CN105626095A - Small coal pillar protection roadway surrounding rock support method under condition of coal seam group mining hard roof - Google Patents

Small coal pillar protection roadway surrounding rock support method under condition of coal seam group mining hard roof Download PDF

Info

Publication number
CN105626095A
CN105626095A CN201511002462.8A CN201511002462A CN105626095A CN 105626095 A CN105626095 A CN 105626095A CN 201511002462 A CN201511002462 A CN 201511002462A CN 105626095 A CN105626095 A CN 105626095A
Authority
CN
China
Prior art keywords
anchor
less
anchor cable
joint
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511002462.8A
Other languages
Chinese (zh)
Other versions
CN105626095B (en
Inventor
陈旭忠
马立强
牛福龙
刘锦荣
许兴亮
周希应
金志远
张郑伟
孙海
杨占国
纪润清
贾永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATONG COAL MINE TASHAN COAL MINE CO., LTD.
Original Assignee
Datong Coal Mine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Coal Mine Group Co Ltd filed Critical Datong Coal Mine Group Co Ltd
Priority to CN201511002462.8A priority Critical patent/CN105626095B/en
Publication of CN105626095A publication Critical patent/CN105626095A/en
Application granted granted Critical
Publication of CN105626095B publication Critical patent/CN105626095B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/006Lining anchored in the rock
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0006Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by the bolt material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Wire Processing (AREA)

Abstract

The invention provides a small coal pillar protection roadway surrounding rock support method under the condition of a coal seam group mining hard roof. According to the method, analytical investigation is conducted for the Jurassic system coal seam gob-side entry driving technology, the gob-side entry support mode and bolt support parameters are optimized through a large amount of theoretical analysis and unceasing experimental verification, a small coal pillar protection roadway is preserved under the condition of the coal seam group mining hard roof, the bad stress environment of gob-side entry surrounding rock is improved, deformation of gob-side entry surrounding rock of the working face is reduced, mining pressure accidents such as roof caving and wall caving are reduced, and guarantees are provided for safe and efficient production of mines.

Description

Coal mine goaf surrounding rock supporting method under the hard hard top plate condition of coal seam group mining
Technical field
The present invention relates to a kind of laneway support method, specifically Coal mine goaf surrounding rock supporting method under the hard hard top plate condition of a kind of coal seam group mining.
Background technology
In recent years, a large amount of human and material resources are constantly dropped in national each mining area, the support issues of entry have been carried out a large amount of research and practice so that bolt support technology there has been large development in solid-coal roadway, and obtains immense success. But the coal column in adjacent empty tunnel stay establish, adjacent empty roadway support, spontaneous fire control etc. in the progress of still achieving no breakthrough property, the technology of entity coal road is continued to use in supporting, the width of section coal pillar and the application of bolt design parameters are unreasonable, ore deposit pressure is caused to manifest excessive, entry distortion is very serious, causing working face ventilation system not smooth, gas problem and spontaneous fire hidden danger are all come thereupon, seriously affect the safe and efficient production of working face.
Summary of the invention
It is an object of the invention to solve above-mentioned problems of the prior art, and Coal mine goaf surrounding rock supporting method under the hard hard top plate condition of a kind of coal seam group mining is provided.
The present invention is achieved through the following technical solutions:
Coal mine goaf surrounding rock supporting method under the hard hard top plate condition of a kind of coal seam group mining, comprises the steps:
1) roof timbering
Metal grill: mesh sheet specification 3800mm �� 2200mm, is made up of 8# iron wire, mesh specification 50mm �� 50mm, adopting docking mode to connect between mesh sheet, docking length is 200mm, and lap-joint uses hole, 14# galvanized wire hole to be connected, the two button of mariages, ties up dead kink and is no less than 3 circles;
Reinforcing bar joist: bar diameter 16mm, joist length is 3700mm;
Pallet: adopt 150mm �� 150mm �� 12mm butterfly pallet, it is desired to sagitta is not less than 36mm, increases antifriction packing ring between torque nut and pallet;
Anchor pole: anchor pole adopts the vertical muscle left hand thread steel anchor rod of the high-strength nothing of �� 22mm �� 2200mm, and material quality of bolt is not less than HRB400; Between anchor pole, array pitch is 850mm �� 800mm, and drift angle rockbolt installation angle becomes 15 �� with vertical direction, and all the other anchor poles and top board are arranged vertically; Anchoring agent adopts two resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, a joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Pre-fastening moment is not less than 300N m;
Anchor cable: anchor cable adopts �� 21.8mm �� 6000mm, unit elongation >=7%, 1 �� 19 prestress wire anchor cable; Anchor cable number is arranged by the mode of 2-3-2, the array pitch of anchor cable is 1600mm, the cable interval of two anchor cable rows is 1600mm, the cable interval of three anchor cable rows is 800mm, the installation angle of anchor cable is arranged vertically (that is: the anchor cable row that anchor cable row divides for the anchor cable being made up of two anchor cables row and is made up of three anchor cables, and two anchor cable rows are arranged alternately with three anchor cable rows, often arrange anchor cable and it is located between two adjacent row's anchor poles, between two adjacent row's anchor cables, have two row's anchor poles); Anchor cable supporting plate adopts the cydariform supporting plate of 300mm �� 300mm �� 16mm, and bulge height is not less than 150mm; Anchoring agent adopts three resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, two joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Preliminary tension is not less than 120kN;
2) roadside support
Metal grill: mesh sheet specification 3500mm �� 2200mm, is made up of 8# iron wire, mesh specification 50mm �� 50mm, adopting docking mode to connect between mesh sheet, docking length is 200mm, and lap-joint uses hole, 14# galvanized wire hole to be connected, the two button of mariages, ties up dead kink and is no less than 3 circles;
Reinforcing bar joist: bar diameter 14mm, joist length is 2300mm;
Pallet: adopt 150mm �� 150mm �� 12mm butterfly pallet, it is desired to sagitta is not less than 36mm, increases antifriction packing ring between torque nut and pallet;
Anchor pole: anchor pole adopts the vertical muscle left hand thread steel anchor rod of the high-strength nothing of �� 22mm �� 2200mm, and material quality of bolt is not less than HRB400; Between anchor pole, array pitch is 700mm �� 800mm, and drift angle anchor pole becomes 15 �� with the installation angle of FLOOR ANCHOR with horizontal direction angle, and all the other anchor poles and lane side are arranged vertically; Anchoring agent adopts two resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, a joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Pre-fastening moment is not less than 300N m.
The present invention be directed to Datong seam group gob-side entry driving technology to have carried out analyzing research, through a large amount of theoretical analysises and continuous verification experimental verification, gob-side entry supporting mode and Bolting Parameters are optimized, stay under achieving the hard hard top plate condition of coal seam group mining and establish Coal mine goaf, improve the severe ambient stress of gob-side entry country rock, reduce the distortion of working face gob-side entry country rock, reduce the generation of the ore deposit such as roof fall, wall caving pressure accident, for the safe and efficient production of mine provides guarantee. The present invention has promoted the development in an all-round way of seam mining technology further, and the aspects such as the supporting of fully-mechanized mining working gob-side entry driving, the raising of exploiting field back production rate is all significant. Improve the rate of recovery of Jurassic coal, extend [underground, maintenance mining area is flourishing, development and stabilization are significant, and this technology can be promoted in whole mining area.
Accompanying drawing explanation
Fig. 1 is the sectional view in tunnel after the inventive method supporting.
Fig. 2 is top board schematic diagram after the inventive method supporting.
Fig. 3 is the inventive method supporting rear lane side schematic diagram.
Fig. 4 is reinforcing bar joist structure schematic diagram in the inventive method.
In figure: 1-metal grill, 2-reinforcing bar joist, 3-pallet, 4-anchor pole, 5-anchor cable, 6-anchor cable supporting plate.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described:
Coal mine goaf surrounding rock supporting method under the hard hard top plate condition of a kind of coal seam group mining, comprises the steps:
1) roof timbering
Metal grill 1: mesh sheet specification 3800mm �� 2200mm, is made up of 8# iron wire, mesh specification 50mm �� 50mm, adopting docking mode to connect between mesh sheet, docking length is 200mm, and lap-joint uses hole, 14# galvanized wire hole to be connected, the two button of mariages, ties up dead kink and is no less than 3 circles;
Reinforcing bar joist 2: bar diameter 16mm, joist length is 3700mm;
Pallet 3: adopt 150mm �� 150mm �� 12mm butterfly pallet, it is desired to sagitta is not less than 36mm, increases antifriction packing ring between torque nut and pallet;
Anchor pole 4: anchor pole 4 adopts the vertical muscle left hand thread steel anchor rod of the high-strength nothing of �� 22mm �� 2200mm, and anchor pole 4 material is not less than HRB400; Between anchor pole 4, array pitch is 850mm �� 800mm, and drift angle anchor pole 4 is installed angle and become 15 �� with vertical direction, and all the other anchor poles 4 are arranged vertically with top board; Anchoring agent adopts two resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, a joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Pre-fastening moment is not less than 300N m;
Anchor cable 5: anchor cable 5 adopts �� 21.8mm �� 6000mm, unit elongation >=7%, 1 �� 19 prestress wire anchor cable; Anchor cable 5 number is arranged by the mode of 2-3-2, and the array pitch of anchor cable 5 is 1600mm, and anchor cable 5 spacing of two anchor cable rows is 1600mm, and anchor cable 5 spacing of three anchor cable rows is 800mm, and the installation angle of anchor cable 5 is arranged vertically with top board; Anchor cable supporting plate 6 adopts the cydariform supporting plate of 300mm �� 300mm �� 16mm, and bulge height is not less than 150mm; Anchoring agent adopts three resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, two joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Preliminary tension is not less than 120kN;
2) roadside support
Metal grill 1: mesh sheet specification 3500mm �� 2200mm, is made up of 8# iron wire, mesh specification 50mm �� 50mm, adopting docking mode to connect between mesh sheet, docking length is 200mm, and lap-joint uses hole, 14# galvanized wire hole to be connected, the two button of mariages, ties up dead kink and is no less than 3 circles;
Reinforcing bar joist 2: bar diameter 14mm, joist length is 2300mm;
Pallet 3: adopt 150mm �� 150mm �� 12mm butterfly pallet, it is desired to sagitta is not less than 36mm, increases antifriction packing ring between torque nut and pallet;
Anchor pole 4: anchor pole 4 adopts the vertical muscle left hand thread steel anchor rod of the high-strength nothing of �� 22mm �� 2200mm, and anchor pole 4 material is not less than HRB400; Between anchor pole 4, array pitch is 700mm �� 800mm, and drift angle anchor pole 4 becomes 15 �� with the installation angle of FLOOR ANCHOR 4 with horizontal direction angle, and all the other anchor poles 4 are arranged vertically with lane side; Anchoring agent adopts two resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, a joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Pre-fastening moment is not less than 300N m.

Claims (1)

1. Coal mine goaf surrounding rock supporting method under the hard hard top plate condition of coal seam group mining, it is characterised in that, comprise the steps:
1) roof timbering
Metal grill (1): mesh sheet specification 3800mm �� 2200mm, is made up of 8# iron wire, mesh specification 50mm �� 50mm, adopting docking mode to connect between mesh sheet, docking length is 200mm, and lap-joint uses hole, 14# galvanized wire hole to be connected, the two button of mariages, ties up dead kink and is no less than 3 circles;
Reinforcing bar joist (2): bar diameter 16mm, joist length is 3700mm;
Pallet (3): adopt 150mm �� 150mm �� 12mm butterfly pallet, it is desired to sagitta is not less than 36mm, increases antifriction packing ring between torque nut and pallet;
Anchor pole (4): anchor pole (4) adopts the vertical muscle left hand thread steel anchor rod of the high-strength nothing of �� 22mm �� 2200mm, and anchor pole (4) material is not less than HRB400; Between anchor pole (4), array pitch is 850mm �� 800mm, and drift angle anchor pole (4) is installed angle and become 15 �� with vertical direction, and all the other anchor poles (4) and top board are arranged vertically; Anchoring agent adopts two resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, a joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Pre-fastening moment is not less than 300N m;
Anchor cable (5): anchor cable (5) adopts �� 21.8mm �� 6000mm, unit elongation >=7%, 1 �� 19 prestress wire anchor cable; Anchor cable (5) number is arranged by the mode of 2-3-2, and the array pitch of anchor cable (5) is 1600mm, and anchor cable (5) spacing of two anchor cable rows is 1600mm, and anchor cable (5) spacing of three anchor cable rows is 800mm, and the installation angle of anchor cable (5) is arranged vertically with top board; Anchor cable supporting plate (6) adopts the cydariform supporting plate of 300mm �� 300mm �� 16mm, and bulge height is not less than 150mm; Anchoring agent adopts three resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, two joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Preliminary tension is not less than 120kN;
2) roadside support
Metal grill (1): mesh sheet specification 3500mm �� 2200mm, is made up of 8# iron wire, mesh specification 50mm �� 50mm, adopting docking mode to connect between mesh sheet, docking length is 200mm, and lap-joint uses hole, 14# galvanized wire hole to be connected, the two button of mariages, ties up dead kink and is no less than 3 circles;
Reinforcing bar joist (2): bar diameter 14mm, joist length is 2300mm;
Pallet (3): adopt 150mm �� 150mm �� 12mm butterfly pallet, it is desired to sagitta is not less than 36mm, increases antifriction packing ring between torque nut and pallet;
Anchor pole (4): anchor pole (4) adopts the vertical muscle left hand thread steel anchor rod of the high-strength nothing of �� 22mm �� 2200mm, and anchor pole (4) material is not less than HRB400; Between anchor pole (4), array pitch is 700mm �� 800mm, and drift angle anchor pole (4) becomes 15 �� with the installation angle of FLOOR ANCHOR (4) with horizontal direction angle, and all the other anchor poles (4) are arranged vertically with lane side; Anchoring agent adopts two resin explosive roll anchoring agent, a joint rapid resin medicine volume MSK2360, a joint middling speed resin explosive roll MSZ2360, and rapid resin medicine is provided at front end; Pre-fastening moment is not less than 300N m.
CN201511002462.8A 2015-12-29 2015-12-29 Coal mine goaf surrounding rock supporting method under the conditions of coal seam group mining tight roof Expired - Fee Related CN105626095B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511002462.8A CN105626095B (en) 2015-12-29 2015-12-29 Coal mine goaf surrounding rock supporting method under the conditions of coal seam group mining tight roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511002462.8A CN105626095B (en) 2015-12-29 2015-12-29 Coal mine goaf surrounding rock supporting method under the conditions of coal seam group mining tight roof

Publications (2)

Publication Number Publication Date
CN105626095A true CN105626095A (en) 2016-06-01
CN105626095B CN105626095B (en) 2018-02-23

Family

ID=56041386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511002462.8A Expired - Fee Related CN105626095B (en) 2015-12-29 2015-12-29 Coal mine goaf surrounding rock supporting method under the conditions of coal seam group mining tight roof

Country Status (1)

Country Link
CN (1) CN105626095B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121684A (en) * 2016-08-17 2016-11-16 国投新集能源股份有限公司 A kind of jacking coal and rock suspension device and construction method thereof
CN106761813A (en) * 2017-01-23 2017-05-31 山东科技大学 Gob side entry driving unbalanced support method for designing under the unstable overlying strata in deep
CN110792463A (en) * 2019-11-11 2020-02-14 大同煤矿集团有限责任公司 Reinforcing method for machine path leakage top of working surface under complex conditions

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693670A (en) * 2005-05-19 2005-11-09 中国矿业大学 Three-anchor coupling supporting method for high stress tunnel break wall rock
CN201902218U (en) * 2010-12-17 2011-07-20 神华集团有限责任公司 Anchor rod and anchor cable supporting device
CN102182483A (en) * 2011-04-26 2011-09-14 山东大学 Semi-rigid abnormal beam anchor cable truss roadway supporting system
CN202064981U (en) * 2011-05-07 2011-12-07 山西晋城无烟煤矿业集团有限责任公司 Soft coal layer roadway supporting structure
CN102733832A (en) * 2012-07-05 2012-10-17 大同煤矿集团有限责任公司 Support method for extra-thick broken coal seam employing nest anchored ropes
CN102733836A (en) * 2012-07-05 2012-10-17 大同煤矿集团有限责任公司 Roadway support method for fully mechanized caving mining of weak extra-thick coal seam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693670A (en) * 2005-05-19 2005-11-09 中国矿业大学 Three-anchor coupling supporting method for high stress tunnel break wall rock
CN201902218U (en) * 2010-12-17 2011-07-20 神华集团有限责任公司 Anchor rod and anchor cable supporting device
CN102182483A (en) * 2011-04-26 2011-09-14 山东大学 Semi-rigid abnormal beam anchor cable truss roadway supporting system
CN202064981U (en) * 2011-05-07 2011-12-07 山西晋城无烟煤矿业集团有限责任公司 Soft coal layer roadway supporting structure
CN102733832A (en) * 2012-07-05 2012-10-17 大同煤矿集团有限责任公司 Support method for extra-thick broken coal seam employing nest anchored ropes
CN102733836A (en) * 2012-07-05 2012-10-17 大同煤矿集团有限责任公司 Roadway support method for fully mechanized caving mining of weak extra-thick coal seam

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121684A (en) * 2016-08-17 2016-11-16 国投新集能源股份有限公司 A kind of jacking coal and rock suspension device and construction method thereof
CN106121684B (en) * 2016-08-17 2018-11-30 国投新集能源股份有限公司 A kind of construction method of jacking coal and rock suspension device
CN106761813A (en) * 2017-01-23 2017-05-31 山东科技大学 Gob side entry driving unbalanced support method for designing under the unstable overlying strata in deep
CN106761813B (en) * 2017-01-23 2018-04-06 山东科技大学 Gob side entry driving unbalanced support design method under the unstable overlying strata in deep
CN110792463A (en) * 2019-11-11 2020-02-14 大同煤矿集团有限责任公司 Reinforcing method for machine path leakage top of working surface under complex conditions

Also Published As

Publication number Publication date
CN105626095B (en) 2018-02-23

Similar Documents

Publication Publication Date Title
CN102296976B (en) Asymmetrical bolt-net-cable combined supporting method for special-shaped recovery tunnel of large inclination angle coal bed
EP3489459B1 (en) Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method
CN202064981U (en) Soft coal layer roadway supporting structure
CN103233748A (en) Anchor mesh cable column combined supporting design method for expanding extra-large span open-off cut brush into lane
CN105370299B (en) The buried empty roadway protection processing in high seam thin coal pillar edge of km
CN102220866A (en) Pressure relief and consolidation synergizing prevention and control method for rock burst in deep coal drift
CN105134214B (en) A kind of coal mining later stage secondary ventilation roadway layout and adjoining rock stability control method
CN103939107B (en) A kind of inbreak loose rock mass Zhong Cheng lane method
CN105909289B (en) A kind of asymmetric roadway support structure of deep three-soft seam
CN113090284B (en) Roadway support method for soft and broken rock mass of underground mine
CN102852528A (en) Method for controlling floor heave through inverted arch anchoring beam
CN106194203A (en) A kind of coal-mine soft-rock method for protecting support
CN105626095A (en) Small coal pillar protection roadway surrounding rock support method under condition of coal seam group mining hard roof
CN101936172B (en) Governance method of floor heave of mine roadway during mining
CN104533483A (en) Roadway total-space prestress truss, anchor cable and anchor rod coordinated supporting method
CN103806917A (en) Vertical strip roadway tunneling method
CN210948737U (en) Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam
CN204060781U (en) Inclined seam is without the lane other gear cash facility of coal column gob side entry retaining
CN206769931U (en) A kind of bottom arch supporting construction of baseboard of coal mine roadway
CN202467857U (en) Mining shoring device for axial bottom syncline under coal mine
CN105156111B (en) The method for protecting support of high working face lane formula filling Striping noise
CN106567721A (en) High prestressed anchor cable truss support method
CN112901226A (en) Ultra-thin roof roadway supporting method under goaf
CN114087016B (en) Caving-to-filling mining isolation top column pre-control supporting method
CN103742177B (en) Design method for strong mine pressure roadway support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190924

Address after: 037000 Yangjiayao Village, Southern Suburb of Datong City, Shanxi Province

Patentee after: DATONG COAL MINE TASHAN COAL MINE CO., LTD.

Address before: 037003 Shanxi province Datong Xinping Wang School North

Patentee before: Datong Coal Mine Group Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20191229

CF01 Termination of patent right due to non-payment of annual fee