle mounting hole 31 at axis place, soil mouth 32 is entered near outer edge equally distributed first, enter soil mouth 32 staggered second in the circumferential with described first and enter Tu Kou, described second to enter Tu Kou be radial centered by described spindle mounting hole 31, and described second enter Tu Kou near the rectangular opening 33 that described spindle mounting hole 31 place is multiple uniform arrangement, it is a substantially trapezoidal shape profiled holes 34 away from described spindle mounting hole 31 place. the present invention passes through push-bench structure, the especially transformation of Cutting tool 30, solves and enters the problem that soil is not smooth in construction, it can be ensured that construction is normally carried out.
It is preferred that please emphasis with reference to Fig. 1, described first to enter soil mouth 32 be 3 groups, often group 2 row, described second to enter Tu Kou be also 3 groups, is alternately disposed at every two group first and enters between soil mouth 32, in the present embodiment, push-bench is predominantly located in-1 layer of flour sand folder powder soil horizon, is partially located in-2 layers of silty sand ground, and subsoil water content is abundanter, cause into soil not smooth, this Cutting tool 30 stabilized structure, the life-span is long, it is ensured that the normal jacking of push-bench.
It is preferred that please continue to refer to Fig. 1, the side frames of described profiled holes 34 is provided with the steel plate 35 that some thickness is 2cm, in order to stop that in jack-in process bulk slurry calculus enters in muddy water storehouse and sludge out pipe, it is to avoid equipment fault.
Preferably, described muddy water storehouse is connected with sludge out pipe (not shown), remove obstacles bar and giant (not shown) it is provided with in described sludge out pipe, due in construction environment, slurry calculus is more, steel plate 35 is adopted after stopping, to still have part slurry calculus to enter in sludge out pipe, it is easily caused sludge out pipe blocking, therefore, adopt special bar and the giant of removing obstacles, to washing away in sludge out pipe and dredging, efficiently solve the normal problem discharging sand of muddy water circulation, make push pipe jacking can be smoothed out in slurry calculus section construction.
Present invention also offers in a kind of construction and meet into native not smooth processing method, adopt push-bench as above to carry out jacking construction.
Preferably, also include before carrying out jacking construction opening manhole cover, confirm the step of clay bin situation, it is preferred that, described in open manhole cover before be additionally included in head 10 position and make a call to 2 mouthfuls of deep-wells 60, water level is dropped to the step at head less than 10 2m place, in the present embodiment, water level is about 14m, therefore, the degree of depth of 2 mouthfuls of deep-wells 60 respectively 15m and 18m, to guarantee out the safety of manhole cover.
Preferably, also include geology before carrying out jacking construction and survey step in detail, to understand into native not smooth reason as early as possible, preferably, the method that described geology is surveyed in detail is: hole with 20 meters for interval in 200 meters of regions between head 10 to received well 50, and detection of fetching earth, in the present embodiment, it is the slurry calculus of 2��7cm that testing result shows that all there is continuous print thickness from level to level at buried depth 11m and 12m place, and it is all located on the pipe position of push-bench, according to the above results, push-bench provided by the invention is adopted to carry out jacking construction, it is ensured that construction is normally carried out.
In sum, push-bench provided by the invention and construction are met into native not smooth processing method, described push-bench includes head 10, fuselage 20, it is installed on the Cutting tool 30 of head 10 front end, and it is installed on the muddy water storehouse in described fuselage 20, described Cutting tool 30 includes: be positioned at the spindle mounting hole 31 at axis place, soil mouth 32 is entered near outer edge equally distributed first, enter soil mouth 32 staggered second in the circumferential with described first and enter Tu Kou, described second to enter Tu Kou be radial centered by described spindle mounting hole 31, and described second enter Tu Kou near the rectangular opening 33 that described spindle mounting hole 31 place is multiple uniform arrangement, it is profiled holes 34 away from described spindle mounting hole 31 place. the present invention, by the transformation to push-bench structure, solves and enters the problem that soil is not smooth in construction, it can be ensured that construction is normally carried out.
Obviously, invention can be carried out various change and modification without deviating from the spirit and scope of the present invention by those skilled in the art. So, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to include these change and modification.

