CN105648906A - Bridge expansion joint covering device - Google Patents

Bridge expansion joint covering device Download PDF

Info

Publication number
CN105648906A
CN105648906A CN201610233338.0A CN201610233338A CN105648906A CN 105648906 A CN105648906 A CN 105648906A CN 201610233338 A CN201610233338 A CN 201610233338A CN 105648906 A CN105648906 A CN 105648906A
Authority
CN
China
Prior art keywords
extension
structure body
disengagable
head
bridge structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610233338.0A
Other languages
Chinese (zh)
Other versions
CN105648906B (en
Inventor
汪金荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Hailing Hydraulic Machinery Co., Ltd.
Original Assignee
汪金荣
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 汪金荣 filed Critical 汪金荣
Priority to CN201610233338.0A priority Critical patent/CN105648906B/en
Publication of CN105648906A publication Critical patent/CN105648906A/en
Application granted granted Critical
Publication of CN105648906B publication Critical patent/CN105648906B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a bridge expansion joint covering device which is used for covering pavements of bridge expansion joints. The bridge expansion joint covering device comprises a rubber body (9) flush with a bridge pavement in horizontal height, a support body (8) positioned in the rubber body (9) and two extension support members (7) which can move in the same direction or the opposite directions in the support body (8) and are mutually symmetrical in structure, wherein each of the two extension support members (7) comprises a horizontal extension head (721) capable of horizontally sliding in a sliding chute (81) of the support body (8), a vertical extension part (72) connected with the horizontal extension head (721), and a support arm (71) connected with the lower end of the vertical extension part (72) and extending to an adjacent bridge structure body, wherein the end part of each of the two extension support members (7) is provided with a support disk (73) for being butted with the adjacent bridge structure body.

Description

A kind of bridge expanssion joint cladding system
Technical field
The present invention relates to bridge field, be specially a kind of bridge expanssion joint cladding system.
Background technology
The road surface of bridge is often provided with expansion joint, in order to provide the allowance expanded with heat and contract with cold. For traffic safety and the serviceability safeguarding bridge pavement, generally require and this expansion joint is carried out elastomeric objects filling or covering. Known mode is to adopt the materials such as gum elastic to carry out covering or clogging. But, the installation of this elastic rubber material needs the matrix of road pavement to carry out the reprocessing such as surface cutting, in order to install described elastomeric material in place. And this easily causes and produces these working positions when driving to damage and then damage road surface matrix. And the installation and removal for this elastomeric material are also required to expend a large amount of manpower and time cost.
Summary of the invention
It is an object of the invention to provide a kind of bridge expanssion joint cladding system, it can overcome defect of the prior art.
Bridge expanssion joint cladding system according to the present invention, for the road surface place of bridge expanssion joint is covered, including the rubber body flushed with the level height of bridge pavement, it is positioned at the supporter within described rubber body, and can towards and away from mobile and that structure is symmetrical two extension support members in described supporter, wherein, said two extend in support member each include can level is slided in the chute of described supporter horizontal extension head, the vertical extension connected with described horizontal extension head and the support arm connecting with the lower end of described vertical extension and extending towards adjacent bridge structure body, wherein, said two extends the end of support member and is provided with the support plate in order to abut with described adjacent bridge structure body, the end face of described support plate is provided with the shear pin being inserted in the shearing hole being arranged on described adjacent bridge structure body, wherein, the vertical extension of two extended in support member is fixedly installed disengagable lock hook, another vertical extension is fixedly installed the disengagable locking dop of correspondence, being provided with the action bars that cross section is ellipse between described disengagable lock hook and described disengagable locking dop, described action bars is rotatably supported in be fixed on the supporting bar being connected with described bridge structure body,Wherein, the gib head protuberance of described disengagable lock hook includes being connected with adjacent bridge structure body and downward-sloping upper flexible extension and described upper flexible extension are connected vertical extension and the lower end that is positioned at described vertical extension; Described disengagable locking dop includes connected with adjacent bridge structure body and acclivitous lower flexible extension, is positioned at the card head of described lower flexible extension end, when described disengagable lock hook is in mutual lock-out state with described disengagable locking dop, described gib head protuberance engages thus realizing linking locking with the adjacent surface of described card head, now, the oval major axis of the cross section of described action bars is horizontal direction; When the major axis that described action bars rotates the ellipse to cross section is vertical direction, the adjacent surface of described gib head protuberance and described card head departs from thus realizing unlocking, now, said two extension support member can make a described support plate be pressed on adjacent bridge structure body and make in the shearing hole that described shear pin is inserted into correspondence under the effect of the top pressure spring being located at therebetween.
Pass through the present invention, can elastic back down and two support arm parts away from each other owing to being provided with, by coordinating with the supported hole on the side of matrix and can by place for the elastomeric material supporting at road surface place and flush with road surface by end card and the friction of matrix side. and this device is easily installed, reason is in that, it is before the mounting by being arranged on the sealed of hook part between two support arms and card head member, enable to two support arms and be in contraction state close to each other, therefore it is easy in the gap being successfully inserted between matrix, when described cladding system is fixed in place by needs, it is operated by the elliptic cross-section action bars with major axis shape, enable to described hook part and card head member disengages, thus the end of two support arms is pushed up press to matrix side to realize fixing by the elastic top opening force of elastic top pressure part. more importantly, when the described action bars with elliptic cross-section is in the contraction state vertical with described disengaged condition, by extruding or push said two support arm opposite to each other, said two support arm can close to each other and make described hook part and dop component elasticity deformation and be changed into locked state from disengaged condition thus described cladding system is converted to contraction state. this can carry out the conversion operation of this contraction state when transporting described cladding system manufacturing complete, it is also possible to takes when cladding system is removed by needs from flexible gap. this is have the arranging of respective guiding surface being engaged with each other time close to each other and realize by having the setting of the flexible rod portion tilted toward each other from respective arm and hook part and card head member automatically into the performance of locked state by pushing. and by arranging described action bars when being in described plumbness, it allows described hook part to move enough amounts to allow chain conjunction of described hook to disengage towards this action bars, and pushing said two support arm and be close to each other so that described action bars can servo-actuated or slave mode be followed freely rotatable to avoid interference with described sealed action when entering locked state. whole apparatus structure is simple, runs ingenious, it is possible to operate easily to realize installation and removal effect, thus saving time and the cost of labor of installation and removal, and uses reliable, stabilized structure.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the cladding system of the present invention, there is shown said two and extends the state that support member is sealed each other;
Fig. 2 illustrates that the cladding system in Fig. 1 is in released state, state when namely two extension support members are disconnected from each other; Now described cladding system is installed in place in bridge expanssion joint.
Fig. 3 is the concrete enlarged diagram of the disengagable lock hook in Fig. 1 and disengagable dop.
Detailed description of the invention
Below in conjunction with Fig. 1-3, the present invention is described in detail.
A kind of bridge expanssion joint cladding system according to embodiment, for the road surface place of bridge expanssion joint is covered, including the rubber body 9 flushed with the level height of bridge pavement, it is positioned at the supporter 8 within described rubber body 9, and can towards and away from mobile and that structure is symmetrical two extension support members 7 in described supporter 8, wherein, said two extend in support member 7 each include can level is slided in the chute 81 of described supporter 8 horizontal extension head 721, the vertical extension 72 connected with described horizontal extension head 721 and the support arm 71 connecting with the lower end of described vertical extension 72 and extending towards adjacent bridge structure body, wherein, said two extends the end of support member 7 and is provided with the support plate 73 in order to abut with described adjacent bridge structure body, the end face of described support plate 73 is provided with the shear pin 731 being inserted in the shearing hole being arranged on described adjacent bridge structure body, wherein, the vertical extension 72 of two extended in support member 7 is fixedly installed disengagable lock hook 79, another vertical extension 72 is fixedly installed the disengagable locking dop 78 of correspondence, being provided with the action bars 6 that cross section is ellipse between described disengagable lock hook 79 and described disengagable locking dop 78, described action bars 6 is rotatably supported in be fixed on the supporting bar 61 being connected with described bridge structure body, wherein, the gib head protuberance 793 of described disengagable lock hook 79 includes being connected with adjacent bridge structure body and downward-sloping upper flexible extension 791 and described upper flexible extension 791 are connected vertical extension 792 and the lower end that is positioned at described vertical extension 792, described disengagable locking dop 78 includes connected with adjacent bridge structure body and acclivitous lower flexible extension 781, is positioned at the card head 782 of described lower flexible extension 781 end, when described disengagable lock hook 79 is in mutual lock-out state with described disengagable locking dop 78, described gib head protuberance 793 engages thus realizing linking locking with the adjacent surface of described card head 782, now, the oval major axis of the cross section of described action bars 6 is horizontal direction, when the major axis that described action bars 6 rotates the ellipse to cross section is vertical direction, the adjacent surface of described gib head protuberance 793 and described card head 782 departs from thus realizing unlocking, now, said two extension support member 7 can make a described support plate 73 be pressed on adjacent bridge structure body and make in the shearing hole that described shear pin 731 is inserted into correspondence under the effect of the top pressure spring 75 being located at therebetween.
Valuably, wherein, it is provided with sliding bevel portion 790 between described vertical extension 792 and described gib head protuberance 793, the outer upper place of described card head 782 is provided with the dop sliding bevel 780 of correspondence, when said two extends thrust that support member 7 is subject to making it close to each other and is recovered to lock-out state by released state, described sliding bevel portion 790 can be engaged so that with described corresponding dop sliding bevel 780 that described upper flexible extension 791, with described lower flexible extension 781, elastic deformation occurs, and then the adjacent surface of described gib head protuberance 793 and described card head 782 is re-engaged with to reenter lock-out state.
Can elastic back down and two support arm parts away from each other owing to being provided with, by coordinating with the supported hole on the side of matrix and can by place for the elastomeric material supporting at road surface place and flush with road surface by end card and the friction of matrix side. and this device is easily installed, reason is in that, it is before the mounting by being arranged on the sealed of hook part between two support arms and card head member, enable to two support arms and be in contraction state close to each other, therefore it is easy in the gap being successfully inserted between matrix, when described cladding system is fixed in place by needs, it is operated by the elliptic cross-section action bars with major axis shape, enable to described hook part and card head member disengages, thus the end of two support arms is pushed up press to matrix side to realize fixing by the elastic top opening force of elastic top pressure part. more importantly, when the described action bars with elliptic cross-section is in the contraction state vertical with described disengaged condition, by extruding or push said two support arm opposite to each other, said two support arm can close to each other and make described hook part and dop component elasticity deformation and be changed into locked state from disengaged condition thus described cladding system is converted to contraction state. this can carry out the conversion operation of this contraction state when transporting described cladding system manufacturing complete, it is also possible to takes when cladding system is removed by needs from flexible gap. this is have the arranging of respective guiding surface being engaged with each other time close to each other and realize by having the setting of the flexible rod portion tilted toward each other from respective arm and hook part and card head member automatically into the performance of locked state by pushing. and by arranging described action bars when being in described plumbness, it allows described hook part to move enough amounts to allow chain conjunction of described hook to disengage towards this action bars, and pushing said two support arm and be close to each other so that described action bars can servo-actuated or slave mode be followed freely rotatable to avoid interference with described sealed action when entering locked state.
By with upper type, those skilled in the art can make various change according to mode of operation within the scope of the invention.

Claims (2)

1. a bridge expanssion joint cladding system, for the road surface place of bridge expanssion joint is covered, including the rubber body (9) flushed with the level height of bridge pavement, it is positioned at the supporter (8) that described rubber body (9) is internal, and can towards and away from mobile and that structure is symmetrical two extensions support member (7) in described supporter (8), wherein, said two extend in support member (7) each include can level is slided in the chute (81) of described supporter (8) horizontal extension head (721), with the vertical extension (72) that described horizontal extension head (721) connects and the support arm (71) that connects with the lower end of described vertical extension (72) and extend towards adjacent bridge structure body, wherein, said two extends the end of support member (7) and is provided with the support plate (73) in order to abut with described adjacent bridge structure body, the end face of described support plate (73) is provided with the shear pin (731) being inserted in the shearing hole being arranged on described adjacent bridge structure body, wherein, the vertical extension (72) of two extended in support member (7) is fixedly installed disengagable lock hook (79), another vertical extension (72) is fixedly installed the disengagable locking dop (78) of correspondence, being provided with the action bars (6) that cross section is ellipse between described disengagable lock hook (79) and described disengagable locking dop (78), described action bars (6) is rotatably supported in be fixed on the supporting bar (61) being connected with described bridge structure body,Wherein, the gib head protuberance (793) of described disengagable lock hook (79) includes being connected with adjacent bridge structure body and downward-sloping upper flexible extension (791) and described upper flexible extension (791) are connected vertical extension (792) and the lower end that is positioned at described vertical extension (792); Described disengagable locking dop (78) includes connected with adjacent bridge structure body and acclivitous lower flexible extension (781), is positioned at the card head (782) of described lower flexible extension (781) end, when described disengagable lock hook (79) is in mutual lock-out state with described disengagable locking dop (78), described gib head protuberance (793) engages thus realizing linking locking with the adjacent surface of described card head (782), now, the oval major axis of the cross section of described action bars (6) is horizontal direction; When the major axis that described action bars (6) rotates the ellipse to cross section is vertical direction, the adjacent surface of described gib head protuberance (793) and described card head (782) departs from thus realizing unlocking, now, said two extension support member (7) can make a described support plate (73) be pressed on adjacent bridge structure body and make in the shearing hole that described shear pin (731) is inserted into correspondence under the effect being located at top pressure spring therebetween (75).
2. a kind of bridge expanssion joint cladding system as claimed in claim 1, wherein, it is provided with sliding bevel portion (790) between described vertical extension (792) and described gib head protuberance (793), the outer upper place of described card head (782) is provided with the dop sliding bevel (780) of correspondence, when said two extends thrust that support member (7) is subject to making it close to each other and is recovered to lock-out state by released state, described sliding bevel portion (790) can be engaged so that with described corresponding dop sliding bevel (780) that described upper flexible extension (791), with described lower flexible extension (781), elastic deformation occurs, and then the adjacent surface of described gib head protuberance (793) and described card head (782) is re-engaged with to reenter lock-out state.
CN201610233338.0A 2016-04-15 2016-04-15 A kind of bridge expanssion joint cladding system Active CN105648906B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610233338.0A CN105648906B (en) 2016-04-15 2016-04-15 A kind of bridge expanssion joint cladding system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610233338.0A CN105648906B (en) 2016-04-15 2016-04-15 A kind of bridge expanssion joint cladding system

Publications (2)

Publication Number Publication Date
CN105648906A true CN105648906A (en) 2016-06-08
CN105648906B CN105648906B (en) 2017-11-07

Family

ID=56497491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610233338.0A Active CN105648906B (en) 2016-04-15 2016-04-15 A kind of bridge expanssion joint cladding system

Country Status (1)

Country Link
CN (1) CN105648906B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3423119A1 (en) * 1984-06-22 1986-01-02 Kober Ag, Glarus Device for laying an elastomeric sealing profile in strip form in expansion joints of carriageways
CN201901844U (en) * 2010-12-08 2011-07-20 衡水橡胶股份有限公司 Expansion device for railway bridges
CN203768806U (en) * 2014-04-15 2014-08-13 金陵科技学院 Bridge expansion joint
CN204298726U (en) * 2014-12-02 2015-04-29 王祥国 A kind of Expansion Units for Highway Bridges
CN204714374U (en) * 2015-05-23 2015-10-21 河南省矿山起重机有限公司 A kind of hoisting box locking assembly
CN105428024A (en) * 2016-01-04 2016-03-23 陈建 Transformer installation device capable of running stably

