CN105649571A - 大断层褶曲带起伏段输送机调整和机道顶板维护方法 - Google Patents
大断层褶曲带起伏段输送机调整和机道顶板维护方法 Download PDFInfo
- Publication number
- CN105649571A CN105649571A CN201510947930.2A CN201510947930A CN105649571A CN 105649571 A CN105649571 A CN 105649571A CN 201510947930 A CN201510947930 A CN 201510947930A CN 105649571 A CN105649571 A CN 105649571A
- Authority
- CN
- China
- Prior art keywords
- machine
- track
- roof plate
- top board
- methods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/06—Transport of mined material at or adjacent to the working face
Abstract
本发明涉及工作面支护领域,具体为大断层褶曲带起伏段输送机调整和机道顶板维护方法,包括机道顶板维护方法和输送机调整方法,其中机道顶板维护方法即将木垛通过锚索、锚索吊梁固定在大断层褶曲带顶板上;在巷道工作面侧、与锚索吊梁平行的位置施工注马丽散孔,最后在注马丽散孔内注射马丽散,完成机道顶板维护;输送机调整方法包括以下步骤:平行于巷道走向在皮带H架下铺设轨道;在轨道下,垂直于轨道铺设道木,当转载机与自移机尾达到该段区域时,可以在轨道上缓慢滑行通过。本方法使得工作面过断层顺利通过,缩短了近一半工时,提高开机率,减轻劳动强度,增加安全系数。此方法可在本行业相同类型工作面推广应用。
Description
技术领域
本发明涉及工作面支护领域,具体为大断层褶曲带起伏段输送机调整和机道顶板维护方法。
背景技术
采煤工作面的布置与设备选用是通过前期地质勘探与掘进期间综合地质情况分析来决定的,工作面开采为一般为一次采全高,受褶曲破碎带影响,工作面机道后半部煤壁顶板极难管理。当工作面开采时,液压支架对应机道顶板破碎,塌落碎小矸石严重,其中部分支架受破碎地段矸石挤压,支架高度已无法保证机组正常通过,影响到工作面正常生产。因工作面机道顶板冒落均为碎裂小型石块,如果通过施工顶帮锚索,控制破碎顶板区域,必然发生漏顶、冒顶等事故。同时当开采至该段,受巷道起伏坡度大影响,转载机头与皮带尾部通过时,会造成工作面顶溜、缩皮带困难,从而制约皮带运输能力,满足不了工作面正常开采要求。为了顺利、安全、经济地通过该大断层破碎带,需制定出一个切实可行的支护设计和起伏段输送机调整方法,保证了工作面顺利开采。
发明内容
本发明为了能顺利、安全、经济地通过该大断层破碎带,提供了大断层褶曲带起伏段输送机调整和机道顶板维护方法。
本发明是采用如下的技术方案实现的:大断层褶曲带起伏段输送机调整和机道顶板维护方法,包括机道顶板维护方法和输送机调整方法,其中机道顶板维护方法包括以下步骤:将木垛通过锚索、锚索吊梁固定在大断层褶曲带顶板上;在巷道工作面侧、与锚索吊梁平行的位置施工注马丽散孔,注马丽散孔的孔深为4.5m、仰角为50°、孔直径为28mm、孔间距为3m;最后在注马丽散孔内注射马丽散,完成机道顶板维护;输送机调整方法包括以下步骤:平行于巷道走向在皮带H架下铺设轨道,轨道间距300mm;在轨道下,垂直于轨道铺设长2.2m道木,间距500mm,达到减小该段坡度,当转载机与自移机尾达到该段区域时,可以在轨道上缓慢滑行通过。
工作面过大断层破碎带时,提前在顶板破碎严重区域注马丽散固化剂加固维护,提高顶板岩层稳定性,减小了劳动强度,缩短了时间,提高了开机率,增加了安全系数,保证了回采过断层的顺利通过;转载机与自移机尾在通过该段时,完成铺设铁轨垫道,在开采至该段后,确保了工作面设备的正常通过,并保障了皮带拉煤能力。
本发明提供了一种大断层褶曲带起伏段输送机调整和机道顶板维护方法,该方法使得工作面过断层顺利通过,缩短了近一半工时,提高开机率,减轻劳动强度,增加安全系数。此方法可在本行业相同类型工作面推广应用。
附图说明
图1为机道顶板维护方法的示意图。
图中:1-木垛,2-锚索,3-锚索吊梁,4-顶板。
具体实施方式
