CN105648928A - Bridge replacement device and construction method thereof - Google Patents

Bridge replacement device and construction method thereof Download PDF

Info

Publication number
CN105648928A
CN105648928A CN201610020699.7A CN201610020699A CN105648928A CN 105648928 A CN105648928 A CN 105648928A CN 201610020699 A CN201610020699 A CN 201610020699A CN 105648928 A CN105648928 A CN 105648928A
Authority
CN
China
Prior art keywords
crane
bridge
way
screw mandrel
damaged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610020699.7A
Other languages
Chinese (zh)
Inventor
郑悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610020699.7A priority Critical patent/CN105648928A/en
Publication of CN105648928A publication Critical patent/CN105648928A/en
Priority to CN201710019898.0A priority patent/CN106544963B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a bridge replacement device which comprises crane guide rails 1 and crane supporting frames 2. The crane supporting frames 2 are installed on piers. The crane guide rails 1 are installed on the crane guide rails 1 and provided with a crane 4. Guide wheels 46 are installed between the crane 4 and the crane guide rails 1. The bridge replacement device and a construction method of the bridge replacement device have the beneficial effects that the bridge replacement device and the construction method of the bridge replacement device are particularly suitable for remote and mountainous areas, a damaged bridge can be rapidly replaced, a construction period is shortened, cost is saved, practicality is high, and the device and the method are suitable for being used and popularized.

Description

Exchanging bridge device and construction method thereof
Technical field
The present invention relates to a kind of exchanging bridge device and construction method thereof, belong to engineering construction technology field.
Background technology
Bailey bridge is to be widely used in the world, a kind of bridge the most popular, and it has simple in construction, convenient transportation, and erection quickly, decomposes the feature of being easy to. Being provided simultaneously with bearing capacity big, structural rigidity is strong, fatigue life the advantage such as length. It difference according to actual needs can form the temporary bridge of all kinds and various uses, emergent bridge and fixed bridge across footpath, has component few, lightweight, the feature that cost is low. Initial Bei Lei army bridge is designed the World War II initial stage in 1938 by Britain engineer. During the Second World War, this military steel bridge is widely used, and after the war, many countries transfer to shellfish thunder steel bridge civilian after some improve, and nowadays, shellfish thunder steel bridge plays irreplaceable effect in transport development, flood-fighting. .
If an application number is that CN204589784U discloses and a kind of is easy to the bridge structure that arched girder is changed, adopt anchor pole from the Upper vertical of the arched girder bottom downward through the cement platform to pier base, be fixed thereon lower two ends with nut; Bridge plate connects in the mutual copline of the horizontal and vertical compression in the surface of arched girder. This utility model beneficial effect, this utility model simple in construction, intensity is big, it is prone to construction, the removable bridge plate laying down its surface when needing to change after bridge damnification, only need during bridge dismounting to remove its internal anchor pole, other structures need not be destroyed and set, reduce difficulty of construction and cost; Bridge plate bears a constant load on the surface of arched girder and reduces the load of arched girder, extends its life-span.
And for example an application number be CN104562924A disclose a kind of bridge pad from jacking backing plate replacing options, after adopting a support arrangement to support bridge superstructure beam body, remove former bearing and pinner, fold in bridge pier pier top or bent cap end face upper strata and be placed through the wedge type block slip realization backing plate from jacking and new bearing, applying pulling force makes the wedge type block of backing plate slide, backing plate jacking, new bearing rises supporting bridge superstructure beam body, and new bearing bears pressure; When bridge superstructure beam body rises to former elevation location, fixing wedge type block, remove a support arrangement, complete bearing replacement; In the bearing replacement process of the inventive method, bridge superstructure beam body not lifting or its absolute altitude only slightly move up and down in the scope of license. The existing jacking of bearing one by one can be prevented effectively from and change the drawback that method needs lifting beam body, causes bridge superstructure to damage.
If an application number is that CN102472025A discloses and a kind of uses the pre-founding materials method and apparatus to replace bridge, this pre-founding materials includes convex and the female connectors of piling bar, steel Concrete Structure cushion cap and metal.Pre-founding materials can deliver to building site for bridge replacement engineering before control the environment of plant in be formed as accurate standard. And, convex and female connectors provide quickly and firmly method connects cushion cap and stake, and do not use welding between stake and cushion cap.
In the area that some remote and mountains are more, large-scale crane is difficult to arrive, and Bailey bridge bridge reaches or service life such as damage etc., it is necessary to changing, be all by artificial disassembling, assembling and replacing at present, speed is slow, and the engineering time is long, has a strong impact on traffic.
Summary of the invention
Instant invention overcomes prior art Problems existing, it is proposed that a kind of exchanging bridge device and construction method thereof, this device and construction method thereof are particularly suitable for remote and that mountain is more area, it is possible to the exchanging bridge that quickly will damage, and save duration and cost.
The concrete technical scheme of the present invention is as follows:
Exchanging bridge device, including crane way and crane bracing frame, described crane bracing frame is arranged on bridge pier, crane way is arranged on described crane way, it is characterized in that, described crane way is provided with crane, between described crane and crane way, directive wheel is installed;
Described crane both sides are provided with screw mandrel, and spindle motor is arranged on screw mandrel, and described spindle motor drives crane to move on screw mandrel by transfer gear box transmission; Hawser motor is arranged on described crane by bolt, and described hawser motor both sides are provided with steel wire rope, and suspension hook is installed on a steel cord.
Preferentially, described screw mandrel two ends are provided with back-up ring.
The invention allows for a kind of exchanging bridge device construction method, it is characterised in that comprise the following steps:
1) first with transport vehicle, bridge transportation to be replaced to needs is changed Bridge position, on bridge pier, then build crane bracing frame and crane way;
2) at crane way crane installed above and directive wheel thereof, make directive wheel and crane realize being synchronized with the movement, then assemble crane again;
3) step 2) all parts installations after carry out crane on crane way and screw mandrel running debugging, check equipment operational reliability;
4) control the top that crane runs to the bridge of damage, then the length according to the bridge damaged, control spindle motor and rotate, drive trolley movement through transfer gear box, thus adjusting to the position being suitable for;
5) control hawser motor to rotate, lower wire rope, until stopping when suspension hook touches the bridge of damage, then at the Bridge position point auger shell pit of suspension hook correspondence damage suspension ring of screwing on;
6) by hook suspension ring, control hawser motor rotation recovery steel wire rope and the bridge of damage is sling and transports transport vehicle rear;
7) being sling bridge to be replaced above transport vehicle again with crane, the position being transported to the bridge damaged is replaced, and when close to bridge pier, point operation control hawser motor is transferred, until installing bridge to be replaced;
8) finally utilizing crane to be sling by the bridge of damage and be placed in transport vehicle, transport vehicle is left, and construction completes.
Beneficial effects of the present invention: this device and construction method thereof are particularly suitable for remote and that mountain is more area, it is possible to the exchanging bridge that quickly will damage, and save duration and cost, practical, are suitable for promoting the use of.
Accompanying drawing explanation
Fig. 1 is the front view of exchanging bridge device of the present invention;
Fig. 2 is the structural representation of exchanging bridge device of the present invention;
Fig. 3 is the structural representation of crane;
Fig. 4 is present invention schematic diagram when constructing;
Fig. 5 is present invention schematic diagram when constructing.
Detailed description of the invention
As it can be seen, exchanging bridge device, including crane way 1 and crane bracing frame 2, described crane bracing frame 2 is arranged on bridge pier, crane way 1 is arranged on described crane way 1, described crane way 1 is provided with crane 4, is provided with directive wheel 46 between described crane 4 and crane way 1. Crane 4 is installed above cold quartz mercury vapor lamp, for night work.
Described crane 4 both sides are provided with screw mandrel 411, and spindle motor 48 is arranged on screw mandrel 411, and described spindle motor 48 drives crane 4 to move on screw mandrel 411 by transfer gear box 47 transmission; Hawser motor 49 is arranged on described crane 4 by bolt 43, and described hawser motor 49 both sides are provided with steel wire rope 45, and suspension hook 46 is arranged on steel wire rope 45, and screw mandrel 411 two ends are provided with back-up ring 41.
The invention allows for a kind of exchanging bridge device construction method, it is characterised in that comprise the following steps:
1) first with transport vehicle 5 bridge 8 to be replaced transported and need to change Bridge position, on bridge pier, then build crane bracing frame 2 and crane way 1;
2) at crane way 1 crane 4 installed above and directive wheel 46 thereof, make directive wheel 46 and crane 4 realize being synchronized with the movement, then assemble crane 4 again;
3) step 2) all parts installations after carry out crane 4 on crane way 1 and screw mandrel 411 running debugging, check equipment operational reliability;
4) control the top that crane 4 runs to the bridge 7 of damage, then the length according to the bridge 7 damaged, control spindle motor 48 and rotate, drive crane 4 to move through transfer gear box 47, thus adjusting to the position being suitable for;
5) control hawser motor 49 to rotate, lower wire rope 45, until stopping when suspension hook 46 touches the bridge 7 of damage, then at the corresponding bridge 7 location point auger shell pit damaged of suspension hook 46 suspension ring 3 of screwing on;
6) suspension hook 46 is hooked suspension ring 3, control hawser motor 49 rotation recovery steel wire rope 45 and the bridge 7 of damage is sling and transports transport vehicle 5 rear;
7) being sling bridge 8 to be replaced above for transport vehicle 5 again with crane 4, the position being transported to the bridge 7 damaged is replaced, and when close to bridge pier, point operation control hawser motor 49 is transferred, until installing bridge 8 to be replaced;
8) finally utilizing crane 4 to be sling by the bridge 7 of damage and be placed in transport vehicle 5, transport vehicle 5 is left, and construction completes.
In addition to the implementation, the present invention can also have other embodiments. All employings are equal to replacement or the technical scheme of equivalent transformation formation, all fall within the protection domain of application claims.