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3423119A1 (en) * 1984-06-22 1986-01-02 Kober Ag, Glarus Device for laying an elastomeric sealing profile in strip form in expansion joints of carriageways
CN201901844U (en) * 2010-12-08 2011-07-20 衡水橡胶股份有限公司 Expansion device for railway bridges
CN203768806U (en) * 2014-04-15 2014-08-13 金陵科技学院 Bridge expansion joint
CN204298726U (en) * 2014-12-02 2015-04-29 王祥国 A kind of Expansion Units for Highway Bridges
CN204714374U (en) * 2015-05-23 2015-10-21 河南省矿山起重机有限公司 A kind of hoisting box locking assembly
CN105428024A (en) * 2016-01-04 2016-03-23 陈建 Transformer installation device capable of running stably

Also Published As

Publication number Publication date
CN105648906B (en) 2017-11-07

Similar Documents

Publication Publication Date Title
CN105735119A (en) High-stability bridge expansion joint covering assembly
CN105735124A (en) Bridge expansion joint coverage device capable of stably running
CN105839531A (en) Covering device for expansion joint of municipal bridge
CN105648904A (en) Bridge expansion joint covering device with buffering function
CN105648907A (en) Municipal bridge expansion joint covering device convenient to install
CN105648905A (en) Bridge expansion joint covering assembly with LED indicating lamp
CN105839525A (en) Bridge expansion joint covering device flexible to use
CN105735122A (en) Expansion joint covering device for municipal bridge
CN105735121A (en) Covering mechanism for bridge expansion joint
CN105672127A (en) Bridge expansion joint covering device high in safety
CN105648903A (en) Bridge expansion joint covering device capable of increasing service performance of bridge
CN105648906A (en) Bridge expansion joint covering device
CN105839524A (en) Simple bridge expansion joint covering mechanism
CN105839528A (en) Bridge expansion joint covering device with vibration attenuation function
CN105862580A (en) Bridge expansion joint covering equipment convenient to mount
CN105887671A (en) Cover component for covering bridge expansion joint
CN105839529A (en) Bridge expansion joint covering mechanism provided with sound insulation cover
CN105887670A (en) Covering device for expansion joint of bridge pavement
CN105735120A (en) Bridge expansion joint covering mechanism with adjustable tightness
CN105862582A (en) Municipal bridge expansion joint covering device with indication function
CN105803933A (en) Expansion joint covering device of municipal bridge
CN105839523A (en) Safe bridge expansion joint covering device
CN105735125A (en) Indicatable bridge expansion joint coverage structure
CN105839526A (en) Bridge expansion joint covering structure
CN105839527A (en) Covering device for bridge expansion joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170818

Address after: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Applicant after: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

Address before: 317599 Taizhou City, Wenling Province Taiping Street, a village of Samsung bridge, building No. 62, No. 2

Applicant before: Wang Jinrong

TA01 Transfer of patent application right
CB03 Change of inventor or designer information

Inventor after: Ding Kefang

Inventor after: Ding Li

Inventor after: Gu Yajun

Inventor after: Zhou Tao

Inventor after: Shen Yu

Inventor before: Wang Jinrong

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170919

Address after: 225300 Jiangsu province Taizhou Taidong Industrial Park No. 8

Applicant after: Suzhou Hailing Hydraulic Machinery Co., Ltd.

Address before: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Applicant before: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 225300 Taidong Industrial Park No. 8, Taizhou City, Jiangsu Province

Patentee after: Taizhou Hailing Hydraulic Machinery Co., Ltd.

Address before: 225300 Taidong Industrial Park No. 8, Taizhou City, Jiangsu Province

Patentee before: Suzhou Hailing Hydraulic Machinery Co., Ltd.

CP01 Change in the name or title of a patent holder