CN105649334B - A kind of concrete shear force wall tower crane attached wall construction method and its device - Google Patents

A kind of concrete shear force wall tower crane attached wall construction method and its device Download PDF

Info

Publication number
CN105649334B
CN105649334B CN201610069724.0A CN201610069724A CN105649334B CN 105649334 B CN105649334 B CN 105649334B CN 201610069724 A CN201610069724 A CN 201610069724A CN 105649334 B CN105649334 B CN 105649334B
Authority
CN
China
Prior art keywords
shear force
tower crane
concrete shear
force wall
load plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610069724.0A
Other languages
Chinese (zh)
Other versions
CN105649334A (en
Inventor
常登荣
涂刚要
张楠
程洋
罗炜
陈龙
朱纪泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201610069724.0A priority Critical patent/CN105649334B/en
Publication of CN105649334A publication Critical patent/CN105649334A/en
Application granted granted Critical
Publication of CN105649334B publication Critical patent/CN105649334B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of concrete shear force wall tower crane attached wall construction method, and reinforcement treatment is carried out to the shear wall at tower crane attachment point, improves its side bearing capacity.Before shear wall concreting, pre-embedded steel slab and high-strength bolt at tower crane attachment position are poured integral with independent shear wall.Install load conduction device, upper auxiliary load plate, under auxiliary load plate be separately fixed on upper and lower floor.Then the otic placode of welding specialty producer making is carried out on pre-embedded steel slab, then tower crane attachment frame is installed in succession with brace bar attached, the attachment of completion tower crane and agent structure.Before shear wall casting concrete; outside being reinforced to it by reinforcement; additionally use the means of pre-embedded steel slab and high-strength bolt; after the completion of pouring shear wall; in the back side fixed load conduction device of shear wall; the adhesive force of strut is disperseed by bolt and load conduction device, so that the stability and security of tower crane are improved, while can also protect shear wall not to be damaged.

Description

A kind of concrete shear force wall tower crane attached wall construction method and its device
Technical field
The present invention relates to technical field of building construction, a kind of specifically concrete shear force wall tower crane attached wall construction method And its device.
Background technology
Assembled arthitecutral structure is with concrete prefabricated element as main member, through assembling, connection and part using existing Pouring concrete shear wall and the concrete structure that is formed.The characteristics of assembled arthitecutral structure is maximum is green construction, energy-conserving and environment-protective: Industrialization flowing water prefabricated components industrialization degree is high;Reusable, consumptive material after mould and the disposable input of production equipment It is few, economize on resources and expense;Assembled in situ, connection can avoid or mitigate influence of the construction to surrounding enviroment;Prefabrication and assembly construction technique With making human resources put into relative reduction;Mechanization degree is higher, and labor intensity of operating staff is effectively alleviated.Dress It is set at home and abroad to have obtained being widely popularized and application with its advantage for protruding with formula building structure.
Assembled arthitecutral structure also encounters a large amount of technical barriers during popularization and application, is carrying out tower crane jacking attached wall Shi Rongyi occur building structure in tower crane side Cast-in-situ Beam or T-shaped shear wall without suitable drawknot, my company is directed to assembled Building structure tower crane jacking attached wall technology is studied and summarized, when ultimately forming the construction of concrete shear force wall tower crane jacking attached wall Load conduction device.
The content of the invention
The invention aims to solve in the prior art assembled arthitecutral structure in tower crane side without suitable drawknot The defect of Cast-in-situ Beam or T-shaped shear wall, there is provided a kind of concrete shear force wall tower crane attached wall construction method and its device are solved Above mentioned problem.
The present invention is to be achieved through the following technical solutions above-mentioned technical purpose:
A kind of concrete shear force wall tower crane attached wall construction method, comprises the following steps:
Step 1. concrete shear force wall is reinforced
In the reinforcing bar colligation stage, reinforced by increasing reinforcing bar in the attachment point position of concrete shear force wall;
Step 2. steel plate and bolt embedment
In attachment point position pre-embedded steel slab, and the pre-buried many bolts in the horizontal direction of concrete shear force wall;
Step 3. concrete shear force wall is poured
Pre-buried good steel plate, many bolts and concrete shear force wall are poured integral;
Step 4. load conduction device is installed
Load conduction device is arranged on the concrete shear force wall side relative with the attachment point;
Step 5. otic placode is welded
Otic placode is welded on the steel plate;
Step 6. installs tower crane attachment frame;
It is brace bar attached that step 7. installs tower crane
Brace bar attached one end is fixed on the otic placode, the other end is fixed on the attachment frame;
Step 8. tower crane jacking.
Preferably, in the step 1, the elongated reinforcing bar in longitudinal direction, institute are increased on the basis of the original reinforcing bar of concrete shear force wall The two ends for stating elongated reinforcing bar anchor into upper and lower floor, and encrypt stirrup.
Preferably, in the step 2, the one side of the steel plate is in same vertical with the surface of concrete shear force wall Face;At least two is split bolt and through the steel plate in many bolts.
Preferably, many bolts are 4 bolts;4 bolts are longitudinally on same vertical plane;Described pair of drawing Bolt is 2, and two bolts are respectively at the upper and lower of the steel plate in addition.
Preferably, 4 bolts expose a tooth in the concrete shear force wall side relative with the attachment point.
Preferably, the load conduction device is bolted on concrete shear force wall by described 4.
Preferably, in the step 5, a pair of otic placodes are welded on the steel plate;The pair of otic placode is in same level Face.
The load conduction device include main load plate, upper auxiliary load plate, under auxiliary load plate;The upper auxiliary load plate level It is fixed on the upper end of the main load plate;Auxiliary load plate is horizontally fixed on the lower end of the main load plate under described;It is described auxiliary Load plate with it is described under auxiliary load plate be in the main load plate the same side;The upper and lower auxiliary load plate and the main load Plate angle is equipped with diagonal brace.
Preferably, the load conduction device is contour with concrete shear force wall;The upper auxiliary load plate is fixed with upper floor; Auxiliary load plate is fixed with lower floor under described.
Preferably, screw is offered with the corresponding position of many bolts in the main load plate.
The present invention compared with prior art, has the advantages that:
Before shear wall casting concrete, outside being reinforced to it by reinforcement, pre-embedded steel slab and high-strength is additionally used The means of bolt, after the completion of pouring shear wall, in the back side fixed load conduction device of shear wall, are passed by bolt and load Device is led to disperse the adhesive force of strut, so that the stability and security of tower crane are improved, while shear wall also can be protected not It is damaged.The method that the present invention is provided, simple to operate, load conduction device is repeatable to be utilized, and greatlys save construction cost.
Brief description of the drawings
Fig. 1 is a kind of flow chart of concrete shear force wall tower crane attached wall construction method of the invention;
Fig. 2 is fixed on the structural representation on shear wall for the load conduction device for providing of the invention;
Fig. 3 is the top view that strut of the present invention is connected with otic placode;
The load conduction device structural representation that Fig. 4 is provided for the present invention.
Specific embodiment
To make have a better understanding and awareness to architectural feature of the invention and the effect reached, to preferably Embodiment and accompanying drawing coordinate detailed description, are described as follows:
As shown in figure 1, a kind of concrete shear force wall tower crane attached wall construction method, comprises the following steps:
Step 1. concrete shear force wall is reinforced
In the concrete shear force wall a reinforcing bar colligation stages, concrete shear force wall a is reinforced by increasing reinforcing bar, that is, existed Increase the elongated reinforcing bar in longitudinal direction on the basis of the original reinforcing bars of concrete shear force wall a, the two ends of elongated reinforcing bar are anchored into upper and lower floor, And encrypt stirrup.
Step 2. steel plate and bolt embedment
In attachment point position longitudinal direction pre-embedded steel slab 11, the outer surface of steel plate 11 and the outer surface of concrete shear force wall a in Same plane;Simultaneously in the horizontal direction of concrete shear force wall a pre-buried many bolts 12, wherein at least have two be to draw spiral shell Bolt 121 simultaneously runs through the steel plate 11.
Step 3. concrete shear force wall is poured
Pre-buried good steel plate 11, many bolts 12 are poured with concrete shear force wall a integral;
Step 4. load conduction device 2 is installed
Load conduction device 2 is arranged on the concrete shear force wall a sides relative with the attachment point;
Step 5. otic placode 13 is welded
A pair of otic placodes 13 are welded on steel plate 11;A pair of otic placodes 13 are in same level;
Step 6. installs tower crane attachment frame;
It is brace bar attached that step 7. installs tower crane
Brace bar attached b one end is fixed on the otic placode 13, the other end is fixed on attachment frame;
Step 8. tower crane jacking.
The many bolts 12 that the present invention is provided are 4.4 longitudinal directions of bolt 12 are on same vertical plane.Wherein to drawing spiral shell Bolt 121 is 2, and 2 bolts 12 are respectively at the upper and lower of steel plate 11 in addition, specially at upper and lower floor 600mm.4 Bolt 12 is in the concrete shear force wall a sides relative with attachment point and exposes a tooth, in order to fixed load conduction device 2.
As shown in Figure 2, Figure 3, Figure 4, the load conduction device 2 that the present invention is provided includes main load plate 21, upper auxiliary load plate 22nd, auxiliary load plate 23 under.Upper auxiliary load plate 22 is fixed on the upper end of main load plate 21, under auxiliary load plate 23 be fixed on main load plate 21 lower end.Upper auxiliary load plate 22 auxiliary load plate 23 with is in the same side of main load plate 21, forms the U-shaped that a side is fallen Shape.Upper and lower auxiliary load plate 23 is provided with diagonal brace 24 with the angle of main load plate 21.Load conduction device 2 and concrete shear force wall a etc. It is high;The upper surface of upper auxiliary load plate 22 attaches the lower surface for being fixed on floor;Under the lower surface of auxiliary load plate 23 be attached at down The upper surface of floor.And upper and lower auxiliary load plate 23 is fixed on upper and lower floor by round steel U-shaped card ring 14.Main load plate 21 Screw is being offered with 4 corresponding positions of bolt 12.What 4 bolts 12 exposed concrete shear force wall a partially passes through screw 211, and load conduction device 2 is fixed on concrete shear force wall a with nut screwing clamping.
Operating principle of the invention is:Reinforcement treatment is carried out to the cast-in-place concrete shear wall at tower crane attachment point, is improved Its side bearing capacity.Before shear wall concreting, the steel plate 11 of pre-buried tower crane producer customization at tower crane attachment position (related two high-strength split bolts 121), and in pre-buried two high-strength bolts 12 of specific location, poured with shear wall build up it is whole Body.Install by the channel-section steel load conduction device 2 that is made of welding, as shown in figure 4, upper auxiliary load plate 22, under auxiliary load plate 23 distinguish It is fixed on upper and lower floor with round steel U-shaped card ring.Treat after the completion of above operation, welding specialty factory is carried out on pre-embedded steel slab 11 The otic placode 13 that family makes, then tower crane attachment frame and brace bar attached b are installed in succession, complete the attachment of tower crane and agent structure.Tower crane Concrete shear force wall a carries out jacking concerned process steps again after finishing.