Claims (3)

1. exchanging bridge device, including crane way (1) and crane bracing frame (2), described crane bracing frame (2) is arranged on bridge pier, crane way (1) is arranged on described crane way (1), it is characterized in that, described crane way (1) is provided with crane (4), directive wheel (46) is installed between described crane (4) and crane way (1);
Described crane (4) both sides are provided with screw mandrel (411), spindle motor (48) is arranged on screw mandrel (411), and described spindle motor (48) drives crane (4) in the upper motion of screw mandrel (411) by transfer gear box (47) transmission; Hawser motor (49) is arranged on described crane (4) by bolt (43), described hawser motor (49) both sides are provided with steel wire rope (45), and suspension hook (46) is arranged on steel wire rope (45).
2. exchanging bridge device as claimed in claim 1, it is characterised in that: described screw mandrel (411) two ends are provided with back-up ring (41).
3. exchanging bridge device construction method, it is characterised in that comprise the following steps:
1) first with transport vehicle (5), bridge (8) transport to be replaced is changed Bridge position to needs, on bridge pier, then build crane bracing frame (2) and crane way (1);
2) at crane way (1) crane installed above (4) and directive wheel (46) thereof, make directive wheel (46) and crane (4) realize being synchronized with the movement, then assemble crane (4) again;
3) step 2) all parts installations after carry out crane (4) on crane way (1) and screw mandrel (411) running debugging, check equipment operational reliability;
4) top that crane (4) runs to the bridge (7) of damage is controlled, then the length according to the bridge (7) damaged, control spindle motor (48) to rotate, crane (4) motion is driven, thus adjusting to the position being suitable for through transfer gear box (47);
5) control hawser motor (49) to rotate, lower wire rope (45), until suspension hook (46) stops when touching bridge (7) of damage, then at corresponding bridge (7) the location point auger shell pit damaged of suspension hook (46) suspension ring of screwing on (3);
6) suspension hook (46) is hooked suspension ring (3), control hawser motor (49) rotation recovery steel wire rope (45) and the bridge (7) damaged is sling and transported transport vehicle (5) rear;
7) again with crane (4), bridge (8) to be replaced above for transport vehicle (5) is sling, the position being transported to the bridge (7) damaged is replaced, when close to bridge pier, point operation control hawser motor (49) is transferred, until installing bridge (8) to be replaced;
8) finally utilizing crane (4) to be sling by the bridge (7) damaged and be placed in transport vehicle (5), transport vehicle (5) is left, and construction completes.
CN201610020699.7A 2016-01-13 2016-01-13 Bridge replacement device and construction method thereof Pending CN105648928A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610020699.7A CN105648928A (en) 2016-01-13 2016-01-13 Bridge replacement device and construction method thereof
CN201710019898.0A CN106544963B (en) 2016-01-13 2017-01-12 Exchanging bridge device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610020699.7A CN105648928A (en) 2016-01-13 2016-01-13 Bridge replacement device and construction method thereof

Publications (1)

Publication Number Publication Date
CN105648928A true CN105648928A (en) 2016-06-08

Family

ID=56487408

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610020699.7A Pending CN105648928A (en) 2016-01-13 2016-01-13 Bridge replacement device and construction method thereof
CN201710019898.0A Expired - Fee Related CN106544963B (en) 2016-01-13 2017-01-12 Exchanging bridge device and its construction method

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710019898.0A Expired - Fee Related CN106544963B (en) 2016-01-13 2017-01-12 Exchanging bridge device and its construction method

Country Status (1)

Country Link
CN (2) CN105648928A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818364B (en) * 2021-10-14 2023-05-26 上海公路桥梁(集团)有限公司 Girder transporting device and replacement method for viaduct

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102199913A (en) * 2010-11-30 2011-09-28 大连华锐股份有限公司 Bridge detection trolley
US8671490B1 (en) * 2013-03-06 2014-03-18 Mark Carney Bridge span replacement system
CN204151699U (en) * 2014-07-10 2015-02-11 中铁大桥局武汉桥梁特种技术有限公司 A kind of frame plate machine for changing steel truss girder bridge bridge deck
JP2015113576A (en) * 2013-12-09 2015-06-22 日本車輌製造株式会社 Vehicle and method for replacing bridge girder

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4515996B2 (en) * 2005-10-26 2010-08-04 オックスジャッキ株式会社 Method and apparatus for erection of elevated bridge
CN104631345A (en) * 2014-12-22 2015-05-20 中国铁路总公司 Rapid replacing method of concrete bridge beam of dual-line electric railway
CN104894982B (en) * 2015-04-20 2016-08-17 上海同罡建筑工程有限公司 Bridge pad draw-out device
CN204959518U (en) * 2015-09-17 2016-01-13 成都明日星辰科技有限公司 Steel rail drilling machine
CN105568873B (en) * 2016-01-13 2017-03-22 臧云飞 Detachable bridge replacement device and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102199913A (en) * 2010-11-30 2011-09-28 大连华锐股份有限公司 Bridge detection trolley
US8671490B1 (en) * 2013-03-06 2014-03-18 Mark Carney Bridge span replacement system
JP2015113576A (en) * 2013-12-09 2015-06-22 日本車輌製造株式会社 Vehicle and method for replacing bridge girder
CN204151699U (en) * 2014-07-10 2015-02-11 中铁大桥局武汉桥梁特种技术有限公司 A kind of frame plate machine for changing steel truss girder bridge bridge deck

Also Published As

Publication number Publication date
CN106544963A (en) 2017-03-29
CN106544963B (en) 2018-04-13

Similar Documents

Publication Publication Date Title
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN102031758B (en) Simply supported structure bridge horizontal swivel construction system and method
CN103982045A (en) Installation construction method of roof lattice shell structure without supports and cantilevers
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN104005338A (en) Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge
CN204899238U (en) Unitized curtain wall plate hoist device
CN106677542A (en) Construction method of roof base truss structure
CN205077878U (en) Unit type curtain plate hoisting device
CN102425227A (en) Hanging system for large-diameter sewage pipeline
CN109629449B (en) Mounting and positioning support and alignment method for steel-concrete combined section of arch foot of steel box arch bridge
CN107905127B (en) A kind of low vibration global orientation method for dismounting suitable for bridge pier column
CN103061269B (en) Integral installation method for guy rope hanging basket
CN204703480U (en) A kind of integral supporting structure for building
CN203866711U (en) Large span cable-stayed bridge tower beam three-way temporary consolidation structure
CN105648928A (en) Bridge replacement device and construction method thereof
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN105464009A (en) Device for rapidly replacing bridge and construction method thereof
CN104674944A (en) Novel recoverable functional frame-supporting structure system
CN105568873B (en) Detachable bridge replacement device and construction method thereof
CN102372228B (en) Translational installation method for large-span crane beam
CN105648929A (en) Bridge floor replacing construction device and construction method thereof
CN204371359U (en) A kind of chassis for the construction of tunnel ditch cable channel concrete pouring
CN201187030Y (en) Roller compacted concrete automobile warehousing apparatus
CN104313993A (en) Highway bridge and construction method thereof
CN103410104B (en) The bearing replacement method and apparatus of overhead road of city

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160608

WD01 Invention patent application deemed withdrawn after publication