CN105645850A - Pavement quick-repair asphalt mixture, and preparation method and application method thereof - Google Patents

Pavement quick-repair asphalt mixture, and preparation method and application method thereof Download PDF

Info

Publication number
CN105645850A
CN105645850A CN201610015226.8A CN201610015226A CN105645850A CN 105645850 A CN105645850 A CN 105645850A CN 201610015226 A CN201610015226 A CN 201610015226A CN 105645850 A CN105645850 A CN 105645850A
Authority
CN
China
Prior art keywords
water
road surface
asphalt
emulsified asphalt
epoxy resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610015226.8A
Other languages
Chinese (zh)
Inventor
季节
索智
许鹰
杨松
刘禄厚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Civil Engineering and Architecture
Original Assignee
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Civil Engineering and Architecture filed Critical Beijing University of Civil Engineering and Architecture
Priority to CN201610015226.8A priority Critical patent/CN105645850A/en
Publication of CN105645850A publication Critical patent/CN105645850A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/0028Aspects relating to the mixing step of the mortar preparation
    • C04B40/0039Premixtures of ingredients
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/0075Uses not provided for elsewhere in C04B2111/00 for road construction

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention relates to a pavement quick-repair asphalt mixture, and a preparation method and application method thereof. The pavement quick-repair asphalt mixture is prepared from water, aggregate, water-based epoxy resin modified emulsified asphalt, ore powder and cement according to the weight ratio of (0-5):100:(5-10):(1-10):(0-3). The pavement quick-repair asphalt mixture is simple and easy to operate, is convenient and quick for construction, does not have volatile contaminants, can implement in-time opening to traffic, and has low requirements for the construction environment.