Claims (9)

1. a push-bench, including head, fuselage, it is installed on the Cutting tool of head front end, and it is installed on the muddy water storehouse in described fuselage, it is characterized in that, described Cutting tool includes: be positioned at the spindle mounting hole at axis place, Tu Kou is entered near outer edge equally distributed first, enter soil mouth staggered second in the circumferential with described first and enter Tu Kou, described second to enter Tu Kou be radial centered by described spindle mounting hole, and described second enter Tu Kou near the rectangular opening that described spindle mounting hole place is multiple uniform arrangement, it is profiled holes away from described spindle mounting hole place.
2. push-bench as claimed in claim 1, it is characterised in that described first to enter Tu Kou be 3 groups, often group 2 row, described second to enter Tu Kou be also 3 groups, is alternately disposed at every two group first and enters between soil mouth.
3. push-bench as claimed in claim 1, it is characterised in that the side frames of described profiled holes is provided with the steel plate that some thickness is 2cm.
4. push-bench as claimed in claim 1, it is characterised in that described muddy water storehouse is connected with sludge out pipe, is provided with remove obstacles bar and giant in described sludge out pipe.
5. a construction is met into native not smooth processing method, it is characterised in that adopt push-bench as claimed in claim 1 to carry out jacking construction.
6. processing method as claimed in claim 5, it is characterised in that also include opening manhole cover before carrying out jacking construction, confirm the step of clay bin situation.
7. processing method as claimed in claim 6, it is characterised in that described in open manhole cover before be additionally included in Handpiece Location and make a call to 2 mouthfuls of deep-wells, water level is dropped to the step at below head 2m place.
8. processing method as claimed in claim 5, it is characterised in that also include geology before carrying out jacking construction and survey step in detail.
9. processing method as claimed in claim 8, it is characterised in that the method that described geology is surveyed in detail is: hole with 20 meters for interval in 200 meters of regions between head to received well, and detection of fetching earth.
CN201511030123.0A 2015-12-31 2015-12-31 Met in a kind of push-bench and construction into the not smooth processing method of soil Active CN105649643B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511030123.0A CN105649643B (en) 2015-12-31 2015-12-31 Met in a kind of push-bench and construction into the not smooth processing method of soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511030123.0A CN105649643B (en) 2015-12-31 2015-12-31 Met in a kind of push-bench and construction into the not smooth processing method of soil

Publications (2)

Publication Number Publication Date
CN105649643A true CN105649643A (en) 2016-06-08
CN105649643B CN105649643B (en) 2018-04-20

Family

ID=56490173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511030123.0A Active CN105649643B (en) 2015-12-31 2015-12-31 Met in a kind of push-bench and construction into the not smooth processing method of soil

Country Status (1)

Country Link
CN (1) CN105649643B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593462A (en) * 2016-12-29 2017-04-26 安徽唐兴机械装备有限公司 Multi-angle high-pressure water injection device for front cabin of pipe jacking machine
CN111622775A (en) * 2020-06-08 2020-09-04 北京市轨道交通建设管理有限公司 Hydraulic cutting resistance-reducing pre-supporting device and hydraulic cutting system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1122387A (en) * 1997-07-04 1999-01-26 Mitsubishi Heavy Ind Ltd Tunnel excavator and muddy water shield excavator
CN201560767U (en) * 2010-02-26 2010-08-25 海瑞克(广州)隧道设备有限公司 Eight-spoke type cutter mechanism for shield machine
CN201738929U (en) * 2010-04-21 2011-02-09 朱伯锦 Cutter arm crushing type tube push bench
CN201843620U (en) * 2010-07-01 2011-05-25 上海市第二市政工程有限公司 Cutting cutter head of pipe-jacking tunneling machine
CN103161472A (en) * 2011-12-12 2013-06-19 上海市基础工程有限公司 Concave cutter of slurry balance tube push bench
CN103397891A (en) * 2013-08-13 2013-11-20 上海力行工程技术发展有限公司 Cutting blade disc of muddy water balance push bench
CN204060702U (en) * 2014-07-28 2014-12-31 中铁二十局集团有限公司 A kind of underground pipe gallery shield-tunneling construction shield machine head

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1122387A (en) * 1997-07-04 1999-01-26 Mitsubishi Heavy Ind Ltd Tunnel excavator and muddy water shield excavator
CN201560767U (en) * 2010-02-26 2010-08-25 海瑞克(广州)隧道设备有限公司 Eight-spoke type cutter mechanism for shield machine
CN201738929U (en) * 2010-04-21 2011-02-09 朱伯锦 Cutter arm crushing type tube push bench
CN201843620U (en) * 2010-07-01 2011-05-25 上海市第二市政工程有限公司 Cutting cutter head of pipe-jacking tunneling machine
CN103161472A (en) * 2011-12-12 2013-06-19 上海市基础工程有限公司 Concave cutter of slurry balance tube push bench
CN103397891A (en) * 2013-08-13 2013-11-20 上海力行工程技术发展有限公司 Cutting blade disc of muddy water balance push bench
CN204060702U (en) * 2014-07-28 2014-12-31 中铁二十局集团有限公司 A kind of underground pipe gallery shield-tunneling construction shield machine head

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
樊豪 等: "淤泥地质管道顶管施工技术研究", 《安装》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593462A (en) * 2016-12-29 2017-04-26 安徽唐兴机械装备有限公司 Multi-angle high-pressure water injection device for front cabin of pipe jacking machine
CN111622775A (en) * 2020-06-08 2020-09-04 北京市轨道交通建设管理有限公司 Hydraulic cutting resistance-reducing pre-supporting device and hydraulic cutting system

Also Published As

Publication number Publication date
CN105649643B (en) 2018-04-20

Similar Documents

Publication Publication Date Title
CN101705691B (en) Construction method of dewatering well under foundation slab in foundation pit
CN103266638B (en) A kind of detection method of underground concrete diaphragm wall breakthrough position
CN106437798B (en) A kind of preprocess method of the anchor cable group across shield driving section
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN103938617A (en) Super-deep underground continuous wall and construction method thereof
CN102912789B (en) Mechanical hole forming technology applied to karst landform
CN105649643A (en) Pipe pusher and method for handling problem that pipe pusher cannot enter soil smoothly during construction
CN102562080A (en) Method and system for dredging clogged slurry door by reverse circulation of slurry shield
JP6870969B2 (en) How to extubate an existing well
CN210341957U (en) Precipitation structure suitable for caisson
CN104480944B (en) Unearthed pits rampway structure and construction method thereof
CN103161469A (en) Method for excavating vertical shaft to underground repair pipe-jacking tool pipe
US10267147B2 (en) Surface access borehole resource extraction method
KR101416716B1 (en) rotary table of excavation device of having water jet
CN104141294A (en) Judgment method for soil body seepage failure caused by foundation pit supporting water stopping body defect
CN107975376A (en) Tunneling shield push pipe and vertical duct connection structure and construction method
CN105064384B (en) Vacuum tube well precipitation system
CN204676518U (en) Foundation pit dewatering protection system
CN110158601A (en) Ruggedized construction and its reinforcement means for shield tunnel
CN206346242U (en) A kind of environment-protective desilting construction system
CN105696625B (en) The dredging method of immersed tube tunnel rubble bedding desilting system
CN202347545U (en) Rock-entering determination system for pile foundation
CN108533270A (en) A kind of method that underground deep layer flexible pipe line is removed in rich water soft soil layer
CN212000918U (en) Pipe burying device for emptying under foundation core earth-rock dam
TWI637094B (en) Continuous wall construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20160608

Assignee: Shanghai Foundation Engineering Group Co., Ltd.

Assignor: SHANGHAI MUNICIPAL CONSTRUCTION CO., LTD.

Contract record no.: 2019310000039

Denomination of invention: Pipe pusher and method for handling problem that pipe pusher cannot enter soil smoothly during construction

Granted publication date: 20180420

License type: Common License

Record date: 20190531