CN105604582A - Steel protection rail trolley used for borehole-blasting method construction of tunnels in moderate and above rock burst regions - Google Patents

Steel protection rail trolley used for borehole-blasting method construction of tunnels in moderate and above rock burst regions Download PDF

Info

Publication number
CN105604582A
CN105604582A CN201610176504.8A CN201610176504A CN105604582A CN 105604582 A CN105604582 A CN 105604582A CN 201610176504 A CN201610176504 A CN 201610176504A CN 105604582 A CN105604582 A CN 105604582A
Authority
CN
China
Prior art keywords
steel
construction
protection
rock burst
shielded frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610176504.8A
Other languages
Chinese (zh)
Inventor
王彩艳
张宁
马妹英
胡朝晖
孟繁杰
赵立民
王贤忠
丁秀霞
李鹏
张艳君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201610176504.8A priority Critical patent/CN105604582A/en
Publication of CN105604582A publication Critical patent/CN105604582A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a steel protection rail trolley used for borehole-blasting method construction of tunnels in moderate and above rock burst regions. The steel protection rail trolley comprises a cave-shaped steel protection framework, and a bottomless protection steel plate fixed on the steel protection framework in the length direction, wherein an I-shaped steel framework is welded above the top of the steel protection framework; a steel strand protection net is anchored on the steel framework; a plurality of wheels are mounted at the lower edge of the steel protection framework along the length direction of the steel protection framework; a detachable front end top plate is arranged at the front end of the steel protection framework; a plurality of rows and lines of shot holes for borehole-blasting positioning are formed in the front end top plate; a steel-made safety door is arranged at the lower part of the front end top plate; and furthermore, movable steel rails, which are mounted in the construction field, are arranged. Under the protection of the protection net, the steel protection rail trolley has a buffering effect on the falling of rock-burst falling stones so that a steel protection structure is protected, constructors are protected, and furthermore, the aim of safety construction is guaranteed. The disadvantages of a traditional construction method that a construction period is long, potential safety hazards are great, and the distribution of borehole-blasting shot holes is complicated are avoided; and the steel protection rail trolley has the advantages of simplicity in operation, low cost, safety guarantee, rapid construction progress and the like.

Description

For the steel guard rail road chassis of medium and above rock burst area tunnel drill bursting construction
Technical field
The present invention relates to a kind of construction equipment, especially a kind of for medium and above rock burst area tunnel brillThe steel guard rail road chassis of quick-fried method construction.
Background technology
Guarantee that tunnel construction safety is the important prerequisite of tunnel drill bursting construction without hidden danger, but medium and withUpper rock burst area tunnel construction, after tunnel excavation completes, is affected by violent rock burst, tunnel crag launches,Peel off sillar, energy is large, speed is fast, very easily causes casualties and mechanical failure, and personnel and machinery are difficultTo enter tunnel construction, and rock burst is longer perdurabgility, and tunnel excavation completes to stress major part and releasesBecome, rock burst weakens to not affecting construction safety, about 2 days-120 days time, has seriously affected constructionProgress. And traditionally, for the drill bursting construction in medium and above rock burst area, for Rockburst Problem masterThere is boring in advance to discharge stress method, spraying, shotcrete with mesh protection method etc., but these methodsAll be difficult to effectively ensure the safety of workmen and construction equipment, easily cause personnel's lives and properties to damageLose. Therefore, ensure medium and above rock burst area tunnel construction personnel's personal safety and plant equipmentSafety, and then reach normal construction and do not affect construction speed object, problem in the urgent need to address become.
Summary of the invention
Technical problem to be solved by this invention is, provide a kind of safe and reliable, easy to use, shorten and executeThe work duration, be convenient to safeguard, use cost is low for medium and above rock burst area tunnel drill bursting constructionSteel guard rail road chassis.
In order to address the above problem, the technical solution adopted in the present invention is: a kind of for medium and more thanThe steel guard rail road chassis of rock burst area tunnel drill bursting construction, comprises the steel shielded frame of hole shape and fixesBottomless shoulder guard on steel shielded frame length direction, steel shielded frame over top welding I-shapedSteel skeleton, anchoring steel strand wires protection network on steel skeleton, steel shielded frame lower frame is long along steel shielded frameIn degree direction, multiple wheels are installed, the front end of steel shielded frame is with dismountable front end top board, frontOn end top board, arrange that many row's multiple rows, for boring the borehole of quick-fried location, are provided with steel in the bottom of front end top boardSafety door, configuration is installed on the removable steel track of construction site in addition.
Multiple handrails of being convenient to drag chassis are installed in shoulder guard inboard.
Described steel safety door is interior double door.
Described steel shielded frame is arch, rectangle or circle.
The mesh spacing of described steel strand wires protection network is not more than 200mm.
The longitudinal length of described steel shielded frame is not more than 10 meters.
Beneficial effect of the present invention: the safety assurance of tunnel drill bursting construction is provided, ensured medium andThe safety of workmen and construction equipment in the tunnel construction of above rock burst area, and then accelerated constructionProgress, has ensured construction quality. And fabrication and installation are easy, simple operation, later period maintenance is changed easily,Expense is low, for medium and above rock burst area tunnel excavation provides safe measure.
Fig. 1 is the structural representation of steel guard rail of the present invention road chassis.
Fig. 2 is the front end end face schematic diagram of steel guard rail of the present invention road chassis.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail:
As shown in Figure 1, 2, the steel for medium and above rock burst area tunnel drill bursting construction of the present inventionGuard rail road chassis, comprises the steel shielded frame 1 of hole shape and is fixed on steel shielded frame length directionBottomless shoulder guard 3, steel shielded frame 1 over top welding H-bar skeleton 6, anchor on steel skeleton 6Gu steel strand wires protection network 7, steel shielded frame 1 lower frame is provided with on steel shielded frame length directionMultiple wheels 4, the front end of steel shielded frame 1 is with dismountable front end top board 8, at front end top board 8Upper layout is arranged multiple row for boring the borehole 9 of quick-fried location more, is provided with steel peace in the bottom of front end top board 8Air cock 2, configuration is installed on the removable steel track 5 of construction site in addition.
Multiple handrails 10 of being convenient to drag chassis are installed in shoulder guard 3 inboards.
Described steel safety door 8 is interior double door.
Described steel shielded frame 1 is arch, rectangle or circle.
The mesh spacing of described steel strand wires protection network 7 is not more than 200mm.
The longitudinal length of described steel shielded frame 1 is not more than 10 meters.
Specifically, the tunnel by steel guard rail platform where rites are performed car for drill bursting construction, track is laid on ground5, so that construction is advanced conveniently, actual mechanical process is as follows: tunnel drilling and blasting method excavates-slagged tap-standardStandby next operation-removable steel track 5 moves forward to excavation face-workmen and passes through handrail10 moving protection track chassis fixing-hole, put in poison-blow out by the borehole 9 on front end top board 8-slag tap and carry out next process.
The present invention is welding H-bar skeleton 6 above steel shielded frame 1, so that anchoring steel strand wires protection network 7,Protection network 7 is used for resisting the percussion of the falling rocks in construction; Before the front of steel shielded frame is provided withEnd top board, on front end top board, arrange construction of explosion borehole, with convenient construction personnel at steel guard rail road chassisInterior construction of explosion.
In the present embodiment, H shaped steel protects bow member as steel, and shoulder guard is welded on H shaped steel arch, steelShielded frame below is provided with wheel, and ground is provided with removable steel track, at the top of steel shielded frameWelding H-bar skeleton, so that anchoring steel strand wires protection network, protection network is used for resisting the falling rocks in construction,Protection steel safeguard structure reaches the object of safe construction, in the front of steel shielded frame, front end top board is installed,On front end top board, arrange construction of explosion borehole, to facilitate construction of explosion, total is the brill of safe readyQuick-fried construction installation.
In the structure of steel shielded frame, the version of steel shielded frame is not limited to this, real according to tunnelBorder situation can be designed to other form.
The material that protection network is installed above steel shielded frame adopts steel strand wires. Steel strand wires intensity is high, opposingThe impulsive force of rock is strong.
Borehole arrangement form is not limited to this, can design the top board of multiple borehole arrangement forms, according to rock typeNot etc. choose reasonable is not used and dismantles.
Above-described embodiment is only for illustrating technological thought of the present invention and feature, and its object is to makeThose skilled in the art can understand content of the present invention and implement according to this, can not be only with the present embodimentLimit the scope of the claims of the present invention, equal variation or modification that all disclosed spirit is done,Still drop in the scope of the claims of the present invention.

Claims (6)

1. for the steel guard rail road chassis of medium and above rock burst area tunnel drill bursting construction, itsBe characterised in that, comprise the steel shielded frame (1) of hole shape and be fixed on the nothing on steel shielded frame length directionThe shoulder guard (3) at the end, steel shielded frame (1) over top welding H-bar skeleton (6), steel skeleton(6) upper anchoring steel strand wires protection network (7), steel shielded frame (1) lower frame is along steel shielded frame lengthMultiple wheels (4) are installed in direction, and the front end of steel shielded frame (1) is with dismountable front end top board(8), arrange multiple rows for boring the boreholes (9) of quick-fried location, push up at front end upper layout of front end top board (8) moreThe bottom of plate (8) is provided with steel safety door (2), and configuration is installed on the removable steel of construction site in additionTrack (5).
2. the steel for medium and above rock burst area tunnel drill bursting construction according to claim 1Guard rail road chassis, is characterized in that, is provided with and is convenient to drag the many of chassis in shoulder guard (3) inboardIndividual handrail (10).
3. the steel for medium and above rock burst area tunnel drill bursting construction according to claim 1Guard rail road chassis, is characterized in that, described steel safety door (8) is interior double door.
4. the steel for medium and above rock burst area tunnel drill bursting construction according to claim 1Guard rail road chassis, is characterized in that, described steel shielded frame (1) is arch, rectangle or circle.
5. the steel for medium and above rock burst area tunnel drill bursting construction according to claim 1Guard rail road chassis, is characterized in that, the mesh spacing of described steel strand wires protection network (7) is not more than 200mm.
According to described in claim 1-5 any one for medium and above rock burst area tunnel drilling and blasting methodThe steel guard rail road chassis of construction, is characterized in that, the longitudinal length of described steel shielded frame (1) is littleIn 10 meters.
CN201610176504.8A 2016-03-24 2016-03-24 Steel protection rail trolley used for borehole-blasting method construction of tunnels in moderate and above rock burst regions Pending CN105604582A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610176504.8A CN105604582A (en) 2016-03-24 2016-03-24 Steel protection rail trolley used for borehole-blasting method construction of tunnels in moderate and above rock burst regions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610176504.8A CN105604582A (en) 2016-03-24 2016-03-24 Steel protection rail trolley used for borehole-blasting method construction of tunnels in moderate and above rock burst regions

Publications (1)

Publication Number Publication Date
CN105604582A true CN105604582A (en) 2016-05-25

Family

ID=55984867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610176504.8A Pending CN105604582A (en) 2016-03-24 2016-03-24 Steel protection rail trolley used for borehole-blasting method construction of tunnels in moderate and above rock burst regions

Country Status (1)

Country Link
CN (1) CN105604582A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165653A (en) * 2017-06-29 2017-09-15 西南交通大学 A kind of Rock-burst in Underground Rock Engineering geological disaster passively prevents and treats equipment and its application method
CN107435539A (en) * 2017-08-28 2017-12-05 中交第二航务工程局有限公司 Vertical shaft Tunnel Blasting construction protection device and its construction method
CN111997664A (en) * 2020-09-08 2020-11-27 宁波朗达工程科技有限公司 Rock burst prevention tunnel construction platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201155331Y (en) * 2008-01-31 2008-11-26 肖根祥 Head-on safe protection shield for tunnel development
US20090320987A1 (en) * 2005-08-22 2009-12-31 Hubbard Michael J Fire resistant covering system
CN201763364U (en) * 2010-08-30 2011-03-16 山东科技大学 Safety protection frame for drilling operating platform
CN202400052U (en) * 2012-01-06 2012-08-29 刘铭飞 Safety protective hood at top of slag discharging machine
CN103410524A (en) * 2013-08-19 2013-11-27 葛洲坝新疆工程局(有限公司) Soft rock tunnel construction method
CN203821443U (en) * 2014-04-16 2014-09-10 中铁三局集团有限公司 Cave opening protecting device for blasting excavation at light and shade junction part of subway tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090320987A1 (en) * 2005-08-22 2009-12-31 Hubbard Michael J Fire resistant covering system
CN201155331Y (en) * 2008-01-31 2008-11-26 肖根祥 Head-on safe protection shield for tunnel development
CN201763364U (en) * 2010-08-30 2011-03-16 山东科技大学 Safety protection frame for drilling operating platform
CN202400052U (en) * 2012-01-06 2012-08-29 刘铭飞 Safety protective hood at top of slag discharging machine
CN103410524A (en) * 2013-08-19 2013-11-27 葛洲坝新疆工程局(有限公司) Soft rock tunnel construction method
CN203821443U (en) * 2014-04-16 2014-09-10 中铁三局集团有限公司 Cave opening protecting device for blasting excavation at light and shade junction part of subway tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165653A (en) * 2017-06-29 2017-09-15 西南交通大学 A kind of Rock-burst in Underground Rock Engineering geological disaster passively prevents and treats equipment and its application method
CN107435539A (en) * 2017-08-28 2017-12-05 中交第二航务工程局有限公司 Vertical shaft Tunnel Blasting construction protection device and its construction method
CN111997664A (en) * 2020-09-08 2020-11-27 宁波朗达工程科技有限公司 Rock burst prevention tunnel construction platform

Similar Documents

Publication Publication Date Title
Yang et al. Design principles and key technologies of gob side entry retaining by roof pre-fracturing
CN110700883B (en) Gob-side entry driving prevention and control method for large-dip-angle coal seam composite disaster small coal pillar
CN110318761B (en) Construction method for controlling roadway deformation
Tu et al. Present situation of fully mechanized mining technology for steeply inclined coal seams in China
CN109209392B (en) Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel
CN205189893U (en) Be used for a lane coal column to wearing reinforced (rfd) supporting construction
CN107355226B (en) Broken area hole section processing structure of TBM construction tunnel fault
US10662771B2 (en) Drill and blast method and apparatus for the same
CN103195443B (en) Deep mining method capable of optimizing support parameters and preventing roadway delaying water gushing
CN105604582A (en) Steel protection rail trolley used for borehole-blasting method construction of tunnels in moderate and above rock burst regions
AU2014292699A1 (en) Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same
CN109763861A (en) One kind cutting intraocular fault belt treatment of roof collapse method
CN209892217U (en) Rapid tunneling system
CN108035752A (en) Coal road based on roof stability pushes up by force wall supporting anchor rod support method
CN109958454A (en) Stope drift active workings pucking control system and its control method
CN104500117B (en) Without repeatedly supporting continuous supporting advanced hydraulic support
CN109519221A (en) A kind of bump danger zone seat earth is broken water-filling method
CN111022050B (en) Fully-closed blasting pressure relief and self-retained roadway method for grouting reconstruction of composite roof
CN105201510B (en) A kind of creepage type bump preventing control method
CN205477662U (en) A steel guard rail way platform truck that is used for mediumly and above rock burst area tunnel brill method of exploding is under construction
CN104234685A (en) Staggered distribution method of anti-impact pressure relief drill holes in super high seam stoping surface
CN115288701B (en) Tunneling method for long-tunneling long-branch roadway
Townend et al. Mitigation strategies for mining in high stress sill pillars at Coleman Mine–a case study
CN113338979A (en) Hydraulic tunnel drilling trolley excavation construction method and device
CN111502663A (en) Tunneling method for collapse column in over-stress concentration area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160525