Description

A kind of repairing road surface at quick speed asphalt and preparation method thereof, using method
Technical field
The invention belongs to building field, relate to a kind of repairing road surface at quick speed asphalt and preparation method thereof, using method.
Background technology
Development along with highway in China network, repair after road surface breakage and also become more and more important, usual asphalt concrete pavement pit repairing material is to adopt hot-mix asphalt mixture, but be subject to weather, the impact of workload tends not to realize timely Rapid-Repair, the even more serious pavement diseases such as subgrade frost heaving will be caused particularly in spring, winter, begin with asphalt cold repairing material in the last few years and Asphalt Pavement Damage is carried out Rapid-Repair.
Currently used cold repairing asphalt mixture mainly has two categories below: solvent-borne type cold-patch compound, emulsion-type cold-patch compound.
Wherein solvent-borne type cold-patch compound uses the petroleum solvent such as diesel oil, kerosene to be diluted by Colophonium as diluent, makes Colophonium have relatively low viscosity under room temperature or low temperature and ensure that Colophonium has certain mobility. This cold-patch compound is little due to asphalt viscosity, it is possible to store the longer time, without bigger External Force Acting during storage, molding bonded can't occur between mixture particle. When on the road surface that paves after compacting, diluent in compound volatilizees gradually under extraneous such environmental effects, gradually form the entirety with intensity, but the volatilization of solvent easily causes environmental pollution, and the early strength of this kind of cold-repairing material is low, gain in strength slowly, be only adapted to road surface provisional, should acute Rapid-Repair, it is difficult to meet the requirement of high-grade highway, particularly highway Rapid-Repair.
What emulsion-type cold-patch compound binder adopted is emulsified asphalt, and emulsified asphalt has the features such as pollution-free, easy construction, but traditional Emulsified Asphalt Mixture limits its range of application due to shortcomings such as emulsified asphalt viscosity are low, intensity is low.
It is thus desirable to provide a kind of simple to operation, easy construction, fast, non-volatility pollutes, and energy is open to traffic in time, and construction environment is required low asphalt.
Summary of the invention
In order to overcome the deficiencies in the prior art, the present invention provides a kind of repairing road surface at quick speed asphalt and preparation method thereof, using method. The compound non-volatility of the present invention pollutes, and environmental requirement is low, easy construction, fast.
The invention provides following technical scheme:
A kind of repairing road surface at quick speed asphalt, raw material includes water and gathers materials, raw material also includes emulsified asphalt modified with water-epoxy resin, mineral aggregate and cement, wherein gathers materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: the weight ratio of water is 100: (1��10): (0��3): (5��10): (0��5).
Stacking under condition in the open if gathered materials, then the impact of rainwater of originally experiencing of gathering materials, causing that itself is moisture, therefore, in raw material, water can be not added with; The effect of cement is the early strength improving compound, when early strength is less demanding, it is possible to need not add cement.
In such scheme preferably, gather materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: the weight ratio of water is 95: 4: 1: 8: 3.
In any of the above-described scheme preferably, the raw material preparing described emulsified asphalt modified with water-epoxy resin includes aqueous epoxy resins, firming agent and emulsified asphalt, and wherein the weight ratio of aqueous epoxy resins, firming agent and emulsified asphalt is 2��10:2��10:80��100.
In any of the above-described scheme preferably, the raw material preparing described emulsified asphalt modified with water-epoxy resin includes aqueous epoxy resins, firming agent and emulsified asphalt, wherein the weight ratio 5:5:100 of aqueous epoxy resins, firming agent and emulsified asphalt.
Based on laboratory test research and economical consideration, the optimum weight percent of aqueous epoxy resins, firming agent and emulsified asphalt is defined as 5:5:100.
In any of the above-described scheme preferably, the method preparing described emulsified asphalt modified with water-epoxy resin is: is joined in emulsified asphalt by aqueous epoxy resins and is stirred, and adds firming agent and is again stirring for uniformly; Or after aqueous epoxy resins is mixed homogeneously with firming agent, join in emulsified asphalt and stir.
So add purpose be, for ensure both mix homogeneously, ensure that it will not too fast generation curing reaction within the regular hour simultaneously.
In any of the above-described scheme preferably, described aqueous epoxy resins includes EP-20 solid epoxy water-based emulsion, one or more of EP-44 semisolid epoxy resin water-based emulsion or EP-51 liquid epoxies water-based emulsion.
In any of the above-described scheme preferably, described firming agent includes modified multicomponent amine epoxy curing agent water-based emulsion, modified fat amine epoxy curing agent water-based emulsion, one or more of aromatic amine epoxy curing agent water-based emulsion.
In any of the above-described scheme preferably, described emulsified asphalt includes cationic emulsified bitumen.
In any of the above-described scheme preferably, described in gather materials and include that 10-15mm gathers materials, 5-10mm gathers materials and 0-5mm gathers materials, the weight ratio of three is 30:27:38.
In any of the above-described scheme preferably, described breeze includes limestone dust, limestone mineral powder or basalt breeze.
In any of the above-described scheme preferably, described cement includes Portland cement or road road cement.
Gather materials in the present invention, breeze should meet asphalt highway job specfication, and cement is Portland cement or road cement; Emulsified asphalt also should ensure that except meeting asphalt highway specification and will not react with aqueous epoxy resins and firming agent; Aqueous epoxy resins and firming agent should according to being open to traffic the time and the miscible degree with emulsified asphalt selects.
The preparation method that the present invention also provides for described repairing road surface at quick speed asphalt, including following steps:
(1) will gather materials and prepare by proportioning, and carry out dry mixing 10-15s, stir;
(2) the middle addition water that gathers materials obtained in step (1), by aggregate blending 30-45s, moistening;
(3) in the mixture that step (3) obtains, add emulsified asphalt modified with water-epoxy resin, after adding cement and breeze, after mix 60-90s, stir without grey material, i.e. described repairing road surface at quick speed asphalt.
In such scheme preferably, the raw material preparing described emulsified asphalt modified with water-epoxy resin includes aqueous epoxy resins, firming agent and emulsified asphalt, and wherein the weight ratio of aqueous epoxy resins, firming agent and emulsified asphalt is (2��10): (2��10): (80��100).
In any of the above-described scheme preferably, the raw material preparing described emulsified asphalt modified with water-epoxy resin includes aqueous epoxy resins, firming agent and emulsified asphalt, wherein the weight ratio 5:5:100 of aqueous epoxy resins, firming agent and emulsified asphalt.
In any of the above-described scheme preferably, the method preparing described emulsified asphalt modified with water-epoxy resin is: is joined in emulsified asphalt by aqueous epoxy resins and is stirred, and adds firming agent and is again stirring for uniformly; Or after aqueous epoxy resins is mixed homogeneously with firming agent, join in emulsified asphalt and stir.
This preparation method is simple to operation, it is not necessary to main equipment, and compound need not heat, and the compound being simultaneously manufactured is non-volatile, pollution-free. Simultaneously preparation method amount as required can configure raw material, it is to avoid waste.
The present invention also provides for the using method of described repairing road surface at quick speed asphalt, pit is carried out milling cleaning, bottom pit and surrounding brushing sticking layer oil, by in described mixture laying to pit, carry out compacting, after compacting operation completes, repairing road surface is carried out painting with former road surface joint part and spreads Colophonium edge sealing.
Bottom pit and surrounding brushing sticking layer oil be to strengthen and the bonding on former road surface, carry out painting spread Colophonium edge sealing to repairing road surface and former road surface joint part, be prevent rainwater from oozing under junction, the old and new road surface.
In such scheme preferably, described mixture laying includes layering to the mode in pit and paves.
In such scheme preferably, paving thickness is 2-4 times of nominal maximum aggregate size.
In any of the above-described scheme preferably, described compacting operation adopts baby roller or vibrating plate compactor to complete.
In such scheme preferably, control compactness, namely after compacting voidage at 6%-10%.
The present invention also provides for the using method of repairing road surface at quick speed asphalt prepared by described preparation method, pit is carried out milling cleaning, bottom pit and surrounding brushing sticking layer oil, by in described mixture laying to pit, carry out compacting, after compacting operation completes, repairing road surface is carried out painting with former road surface joint part and spreads Colophonium edge sealing.
In such scheme preferably, described mixture laying includes layering to the mode in pit and paves.
In such scheme preferably, paving thickness is 2-4 times of nominal maximum aggregate size.
In any of the above-described scheme preferably, described compacting operation adopts baby roller or vibrating plate compactor to complete.
In such scheme preferably, control compactness, namely after compacting voidage at 6%-10%.
The compound of the present invention is in the preparation, each shelves can be gathered materials and transport to scene and coordinate in proportion by the configuration wherein gathered materials, it is also possible to having prepared in proportion in stock ground, job site is moved in entrucking to, add water and modified emulsifying asphalt to being done directly after scene, carry out mix.
The repairing road surface at quick speed asphalt of the present invention modifying function by epoxy resin, epoxy resin is uniformly distributed after adding with firming agent in emulsified asphalt, Colophonium is attached in the framing structure that epoxy resin is formed, form the three dimensional structure that intensity is higher, additionally the caking property of epoxy resin is better, thus it is possible to vary the shortcoming that conventional emulsification goes through the bad adhesion of green grass or young crops.The slow feature of the gain in strength of traditional solvent-borne Colophonium is overcome by the solidification of epoxy resin. The compound of the present invention takes job mix, it is to avoid the steps such as storage, can directly use after mix, amount carries out mix as desired, it is to avoid waste. The repairing road surface at quick speed asphalt of the present invention is simple to operation, easy construction, and fast, non-volatility pollutes, and energy is open to traffic in time, requires low to construction environment.
Detailed description of the invention
In order to further appreciate that the technical characteristic of the present invention, below in conjunction with specific embodiment, the present invention is set forth in. The present invention is only had exemplary effect by embodiment, and does not have any restrictive effect, and the amendment of any unsubstantiality that those skilled in the art makes on the basis of the present invention all should belong to protection scope of the present invention.
Embodiment 1
A kind of repairing road surface at quick speed asphalt, raw material includes water and gathers materials, raw material also includes emulsified asphalt modified with water-epoxy resin, mineral aggregate and cement, wherein gathers materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: the weight ratio of water is 95: 4: 1: 8: 3.
Embodiment 2
A kind of repairing road surface at quick speed asphalt, raw material also includes emulsified asphalt modified with water-epoxy resin, mineral aggregate and cement, wherein gathers materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: the weight ratio of water is 94: 5.5: 0.5: 8: 0.
Embodiment 3
A kind of repairing road surface at quick speed asphalt, in such scheme preferably, raw material also includes emulsified asphalt modified with water-epoxy resin, mineral aggregate and cement, wherein gathers materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: the weight ratio of water is 95: 5: 0: 7: 3.
Embodiment 4
A kind of repairing road surface at quick speed asphalt, in such scheme preferably, raw material also includes emulsified asphalt modified with water-epoxy resin, mineral aggregate and cement, wherein gathers materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: the weight ratio of water is 94: 5: 1: 8: 3.
Embodiment 5
The difference of the present embodiment and embodiment 1 is: the raw material preparing described emulsified asphalt modified with water-epoxy resin includes aqueous epoxy resins, firming agent and emulsified asphalt, and wherein the weight ratio of aqueous epoxy resins, firming agent and emulsified asphalt is 5:5:100.
The present invention prepares the raw material of described emulsified asphalt modified with water-epoxy resin and includes aqueous epoxy resins, firming agent and emulsified asphalt, and wherein the weight ratio of aqueous epoxy resins, firming agent and emulsified asphalt also may be selected to be 2: 2: 80 or 10:10:100.
Embodiment 6
The difference of the present embodiment and embodiment 5 is: the method preparing described emulsified asphalt modified with water-epoxy resin is: is joined in emulsified asphalt by aqueous epoxy resins and is stirred, and adds firming agent and is again stirring for uniformly; Or after aqueous epoxy resins is mixed homogeneously with firming agent, join in emulsified asphalt and stir.
Embodiment 6
The difference of the present embodiment and embodiment 5 is: described aqueous epoxy resins includes EP-20 solid epoxy water-based emulsion, one or more of EP-44 semisolid epoxy resin water-based emulsion or EP-51 liquid epoxies water-based emulsion.
Embodiment 7
The difference of the present embodiment and embodiment 6 is: described firming agent includes modified multicomponent amine epoxy curing agent water-based emulsion, modified fat amine epoxy curing agent water-based emulsion, one or more of aromatic amine epoxy curing agent water-based emulsion.
Embodiment 8
The difference of the present embodiment and embodiment 7 is: described emulsified asphalt includes cationic emulsified bitumen.
Embodiment 9
The difference of the present embodiment and embodiment 1 is: described in gather materials and include that 10-15mm gathers materials, 5-10mm gathers materials and 0-5mm gathers materials, the weight ratio of three is 30:27:38.
Embodiment 10
The difference of the present embodiment and embodiment 1 is: described breeze includes limestone dust, limestone mineral powder or basalt breeze.
Embodiment 11
The difference of the present embodiment and embodiment 11 is: described cement includes Portland cement or road cement.
Embodiment 12
A kind of preparation method of repairing road surface at quick speed asphalt, including following steps:
(1) will gather materials and prepare by proportioning, and carry out dry mixing 10-15s, stir;
(2) the middle addition water that gathers materials obtained in step (1), by aggregate blending 30-45s, by aggregate blending moistening;
(3) in the mixture that step (3) obtains, add emulsified asphalt modified with water-epoxy resin, after adding cement and breeze, after mix 60-90s, stir without grey material, i.e. described repairing road surface at quick speed asphalt.
Embodiment 13
The difference of the present embodiment and embodiment 12 is: the raw material preparing described emulsified asphalt modified with water-epoxy resin includes aqueous epoxy resins, firming agent and emulsified asphalt, and wherein the weight ratio of aqueous epoxy resins, firming agent and emulsified asphalt is 5:5:100.
Embodiment 14
The difference of the present embodiment and embodiment 12 is: the method preparing described emulsified asphalt modified with water-epoxy resin is: is joined in emulsified asphalt by aqueous epoxy resins and is stirred, and adds firming agent and is again stirring for uniformly; Or after aqueous epoxy resins is mixed homogeneously with firming agent, join in emulsified asphalt and stir.
Embodiment 15
The using method of repairing road surface at quick speed asphalt described in a kind of embodiment 1, pit is carried out milling cleaning, bottom pit and surrounding brushing sticking layer oil, by in described mixture laying to pit, carry out compacting, after compacting operation completes, repairing road surface is carried out painting with former road surface joint part and spreads Colophonium edge sealing.
Embodiment 16
The difference of the present embodiment and embodiment 15 is: described mixture laying includes layering to the mode in pit and paves. Paving thickness is 2-4 times of nominal maximum aggregate size.
Embodiment 17
The difference of the present embodiment and embodiment 16 is: described compacting operation adopts baby roller or vibrating plate compactor to complete. Control compactness, namely after compacting voidage at 6%-10%.
Embodiment 18
A kind of using method of the repairing road surface at quick speed asphalt of embodiment 12 preparation, pit is carried out milling cleaning, bottom pit and surrounding brushing sticking layer oil, by in described mixture laying to pit, carry out compacting, after compacting operation completes, repairing road surface is carried out painting with former road surface joint part and spreads Colophonium edge sealing.
Embodiment 19
The difference of the present embodiment and embodiment 18 is: described mixture laying includes layering to the mode in pit and paves. Paving thickness is 2-4 times of nominal maximum aggregate size.
Embodiment 20
The difference of the present embodiment and embodiment 19 is: described compacting operation adopts baby roller or vibrating plate compactor to complete. Control compactness, namely after compacting voidage at 6%-10%.
Embodiment 21:
To fill up the pit of 1m �� 1.5m �� 0.08m, the emulsified asphalt modified with water-epoxy resin asphalt mixture design using nominal particle diameter to be 13.2 is example (it is 13.2mm that current road surface common type is mainly nominal particle diameter).
1. raw material selects and performance test
Test raw materials mainly has tri-kinds of crushed stone material of 0-5mm, 5-10mm, 10-15mm, limestone mineral powder, cement, aqueous epoxy resins, firming agent and emulsified asphalt.
Table 1.10-15mm coarse aggregate result of the test
Pilot project Unit Technology requirement Result of the test Test method
Apparent relative density is not less than �� 2.60 2.803 T0304
Bulk specific gravity �� �� 2.664 T0304
Water absorption rate is not more than % 2.0 1.86 T0304
Building stones crush values is not more than % 28 12.6 T0316
Los Angeles abrasion loss is not more than % 30 15.4 T0317
Adhesion is not less than Level 3 4 T0616
Flat-elongated particles content is not more than % 18 �� T0312
Wherein particle diameter is not more than more than 9.5mm % 15 7.8 T0312
Wherein particle diameter is not more than less than 9.5mm % 20 �� T0312
< 0.075mm granule content is not more than WATER-WASHING METHOD % 1 0.8 T0310
Table 2.4.75-9.5mm coarse aggregate result of the test
Pilot project Unit Technology requirement Result of the test Test method
Apparent relative density is not less than �� 2.60 2.818 T0304
Bulk specific gravity �� �� 2.683 T0304
Water absorption rate is not more than % 2.0 1.79 T0304
Flat-elongated particles content is not more than % 15 �� T0312
Wherein particle diameter is not more than more than 9.5mm % 12 �� T0312
Wherein particle diameter is not more than less than 9.5mm % 18 6.4 T0312
< 0.075mm granule content is not more than WATER-WASHING METHOD % 3 0.6 T0310
Table 3.2.36-4.75mm fine aggregate result of the test
Pilot project Unit Technology requirement Result of the test Test method
Apparent relative density is not less than �� 2.60 2.813 T0330
Bulk specific gravity �� �� 2.669 T0330
Water absorption rate is not more than % 2.0 1.92 T0304
< 0.075mm granule content is not more than WATER-WASHING METHOD % 3 0.9 T0310
Table 4.0-5mm fine aggregate result of the test
Table 5. breeze result of the test
Pilot project Unit Technical standard Result of the test Test method
Apparent density, is not less than - 2.5 2.732 T0352
Water content, is not more than % 1 0.5 T0332
Particle size range < % 100 100 T0351
< 0.15mm % 90��100 99.75 T0351
< 0.075mm % 75��100 88.56 T0351
Hydrophilic coefficient �� 1 0.71 T0353
Plasticity index % 4 2.8 T0354-2000
The character of table 6 aqueous epoxy resins and firming agent
Project Aqueous epoxy resins Firming agent
Outward appearance Milky uniform liquid Yellowish transparency liquid
Solid content (%) ��58 ��50
Proportion (g/cm3) 1.05-1.10 1.05-1.10
Viscosity (pa.s) ��2 ��10
PH value 6-8 8-10
Epoxide number 0.24-0.27 -
Active hydrogen equivalent weight - 300
In table 6, aqueous epoxy resins is EP51 liquid epoxies water-based emulsion, i.e. EP51; Firming agent is aromatic amine epoxy curing agent water-based emulsion, i.e. waterborne curing agent AB-HGF.
Table 7 emulsified asphalt quality testing table (" highway engineering Colophonium and Asphalt Mixture Experiment code " (JTGE20-2011))
Table 8. gathers materials and the gradation composition of breeze
According to above-mentioned each table it can be seen that raw-material test and technical standard contrast, raw material meets the requirement of existing specification.
2, parameter is determined
The asphalt mixture gradation that this example adopts is as shown in table 9.
The formate gradation composition of table 9 asphalt
Can be calculated according to table 8 and table 9:
10-15mm:5-10mm:0-5mm: breeze: cement=30:27:38:4:1
Need additional wet water 3% (for gathering materials, the 3% of breeze and cement gross weight), emulsified asphalt modified with water-epoxy resin binder 8% (for gathering materials, the 8% of breeze and cement gross weight).
The pit being computed filling up a 1m �� 1.5m �� 0.08m needs compound 333kg, wherein 10-15mm need 90kg, 5-10mm's to need 81kg, 0-5mm needs 114kg, breeze to need 12kg, and cement needs 3kg, water needs 9kg, emulsified asphalt modified with water-epoxy resin 24kg.
3, the preparation of compound:
1) load weighted gathering materials is prepared, carry out dry mixing 10-15s, mix homogeneously;
2) by each to aqueous epoxy resins and firming agent 5% (accounting for the mass fraction of emulsified asphalt), it is separately added in emulsified asphalt and stirs;
3) the uniform 30-45s of water mix of the middle addition 3% of gathering materials step (1) obtained;
4) in the mixture that step (3) obtains, the emulsified asphalt that addition step (2) has configured is stirred;
5) in the mixture that step (4) obtains, cement and breeze are added, after being again stirred 60-90s, until compound is without grey, till mix is uniform, i.e. described repairing road surface at quick speed asphalt.
4, the use of compound
Its using method is: Water Damage pit place is carried out milling, and the pit degree of depth of milling is 8cm, is cleaned up by milling material, bottom is cleaned;
Bottom pit and surrounding brushing sticking layer oil;
First by the mixture laying that mixes to pit, pave as 6cm for the first time, adopt vibrating plate compactor to tamp, continue making and filled up, fill into middle high, the convex that surrounding is low, again tamp with vibrating plate compactor; Repairing road surface is carried out painting with former road surface joint part and spreads Colophonium edge sealing.
The configuration more than gathered materials can complete in stock ground, and job site is moved in entrucking to, adds water and modified emulsifying asphalt to being done directly after scene, carries out mix.
This compound takes job mix, it is to avoid the steps such as storage, can directly use after mix, amount carries out mix as desired, it is to avoid waste.
Current specifications thinks that cold repairing asphalt mixture intensity needs to reach 2KN, and the compound of the present embodiment, namely proportioning is for gather materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: when the weight ratio of water is 95: 4: 1: 8: 3, within two hours, intensity is up to 4.2KN, and final strength is up to 15.8KN. It addition, in proportioning for gather materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: when the weight ratio of water is 95: 5: 0: 7: 3, two hours intensity is 3.5KN, and final strength is 13.2KN.

Claims (10)

1. a repairing road surface at quick speed asphalt, raw material includes water and gathers materials, it is characterized in that: raw material also includes emulsified asphalt modified with water-epoxy resin, mineral aggregate and cement, wherein gathers materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: the weight ratio of water is 100: (1��10): (0��3): (5��10): (0��5).
2. repairing road surface at quick speed asphalt according to claim 1, it is characterised in that: gather materials: breeze: cement: emulsified asphalt modified with water-epoxy resin: the weight ratio of water is 95: 4: 1: 8: 3.
3. repairing road surface at quick speed asphalt according to claim 1 and 2, it is characterized in that: the raw material preparing described emulsified asphalt modified with water-epoxy resin includes aqueous epoxy resins, firming agent and emulsified asphalt, wherein the weight ratio of aqueous epoxy resins, firming agent and emulsified asphalt is (2��10): (2��10): (80��100).
4. repairing road surface at quick speed asphalt according to claim 3, it is characterized in that: the raw material preparing described emulsified asphalt modified with water-epoxy resin includes aqueous epoxy resins, firming agent and emulsified asphalt, wherein the weight ratio 5:5:100 of aqueous epoxy resins, firming agent and emulsified asphalt.
5. repairing road surface at quick speed asphalt according to claim 4, it is characterized in that: the method preparing described emulsified asphalt modified with water-epoxy resin is: is joined in emulsified asphalt by aqueous epoxy resins and is stirred, add firming agent and be again stirring for uniformly; Or after aqueous epoxy resins is mixed homogeneously with firming agent, join in emulsified asphalt and stir.
6. repairing road surface at quick speed asphalt according to claim 3, it is characterized in that: described aqueous epoxy resins includes EP-20 solid epoxy water-based emulsion, one or more in EP-44 semisolid epoxy resin water-based emulsion or EP-51 liquid epoxies water-based emulsion.
7. repairing road surface at quick speed asphalt according to claim 3, it is characterized in that: described firming agent includes modified multicomponent amine epoxy curing agent water-based emulsion, modified fat amine epoxy curing agent water-based emulsion, one or more of aromatic amine epoxy curing agent water-based emulsion.
8. the preparation method of repairing road surface at quick speed asphalt according to any one of claim 1 to 7, it is characterised in that: include following steps:
(1) will gather materials and prepare by proportioning, and carry out dry mixing 10-15s, stir;
(2) the middle addition water that gathers materials obtained in step (1), by aggregate blending 30-45s, moistening;
(3) in the mixture that step (3) obtains, add emulsified asphalt modified with water-epoxy resin, after adding cement and breeze, after mix 60-90s, stir without grey material, i.e. described repairing road surface at quick speed asphalt.
9. the using method of repairing road surface at quick speed asphalt according to any one of claim 1 to 7, it is characterized in that: pit is carried out milling cleaning, bottom pit and surrounding brushing sticking layer oil, by in described mixture laying to pit, carry out compacting, after compacting operation completes, repairing road surface is carried out painting with former road surface joint part and spreads Colophonium edge sealing.
10. the using method of the repairing road surface at quick speed asphalt that prepared by preparation method described in claim 8, it is characterized in that: pit is carried out milling cleaning, bottom pit and surrounding brushing sticking layer oil, by in described mixture laying to pit, carry out compacting, after compacting operation completes, repairing road surface is carried out painting with former road surface joint part and spreads Colophonium edge sealing.
CN201610015226.8A 2016-01-11 2016-01-11 Pavement quick-repair asphalt mixture, and preparation method and application method thereof Pending CN105645850A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610015226.8A CN105645850A (en) 2016-01-11 2016-01-11 Pavement quick-repair asphalt mixture, and preparation method and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610015226.8A CN105645850A (en) 2016-01-11 2016-01-11 Pavement quick-repair asphalt mixture, and preparation method and application method thereof

Publications (1)

Publication Number Publication Date
CN105645850A true CN105645850A (en) 2016-06-08

Family

ID=56487279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610015226.8A Pending CN105645850A (en) 2016-01-11 2016-01-11 Pavement quick-repair asphalt mixture, and preparation method and application method thereof

Country Status (1)

Country Link
CN (1) CN105645850A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106477974A (en) * 2016-09-29 2017-03-08 长安大学 A kind of glass fibre and water-base epoxy emulsified asphalt material for road repair
CN106587821A (en) * 2016-12-08 2017-04-26 贵州省交通规划勘察设计研究院股份有限公司 Cold-regeneration quick repairing material and preparation method thereof
CN106810153A (en) * 2016-12-31 2017-06-09 山西省交通科学研究院 It is a kind of can quick bituminous pavement cold patch material of open to traffic and preparation method thereof
CN108409263A (en) * 2018-06-12 2018-08-17 四川巴南高速公路有限责任公司 A kind of asphalt pavement cold paving mixture and its preparation method and application method
CN108558274A (en) * 2018-05-30 2018-09-21 河南省大道路业有限公司 The preparation method of road surface aqueous epoxy resins emulsified bitulith
CN109133816A (en) * 2018-09-12 2019-01-04 郑州航空工业管理学院 A kind of pouring type repair materials with high early strength and non-deformability
CN109626901A (en) * 2018-12-26 2019-04-16 武汉理工大学 A kind of preparation method of high tenacity cement concrete
CN110282909A (en) * 2019-05-28 2019-09-27 南通福伦利新材料有限公司 A kind of cold mixing material of epoxy-modified emulsified asphalt and preparation method thereof
CN110713362A (en) * 2019-12-12 2020-01-21 湖南鑫长胜材料科技有限公司 Normal-temperature asphalt mixture and preparation method thereof
CN111606605A (en) * 2020-06-11 2020-09-01 郭炎伟 Water-based epoxy resin modified emulsified asphalt cold-patch material for rapid road repair and preparation method thereof
CN113604063A (en) * 2021-08-06 2021-11-05 山西诺通公路养护有限公司 Emulsified asphalt activated and regenerated pavement repairing material
CN113622247A (en) * 2021-08-13 2021-11-09 浙江固路交通科技有限公司 Low-carbon rapid maintenance paving method for asphalt pavement track
CN113831069A (en) * 2021-10-13 2021-12-24 武汉工程大学 Pavement self-compacting rapid repairing material capable of being constructed at normal temperature and preparation method and construction process thereof
CN114426416A (en) * 2022-01-23 2022-05-03 山西省交通科技研发有限公司 Reactive quick-setting asphalt pavement cold repair material capable of being stored for long time and preparation method thereof
CN115043613A (en) * 2022-06-30 2022-09-13 华南农业大学 Fiber rib-geopolymer emulsified asphalt pavement pit repairing material and preparation method thereof
CN115819027A (en) * 2022-12-24 2023-03-21 北京路新沥青混凝土有限公司 Hot-mix epoxy asphalt concrete and preparation method and application thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103951323A (en) * 2014-04-17 2014-07-30 交通运输部公路科学研究所 Reinforced emulsified asphalt concrete for roads and preparation method of concrete
CN103951343A (en) * 2014-04-10 2014-07-30 中国石油大学(华东) Composite cold repair material for asphalt pavement pit repair

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103951343A (en) * 2014-04-10 2014-07-30 中国石油大学(华东) Composite cold repair material for asphalt pavement pit repair
CN103951323A (en) * 2014-04-17 2014-07-30 交通运输部公路科学研究所 Reinforced emulsified asphalt concrete for roads and preparation method of concrete

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106477974A (en) * 2016-09-29 2017-03-08 长安大学 A kind of glass fibre and water-base epoxy emulsified asphalt material for road repair
CN106587821A (en) * 2016-12-08 2017-04-26 贵州省交通规划勘察设计研究院股份有限公司 Cold-regeneration quick repairing material and preparation method thereof
CN106810153A (en) * 2016-12-31 2017-06-09 山西省交通科学研究院 It is a kind of can quick bituminous pavement cold patch material of open to traffic and preparation method thereof
CN106810153B (en) * 2016-12-31 2019-07-30 山西省交通科学研究院 It is a kind of can quickly open to traffic bituminous pavement cold patch material and preparation method thereof
CN108558274A (en) * 2018-05-30 2018-09-21 河南省大道路业有限公司 The preparation method of road surface aqueous epoxy resins emulsified bitulith
CN108409263A (en) * 2018-06-12 2018-08-17 四川巴南高速公路有限责任公司 A kind of asphalt pavement cold paving mixture and its preparation method and application method
CN108409263B (en) * 2018-06-12 2020-11-03 四川巴南高速公路有限责任公司 Asphalt pavement cold-patch mixture and preparation method and application method thereof
CN109133816A (en) * 2018-09-12 2019-01-04 郑州航空工业管理学院 A kind of pouring type repair materials with high early strength and non-deformability
CN109626901A (en) * 2018-12-26 2019-04-16 武汉理工大学 A kind of preparation method of high tenacity cement concrete
CN110282909A (en) * 2019-05-28 2019-09-27 南通福伦利新材料有限公司 A kind of cold mixing material of epoxy-modified emulsified asphalt and preparation method thereof
CN110713362B (en) * 2019-12-12 2020-06-02 湖南鑫长胜材料科技有限公司 Normal-temperature asphalt mixture and preparation method thereof
CN110713362A (en) * 2019-12-12 2020-01-21 湖南鑫长胜材料科技有限公司 Normal-temperature asphalt mixture and preparation method thereof
CN111606605A (en) * 2020-06-11 2020-09-01 郭炎伟 Water-based epoxy resin modified emulsified asphalt cold-patch material for rapid road repair and preparation method thereof
CN113604063A (en) * 2021-08-06 2021-11-05 山西诺通公路养护有限公司 Emulsified asphalt activated and regenerated pavement repairing material
CN113622247A (en) * 2021-08-13 2021-11-09 浙江固路交通科技有限公司 Low-carbon rapid maintenance paving method for asphalt pavement track
CN113831069A (en) * 2021-10-13 2021-12-24 武汉工程大学 Pavement self-compacting rapid repairing material capable of being constructed at normal temperature and preparation method and construction process thereof
CN114426416A (en) * 2022-01-23 2022-05-03 山西省交通科技研发有限公司 Reactive quick-setting asphalt pavement cold repair material capable of being stored for long time and preparation method thereof
CN114426416B (en) * 2022-01-23 2022-11-08 山西省交通科技研发有限公司 Reactive quick-setting asphalt pavement cold repair material capable of being stored for long time and preparation method thereof
CN115043613A (en) * 2022-06-30 2022-09-13 华南农业大学 Fiber rib-geopolymer emulsified asphalt pavement pit repairing material and preparation method thereof
CN115043613B (en) * 2022-06-30 2023-03-10 华南农业大学 Fiber rib-geopolymer emulsified asphalt pavement pit repairing material and preparation method thereof
CN115819027A (en) * 2022-12-24 2023-03-21 北京路新沥青混凝土有限公司 Hot-mix epoxy asphalt concrete and preparation method and application thereof
CN115819027B (en) * 2022-12-24 2023-06-30 北京路新沥青混凝土有限公司 Hot-mix epoxy asphalt concrete and preparation method and application thereof

Similar Documents

Publication Publication Date Title
CN105645850A (en) Pavement quick-repair asphalt mixture, and preparation method and application method thereof
CN103669207B (en) A kind of prefabricated bituminous concrete steel bridge surface paving structure and paving method thereof
CN103114526B (en) Steel bridge deck pavement cold mixing maintenance material and manufacturing method thereof
CN103043962B (en) Mixture for normal-temperature repairing of asphalt pavement pits, and preparation method and application thereof
MX2011001966A (en) Composition and process of using an asphalt emulsion to convert an unpaved surface into a paved surface.
CN106149500B (en) A kind of construction method of cement emulsified asphalt mortar penetration type half-flexible pavement
CN104031397A (en) Regenerated epoxy asphalt pavement and making method thereof
CN104446156B (en) A kind of emulsified bitumen slurry mixture penetration type bituminous paving
CN106587835A (en) Cold-mixed cement-emulsified asphalt concrete and pavement method thereof
CN103693896A (en) Asphalt mixture capable of suppressing reflection cracks in road surface, and preparation method and application of asphalt mixture
CN108411752A (en) The restorative procedure of asphalt pavement pit
CN106396502A (en) Foamed warm mix recycled asphalt mixture and preparation method thereof
CN105036613A (en) Crack pressure-sensitive solidification self-healing asphalt concrete, as well as preparation method and application method thereof
CN105176116A (en) Cold mixing self-emulsifying retinasphal material, preparation method and purpose of cold mixing self-emulsifying retinasphal material
CN102051849A (en) Preparation method of stone matrix asphalt mixture
CN104929011A (en) Cold repairing material for asphalt road surfaces as well as preparation method and application of cold repairing material
CN110714389A (en) Ultrathin high-performance composite semi-flexible surface layer pavement structure and construction method thereof
CN112252108B (en) Road construction method for in-situ cold recycling of asphalt pavement
CN106517895A (en) Reworked material cold mixing storage cold patch material and preparing method and application thereof
KR100884208B1 (en) Pavement method
CN106995302A (en) A kind of high-performance compound and its construction method
CN202347384U (en) Low-noise abrasion-resisting pavement structure
RU2351703C1 (en) Method for production of cold organic mineral mixture for road pavements
CN103242013A (en) Low-quality-flyash concrete pavement material and construction method thereof
CN112962380B (en) Construction method of asphalt pavement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160608

RJ01 Rejection of invention patent application after publication