During site operation, concrete operation step is:
1. preparation of construction
Place is cleaned out around foundation for tower crane first, it is desirable to smooth, clear, and set warning region on request. Eye-catching caution notice is hung up, forbids non-operating personnel to enter construction area, and exercised supervision management by special messenger.Preparing some must The measuring instrument such as standby instrument and theodolite.The all barriers in overhead and temporary construction electric wire must be removed in the range of tower crane installation Or change its course.Foundation for tower crane side sets special distribution box 1, and one lock of symbol unification engine one leaks a regulation protected, and voltage request is 380V ± 5%.
2. concrete shear force wall a geo-grid reinforcements
Increase by the 6 elongated reinforcing bars of C18 in longitudinal direction, the two ends of elongated reinforcing bar anchor into levels floor respectively, and original Increase the overall height encryptions of 250 × 750@of stirrup 100 on the basis of the stirrup of structure, bar diameter is identical with original stirrup.
3. steel plate and bolt embedment
Before concrete shear force wall a is poured, pre-buried good (the two related M22 of steel plate 11 of steel plate 11 at attachment point position It is pre-buried in the lump to drawing high strength bolt 121);It is pre-buried respectively at upper and lower floor superimposed sheet 600mm on concrete shear force wall a One M22 high-strength bolt 12.The necessary position of four pre-buried high-strength bolts 12 is accurate, and on same vertical plane, in order to The installation of load conduction device 2.
4. load conduction device makes
As shown in Fig. 2 load conduction device 2 is welded by the channel-section steel and 4 size identical haunch angle steel of 3 different lengths Connect and form, channel-section steel long is above-mentioned main load plate 21, two short channel-section steels be respectively above-mentioned upper auxiliary load plate 22 and under auxiliary load Lotus plate 23, haunch angle steel is above-mentioned diagonal brace 24, and two are respectively welded in upper and lower auxiliary load plate and the angle of main load plate Diagonal brace 24, the two ends of diagonal brace 24 are welded on the edge of upper and lower auxiliary load plate and main load plate.4 diagonal braces are about 24, left and right Symmetrically.Level weld seam requirement is smoothed during welding, must not there is the weld defects such as stomata slag inclusion, it is found that defect should be repaired in time.Passed in load Lead and 4 holes of 24 bolts of Φ 12 are opened at the main channel-section steel web position of load plate 21 of device 2, its position and the pre-buried position of high-strength bolt 12 Corresponding, position needs accurately reliable.
5. load conduction device 2 is installed
After load conduction device 2 holds out against in place and with shear wall, four M22 high-strength bolts 12 are twisted using double nut Tightly, it is ensured that silk tooth exposes, its Tightening moment must reach 650Nm.The upper and lower U-shaped card of upper and lower auxiliary load plate is respectively mounted again Ring, is fixed using double nut, it is ensured that the outer Rose's tooth of screw rod, tightens screw, is installed.
6. otic placode welding
After above operation completes, then the otic placode 13 for carrying out the making of on-the-spot welding specialized factory.Level weld seam requirement is put down during welding Cunning is full, must not there is the weld defects such as stomata slag inclusion, and quality must be guaranteed.
7. tower crane attachment frame is installed
Each of frame will be adhered to and acts the setting height(from bottom) for being raised to attachment frame respectively, same absolute altitude is located at attachment point needed for tower body, With 8# iron wire fixations, first will entirely adhere to frame leveling, then each attachment ring beam frame is connected fastening with tower body.
8. tower crane is installed brace bar attached
After brace bar attached b is adjusted into installation site with tower crane, after be firmly linked with for safety belt by operating personnel, with the bottle gouard moved by hands of 2t Brace bar attached b is lived near attachment frame layback, the bearing pin near wall side is first installed.4 strut b of attachment are installed successively Near the bearing pin of wall side.
Sling section standard knot a to jacking when trim position.Whether tower crane perpendicularity is observed from both direction by theodolite Meet and require, no more than 2/1000, attachment frame above tower body perpendicularity is no more than 4/ for the following tower body perpendicularity of attachment frame 1000.Attachment frame side bearing pin is installed, when perpendicularity is unsatisfactory for requiring, dolly is slow by when perpendicularity meets requirements above Movement makes attachment pull bar be in unstressed condition, while rotating tower crane, the bearing pin of attachment frame side is installed after perpendicularity is mixed up. After tower crane perpendicularity reaches requirement, the bearing pin of attachment frame side is installed.4 strut b attachment frames one of attachment are installed successively The bearing pin of side.
9. tower crane jacking
Hydraulic work system is had to check for before jacking whether normal.One section standard knot is hung into climbing support and introduces platform.Will Loading trolley reaches jacking balance position.Using trainstop, do not allow tower crane to turn round, unload tower body top and connect with undersetting 8 bearing pins for connecing.Hydraulic system is started, is made to climb pawl and is rested on the marking time of closest tower body, then operate hydraulic system to cover Frame is slightly risen, and checks whether the drive disk assemblies such as jacking hanging plate, climbing support have abnormal sound, deformation, after confirming normally, continue jacking. (note:It is provided with special messenger station is marked time in groove and inserted, extracts safety pin whether lower platform observation raising plate hangs over) push up to about More than 1/3 standard knot height and make on climbing support changing step push rod be located at mark time top when, oil cylinder is packed up, change top of marking time Rise.Being repeated twice rear tower body top should have one space of standard knot of loading.The standard knot introduced on platform is being caused into tower body just Top, aligns undersetting and is connected bearing pin with standard knot, plugs interim bearing pin, releases and introduces dolly, the new standard knot introduced of alignment With company's bearing pin of side standard knot, bearing pin is inserted.It is above a lifting guide support adding process, continuous supernumerary segment completes jacking operation.
Above operation must carry out strict quality control, specially:
All levels of management personnel is organized before going into operation, drawing is conscientiously familiar with, organization unit's engineering construction organization design and special project are applied Work scheme, specifies qualifying point and quality requirement.With reference to construction drawing and technical specification, the work of confiding a technological secret before construction is carried out Make, all personnel for participating in construction is grasped respective working procedure and main points of operation, construction reference, method and quality will Ask.
Strict implement national regulation, standard and construction technology in construction, strict technical training warp is carried out to special work post On duty can be operated after passing the examination.
High-strength bolt on attachment frame must be tightened, and the internal overarm support of adjacent two standards internode must be installed, and every tower crane is matched somebody with somebody A set of internal overarm support is put, internal overarm support is arranged on one attachment device topmost.
Tower crane attachment must measure perpendicularity before installing, and to the undesirable tower crane of perpendicularity, can be installed after rectification Brace bar attached b.
All attachment pull bars forbid directly welding using being hinged.
Forbid superelevation, attachment above cantilever height is no more than the requirement that specification and scheme specify.
Wall ear mount is bilayer MC120B:Two panels ear mount spacing is controlled in 50mm or so, bearing pin length (A30 × 70mm), If spacing is excessive, the bearing pin of standard configuration is not enough used, and spacing is too small, can cause pull bar installation difficulty.
The a diameter of 30mm of wall ear mount pin-and-hole, without increasing, it is ensured that Anchored Bar and ear mount pin joint, pin-and-hole crosses conference causes tower Body is rocked seriously, and the angle of inclination of brace bar attached b is no more than 10 °.
Attachment plane, facade are please performed in strict accordance with this method, and attachment horizontal layout does not allow arbitrarily change.Attachment facade Arrangement allows to move up and down 1 section standard knot.
Before coming into operation, it is necessary to by checking and accepting, acceptance(check) rear can be used.After examination is come into operation, anyone must not Tear down and reconstruct without authorization.
General principle of the invention, principal character and advantages of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not limited to the above embodiments, the simply present invention described in above-described embodiment and specification Principle, various changes and modifications of the present invention are possible without departing from the spirit and scope of the present invention, these change and Improvement is both fallen within the range of claimed invention.The protection domain of application claims by appending claims and its Equivalent is defined.

Claims (10)

1. a kind of concrete shear force wall tower crane attached wall construction method, it is characterised in that:Comprise the following steps:
1) concrete shear force wall is reinforced
In the reinforcing bar colligation stage, reinforced by increasing reinforcing bar in the attachment point position of concrete shear force wall;
2) steel plate and bolt embedment
In attachment point position pre-embedded steel slab, and the pre-buried many bolts in the horizontal direction of concrete shear force wall;
3) concrete shear force wall is poured
Pre-buried good steel plate, many bolts and concrete shear force wall are poured integral;
4) load conduction device is installed
Load conduction device is arranged on the concrete shear force wall side relative with the attachment point;
5) otic placode welding
Otic placode is welded on the steel plate;
6) tower crane attachment frame is installed;
7) tower crane is installed brace bar attached
Brace bar attached one end is fixed on the otic placode, the other end is fixed on the attachment frame;
8) tower crane jacking.
2. a kind of concrete shear force wall tower crane attached wall construction method according to claim 1, it is characterised in that:The step 1) in, the elongated reinforcing bar in longitudinal direction is increased on the basis of the original reinforcing bar of concrete shear force wall, the two ends of the elongated reinforcing bar anchor into, In lower floor, and encrypt stirrup.
3. a kind of concrete shear force wall tower crane attached wall construction method according to claim 1, it is characterised in that:The step 2) in, the one side of the steel plate is in same vertical plane with the surface of concrete shear force wall;In many bolts at least Two for split bolt and through the steel plate.
4. a kind of concrete shear force wall tower crane attached wall construction method according to claim 3, it is characterised in that:Described many Bolt is 4 bolts;4 bolts are longitudinally on same vertical plane;The split bolt is 2, in addition two bolts It is respectively at the upper and lower of the steel plate.
5. a kind of concrete shear force wall tower crane attached wall construction method according to claim 4, it is characterised in that:Described 4 Bolt is in the concrete shear force wall side relative with the attachment point and exposes a tooth.
6. a kind of concrete shear force wall tower crane attached wall construction method according to claim 5, it is characterised in that:The load Conduction device is bolted on concrete shear force wall by described 4.
7. a kind of concrete shear force wall tower crane attached wall construction method according to claim 1, it is characterised in that:The step 5) in, a pair of otic placodes are welded on the steel plate;The pair of otic placode is in same level.
8. a kind of load conduction device in concrete shear force wall tower crane attached wall construction method as claimed in claim 1, It is characterized in that:The load conduction device include main load plate, upper auxiliary load plate, under auxiliary load plate;The upper auxiliary load plate It is horizontally fixed on the upper end of the main load plate;Auxiliary load plate is horizontally fixed on the lower end of the main load plate under described;It is described Upper auxiliary load plate with it is described under auxiliary load plate be in the same side of the main load plate;The upper and lower auxiliary load plate and the master Load plate angle is equipped with diagonal brace.
9. load conduction device according to claim 8, it is characterised in that:The load conduction device and concrete shear Wall is contour;The upper auxiliary load plate is fixed with upper floor;Auxiliary load plate is fixed with lower floor under described.
10. load conduction device according to claim 8, it is characterised in that:With many spiral shells in the main load plate The corresponding position of bolt offers screw.
CN201610069724.0A 2016-01-28 2016-01-28 A kind of concrete shear force wall tower crane attached wall construction method and its device Active CN105649334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610069724.0A CN105649334B (en) 2016-01-28 2016-01-28 A kind of concrete shear force wall tower crane attached wall construction method and its device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610069724.0A CN105649334B (en) 2016-01-28 2016-01-28 A kind of concrete shear force wall tower crane attached wall construction method and its device

