CN103951343A - Composite cold repair material for asphalt pavement pit repair - Google Patents
Composite cold repair material for asphalt pavement pit repair Download PDFInfo
- Publication number
- CN103951343A CN103951343A CN201410152555.8A CN201410152555A CN103951343A CN 103951343 A CN103951343 A CN 103951343A CN 201410152555 A CN201410152555 A CN 201410152555A CN 103951343 A CN103951343 A CN 103951343A
- Authority
- CN
- China
- Prior art keywords
- component
- asphalt pavement
- patch material
- pavement pit
- compound cold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention relates to a composite cold repair material for asphalt pavement pit repair, which is prepared from a component A and a component B in a weight ratio of 1:1. The component A is prepared from the following raw materials in parts by weight: 10-30 parts of cationic emulsified asphalt, 0.1-0.3 part of water reducing agent, 0.1-0.3 part of defoaming agent, 0.3-0.5 part of adhesive, 0-5 parts of water, 10-20 parts of cement, 5-15 parts of sand and 0.01-0.03 part of expanding agent. The component B is prepared from the following raw materials in parts by weight: 35-48 parts of basalt with the particle size of 10-15mm, 45-60 parts of basalt with the particle size of 5-10mm and 8-15 parts of basalt with the particle size of 0-3mm. The composite cold repair material does not need heating, is simple for construction, does not need well-trained personnel or special equipment, and has the advantages of small environmental pollution, low price, energy saving, environment friendliness, high environmental adaptability, short curing time, favorable compatibility with original pavement and favorable strength.
Description
Technical field
The present invention relates to Road maintenance, repairing technique field, particularly composite cold feed supplement preparation method for a kind of asphalt pavement pit repairing.
Background technology
Hole groove is one of common typical disease of bituminous pavement, can have a strong impact on the planeness on road surface and the comfortableness of driving.Process timely if can not get, under the comprehensive action of traffic loading, weather, water etc., destroy and continue development, consider from security standpoint, can cause great threat to driver and crew's personnel safety; Consider from economic angle, the continuation development of hole groove also makes being multiplied of maintenance costs.
Pit repairing is mainly repairing and the reinforcement for diseases such as hole groove, local check crack, be full of cracks, but also can be to local subsidence, gather around bag and slumping crack is repaired.Carry out at present pit repairing and mainly contain two kinds of techniques: cold-patch and vulcanizing.Cold-patch and the performance of vulcanizing and feature contrast are as shown in table 1
Table 1 cold-patch and the performance of vulcanizing and feature contrast
It is very outstanding that cold-patch material is vulcanized material advantage relatively, but existing cold-patch and the maximum weak point of vulcanizing material be exactly poor with former road surface consistency after forming materials, later strength is little, the life-span is not long.Therefore the present invention propose invention a kind of good with former road surface consistency, later strength is suitable with bituminous pavement, the compound cold-patch material of pit repairing that the life-span is grown.
The main forms that hole groove destroys is divided into following three kinds:
Upper layer produces hole groove.Cohesive force because asphalt uplayer compound local porosity is large, between pitch and building stones is not strong, road table water enters and is trapped in upper layer asphalt, under traffic load especially heavy load constantly acts on, the hydrodynamic pressure producing makes the pitch of upper layer get off from building stones surfacial spalling, and bituminous pavement just can produce local loose destruction.The building stones that are scattered are thrown away by wheel, and road surface forms hole groove from top to bottom, and the degree of depth of this class hole groove is generally 2~5cm, and in Chinese Protective Measures of Bitumen Pavement Initial Damage, all kinds of holes groove produces the earliest, is also to produce the maximum class of quantity.
Upper layer and middle surface layer produce hole groove simultaneously.When bituminous pavement upper layer and middle surface layer are all the half open gradation asphalts that voidage is larger, and when the bottom surface layer dense bitumen compound that to be voidage less, the free water of road table is more easily infiltrated and is trapped in upper layer and middle surface layer.Asphalt stripping during the effect of driving load makes, in upper layer, asphalt loses cohesive strength, causes road surface produce check crack, deformation (local falling into enemy hands) and push laterally, and finally occurs that pellet separates.The pellet effect of being driven a vehicle takes away, the final hole groove that forms, and the degree of depth after this type of hole groove is completed into is generally 8~10cm.
Between bottom surface layer and basic unit, produce hole groove.This type of disease easily occurs in the frost boiling very serious road surface of phenomenon, and under heavy-duty vehicle effect, the pressure that free water produces washes away base mixture top layer fines, forms greyish white mill base.Under the repeated action of hydrodynamic pressure and pore water pressure, make the base-material particle appearance in whole surface layer loose, and reflex to surface layer, form vicious cycle, finally can cause cheating the appearance of groove.The degree of depth of this type of hole groove is generally greater than 10cm.
Summary of the invention
For the defect existing in prior art, the object of this invention is to provide a kind of good with former road surface consistency, later strength is suitable with bituminous pavement, the compound cold-patch material of asphalt pavement pit repairing that life-span is grown, this kind of technological deficiency that material can overcome existing hole groove cold-patch, vulcanize material.
The present invention adopts following technical scheme:
A kind of for the compound cold-patch material of asphalt pavement pit repairing, be prepared from according to the ratio of weight and number of 1: 1 by A component and B component; Described A component and B component are made up of following raw materials by weight portion:
A component:
Cationic emulsified bitumen 10-30 part, water reducer 0.1-0.3 part, defoamer 0.1-0.3 part, binding agent 0.3-0.5 part, water 0-5 part; Cement 10-20 part, sand 5-15 part, swelling agent 0.01-0.03 part.
B component:
Particle diameter 10-15mm basalt 35-48 part, particle diameter 5-10mm basalt 45-60 part, particle diameter 0-3mm basalt 8-15 part.
On the basis of such scheme, described cationic emulsified bitumen is made up of according to parts by weight per-cent following component:
Pitch: 60%-65%;
Cats product: 1.8%-2.5%;
PH adjusting agent: 3-5%;
Surplus is water.
On the basis of such scheme, described pitch is any one in heavy-duty road bitumen A H-30~AH-90.
On the basis of such scheme, described cats product is one or more the mixture in alkyl polyamine class, quaternary ammonium salt, alkyl imidazoline salt, alkyl pyridine salt, amide group amine or lignin.
On the basis of such scheme, described water reducer is one or more the mixture in polyocarboxy acid type, naphthalene type, aliphatics type or amino-type.
On the basis of such scheme, described defoamer is one or more the mixture in silicone based, mineral oils, polyethers or aliphatic alcohols.
On the basis of such scheme, described binding agent is one or more the mixture in water-borne acrylic resin, aqueous epoxy resins or SBR latex.
On the basis of such scheme, described swelling agent is one or more the mixture in calcium sulphoaluminate class, calcium oxide-calcium sulphoaluminate class, calcium oxide or aluminium powder.
On the basis of such scheme, described pH adjusting agent is one or more the mixture in hydrochloric acid, phosphoric acid or acetic acid.
On the basis of such scheme, described cement is one or more the mixture in cement PO32.5, PO42.5, PO42.5R or PO52.5.
On the basis of such scheme, described sand is that particle diameter is the quartz sand of 0.15-0.25mm.
Prepare the above-mentioned method for the compound cold-patch material of asphalt pavement pit repairing, concrete preparation method is as follows:
1) preparation of A component:
Take according to quantity each component in A component, by cats product, water and pH adjusting agent, mix, by mixeding liquid temperature control temperature at 45-60 DEG C, then asphalt heating is arrived to 130-150 DEG C, and after adopting emulsified bitumen colloidal mill (3000-10000rpm) processing 2-2.5min with above-mentioned mixed solution, obtain cationic emulsified bitumen, cooling after and water reducer, defoamer, binding agent and water and cement, sand and swelling agent in mortar mixer, stir 5min and obtain A component;
2) preparation of B component:
Take according to quantity each component in B component, and each component is stirred in stirrer;
3), while construction, on-the-spot A component and B component A and the B of evenly mixing mixes according to the ratio of weight and number of 1: 1, fills out immediately and cheats construction, fills out compacting behind hole.
A kind of as above for the compound cold-patch material of asphalt pavement pit repairing, described compound cold-patch material is for Reparation of Bituminous Pavement hole groove, the degree of depth≤9cm of hole groove; As hole groove depth≤9cm, just upper layer and the middle surface layer on road surface are damaged, and the destruction of base layer structure does not occur.
The invention has the beneficial effects as follows:
Utilize the liquid fluidity of emulsification asphalt cement mortar, mix large particle diameter aggregate, after curing molding, form a kind of novel compound pit repairing material, this material can embody the malleable of pitch, can embody again the rigidity characteristics of cement material, the own intensity of the intensity after this kind of pit repairing forming materials and road surface is suitable, and the adhesive property that can improve material that adds of binding agent makes this material and former road surface have good consistency.
This compound cold-patch material that is used for road surface pit repairing has while filling up hole groove without heating, construction is simple, without skilled person and specific equipment, the advantage that environmental pollution is little and cheap, thereby introduce de-emulsification speed that cement component can regulate emulsified bitumen and regulate open to traffic time and intensity that can the strongthener later stage, the material after moulding has rigidity and flexible double properties to be played at groove place, hole and supports and the effect of the power of transmission makes the validity period of material long; In material, introduce the Binder Phase capacitive that binding agent can improve material and protobitumen road surface.
This is used for the compound cold-patch material convenient and quick construction of asphalt pavement pit repairing, there is no particular requirement (vulcanize and need special equipment) to mixing and stirring, fill out hole equipment, pourable after stirring, easily inject hole groove, energy-conserving and environment-protective (vulcanize and need heating); Environmental compatibility is strong, set time is short, good with the consistency on former road surface, (this material ultimate compression strength between 4MPa-8MPa, the dynamic stability of 60 DEG C is in 29000 left and right, and the ultimate compression strength after other vulcanize, cold-patch forming materials is little to have good intensity, dynamic stability is at 3000-9000), long service life (work-ing life of this material, existing pit repairing material major part was interim repairing more than 3 years, and validity period is shorter); Can be according to pavement behavior, construction requirement, adjusts formula, and production character product, to reach the effect of better repairing hole groove.
Embodiment
Embodiment 1
A component: get cationic emulsifier (alkyl imidazoline salt-alkylphosphonic acid carboxylic acid imidazoline salt) 24g, water 400g, acetic acid 50g is mixed with soap lye, soap lye temperature is controlled at 45 DEG C, heavy-duty road asphalt AH-70600g is heated to 130 DEG C, in colloidal mill, processes 2min with soap lye and prepare emulsified bitumen; The aluminium powder of getting cooled cationic emulsified bitumen 1000g prepared by aforesaid method, 18g water reducer (naphthalene type-polymethine naphthene sulfonic acid), 15g defoamer (polyether-type-polyetheramine), 35g aqueous epoxy resins, 1200g PO42.5R cement, quartz sand that 600g particle diameter is 0.15-0.25mm, 1g stirs 5min and obtains A component in mortar mixer.Control rotating speed 260rpm; Colloidal mill rotating speed 3000rpm.
B component: particle diameter 10-15mm basalt 4300g, particle diameter 5-10mm basalt 5400g, particle diameter 0-3mm basalt 1200g are stirred in stirrer.Control rotating speed at 60rpm.
When use, mix A, B component at scene according to the ratio of weight and number of 1: 1, mix, and is filled in the hole groove of the degree of depth≤9cm, uses vibro-rammer compacting, moulding open to traffic.
Embodiment 2
A component: get cationic emulsifier (alkyl imidazoline salt-2,3-dimethyl-1-is to chlorobenzene sulfonylimidazoles quinoline salt) 32g, water 400g, phosphatase 24 0g be mixed with soap lye, soap lye temperature is controlled at 45 DEG C, heavy-duty road asphalt AH-30 600g is heated to 150 DEG C, in colloidal mill, processes 2.5min with soap lye and prepare emulsified bitumen; The sulfuric acid calcium aluminate of getting cooled cationic emulsified bitumen 1000g, 25g water reducer (polyocarboxy acid type-Sunmorl N 60S), 20g defoamer (polyether-type-polyetherimide), 36g aqueous epoxy resins, 1000g PO32.5 cement, 400g quartz sand, the 1g of above-mentioned preparation stirs 5min and obtains A component in mortar mixer.Control rotating speed 260rpm, colloidal mill rotating speed 10000rpm.
B component: particle diameter 10-15mm basalt 4320g, particle diameter 5-10mm basalt 5180g, particle diameter 0-3mm basalt 1100g are stirred in stirrer.Control rotating speed at 60rpm.
When use, mix A, B component at scene according to the ratio of weight and number of 1: 1, mix, and is filled in the hole groove of the degree of depth≤9cm, uses ram hammer compacting, moulding open to traffic.
Embodiment 3
A component: get cationic emulsifier (lignin-sodium lignosulfonate) 18g, water 400g, hydrochloric acid 45g are mixed with soap lye, soap lye temperature is controlled at 45 DEG C, heavy-duty road asphalt AH-50 600g is heated to 140 DEG C, in colloidal mill, processes 2min with soap lye and prepare emulsified bitumen; The aluminium powder of getting cooled cationic emulsified bitumen 1000g, 20g water reducer (aliphatics type-fatty alcohol-ether sulfosuccinic ester disodium salt), 16g defoamer (mineral oil origin-mineral oil), 30gSBR, 1000g PO42.5R cement, 500g quartz sand, the 1g of above-mentioned preparation stirs 5min and obtains A component in mortar mixer.Control rotating speed 260rpm; Colloidal mill rotating speed 5000rpm.
B component: particle diameter 10-15mm basalt 4700g, particle diameter 5-10mm basalt 5500g, particle diameter 0-3mm basalt 1000g are stirred in stirrer.Control rotating speed at 60rpm.
When use, mix A, B component at scene according to the ratio of weight and number of 1: 1, mix, and is filled in the hole groove of the degree of depth≤9cm, uses baby roller compacting, moulding open to traffic.
Table 2 embodiment performance index:
Performance index | Embodiment 1 | Embodiment 2 | Embodiment 3 |
Molding time, h | 1-2 | 1-2 | 1-2 |
Ultimate compression strength, Mpa | 6.8 | 6.5 | 9.1 |
60 DEG C of dynamic stabilities, inferior/mm | 27631 | 31684 | 29664 |
Validity period, y | >3 | >3 | >3 |
Describe the present invention with way of example above, but the invention is not restricted to above-mentioned specific embodiment, all any changes of doing based on the present invention or modification all belong to the scope of protection of present invention.
Claims (13)
1. for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that: be prepared from according to the ratio of weight and number of 1: 1 by A component and B component; Described A component and B component are made up of following raw materials by weight portion:
A component:
Cationic emulsified bitumen 10-30 part, water reducer 0.1-0.3 part, defoamer 0.1-0.3 part, binding agent 0.3-0.5 part, water 0-5 part; Cement 10-20 part, sand 5-15 part, swelling agent 0.01-0.03 part.
B component:
Particle diameter 10-15mm basalt 35-48 part, particle diameter 5-10mm basalt 45-60 part, particle diameter 0-3mm basalt 8-15 part.
2. according to claim 1 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described cationic emulsified bitumen is made up of according to parts by weight per-cent following component:
Pitch: 60%-65%;
Cats product: 1.8%-2.5%;
PH adjusting agent: 3-5%;
Surplus is water.
3. according to claim 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described pitch is any one in heavy-duty road bitumen A H-30~AH-90.
According to described in claim 2 or 3 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described cats product is one or more the mixture in alkyl polyamine class, quaternary ammonium salt, alkyl imidazoline salt, alkyl pyridine salt, amide group amine or lignin.
5. according to claim 1 and 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described water reducer is one or more the mixture in polyocarboxy acid type, naphthalene type, aliphatics type or amino-type.
6. according to claim 1 and 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described defoamer is one or more the mixture in silicone based, mineral oils, polyethers or aliphatic alcohols.
7. according to claim 1 and 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described binding agent is one or more the mixture in water-borne acrylic resin, aqueous epoxy resins or SBR latex.
8. according to claim 1 and 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described swelling agent is one or more the mixture in calcium sulphoaluminate class, calcium oxide-calcium sulphoaluminate class, calcium oxide or aluminium powder.
9. according to claim 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described pH adjusting agent is one or more the mixture in hydrochloric acid, phosphoric acid or acetic acid.
10. according to claim 1 and 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described cement is one or more the mixture in cement PO32.5, PO42.5, PO42.5R or PO52.5.
11. is according to claim 1 and 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described sand is that particle diameter is the quartz sand of 0.15-0.25mm.
Prepare the method for the compound cold-patch material of asphalt pavement pit repairing claimed in claim 2 for 12. 1 kinds, it is characterized in that concrete preparation method is as follows:
1) preparation of A component:
Take according to quantity each component in A component, by cats product, water and pH adjusting agent, mix, by mixeding liquid temperature control temperature at 45-60 DEG C, then asphalt heating is arrived to 130-150 DEG C, and after adopting emulsified bitumen colloidal mill processing 2-2.5min with above-mentioned mixed solution, obtain cationic emulsified bitumen, cooling after and water reducer, defoamer, binding agent and water and cement, sand and swelling agent in mortar mixer, stir 5min and obtain A component;
2) preparation of B component:
Take according to quantity each component in B component, and each component is stirred in stirrer;
3), while construction, on-the-spot A component and the B component of evenly mixing, fills out immediately hole and constructs, and fills out compacting behind hole.
13. 1 kinds as claimed in claim 1 or 2 for the compound cold-patch material of asphalt pavement pit repairing, it is characterized in that described compound cold-patch material cheats groove for Reparation of Bituminous Pavement, the degree of depth≤9cm of hole groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410152555.8A CN103951343B (en) | 2014-04-10 | 2014-04-10 | A kind of compound cold asphalt mixture for asphalt pavement pit repairing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410152555.8A CN103951343B (en) | 2014-04-10 | 2014-04-10 | A kind of compound cold asphalt mixture for asphalt pavement pit repairing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103951343A true CN103951343A (en) | 2014-07-30 |
CN103951343B CN103951343B (en) | 2016-10-05 |
Family
ID=51328734
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410152555.8A Expired - Fee Related CN103951343B (en) | 2014-04-10 | 2014-04-10 | A kind of compound cold asphalt mixture for asphalt pavement pit repairing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103951343B (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104724992A (en) * | 2015-03-16 | 2015-06-24 | 山西省交通科学研究院 | Composite cementing pavement material and using method thereof |
CN105645850A (en) * | 2016-01-11 | 2016-06-08 | 北京建筑大学 | Pavement quick-repair asphalt mixture, and preparation method and application method thereof |
CN105693171A (en) * | 2016-04-25 | 2016-06-22 | 广州市市政工程维修处 | Cold filling asphalt mixture capable of being used for underwater work and preparation method thereof |
CN106007597A (en) * | 2016-05-25 | 2016-10-12 | 贵州省交通规划勘察设计研究院股份有限公司 | Material for quickly repairing semi-rigid base of asphalt pavement and preparation method thereof |
CN106120511A (en) * | 2016-08-31 | 2016-11-16 | 黄亮光 | Rear hybrid road surface pit restorative procedure |
CN106316221A (en) * | 2016-08-22 | 2017-01-11 | 苏交科集团股份有限公司 | Rubber cold-mixed epoxy asphalt mixture used for repairing cracks and preparation method |
CN106368110A (en) * | 2016-08-31 | 2017-02-01 | 黄亮光 | Method for repairing pit slots on road surface |
CN106810153A (en) * | 2016-12-31 | 2017-06-09 | 山西省交通科学研究院 | It is a kind of can quick bituminous pavement cold patch material of open to traffic and preparation method thereof |
CN107417217A (en) * | 2017-06-12 | 2017-12-01 | 哈尔滨工业大学 | Thin iron tailings CA mortars for road surface normal temperature Rapid-Repair and preparation method thereof |
CN109133816A (en) * | 2018-09-12 | 2019-01-04 | 郑州航空工业管理学院 | A kind of pouring type repair materials with high early strength and non-deformability |
CN109734358A (en) * | 2019-01-22 | 2019-05-10 | 长安大学 | Mixing materials and method are filled up after a kind of bituminous pavement core boring sampling |
CN113563009A (en) * | 2021-07-15 | 2021-10-29 | 重庆特铺路面工程技术有限公司 | Pouring type normal-temperature cementing material and normal-temperature pouring type asphalt concrete |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102206064A (en) * | 2010-09-01 | 2011-10-05 | 重庆市新安洁环境绿化工程(集团)有限公司 | Cold-patch bituminous mixture and preparation method thereof |
CN103570334A (en) * | 2013-09-13 | 2014-02-12 | 长沙理工大学 | Quick cold-patch repair method for asphalt pavement, and application thereof |
CN103601423A (en) * | 2013-11-05 | 2014-02-26 | 江苏东交工程检测有限公司 | Energy-saving emission-reducing type asphalt mixture and preparation method thereof |
CN103613333A (en) * | 2013-11-19 | 2014-03-05 | 中国石油大学(华东) | Asphalt base composite material for pavement crack repair |
-
2014
- 2014-04-10 CN CN201410152555.8A patent/CN103951343B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102206064A (en) * | 2010-09-01 | 2011-10-05 | 重庆市新安洁环境绿化工程(集团)有限公司 | Cold-patch bituminous mixture and preparation method thereof |
CN103570334A (en) * | 2013-09-13 | 2014-02-12 | 长沙理工大学 | Quick cold-patch repair method for asphalt pavement, and application thereof |
CN103601423A (en) * | 2013-11-05 | 2014-02-26 | 江苏东交工程检测有限公司 | Energy-saving emission-reducing type asphalt mixture and preparation method thereof |
CN103613333A (en) * | 2013-11-19 | 2014-03-05 | 中国石油大学(华东) | Asphalt base composite material for pavement crack repair |
Non-Patent Citations (1)
Title |
---|
宋金华: "《沥青路面施工》", 30 September 2011, 中国建材工业出版社 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104724992A (en) * | 2015-03-16 | 2015-06-24 | 山西省交通科学研究院 | Composite cementing pavement material and using method thereof |
CN105645850A (en) * | 2016-01-11 | 2016-06-08 | 北京建筑大学 | Pavement quick-repair asphalt mixture, and preparation method and application method thereof |
CN105693171A (en) * | 2016-04-25 | 2016-06-22 | 广州市市政工程维修处 | Cold filling asphalt mixture capable of being used for underwater work and preparation method thereof |
CN106007597A (en) * | 2016-05-25 | 2016-10-12 | 贵州省交通规划勘察设计研究院股份有限公司 | Material for quickly repairing semi-rigid base of asphalt pavement and preparation method thereof |
CN106316221B (en) * | 2016-08-22 | 2019-02-22 | 苏交科集团股份有限公司 | A kind of rubber cold mixing epoxy asphalt mixture and preparation method for crack repairing |
CN106316221A (en) * | 2016-08-22 | 2017-01-11 | 苏交科集团股份有限公司 | Rubber cold-mixed epoxy asphalt mixture used for repairing cracks and preparation method |
CN106368110A (en) * | 2016-08-31 | 2017-02-01 | 黄亮光 | Method for repairing pit slots on road surface |
CN106120511A (en) * | 2016-08-31 | 2016-11-16 | 黄亮光 | Rear hybrid road surface pit restorative procedure |
CN106810153A (en) * | 2016-12-31 | 2017-06-09 | 山西省交通科学研究院 | It is a kind of can quick bituminous pavement cold patch material of open to traffic and preparation method thereof |
CN106810153B (en) * | 2016-12-31 | 2019-07-30 | 山西省交通科学研究院 | It is a kind of can quickly open to traffic bituminous pavement cold patch material and preparation method thereof |
CN107417217A (en) * | 2017-06-12 | 2017-12-01 | 哈尔滨工业大学 | Thin iron tailings CA mortars for road surface normal temperature Rapid-Repair and preparation method thereof |
CN109133816A (en) * | 2018-09-12 | 2019-01-04 | 郑州航空工业管理学院 | A kind of pouring type repair materials with high early strength and non-deformability |
CN109734358A (en) * | 2019-01-22 | 2019-05-10 | 长安大学 | Mixing materials and method are filled up after a kind of bituminous pavement core boring sampling |
CN113563009A (en) * | 2021-07-15 | 2021-10-29 | 重庆特铺路面工程技术有限公司 | Pouring type normal-temperature cementing material and normal-temperature pouring type asphalt concrete |
Also Published As
Publication number | Publication date |
---|---|
CN103951343B (en) | 2016-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103951343A (en) | Composite cold repair material for asphalt pavement pit repair | |
CN103613333B (en) | A kind of asphalt-base composite materials for pavement crack repair | |
CN103866667B (en) | Half flexible Supporting Load Pavement paving structure | |
CN104176985B (en) | A kind of aqueous polyurethane emulsified bitulith and its production and use | |
KR101284685B1 (en) | Cold recycling asphalt mixtures and manufacturing method thereof | |
CN106587835B (en) | A kind of cold mixing formula Cement emulsified asphalt concrete and its method for paving | |
CN101643636A (en) | Water-base joint grouting glue for normal temperature road | |
CN103979896B (en) | A kind of high Rut resistance Emulsified Asphalt Mixture for asphalt pavement rut punishment and preparation method thereof | |
CN101725103A (en) | Polymer cement concrete lamella | |
CN103113751A (en) | Cation-modified emulsified asphalt for bonding layer and preparation method of cation-modified emulsified asphalt | |
CN110423090B (en) | Quick-setting anti-crack cold crack pouring material for pavement crack repair and preparation method thereof | |
CN104003661B (en) | A kind of permeable reclaimed asphalt mixture pavior brick and preparation method thereof | |
CN108411752A (en) | The restorative procedure of asphalt pavement pit | |
CN111574109A (en) | Epoxy asphalt mastic macadam mixture suitable for airport pavement and preparation method thereof | |
CN105271941A (en) | Rapid damaged road surface repairing material and preparation and construction method thereof | |
KR101088355B1 (en) | Soil hardener composition and construction methods | |
CN106396561A (en) | Micro-surfacing mixture with snow-melting function and preparation method of micro-surfacing mixture | |
CN111662059A (en) | Waterproof crack pouring mortar for pavement cracks | |
CN105017787B (en) | A kind of low cost length takes time high performance modified bitumen and preparation method thereof in | |
CN104631269B (en) | Synchronous pavement surface dressing material for steel slag aggregate for road maintenance, and construction method thereof | |
KR20100083444A (en) | A non-slip and fastly hardened thin layer pavement composition without heating | |
CN103696366B (en) | Pavement structure and pavement method of combined steel bridge deck | |
CN103951344A (en) | Composite cold repair material for asphalt pavement pit repair | |
CN106995302B (en) | High-performance mixture and construction method thereof | |
CN113235351B (en) | Airport pavement structure with asphalt layer paved on old cement airport runway and paving method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161005 Termination date: 20210410 |
|
CF01 | Termination of patent right due to non-payment of annual fee |