大断层褶曲带起伏段输送机调整和机道顶板维护方法,包括机道顶板维护方法和输送机调整方法,其中机道顶板维护方法包括以下步骤:将木垛1通过锚索2、锚索吊梁3固定在大断层褶曲带顶板4上;在巷道工作面侧、与锚索吊梁平行的位置施工注马丽散孔,注马丽散孔的孔深为4.5m、仰角为50°、孔直径为28mm、孔间距为3m;最后在注马丽散孔内注射马丽散,完成机道顶板维护;输送机调整方法包括以下步骤:平行于巷道走向在皮带H架下铺设轨道,轨道间距300mm;在轨道下,垂直于轨道铺设长2.2m道木,道木间距500mm,当转载机与自移机尾达到该段区域时,可以在轨道上缓慢滑行通过。
Claims (1)
1.大断层褶曲带起伏段输送机调整和机道顶板维护方法,其特征在于包括机道顶板维护方法和输送机调整方法,其中机道顶板维护方法包括以下步骤:将木垛(1)通过锚索(2)、锚索吊梁(3)固定在大断层褶曲带顶板(4)上;在巷道工作面侧、与锚索吊梁平行的位置施工注马丽散孔,注马丽散孔的孔深为4.5m、仰角为50°、孔直径为28mm、孔间距为3m;最后在注马丽散孔内注射马丽散,完成机道顶板维护;输送机调整方法包括以下步骤:平行于巷道走向在皮带H架下铺设轨道,轨道间距300mm;在轨道下,垂直于轨道铺设长2.2m道木,道木间距500mm,当转载机与自移机尾达到该段区域时,可以在轨道上缓慢滑行通过。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510947930.2A CN105649571A (zh) | 2015-12-17 | 2015-12-17 | 大断层褶曲带起伏段输送机调整和机道顶板维护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510947930.2A CN105649571A (zh) | 2015-12-17 | 2015-12-17 | 大断层褶曲带起伏段输送机调整和机道顶板维护方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105649571A true CN105649571A (zh) | 2016-06-08 |
Family
ID=56476652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510947930.2A Pending CN105649571A (zh) | 2015-12-17 | 2015-12-17 | 大断层褶曲带起伏段输送机调整和机道顶板维护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105649571A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106481346A (zh) * | 2016-12-16 | 2017-03-08 | 中国神华能源股份有限公司 | 一种综采工作面回采通过空巷的方法 |
CN109707421A (zh) * | 2019-03-13 | 2019-05-03 | 淮南矿业(集团)有限责任公司 | 综采工作面过高位钻场支护方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202039894U (zh) * | 2011-04-30 | 2011-11-16 | 山西晋城无烟煤矿业集团有限责任公司 | 新型皮带机尾固定装置 |
CN102558763A (zh) * | 2012-01-04 | 2012-07-11 | 山西兆信生物科技有限公司 | 煤矿用可发泡酚醛树脂类加固和充填材料 |
CN103395615A (zh) * | 2013-07-26 | 2013-11-20 | 中国矿业大学 | 一种充填材料输送机姿态调整系统和方法 |
CN103470291A (zh) * | 2013-10-08 | 2013-12-25 | 安徽理工大学 | 一种大倾角机尾接架方法 |
CN103775084A (zh) * | 2014-01-26 | 2014-05-07 | 四川川煤华荣能源股份有限公司花山煤矿 | 大倾角、大采高综采设备过地质构造破碎带施工工艺 |
CN104358587A (zh) * | 2014-09-30 | 2015-02-18 | 宁夏天地奔牛实业集团有限公司 | 煤矿井下工作面设备逆反馈式输送系统 |
-
2015
- 2015-12-17 CN CN201510947930.2A patent/CN105649571A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202039894U (zh) * | 2011-04-30 | 2011-11-16 | 山西晋城无烟煤矿业集团有限责任公司 | 新型皮带机尾固定装置 |
CN102558763A (zh) * | 2012-01-04 | 2012-07-11 | 山西兆信生物科技有限公司 | 煤矿用可发泡酚醛树脂类加固和充填材料 |
CN103395615A (zh) * | 2013-07-26 | 2013-11-20 | 中国矿业大学 | 一种充填材料输送机姿态调整系统和方法 |
CN103470291A (zh) * | 2013-10-08 | 2013-12-25 | 安徽理工大学 | 一种大倾角机尾接架方法 |
CN103775084A (zh) * | 2014-01-26 | 2014-05-07 | 四川川煤华荣能源股份有限公司花山煤矿 | 大倾角、大采高综采设备过地质构造破碎带施工工艺 |
CN104358587A (zh) * | 2014-09-30 | 2015-02-18 | 宁夏天地奔牛实业集团有限公司 | 煤矿井下工作面设备逆反馈式输送系统 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106481346A (zh) * | 2016-12-16 | 2017-03-08 | 中国神华能源股份有限公司 | 一种综采工作面回采通过空巷的方法 |
CN109707421A (zh) * | 2019-03-13 | 2019-05-03 | 淮南矿业(集团)有限责任公司 | 综采工作面过高位钻场支护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101372891B (zh) | 条带充填整体回采采煤方法 | |
CN103410515B (zh) | 一种三软煤层往复式无煤柱综采方法 | |
US10036252B2 (en) | Method for removing hydraulic support for solid filling coal mining | |
CN101349159B (zh) | 一种单通道无轨胶轮车回撤综采工作面的方法 | |
Tu et al. | Present situation of fully mechanized mining technology for steeply inclined coal seams in China | |
CN103016053B (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN111305876A (zh) | 深部巷道锚固-劈裂注浆-水力压裂卸压协同控制方法 | |
CN109209382B (zh) | 无煤柱无掘巷z型工作面回采方法 | |
CN105952453B (zh) | 长壁前进式煤层工作面机械化无巷开采成套设备 | |
CN106703856A (zh) | 一种带排钻的棚式迈步组合支架 | |
CN102966359A (zh) | 工作面过风氧化带区顶板控制方法 | |
CN103775084A (zh) | 大倾角、大采高综采设备过地质构造破碎带施工工艺 | |
CN105649571A (zh) | 大断层褶曲带起伏段输送机调整和机道顶板维护方法 | |
CN101915099B (zh) | 厚煤层沿稳定层布巷的双向凹字型采煤方法 | |
CN102392667A (zh) | 千万吨级综放工作面设备快速安装方法 | |
CN105134212B (zh) | 一种三软厚煤层巷道沿顶掘进综放开采保证回采率的方法 | |
CN102493819B (zh) | 一种控制煤层巷道围岩稳定性的方法 | |
CN104265294A (zh) | 大倾角煤层炮采面无煤柱开采技术 | |
CN106761753A (zh) | 一种厚煤层分层开采下分层工作面回采巷道布置方法 | |
CN104863599B (zh) | 综采工作面同步扩帮安装方法及支护系统 | |
Pongpanya et al. | Numerical study on roadway stability under weak geological condition of PT Gerbang Daya Mandiri underground coal mine in Indonesia | |
CN102733851A (zh) | 合并再建矿井采掘影响区含水陷落柱的防治方法 | |
CN114294018B (zh) | 一种松散滑移区域超前密集护顶层注浆快速通过的方法 | |
CN106499420B (zh) | 一种机械式高恒阻单体支柱安装方法及支设方法 | |
CN205013023U (zh) | 一种适于破碎围岩的全断面快速支护设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160608 |