Publications (2)

Publication Number Publication Date
CN105649334A CN105649334A (en) 2016-06-08
CN105649334B true CN105649334B (en) 2017-06-30

Family

ID=56489232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610069724.0A Active CN105649334B (en) 2016-01-28 2016-01-28 A kind of concrete shear force wall tower crane attached wall construction method and its device

Country Status (1)

Country Link
CN (1) CN105649334B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760530B (en) * 2016-12-09 2018-01-16 广州市恒盛建设工程有限公司 A kind of operating platform and its construction method for the dismounting of tower crane wall attaching rod
CN107654066A (en) * 2017-09-30 2018-02-02 上海建工二建集团有限公司 A kind of detachable tower crane climbing device and construction method
CN108946522B (en) * 2018-08-24 2019-10-29 中建三局集团有限公司 Attached tower crane base steel plinth turnover method outside super high-rise building
CN109467014B (en) * 2018-12-28 2020-06-30 中铁大桥局集团第五工程有限公司 Wall-attached structure for large-tonnage tower crane super-large load in large wind environment
CN109592580A (en) * 2018-12-28 2019-04-09 中铁大桥局集团第五工程有限公司 Large-tonnage tower crane super large load attached wall structure method for rapidly mounting in a kind of strong wind atmosphere
CN110002350B (en) * 2019-05-14 2024-03-22 中交一航局第二工程有限公司 Tower section replacement device, tower crane comprising tower section replacement device and floor penetrating construction method of tower crane
CN110316666A (en) * 2019-08-07 2019-10-11 上海市机械施工集团有限公司 A kind of tower crane wall-attaching equipment and tower crane wall-attaching equipment construction method
CN110541486A (en) * 2019-09-11 2019-12-06 中国建筑第八工程局有限公司 novel steel tube bundle tower crane buttress and construction method
CN113387282B (en) * 2021-07-09 2023-09-05 广州市房屋开发建设有限公司 Construction method of assembled wall-attached column
CN115535877B (en) * 2022-09-20 2023-09-08 合肥建工集团有限公司 Device for fixing tower crane attached arm for fabricated building construction and construction method
CN115784034A (en) * 2022-12-07 2023-03-14 北京房地集团有限公司 Tower crane attachment wall body reinforcing structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3763617A (en) * 1972-04-03 1973-10-09 C M H Inc Tieback apparatus
KR20070117276A (en) * 2006-06-08 2007-12-12 주식회사 근하기공 The spacer for suspension shoe removal
CN202193571U (en) * 2011-08-24 2012-04-18 中国建筑第七工程局有限公司 Connecting piece for connecting wall attaching rod of tower crane with building
CN202575768U (en) * 2011-10-31 2012-12-05 劳升浩 Wall attaching device for construction tower crane
CN202744234U (en) * 2012-08-23 2013-02-20 云南建工第五建设有限公司 Adjustable adhering bar used for tower crane
CN203889956U (en) * 2014-05-12 2014-10-22 中冶天工上海十三冶建设有限公司 Rod-attached-to-wall connecting piece device for tower crane mounting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3763617A (en) * 1972-04-03 1973-10-09 C M H Inc Tieback apparatus
KR20070117276A (en) * 2006-06-08 2007-12-12 주식회사 근하기공 The spacer for suspension shoe removal
CN202193571U (en) * 2011-08-24 2012-04-18 中国建筑第七工程局有限公司 Connecting piece for connecting wall attaching rod of tower crane with building
CN202575768U (en) * 2011-10-31 2012-12-05 劳升浩 Wall attaching device for construction tower crane
CN202744234U (en) * 2012-08-23 2013-02-20 云南建工第五建设有限公司 Adjustable adhering bar used for tower crane
CN203889956U (en) * 2014-05-12 2014-10-22 中冶天工上海十三冶建设有限公司 Rod-attached-to-wall connecting piece device for tower crane mounting

Also Published As

Publication number Publication date
CN105649334A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN105649334B (en) A kind of concrete shear force wall tower crane attached wall construction method and its device
CN105421248B (en) Large-Span Continuous girder span building up station turns and closure construction method
CN106120568B (en) The construction method of cross a river Main Bridge bridge pier secondary locking temporary consolidation structure
CN106836498A (en) A kind of super-span Stadium roof system steel truss lifting construction engineering method
CN105113388B (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN105648926B (en) Large-Span Continuous girder span building up station rotation swivel construction method
CN108412125A (en) A kind of strengthening concrete composite structure frame beam column construction
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
CN101446075B (en) Synchronous vertical swing lift construction method for double inclination arc tower
CN203947771U (en) A kind of Bailey beam pendent form support system
CN113353782B (en) Low-clearance ground wall-connected reinforcement cage rapid hoisting construction method
CN111910902A (en) Construction method of high-altitude double-layer overlong cantilever reinforced concrete structure
CN114150766B (en) Prefabricated reinforced concrete column connecting node and construction method thereof
CN112324131B (en) One-frame dual-purpose large-span stiff beam construction structure and construction method thereof
CN113047181A (en) Synchronous lifting device for inner and outer molds of hollow pier and construction method thereof
CN110184948A (en) A kind of Bridge beam construction method
CN206110635U (en) Automatic convertible integrally lift up elevator shaft operating platform of landing leg
CN106437123A (en) Supporting leg automatic turnover type overall lifting elevator well operation platform
CN106930527A (en) The compound formwork high-altitude long-span prestressed girder construction technology of encorbelmenting of three-dimensional artificial shaped steel
CN107841954A (en) A kind of linear adjuster of track girder ball pivot and method
CN112609584A (en) Prefabricated small box girder installation construction method for intelligent express way
CN107513943A (en) A kind of continuous beam closure section traveling formwork structure and construction method
CN105951599B (en) High column mould bases integrated construction technique
CN109736202A (en) Great cantilever bent cap Bracket method for construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant