CN105625446A - Construction method for railway under tunnel - Google Patents

Construction method for railway under tunnel Download PDF

Info

Publication number
CN105625446A
CN105625446A CN201511014583.4A CN201511014583A CN105625446A CN 105625446 A CN105625446 A CN 105625446A CN 201511014583 A CN201511014583 A CN 201511014583A CN 105625446 A CN105625446 A CN 105625446A
Authority
CN
China
Prior art keywords
tunnel
excavation
sides
railway
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511014583.4A
Other languages
Chinese (zh)
Other versions
CN105625446B (en
Inventor
洪兆庆
张梁
田天长
王承科
付俊武
张海强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN201511014583.4A priority Critical patent/CN105625446B/en
Publication of CN105625446A publication Critical patent/CN105625446A/en
Application granted granted Critical
Publication of CN105625446B publication Critical patent/CN105625446B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a construction method for a railway under a tunnel. The construction method is characterized in that dewatering deep wells are arranged; water at a water-rich drift sand layer section of an excavated tunnel is introduced into the dewatering deep wells, and is extracted out of the dewatering deep wells, so that pressure-bearing underground water in a construction area is drained, and therefore, the water level and depth in the center of a construction area are effectively controlled to achieve construction requirements under a water-free environment, phenomena of sand drifting and piping are avoided, and the stability of an excavation face is ensured. Besides, according to the method, cover plates and retaining walls are arranged at the two sides of a railway subgrade, and side slopes between the retaining walls and the railway subgrade are filled with concrete, so that cover plate sections are formed at the two sides of the railway subgrade; and tunnel extraction is divided into open excavation, cover excavation and underground excavation, so that the underground excavation length is reduced, and therefore, the construction risks are reduced.

Description

The constructional method of a kind of tunnel undercrossing tunnel
Technical field
The present invention relates to constructing tunnel side's method, particularly the method for tunnel construction of a kind of undercrossing tunnel.
Background technology
The early stage physical construction planning of China, a lot of cities railway is positioned at area, outskirts of a town, along with the propelling of urbanization and urbanization, existing railway has badly influenced the unimpeded of urban road, a large amount of planimetric position conflicts, urgent need solving urban road and Railway road change the enforcement of grade separation, improve traffic congestion situation in city. But, south China and coastal major part city be all near the mountain side water and build, geological condition is complicated, it mostly is rich water thick sand bed below existing railway line road, under the severe geologic condition of these rich water thick sand beds, builds highway, carry out tunnel buried shallowly with large-scan construction difficulty very, not only easily occur that the excavation soil body caves in, also easily have influence on the operation of existing line, it is difficult in the process that engineering carries out, ensure both Wired Security.
For avoiding tunnel on the impact of existing line, needing to keep certain spacing between the tunnel of undercrossing tunnel and railway bed, this causes the length needs in tunnel longer, and tunnel excavation length is relatively big, and long pipe shed has the possibility of impouring railway bed, and construction risk is bigger.
Summary of the invention
The present invention is intended to provide a kind of safe under the severe geologic condition of rich water thick sand bed, carries out the method for tunnel undercrossing tunnel construction, to guarantee that railway settlement Control is in allowed band, and protects the safety of railway equipment and surrounding building.
The constructional method of a kind of tunnel of the present invention undercrossing tunnel, comprises the steps:
Precipitation treatment step; Before excavation, multiple precipitation deep-well of respectively constructing in the side slope both sides on existing railway line road; The precipitation deep-well of both sides all bottom together with, extract the water in the precipitation deep-well of both sides out by water pump symmetry, it is achieved precipitation;
In the both sides of railway bed, put the Ji Keng of slope excavation cover plate and barricade by certain slope; And set anchor sprayed concrete and side slope is protected;
With concrete placement in the hole base excavated, apply out cover plate and the cover plate barricade near railway bed side; After completing, fill in Railway Bed Slope and barricade gap casting concrete;
By Tunnel Design direction, two-way tunneling, excavate the lid section of digging of the correspondence below open excavation section, cover plate and the tunneling section of centre successively, until both sides are through, complete the excavation in tunnel.
The constructional method of tunnel of the present invention undercrossing tunnel, by arranging precipitation deep-well, the moisture in husky for the rich current of tunneling layer location is incorporated in deep well, and from deep well from extraction, thus effectively achieve the moisture to excavation location, tunnel, dredge and done construction area pressure-bearing property underground water, effective control construction area central water bit depth, the requirement constructed under reaching water-less environment, avoids quicksand, piping phenomenon occur, it is ensured that the stability of excavation face. In addition, described method, also by arranging cover plate and barricade in railway bed both sides, and at the side slope place fill concrete of barricade and railway ground, it makes railway bed both sides define deck segment, during tunneling, excavates under being in deck segment bottom it, safer, simultaneously by arranging deck segment, the degree of depth of tunneling can be reduced, decrease undercrossing tunnel tunneling length, thus reduce the risk of the long pipe shed impouring railway bed that tunneling is arranged, reduce construction risk.
Enforcement mode
A constructional method for tunnel undercrossing tunnel, comprises the steps:
Precipitation treatment step; Before excavation, multiple precipitation deep-well of respectively constructing in the side slope both sides on existing railway line road; The precipitation deep-well of both sides all bottom together with, extract the water in the precipitation deep-well of both sides out by water pump symmetry, it is achieved precipitation;
In the both sides of railway bed, put the Ji Keng of slope excavation cover plate and barricade by certain slope; And set anchor sprayed concrete and side slope is protected;
With concrete placement in the hole base excavated, apply out cover plate and the cover plate barricade near railway bed side; After completing, fill in Railway Bed Slope and barricade gap casting concrete;
By Tunnel Design direction, two-way tunneling, excavate the lid section of digging of the correspondence below open excavation section, cover plate and the tunneling section of centre successively, until both sides are through, complete the excavation in tunnel.
When the base of construction cover plate and barricade is cheated, put slope excavation in railway bed both sides by the 1:0.3 gradient, set the �� 25 anchor pole injection thick concrete of 20cm and carry out side slope protection.
In order toAvoid existing line train operation load directly to be had an impact by Under-cross tunnel, wear operation line when haved project lawer is constructed under guarantee and do not interrupt normal operation, reduce to greatest extent and both wired drivings are affected, it is ensured that driving safety. Can beExisting line both sides construction artificial digging pile,?Adopt D type construction beam directly over tunnel, by arranging crossbeam, longeron, adopt and horizontal lift the vertical method chosen by existing railway supports on artificial digging pile. It can make train load finally be passed on artificial digging pile, it is ensured that the operation safety of railway when tunnel excavates.

Claims (3)

1. the constructional method of a tunnel undercrossing tunnel, it is characterised in that: comprise the steps:
Precipitation treatment step; Before excavation, multiple precipitation deep-well of respectively constructing in the side slope both sides on existing railway line road; The precipitation deep-well of both sides all bottom together with, extract the water in the precipitation deep-well of both sides out by water pump symmetry, it is achieved precipitation;
In the both sides of railway bed, put the Ji Keng of slope excavation cover plate and barricade by certain slope; And set anchor sprayed concrete and side slope is protected;
With concrete placement in the hole base excavated, apply out cover plate and the cover plate barricade near railway bed side; After completing, fill in Railway Bed Slope and barricade gap casting concrete;
By Tunnel Design direction, two-way tunneling, excavate the lid section of digging of the correspondence below open excavation section, cover plate and the tunneling section of centre successively, until both sides are through, complete the excavation in tunnel.
2. the constructional method of tunnel according to claim 1 undercrossing tunnel, it is characterised in that: when the base of construction cover plate and barricade is cheated, put slope excavation in railway bed both sides by the 1:0.3 gradient, set the �� 25 anchor pole injection thick concrete of 20cm and carry out side slope protection.
3. the constructional method of tunnel according to claim 1 undercrossing tunnel, it is characterised in that:?Existing line both sides construction artificial digging pile,?Adopt D type construction beam directly over tunnel, by arranging crossbeam, longeron, adopt and horizontal lift the vertical method chosen by existing railway supports on artificial digging pile.
CN201511014583.4A 2015-12-31 2015-12-31 A kind of construction method of tunnel undercrossing tunnel Active CN105625446B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511014583.4A CN105625446B (en) 2015-12-31 2015-12-31 A kind of construction method of tunnel undercrossing tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511014583.4A CN105625446B (en) 2015-12-31 2015-12-31 A kind of construction method of tunnel undercrossing tunnel

Publications (2)

Publication Number Publication Date
CN105625446A true CN105625446A (en) 2016-06-01
CN105625446B CN105625446B (en) 2018-02-16

Family

ID=56040756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511014583.4A Active CN105625446B (en) 2015-12-31 2015-12-31 A kind of construction method of tunnel undercrossing tunnel

Country Status (1)

Country Link
CN (1) CN105625446B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106544964A (en) * 2016-11-08 2017-03-29 中铁六局集团天津铁路建设有限公司 Road bed and lowering water level construction method during jacking box culvert
CN107402043A (en) * 2017-07-24 2017-11-28 沈阳工业大学 Half cover and cut method Construction of City Tunnel monitoring method and monitoring system
CN107542470A (en) * 2017-08-30 2018-01-05 中铁三局集团有限公司 Existing railway Business Line construction method is worn under the shallow tunnel of karst broken region
CN109989767A (en) * 2019-01-17 2019-07-09 中铁二院贵阳勘察设计研究院有限责任公司 Reinforcement structure and construction method of long-span tunnel passing through existing railway
CN115306402A (en) * 2022-08-11 2022-11-08 中铁隆工程集团有限公司 A construction method for underpassing existing lines in subway stations

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031736A (en) * 2010-06-12 2011-04-27 中铁十六局集团有限公司 Construction technology for under-passing existing line under complicated geological condition
CN102287195A (en) * 2011-05-13 2011-12-21 中铁四局集团第二工程有限公司 Construction method of large-span tunnel passing through rapid transit railway with shallow tunneling process
CN102562077A (en) * 2011-12-23 2012-07-11 中铁二局股份有限公司 Excavation construction method of frame tunnel penetrating special structure at lower portion
CN103410522A (en) * 2013-08-27 2013-11-27 中铁十三局集团第四工程有限公司 Continuous close-range underpass railway bridge construction method employing shallow tunneling method
JP2014101661A (en) * 2012-11-19 2014-06-05 Kajima Corp Groundwater level raising system, and groundwater level raising method
CN105089698A (en) * 2014-05-13 2015-11-25 中国铁道科学研究院城市轨道交通中心 Settlement control method in process of enabling subway tunnel to penetrate through existing railway

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031736A (en) * 2010-06-12 2011-04-27 中铁十六局集团有限公司 Construction technology for under-passing existing line under complicated geological condition
CN102287195A (en) * 2011-05-13 2011-12-21 中铁四局集团第二工程有限公司 Construction method of large-span tunnel passing through rapid transit railway with shallow tunneling process
CN102562077A (en) * 2011-12-23 2012-07-11 中铁二局股份有限公司 Excavation construction method of frame tunnel penetrating special structure at lower portion
JP2014101661A (en) * 2012-11-19 2014-06-05 Kajima Corp Groundwater level raising system, and groundwater level raising method
CN103410522A (en) * 2013-08-27 2013-11-27 中铁十三局集团第四工程有限公司 Continuous close-range underpass railway bridge construction method employing shallow tunneling method
CN105089698A (en) * 2014-05-13 2015-11-25 中国铁道科学研究院城市轨道交通中心 Settlement control method in process of enabling subway tunnel to penetrate through existing railway

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106544964A (en) * 2016-11-08 2017-03-29 中铁六局集团天津铁路建设有限公司 Road bed and lowering water level construction method during jacking box culvert
CN107402043A (en) * 2017-07-24 2017-11-28 沈阳工业大学 Half cover and cut method Construction of City Tunnel monitoring method and monitoring system
CN107542470A (en) * 2017-08-30 2018-01-05 中铁三局集团有限公司 Existing railway Business Line construction method is worn under the shallow tunnel of karst broken region
CN107542470B (en) * 2017-08-30 2019-09-24 中铁三局集团有限公司 Existing railway Business Line construction method is worn under the shallow tunnel of karst broken region
CN109989767A (en) * 2019-01-17 2019-07-09 中铁二院贵阳勘察设计研究院有限责任公司 Reinforcement structure and construction method of long-span tunnel passing through existing railway
CN115306402A (en) * 2022-08-11 2022-11-08 中铁隆工程集团有限公司 A construction method for underpassing existing lines in subway stations

Also Published As

Publication number Publication date
CN105625446B (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN104018405B (en) The double-deck road structure that a kind of " stake-anchor-framework " is compound
CN101748667B (en) Side slope lattice foundation cantilever structure composite road
CN101831873B (en) Temporary bridge covered excavation method for constructing box culvert below traffic ground line of operating track
CN102251777B (en) Large-scale karst cavity treatment method for karst tunnel
CN103866694B (en) Deep water silty sand ground geology large span multi-line hardened system and jacking culvert construction method
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN105625446A (en) Construction method for railway under tunnel
CN203361033U (en) Protective device for intercepting falling rocks of through cut
CN102352590A (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN102277880B (en) Large-sized box jacking control construction method capable of enhancing accuracy
CN102966358B (en) Construction method for shield-cut reinforced concrete pile under main line of operational railway
CN104533426B (en) An ultra shallow buries the method for tunnel construction of underpass of freeways large span cap excavation method
CN101215815A (en) Construction method of composite road with integral cantilever structure suitable for steep mountainous areas
CN110107303A (en) The deformation control method of shallow earthing shield boring across underneath high-speed railway
CN103883328A (en) Semi-covering semi-darkened construction method for separated tunnels downwards penetrating through high and steep V-shaped gully eccentric compression section
CN102322266A (en) Tunnel excavating and constructing method
CN105201516A (en) Subway station body structure and four-joint-arch PBA underground excavation construction method thereof
CN107700498A (en) Multi-thread crossings on different level abnormal shape deep foundation pit supporting structure and its construction method
CN106812134A (en) Reserved long term line passes through the plain stake reinforcement system and its construction method of existing lines part
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN107965325A (en) Just branch bow member replaces construction method to a kind of small interval shallow tunnel
CN108561139A (en) A kind of horizontal reinforcement concrete steel pile pile pre support method
CN102865084A (en) Expanding excavation method of underground tunnel from fracture surface of double-track tunnel to ultra-large fracture surface of triple-track tunnel
CN210946536U (en) Protective structure of small dangerous rock falling stone
CN102839980A (en) Highway tunnel structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant