CN105625744A - Seepage prevention structure for suspension rod for steel girder reinforcement of aerated concrete roof and construction method of seepage prevention structure - Google Patents

Seepage prevention structure for suspension rod for steel girder reinforcement of aerated concrete roof and construction method of seepage prevention structure Download PDF

Info

Publication number
CN105625744A
CN105625744A CN201610131569.0A CN201610131569A CN105625744A CN 105625744 A CN105625744 A CN 105625744A CN 201610131569 A CN201610131569 A CN 201610131569A CN 105625744 A CN105625744 A CN 105625744A
Authority
CN
China
Prior art keywords
concrete roof
suspension rod
roof boarding
gas concrete
leakage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610131569.0A
Other languages
Chinese (zh)
Inventor
董有
韩兮
杨黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING BLESS BUILDING Co Ltd
Original Assignee
BEIJING BLESS BUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING BLESS BUILDING Co Ltd filed Critical BEIJING BLESS BUILDING Co Ltd
Priority to CN201610131569.0A priority Critical patent/CN105625744A/en
Publication of CN105625744A publication Critical patent/CN105625744A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0281Repairing or restoring roofing or roof covering

Abstract

The invention belongs to the technical field of reinforcement reconstruction of old neighborhoods and relates to a seepage prevention structure for a suspension rod for steel girder reinforcement of an aerated concrete roof and a construction method of the seepage prevention structure. The seepage prevention structure comprises the aerated concrete roof with holes, and an integral T-shaped seepage-proof layer is arranged inside and outside each hole and comprises seepage prevention powder, a lower polyurethane coating, nonwoven fabrics, an upper polyurethane coating and a cement mortar protection layer sequentially from bottom to top. On the basis of steel girder reinforcement of the aerated concrete roof of the old neighborhoods, a waterproof layer of the suspension rod is subjected to seepage prevention treatment, and the problem of roof seepage caused by steel girder reinforcement is well solved. In addition, the seepage prevention structure is convenient and simple in construction, low in manufacturing cost and widely applicable to reinforcement reconstruction of roofs of old buildings.

Description

Gas concrete roof boarding strengthening of steel bridge suspension rod place's leakage-proof structure and constructional method
Technical field
The present invention relates to a kind of old community strengthening reconstruction structure and constructional method thereof, especially a kind of gas concrete roof boarding strengthening of steel bridge suspension rod place's leakage-proof structure and constructional method, belong to old community strengthening reconstruction technical field.
Background technology
Twentieth century the seventies and eighties, some old communities adopt prefabricated aerated concrete panel as roof boarding. This kind of gas concrete roof boarding band structure looks for slope, and easy construction, cost are low, are widely used in old house building. Through wind and rain baptism and the material aging of 30 or 40 years, these old buildings occur that long-term stiffness is poor, component poor durability and the problem such as roof boarding integral rigidity is poor, seriously have impact on the safe handling of building. For this reason, gas concrete roof boarding strengthening of steel bridge is adopted to be a kind of solid measure, but, needing the punching of former gas concrete roof boarding is placed suspension rod in the process reinforced, this just destroys the waterproof layer of original roofing, affects roof leakage.
Summary of the invention
Based on the problems referred to above, the present invention proposes a kind of gas concrete roof boarding strengthening of steel bridge suspension rod place's leakage-proof structure and constructional method. Mainly in order to solve the leak proof technology problem that in the strengthening reconstruction process of old community, roof waterproof layer is destroyed.
The technical scheme of the present invention is as follows:
A kind of gas concrete roof boarding strengthening of steel bridge suspension rod place leakage-proof structure, comprise gas concrete roof boarding, hole offered by described gas concrete roof boarding, hole center is inserted with a suspension rod, described suspension rod one end is stretched in described gas concrete roof boarding through hole, the other end is connected with girder steel, form strengthening of steel bridge suspension rod, described hole inside and outer setting have holistic T-shaped application of anti-leakage layers, described application of anti-leakage layers wraps suspension rod, described application of anti-leakage layers is followed successively by leak stopping spirit from bottom to up, lower floor's polyurethane coating, non-woven fabrics, upper strata polyurethane coating and coating mortar, wherein, described leak stopping spirit and lower floor's polyurethane coating are from bottom to top arranged on described hole inside respectively, described non-woven fabrics is laid on lower floor's polyurethane coating upper surface and stretches out the outer edge of hole and set up on gas concrete roof boarding outside surface, described upper strata polyurethane coating is wrapped in non-woven fabrics top and periphery, and described upper strata polyurethane coating outer wrap has coating mortar.
Further, described hole is cube structure, and it is of a size of length �� wide �� height=60mm �� 60mm �� 30mm.
Further, the total coating thickness of described leak stopping spirit is 20mm.
Further, the outer edge 30mm of hole is stretched out in the every side of described non-woven fabrics.
Further, the thickness of described coating mortar is apart from the outstanding 2cm of gas concrete roof boarding end face.
Further, the strength of cement mortar grade of described coating mortar is not less than M5.
Further, the described coating mortar floating press polish in surface.
Further, described upper strata polyurethane coating outside surface is circular arc.
The constructional method of above-mentioned gas concrete roof boarding strengthening of steel bridge suspension rod place leakage-proof structure, adopts following steps:
Step one: the hole cutting designed size on the gas concrete roof boarding of suspension rod periphery, blows floating dust in hole with oil-free air compressor, and prevent dust or the grains of sand from entering in hole;
Step 2: configuration leak stopping spirit slurry: by leak stopping spirit according to powder: water=1: uniformly slurry without agglomerate is stand-by for the ratio stirring at low speed of 0.3;
Step 3: smear rigid waterproof layer: scraping the first layer leak stopping spirit slurry with scraper plate or trowel, after coating hardens, timely fog curing, vertically scrapes the second layer after 90min, after being all painted with, carry out 48h maintenance;
Step 4: smear flexible waterproof layer: Xian Tu lower floor polyurethane coating, lays non-woven fabrics after solidification on lower floor's polyurethane coating, then smears upper strata polyurethane coating to prevent leakage is scraped along the vertical direction of described lower floor polyurethane coating;
Step 5: upper strata polyurethane coating carries out coating mortar construction after solidifying, floating press polish is answered on coating mortar surface, tackles the timely maintenance of sand-cement slurry after construction, and curing time is not less than 7d.
Useful effect:
The most significant advantage of the present invention is that the flexible water construction adopting leak stopping spirit rigid waterproofing and polyurethane coating to combine with non-woven fabrics is simple and convenient, roof leakage is effective, cost is low, solves well and adopts gas concrete roof boarding strengthening of steel bridge suspension rod place's leakproof problem. When economic condition is permitted, if this technology is applied, gas concrete roof boarding strengthening of steel bridge suspension rod place, existing old community leak-proof measure will have significant economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 is gas concrete roof boarding strengthening of steel bridge suspension rod place of the present invention leakage-proof structure vertical view;
Fig. 2 is gas concrete roof boarding strengthening of steel bridge suspension rod place of the present invention leakage-proof structure sectional view.
In figure, 1: leak stopping spirit; 2: lower floor's polyurethane coating; 3: non-woven fabrics; 4: upper strata polyurethane coating; 5: coating mortar; 6: suspension rod; 7: gas concrete roof boarding; 8: hole.
Embodiment
A kind of gas concrete roof boarding strengthening of steel bridge suspension rod place leakage-proof structure of the present invention, see, shown in Fig. 1 to 2, comprising gas concrete roof boarding 7, gas concrete roof boarding 7 is offered hole 8, hole 8 is cube structure, and it is of a size of length �� wide �� height=60mm �� 60mm �� 30mm. Hole 8 center is inserted with a suspension rod 6; suspension rod 6 one end is stretched in gas concrete roof boarding 7 through hole 8; the other end is connected with girder steel; form strengthening of steel bridge suspension rod; hole 8 inside and outer setting have holistic T-shaped application of anti-leakage layers; application of anti-leakage layers wraps suspension rod 6, and application of anti-leakage layers is followed successively by leak stopping spirit 1, lower floor's polyurethane coating 2, non-woven fabrics 3, upper strata polyurethane coating 4 and coating mortar 5 from bottom to up. Wherein, it is inner that leak stopping spirit 1 and lower floor's polyurethane coating 2 are from bottom to top arranged on described hole 8 respectively; the total coating thickness of leak stopping spirit 1 is 20mm; non-woven fabrics 3 is laid on lower floor's polyurethane coating 2 upper surface and stretches out the outer edge of hole 8 and set up on gas concrete roof boarding 7 outside surface; the outer edge 30mm of hole 8 is stretched out in the every side of non-woven fabrics 3; upper strata polyurethane coating 4 is wrapped in non-woven fabrics 3 top and periphery, and upper strata polyurethane coating 4 outer wrap has coating mortar 5. The thickness of coating mortar 5 is apart from the outstanding 2cm of gas concrete roof boarding 7 end face. Wherein, the strength of cement mortar grade of coating mortar 5 is not less than M5, its surperficial floating press polish, and upper strata polyurethane coating 4 outside surface is circular arc.
The present invention's described leak stopping spirit used 1 is a kind of protection against the tide, impervious rigidity water-proofing material, described lower floor polyurethane coating 2 and upper strata polyurethane coating 4 be a kind of flexible and cracking are had relatively strong adaptability high tensile, good weatherability, waterproof every the flexible waterproof coating of gas, described non-woven fabrics 3 is a kind of air-permeable dampproof, drying is antibacterial, price is low, the environment-friendly materials that can be recycled. And above-mentioned leak stopping spirit 1, lower floor's polyurethane coating 2 and upper strata polyurethane coating 4 and non-woven fabrics 3 are commercially available current material.
The constructional method of above-mentioned gas concrete roof boarding strengthening of steel bridge suspension rod place leakage-proof structure, adopts following steps:
Step one: the hole 8 cutting designed size on the gas concrete roof boarding 7 of suspension rod 6 periphery, blows floating dust in hole 8 with oil-free air compressor, and prevents dust or the grains of sand from entering in hole 8;
Step 2: configuration leak stopping spirit 1 slurry: by leak stopping spirit 1 according to powder: water=1: uniformly slurry without agglomerate is stand-by for the ratio stirring at low speed of 0.3;
Step 3: smear rigid waterproof layer: scraping the first layer leak stopping spirit 1 slurry with scraper plate or trowel, after coating hardens (have gentle hands pressure does not stay fingerprint), timely fog curing, vertically scrapes the second layer after 90min, after being all painted with, carry out 48h maintenance;
Step 4: smear flexible waterproof layer: Xian Tu lower floor polyurethane coating 2, lays non-woven fabrics 3 on lower floor's polyurethane coating 2 after solidification, then smears upper strata polyurethane coating 4 to prevent leakage is scraped along the vertical direction of described lower floor polyurethane coating 2;
Step 5: upper strata polyurethane coating 4 carries out coating mortar 5 after solidifying and constructs, floating press polish is answered on coating mortar 5 surface, tackles the timely maintenance of sand-cement slurry after construction, and curing time is not less than 7d.
Being more than a kind of exemplary embodiment of the present invention, specific embodiment of the invention is not limited to this.

Claims (9)

1. a gas concrete roof boarding strengthening of steel bridge suspension rod place leakage-proof structure, comprise gas concrete roof boarding (7), it is characterized in that: described gas concrete roof boarding (7) offers hole (8), hole (8) center is inserted with a suspension rod (6), described suspension rod (6) one end is stretched in described gas concrete roof boarding (7) through hole (8), the other end is connected with girder steel, form strengthening of steel bridge suspension rod, described hole (8) inside and outer setting have holistic T-shaped application of anti-leakage layers, described application of anti-leakage layers wraps suspension rod (6), described application of anti-leakage layers is followed successively by leak stopping spirit (1) from bottom to up, lower floor's polyurethane coating (2), non-woven fabrics (3), upper strata polyurethane coating (4) and coating mortar (5), wherein, it is inner that described leak stopping spirit (1) and lower floor's polyurethane coating (2) are from bottom to top arranged on described hole (8) respectively, described non-woven fabrics (3) is laid on lower floor's polyurethane coating (2) upper surface and stretches out hole (8) outer edge and set up on gas concrete roof boarding (7) outside surface, described upper strata polyurethane coating (4) is wrapped in non-woven fabrics (3) top and periphery, and described upper strata polyurethane coating (4) outer wrap has coating mortar (5).
2. gas concrete roof boarding strengthening of steel bridge suspension rod place according to claim 1 leakage-proof structure, it is characterised in that: described hole (8) is cube structure, and it is of a size of length �� wide �� height=60mm �� 60mm �� 30mm.
3. gas concrete roof boarding strengthening of steel bridge suspension rod place according to claim 1 leakage-proof structure, it is characterised in that: the total coating thickness of described leak stopping spirit (1) is 20mm.
4. gas concrete roof boarding strengthening of steel bridge suspension rod place according to claim 1 leakage-proof structure, it is characterised in that: the outer edge 30mm of hole (8) is stretched out in the every side of described non-woven fabrics (3).
5. gas concrete roof boarding strengthening of steel bridge suspension rod place according to claim 1 leakage-proof structure, it is characterised in that: the thickness of described coating mortar (5) is apart from the outstanding 2cm of gas concrete roof boarding (7) end face.
6. gas concrete roof boarding strengthening of steel bridge suspension rod place according to claim 1 leakage-proof structure, it is characterised in that: the strength of cement mortar grade of described coating mortar (5) is not less than M5.
7. gas concrete roof boarding strengthening of steel bridge suspension rod place according to claim 1 leakage-proof structure, it is characterised in that: the surperficial floating press polish of described coating mortar (5).
8. gas concrete roof boarding strengthening of steel bridge suspension rod place according to claim 1 leakage-proof structure, it is characterised in that: described upper strata polyurethane coating (4) outside surface is circular arc.
9. the constructional method of gas concrete roof boarding strengthening of steel bridge suspension rod place leakage-proof structure according to the arbitrary item of claim 1-8, it is characterised in that: adopt following steps:
Step one: the hole (8) cutting designed size on the gas concrete roof boarding (7) of suspension rod (6) periphery, with oil-free air compressor, hole (8) interior floating dust is blown, and prevent dust or the grains of sand from entering in hole (8);
Step 2: configuration leak stopping spirit (1) slurry: by leak stopping spirit (1) according to powder: water=1: uniformly slurry without agglomerate is stand-by for the ratio stirring at low speed of 0.3;
Step 3: smear rigid waterproof layer: scrape the first layer leak stopping spirit (1) slurry with scraper plate or trowel, after coating hardens, timely fog curing, vertically scrapes the second layer after 90min, after being all painted with, carry out 48h maintenance;
Step 4: smear flexible waterproof layer: Xian Tu lower floor polyurethane coating (2), on lower floor's polyurethane coating (2), lay non-woven fabrics (3) after solidification, then smear upper strata polyurethane coating (4) to prevent leakage is scraped along the vertical direction of described lower floor polyurethane coating (2);
Step 5: upper strata polyurethane coating (4) carries out coating mortar (5) construction after solidifying; floating press polish is answered on coating mortar (5) surface; tackling the timely maintenance of sand-cement slurry after construction, curing time is not less than 7d.
CN201610131569.0A 2016-03-09 2016-03-09 Seepage prevention structure for suspension rod for steel girder reinforcement of aerated concrete roof and construction method of seepage prevention structure Withdrawn CN105625744A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610131569.0A CN105625744A (en) 2016-03-09 2016-03-09 Seepage prevention structure for suspension rod for steel girder reinforcement of aerated concrete roof and construction method of seepage prevention structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610131569.0A CN105625744A (en) 2016-03-09 2016-03-09 Seepage prevention structure for suspension rod for steel girder reinforcement of aerated concrete roof and construction method of seepage prevention structure

Publications (1)

Publication Number Publication Date
CN105625744A true CN105625744A (en) 2016-06-01

Family

ID=56041049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610131569.0A Withdrawn CN105625744A (en) 2016-03-09 2016-03-09 Seepage prevention structure for suspension rod for steel girder reinforcement of aerated concrete roof and construction method of seepage prevention structure

Country Status (1)

Country Link
CN (1) CN105625744A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339355A (en) * 2018-11-21 2019-02-15 中建二局第二建筑工程有限公司 The construction method of the aluminium sheet roofing waterproofing node of structural slab is done using ALC plate
CN109487756A (en) * 2018-01-20 2019-03-19 深圳市深水水务咨询有限公司 The repairing structure and its construction method at the expansion joint of pressurized water transmission box culvert
CN111502324A (en) * 2020-04-29 2020-08-07 湖南先锋防水科技有限公司 Repairing process for leakage between elevator shaft side wall and ground

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066483A (en) * 1991-05-09 1992-11-25 上海市彭浦建筑防水公司 The preparation method of the complex waterproof layer that roofing is used
KR100732473B1 (en) * 2007-04-06 2007-06-27 (주)수산기업 Water-proofing method for urathane flim of paint using zinc galvanizing sheets
CN101718120A (en) * 2009-10-29 2010-06-02 河南省第二建筑工程有限责任公司 Waterproof structure for washroom pipe-through floor slab
CN204311772U (en) * 2014-12-12 2015-05-06 北京筑福国际工程技术有限责任公司 Aero-concrete roof boarding ruggedized construction
CN205400117U (en) * 2016-03-09 2016-07-27 北京筑福建筑事务有限责任公司 Jib department leak protection structure is consolidated to aerated concrete roof boarding girder steel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066483A (en) * 1991-05-09 1992-11-25 上海市彭浦建筑防水公司 The preparation method of the complex waterproof layer that roofing is used
KR100732473B1 (en) * 2007-04-06 2007-06-27 (주)수산기업 Water-proofing method for urathane flim of paint using zinc galvanizing sheets
CN101718120A (en) * 2009-10-29 2010-06-02 河南省第二建筑工程有限责任公司 Waterproof structure for washroom pipe-through floor slab
CN204311772U (en) * 2014-12-12 2015-05-06 北京筑福国际工程技术有限责任公司 Aero-concrete roof boarding ruggedized construction
CN205400117U (en) * 2016-03-09 2016-07-27 北京筑福建筑事务有限责任公司 Jib department leak protection structure is consolidated to aerated concrete roof boarding girder steel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487756A (en) * 2018-01-20 2019-03-19 深圳市深水水务咨询有限公司 The repairing structure and its construction method at the expansion joint of pressurized water transmission box culvert
CN109339355A (en) * 2018-11-21 2019-02-15 中建二局第二建筑工程有限公司 The construction method of the aluminium sheet roofing waterproofing node of structural slab is done using ALC plate
CN111502324A (en) * 2020-04-29 2020-08-07 湖南先锋防水科技有限公司 Repairing process for leakage between elevator shaft side wall and ground

Similar Documents

Publication Publication Date Title
CN201695580U (en) Inverted roof structure
CN100570098C (en) A kind of thermal insulation waterproof roof covering gas-guiding drainage system and job practices thereof
CN104153400B (en) A kind of construction method of soft foundation pouring pile head waterproof
CN205935437U (en) Parapet wall body structure
CN103276858B (en) Drainage structure for inverted roof and construction method of drainage structure
CN204492025U (en) The waterproof construction of the contour deformation joint of roofing
CN203701446U (en) Roof structure for garage roof planting
CN106988489A (en) A kind of implementation method of roofing system structure
CN201695411U (en) Waterproof system of bottom board and wall surface of basement
CN105625744A (en) Seepage prevention structure for suspension rod for steel girder reinforcement of aerated concrete roof and construction method of seepage prevention structure
CN104153521A (en) Roof waterproof structure and roof maintenance method
CN106836663A (en) The construction method of water-proof insulating roof
CN206529905U (en) Basement waterproofing is constructed
CN203499128U (en) Waterproof structure for roof surface
CN206616785U (en) Inverted roof provided with steam passing away
CN204252414U (en) Roof covering water-proof structure
CN206529789U (en) Offshore wind turbine foundation concrete cushion cap waterproof sealing structure
CN105696358B (en) Environment-friendly type composite of water-proof coiled material and its production method
CN208396162U (en) A kind of thermal isolation by water storage roofing
CN105239732B (en) A kind of construction method of the stretching roofing pipe of rainwater leakage prevention
CN207260455U (en) A kind of anti-aging roof structure of waterproof heat insulation
CN110563416A (en) Repairing method suitable for masonry structure surface and application thereof
CN206667500U (en) A kind of toilet waterproofing structure
CN205400117U (en) Jib department leak protection structure is consolidated to aerated concrete roof boarding girder steel
CN205224451U (en) Roofing parapet flashing protective layer structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20160601

WW01 Invention patent application withdrawn after publication