CN105604223A - Dry hanging structure used for stone curtain wall and use method thereof - Google Patents

Dry hanging structure used for stone curtain wall and use method thereof Download PDF

Info

Publication number
CN105604223A
CN105604223A CN201510961717.7A CN201510961717A CN105604223A CN 105604223 A CN105604223 A CN 105604223A CN 201510961717 A CN201510961717 A CN 201510961717A CN 105604223 A CN105604223 A CN 105604223A
Authority
CN
China
Prior art keywords
keel
suspension member
stone material
material plate
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510961717.7A
Other languages
Chinese (zh)
Other versions
CN105604223B (en
Inventor
申利宾
李燕丽
李宴玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Yanling
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510961717.7A priority Critical patent/CN105604223B/en
Publication of CN105604223A publication Critical patent/CN105604223A/en
Application granted granted Critical
Publication of CN105604223B publication Critical patent/CN105604223B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention relates to a dry hanging structure used for a stone curtain wall. The structure comprises a stone plate, a keel and dry hanging assemblies. The end faces of the stone plate are provided with grooves matched with the dry hanging assemblies. The structure is characterized in that each dry hanging assembly comprises a pendant and a limiting element, wherein the pendant is connected with the keel through a connecting piece, and one end of the pendant is provided with a hook matched with the corresponding groove; the assemblies are fixed to the keel or the pendants so that the pendants can be limited to be perpendicular to the keel after the stone plate is installed. The dry hanging assemblies are easier to combine and convenient and quick to install, operation can be achieved by one worker, the problems that in the prior art, drying hanging assemblies are complicated in structure and complex to install, and safety hidden hazards exist are solved, and time and labor are saved in the whole installation process.

Description

For dried hanging hang structure and the using method thereof of stone curtain wall
Technical field
The present invention relates to stone curtain wall, particularly a kind of dried hanging hang structure for stone curtain wall and using method thereof.
Background technology
Notification number is the method for attachment that the patent of CN102720288A discloses a kind of welding curtain wall dried hanging part, this patent discloses a kind of dried hanging hang structure that comprises keel, corner code, stone material corner brace, the flat code composition of double hook, in [0035] of description section, dried hanging hang structure is being installed on keel after body of wall by corner code, also need fixing stone corner brace, stone material corner brace is fixed on to the both sides of keel, then on the stone material corner brace fixing, connect the flat code of double hook ([0036] section of description), and flat double hook code 4 is fixed in the groove that stone material opens. From above-mentioned, the disclosed dried hanging hang structure of this patent is also provided with stone material corner brace between keel and the flat code of double hook, in the process of installing, all to could be connected and fixed with keel by stone material corner brace is installed for the flat code of double hook of direct fixing stone, really loaded down with trivial details in practical operation like this; And, all with bolts between keel, stone material corner brace, the flat code of double hook, install and waste time and energy; In addition, the syndeton of multicompartment, very easily because a certain assembly wherein does not connect, and occurs becoming flexible, and causes danger. In addition, in the document, can clearly know by accompanying drawing, this curtain wall dried hanging part, in installation process, is first by fixing flat the double hook of fixing stone bottom code, again stone material is placed on the flat code of this double hook, then will fix the groove fixing stone corner brace of the flat code of the double hook corresponding stone material upper end of this curtain wall top, complete to being completely fixed of this stone material, afterwards, then the flat code of double hook that stone material is placed in again to upper strata, so circulation is upwards installed. In this installation process, the flat code of double hook is before stone material is installed, all to install, and can only alternately install with stone material, and the flat code of double hook will be bolted, thereby such mounting means at least needs two people, and inconvenient operation and cost of labor are high.
Summary of the invention
Therefore,, for the problems referred to above, the present invention proposes a kind of simple in structure, easy for installation, dry-fasten stone curtain wall structure and using method thereof efficiently.
The present invention adopts following technical scheme:
The dried hanging hang structure of stone curtain wall, comprise stone material plate, keel and dry-hanging component, the end face of described stone material plate is provided with and coordinates the groove of installing with dry-hanging component, it is characterized in that: described dry-hanging component comprises suspension member and locating part, described suspension member is connected with keel by connector, one end of this suspension member is provided with the hook of installing with described groove fit, and described assembly is fixed on keel or suspension member, vertical with keel after installation stone material plate to limit suspension member.
Further, described connector is bolt, this suspension member connect by connector with keel after, can rotate with respect to keel.
Further, described connector is the projection that is arranged at suspension member both sides, is provided with the groove being connected with this projection on the keel of these suspension member both sides.
Further, the cross section of described projection is circle or rectangle, and the groove ends being connected with this projection on described keel is also circle or rectangle.
Further, described locating part is fixed on keel or suspension member, and is positioned at the rear of connector.
Further, described locating part is fixed on keel or suspension member, and is positioned at the front of connector.
Further, described locating part is fixed on keel; This locating part is the crossbeam that connects many keel.
Further, described hook is dove-tail form hook or T-shape hook, to fix two adjacent stone material plates simultaneously.
Beneficial effect of the present invention: the combination of dry-hanging component provided by the present invention is simpler, easy for installation, quick, a workman can operate, solved dry-hanging component complex structure in prior art, installed loaded down with trivial details and have potential safety hazard, whole installation process is time saving and energy saving.
Brief description of the drawings
Fig. 1 is first embodiment of the present invention front schematic view;
Fig. 2 is that the locating part in the present invention is fixed on suspension member, and is positioned at the rear schematic diagram of connector;
Fig. 3 is that the locating part in the present invention is fixed on keel, and is positioned at the front schematic diagram of connector;
Fig. 4 is that the locating part in the present invention is fixed on suspension member, and is positioned at the front schematic diagram of connector;
Fig. 5 is the schematic perspective view of the second embodiment of the present invention;
Fig. 6 is the longitudinal profile schematic diagram of the second embodiment of the present invention;
Fig. 7 is that the locating part of the second embodiment in the present invention is fixed on keel, and is positioned at the front schematic diagram of connector.
Detailed description of the invention
Now the present invention is further described with detailed description of the invention by reference to the accompanying drawings:
Embodiment 1
Refer to Fig. 1, the present invention is for the dried hanging hang structure of stone curtain wall, comprise stone material plate 4, keel 1 and dry-hanging component 2, on the upper and lower end face of described stone material plate 4, be provided with and coordinate the groove 41 of installing with dry-hanging component, described dry-hanging component 2 comprises suspension member 21 and locating part 22, described suspension member 21 is connected in the side 11 of keel 1 by bolt 3, and can be centered by bolt 3 circular-rotation, one end of this suspension member 21 is provided with and coordinates " T " hook 211 of installing with described groove 41, described locating part 22 is fixed on keel 1, and be positioned at the rear of bolt 3, vertical with keel 1 after installation stone material plate 4 with restriction suspension member 21.
In practice of construction, as Fig. 1, can in advance all suspension members 21 be installed on keel by bolt 3, and suspension member 21 can be rotated with respect to keel 1, before placing stone material plate 3, suspension member 21 is rotated to horizontal level, then, by linking up with 211 corresponding the groove 41 on stone material plate 4, stone material plate 4 is positioned over to (being the lower end that suspension member blocks this stone material plate) on suspension member 21, because locating part 22 limits the tail end of suspension member 21, make installing after stone material plate 4, suspension member 21 can not continue to be rotated counterclockwise because of load-bearing; After stone material plate is installed, then the suspension member on upper strata 21 is rotated to horizontal level, so that the suspension member 21 on this upper strata blocks the upper end of this stone material plate, then follows, the stone material plate on upper strata is positioned on the suspension member 21 on aforementioned upper strata, so, circulation is upwards installed. The dry-hanging component that this invention relates to, by rotation suspension member 21 is set on keel 1, makes these dry-hanging component 2 structures simpler, easier for installation, has solved dry-hanging component complex structure in prior art, installs loaded down with trivial details and has a problem of potential safety hazard; In addition, these rotation suspension member 21 fixing stone plate simple and fasts (only need rotate), a workman can operate, time saving and energy saving, greatly improves operating efficiency.
Worth explanation, in above-described embodiment, described suspension member 21 also can arrange the centre (being not limited to be fixed on the side of keel) with keel 1; Described hook 211 also can be dove-tail form, as long as can fix two adjacent stone material plates simultaneously, its shape is not limit.
In addition, described locating part 22 can be directly welded on keel 1, certainly also can pass through connector, as bolt, is fixed on keel 1; And this locating part also can be fixed on suspension member 21, as Fig. 2 and Fig. 4; This locating part also can be placed in front or the rear of bolt 3 simultaneously, as Fig. 1-Fig. 4; The shape of this locating part 22 can be bulk, sheet, strip, or with the above-mentioned shape of stopper slot, in the time that locating part 22 is fixed on keel, this locating part also can be the crossbeam that connects multiple keel, during as bulk, sheet, strip, to save the keel place mounting limit part matching with each suspension member at locating part 22; To sum up, as long as it is vertical with keel 1 after installation stone material plate 4 to limit suspension member 21, shape and the position of locating part are not limit.
Embodiment 2
Refer to Fig. 5, Fig. 6, the present invention is for the dried hanging hang structure of stone curtain wall, comprise stone material plate 4, keel 1 and dry-hanging component 2, on the upper and lower end face of described stone material plate 4, be provided with and coordinate the groove 41 of installing with dry-hanging component, described dry-hanging component 2 comprises suspension member 23 and locating part 22, the both sides of described suspension member 23 are provided with rectangle projection 232, on the side 11 of described keel 1, be provided with the rectangular recess 111 being connected with projection 232, described suspension member 23 passes through projection 232 clampings and groove 111, and realization is connected with keel 1; For convenience of, efficiently by projection 232 clampings and groove 111, the height of described groove 111 is greater than the thickness of projection 232; One end of this suspension member 23 is provided with and coordinates the dove-tail form hook 231 of installing with described groove 41, and described locating part 22 is fixed on keel 1, and is positioned at the rear of projection 232, vertical with keel 1 after installation stone material plate 4 to limit suspension member 21.
In practice of construction, as Fig. 5-Fig. 6, described locating part 22 is to be fixed in advance on keel, when installation, the state that suspension member 23 is added to lateral inclination with fore-and-aft tilt enters between two keel 1, enter into after groove 111 at suspension member 23, by suspension member 23 with longitudinally with laterally all in the state clamping and groove 111 perpendicular to keel 1, be limited in its bottom for limited 22, so that still keep plumbness with keel after stone material plate is installed simultaneously; Subsequently, be the lower end that suspension member blocks this stone material plate by groove 41 correspondences on stone material plate 4 are linked up with to 231(), stone material plate 4 is positioned on suspension member 23, follow again, in the above described manner, the suspension member 23 on upper strata is installed, with the upper end of fixing stone plate, then, then the stone material plate that upper strata is installed is on the suspension member of described upper strata, and so circulation is upwards installed.
In this embodiment, projection 232 is formed in one with suspension member 23, certainly also can be by connector by projection connection and suspension member. In this embodiment, the cross section of projection 232 is rectangle setting, and groove 111 with matching is also rectangle, and rectangle is provided with and helps limit suspension member and rotate with respect to keel, and more firm with being connected of keel; What deserves to be explained is, this rectangular recess 111 is as long as ensure that the part (being the bottom of Fig. 5 further groove 111) coordinating with rectangle projection 232 is the object that rectangle (top shape of Fig. 5 further groove 111 is not limit) can reach this programme; Separately, this rectangular arrangement is a kind of preferred version, also projection 232 can be set to cross section and be other circular etc. shapes, and groove 111 with matching is also for respective shapes or only ensure that the part coordinating with rectangle projection 232 is respective shapes.
In this embodiment, described hook 231 also can be T-shape, as long as can fix two adjacent stone material plates simultaneously, its shape is not limit.
Refer to Fig. 7, in the time that locating part 22 is fixed on keel, this locating part 22 also can be positioned at the front of projection, and still, for vertical with keel after guarantee suspension member installation stone material plate, described projection 232 need be limited in the top of groove 111; In addition, at Fig. 5, in the scheme of Fig. 6, locating part 22 is fixed on keel, in fact, also locating part 22 can not changed under the prerequisite of position, is directly fixed on suspension member 23, can also realize object of the present invention.
As described in Example 1, locating part 22 can be directly welded on keel 1, certainly also can pass through connector, as bolt, is fixed on keel 1; In this embodiment, the shape of locating part 22 also can be bulk, sheet, strip, or with the above-mentioned shape of stopper slot, in the time that locating part 22 is fixed on keel, this locating part also can be the crossbeam that connects multiple keel, during as bulk, sheet, strip, to save the keel place mounting limit part matching with each suspension member at locating part 22; To sum up, as long as it is vertical with keel 1 after installation stone material plate 4 to limit suspension member 23, shape and the position of locating part are not limit.
Use the dried hanging hang structure of embodiment 2 that a method for stone curtain wall is installed, comprising:
Step 1: the state that dry hanging article is added to lateral inclination with fore-and-aft tilt enters between two keel, enter into after groove 111 at suspension member 23, by suspension member 23 with longitudinally with laterally all in the state clamping and groove 111 perpendicular to keel 1, simultaneously limited restriction, still keeps plumbness so that suspension member and keel after stone material plate are installed;
Step 2: by corresponding the groove of stone material plate lower end hook, stone material plate 4 is positioned on suspension member 23;
Step 3: upper strata suspension member is connected in keel by the method for repeating step 1, and this upper strata is linked up with to the groove of corresponding stone material plate upper end, complete the installation of monolithic stone material plate;
The installation circulation step 2 of the stone material plate on upper strata, step 3 operates; If the stone material plate of new row is installed, circulation step 1, step 2, step 3 operates.
Although specifically show and introduced the present invention in conjunction with preferred embodiment; but those skilled in the art should be understood that; not departing from the spirit and scope of the present invention that appended claims limits; can make a variety of changes the present invention in the form and details, be protection scope of the present invention.

Claims (9)

1. for the dried hanging hang structure of stone curtain wall, comprise stone material plate, keel and dry-hanging component, the end face of described stone material plate is provided with and coordinates the groove of installing with dry-hanging component, it is characterized in that: described dry-hanging component comprises suspension member and locating part, described suspension member is connected with keel by connector, one end of this suspension member is provided with the hook of installing with described groove fit, and described locating part is fixed on keel or suspension member, vertical with keel after installation stone material plate to limit suspension member.
2. the dried hanging hang structure for stone curtain wall as claimed in claim 1, is characterized in that: described connector is bolt, this suspension member connect by connector with keel after, can rotate with respect to keel.
3. the dried hanging hang structure for stone curtain wall as claimed in claim 1, is characterized in that: described connector is the projection that is arranged at suspension member both sides, is provided with the groove being connected with this projection on the keel of these suspension member both sides.
4. the dried hanging hang structure for stone curtain wall as claimed in claim 3, is characterized in that: the cross section of described projection is circle or rectangle, and the groove being connected with this projection on described keel is also circle or rectangle.
5. the dried hanging hang structure for stone curtain wall as claimed in claim 1, is characterized in that: described locating part is fixed on keel or suspension member, and is positioned at the rear of connector.
6. the dried hanging hang structure for stone curtain wall as claimed in claim 2, is characterized in that: described locating part is fixed on keel or suspension member, and is positioned at the front of connector.
7. the dried hanging hang structure for stone curtain wall as described in claim 5 or 6, is characterized in that: described locating part is fixed on keel; This locating part is the crossbeam that connects many keel.
8. the dried hanging hang structure for stone curtain wall as claimed in claim 1, is characterized in that: described hook is dove-tail form hook or T-shape hook, to fix two adjacent stone material plates simultaneously.
9. the method that the dried hanging hang structure of right to use requirement 3 is installed stone curtain wall, comprising:
Step 1: the state that dry hanging article is added to lateral inclination with fore-and-aft tilt enters between two keel, enter into after groove at suspension member, by suspension member with longitudinally with laterally all in the state clamping and groove perpendicular to keel, simultaneously limited restriction, still keeps plumbness so that suspension member and keel after stone material plate are installed;
Step 2: by corresponding the groove of stone material plate lower end hook, stone material plate is positioned on suspension member;
Step 3: upper strata suspension member is connected in keel by the method for repeating step 1, and this upper strata is linked up with to the groove of corresponding stone material plate upper end, complete the installation of monolithic stone material plate;
The installation circulation step 2 of upper strata stone material plate, step 3 operates; If the stone material plate of new row is installed, circulation step 1, step 2, step 3 operates.
CN201510961717.7A 2015-12-20 2015-12-20 Dried hanging hang structure and its application method for stone curtain wall Active CN105604223B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510961717.7A CN105604223B (en) 2015-12-20 2015-12-20 Dried hanging hang structure and its application method for stone curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510961717.7A CN105604223B (en) 2015-12-20 2015-12-20 Dried hanging hang structure and its application method for stone curtain wall

Publications (2)

Publication Number Publication Date
CN105604223A true CN105604223A (en) 2016-05-25
CN105604223B CN105604223B (en) 2018-12-25

Family

ID=55984522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510961717.7A Active CN105604223B (en) 2015-12-20 2015-12-20 Dried hanging hang structure and its application method for stone curtain wall

Country Status (1)

Country Link
CN (1) CN105604223B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139991A (en) * 2020-01-17 2020-05-12 洪斯衍 Dry-hanging stone mounting structure and mounting method
CN114150803A (en) * 2021-12-13 2022-03-08 滁州风禹新材料科技有限公司 Light curtain wall keel assembly and mounting method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0293430U (en) * 1989-01-13 1990-07-25
CN2332766Y (en) * 1998-08-24 1999-08-11 王召鹏 Dry hanging fixer for outer curtain wall decorative stone of building
CN2541532Y (en) * 2002-04-15 2003-03-26 云南旭光节能有限公司 Curtain wall hook
CN2641181Y (en) * 2003-08-08 2004-09-15 李怀亮 SE stone curtain wall element
CN2718124Y (en) * 2004-04-30 2005-08-17 林文雄 Dismountable stone dry hanging fixing structure
CN201762935U (en) * 2010-03-09 2011-03-16 薛益成 Plate-type wall material dry-hanging device and upright column thereof
CN102535700A (en) * 2012-02-17 2012-07-04 秦皇岛市中贤幕墙装饰工程有限公司 Independently detachable small unit type stone curtain wall hanging piece system
CN102720288A (en) * 2012-05-23 2012-10-10 天津市韩建科技有限公司 Method for connecting solderless curtain wall dry pendant

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0293430U (en) * 1989-01-13 1990-07-25
CN2332766Y (en) * 1998-08-24 1999-08-11 王召鹏 Dry hanging fixer for outer curtain wall decorative stone of building
CN2541532Y (en) * 2002-04-15 2003-03-26 云南旭光节能有限公司 Curtain wall hook
CN2641181Y (en) * 2003-08-08 2004-09-15 李怀亮 SE stone curtain wall element
CN2718124Y (en) * 2004-04-30 2005-08-17 林文雄 Dismountable stone dry hanging fixing structure
CN201762935U (en) * 2010-03-09 2011-03-16 薛益成 Plate-type wall material dry-hanging device and upright column thereof
CN102535700A (en) * 2012-02-17 2012-07-04 秦皇岛市中贤幕墙装饰工程有限公司 Independently detachable small unit type stone curtain wall hanging piece system
CN102720288A (en) * 2012-05-23 2012-10-10 天津市韩建科技有限公司 Method for connecting solderless curtain wall dry pendant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139991A (en) * 2020-01-17 2020-05-12 洪斯衍 Dry-hanging stone mounting structure and mounting method
CN114150803A (en) * 2021-12-13 2022-03-08 滁州风禹新材料科技有限公司 Light curtain wall keel assembly and mounting method

Also Published As

Publication number Publication date
CN105604223B (en) 2018-12-25

Similar Documents

Publication Publication Date Title
CN107327111A (en) A kind of dried hanging hang structure and finishing systems
AU2017247443B2 (en) Side protector, ceiling formwork system having at least one such side protector, and method for erecting such a side protector
CN105604223A (en) Dry hanging structure used for stone curtain wall and use method thereof
CN203979789U (en) A kind of crane span structure supporting structure and there is its mixing plant
CN106639281A (en) Detachable lifting scaffold
CN104179362A (en) Building site guardrail fast to mount and demount
JP2014101659A (en) Temporary scaffold and method of assembling the same
CN207122081U (en) A kind of dried hanging hang structure and finishing systems
CN206157965U (en) Close joint does not have fossil fragments aluminium veneer curtain
JP6713599B1 (en) Wedge binding scaffolding morning glory device and wedge binding scaffolding morning glory device system
EP3176349B1 (en) Anti-lifting coupling system
CN208500281U (en) The constructing device of prefabricating clear water concrete hanging plate
CN204715675U (en) Decoration panel exempts from basic unit's mounting structure
CN108301585A (en) Armouring keel-free direct pendant
CN213046105U (en) Goods shelf convenient to disassemble
CN209603353U (en) A kind of lattice aluminum facade connection structure
JP7175152B2 (en) Mounting bracket
CN108862119A (en) The constructing device and its application method of prefabricating clear water concrete hanging plate
CN212078772U (en) Cutting unloading device for building steel structure engineering
JP3151985U (en) Building frame with wedge binding part
CN104097252A (en) Concrete formwork seam joint piece
CN110616890A (en) Novel shear wall template reinforcing system and installation method
CN218541439U (en) Suspension type operation platform
CN203856158U (en) Ceiling corner enclosure device for dry-hanging stone veneers
CN215212193U (en) Scaffold for construction operation of building engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160513

Address after: 361021 No. 52 waterfront 301, Jimei District, Fujian, Xiamen

Applicant after: Li Yanling

Address before: 361021 No. 52 waterfront 301, Jimei District, Fujian, Xiamen

Applicant before: Shen Libin

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant