CN105604078A - Installation method of caisson - Google Patents

Installation method of caisson Download PDF

Info

Publication number
CN105604078A
CN105604078A CN201610023784.9A CN201610023784A CN105604078A CN 105604078 A CN105604078 A CN 105604078A CN 201610023784 A CN201610023784 A CN 201610023784A CN 105604078 A CN105604078 A CN 105604078A
Authority
CN
China
Prior art keywords
caisson
foundation
carried out
jacking
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610023784.9A
Other languages
Chinese (zh)
Inventor
李一勇
岳铭滨
李增军
张乃受
陈宝明
薛春刚
孙业发
柳延江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201610023784.9A priority Critical patent/CN105604078A/en
Publication of CN105604078A publication Critical patent/CN105604078A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/16Jointing caissons to the foundation soil, specially to uneven foundation soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses an installation method of a caisson. The method is technically characterized by comprising the steps that firstly, a base groove of the caisson is treated to enable the caisson to be effectively connected with a foundation; secondly, after the base groove of the caisson is formed, the position foundation needing to be treated is filled with or leveled with bagged sand according to actual conditions on a construction site, and caisson primary positioning and initial installation are carried out; thirdly, caisson jacking and leveling work is performed, and the caisson is jacked up to be disengaged from a foundation bed; fourthly, the periphery of the caisson is temporarily plugged; fifthly, a booster pump is adopted for carrying out grouting treatment on the bottom of the caisson through a grouting hole preserved in the bottom of the caisson, a caisson foundation is laid after forming, a jacking mechanism is disassembled after mortar forms the strength, and grouting treatment is carried out inside a jacking pipeline; sixthly, a temporary plugging structure on the periphery of the caisson is dug out, and caisson installation is finished. By the adoption of the technical scheme, the construction mechanization degree is high, construction efficiency is improved, the construction cost is reduced, influences on the environment are reduced, and operation safety and environmental protection capability are improved.

Description

A kind of installation method of caisson
Technical field
The present invention relates to Caisson Placing Construction technology field, specifically a kind of installation method of caisson.
Background technology
Existing Caisson Placing Construction method, first do rubble-mound foundation, rear installation caisson, need to dredge to bedding, jackstone, strong rammer, thick flat, thin equality, there is operation intensity large, large to surrounding environment influence, part operation needs diver's diving operation, has the more high deficiency of construction operation inefficiency and danger.
Summary of the invention
Object of the present invention, solves the problem existing in above technology exactly, and a kind of caisson and installation method thereof are provided for this reason.
An installation method for caisson, the first step, carries out the processing of caisson foundation trench, makes caisson and ground effective connection;
Second step, after the moulding of caisson foundation trench, adopts packed sand according to the actual conditions of job site, basis, need position to be processed to be filled and leveling, carries out the location of caisson and just installs;
The 3rd step, carries out jacking and the leveling work of caisson, and caisson jack-up and bedding are departed from;
The 4th step, carries out temporary plugging to caisson surrounding;
The 5th step, adopts force (forcing) pump by the reserved grout hole in caisson bottom, and grouting treatment is carried out in caisson bottom, and paving caisson foundation after forming, after mortar forms intensity, removes lifting body, and jacking pipe interior is carried out to grouting treatment;
The 6th step, digs out the temporary plugging structure of caisson surrounding, completes the installation of caisson.
Further, describedly caisson surrounding is carried out to temporary plugging adopt piece stone and bagged concrete.
Advantage of the present invention:
1, installation method of the present invention is for caisson is first installed, and rear employing is filled with afterwards the mode of mortar and carried out bedding construction, thereby exempts bedding jackstone, strong rammer, thick flat, thin equality working procedure;
2, this installation method mechanization of building operation degree is high, reduces manual work amount, improves efficiency of construction, reduces construction cost;
3, reduce the impact on environment, improve operational security and capability of environmental protection.
Specific embodiment
For the present invention is more easily understood, following examples are described in detail technical scheme of the present invention.
Embodiment 1
An installation method for caisson, the first step, carries out the processing of caisson foundation trench, makes caisson and ground effective connection; Second step, after the moulding of caisson foundation trench, adopts packed sand according to the actual conditions of job site, basis, need position to be processed to be filled and leveling, carries out the location of caisson and just installs; The 3rd step, carries out jacking and the leveling work of caisson, and caisson jack-up and bedding are departed from; The 4th step, carries out temporary plugging to caisson surrounding; The 5th step, adopts force (forcing) pump by the reserved grout hole in caisson bottom, and grouting treatment is carried out in caisson bottom, and paving caisson foundation after forming, after mortar forms intensity, removes lifting body, and jacking pipe interior is carried out to grouting treatment; The 6th step, digs out the temporary plugging structure of caisson surrounding, completes the installation of caisson.
Embodiment 2
An installation method for caisson, the first step, carries out the processing of caisson foundation trench, makes caisson and ground effective connection; Second step, after the moulding of caisson foundation trench, adopts packed sand according to the actual conditions of job site, basis, need position to be processed to be filled and leveling, carries out the location of caisson and just installs; The 3rd step, carries out jacking and the leveling work of caisson, and caisson jack-up and bedding are departed from; The 4th step, carries out temporary plugging to caisson surrounding, and caisson surrounding is carried out temporary plugging and adopted piece stone and bagged concrete; The 5th step, adopts force (forcing) pump by the reserved grout hole in caisson bottom, and grouting treatment is carried out in caisson bottom, and paving caisson foundation after forming, after mortar forms intensity, removes lifting body, and jacking pipe interior is carried out to grouting treatment; The 6th step, digs out the temporary plugging structure of caisson surrounding, completes the installation of caisson.

Claims (2)

1. an installation method for caisson, is characterized in that: the first step, carry out the processing of caisson foundation trench, and make caisson and ground effective connection;
Second step, after the moulding of caisson foundation trench, adopts packed sand according to the actual conditions of job site, basis, need position to be processed to be filled and leveling, carries out the location of caisson and just installs;
The 3rd step, carries out jacking and the leveling work of caisson, and caisson jack-up and bedding are departed from;
The 4th step, carries out temporary plugging to caisson surrounding;
The 5th step, adopts force (forcing) pump by the reserved grout hole in caisson bottom, and grouting treatment is carried out in caisson bottom, and paving caisson foundation after forming, after mortar forms intensity, removes lifting body, and jacking pipe interior is carried out to grouting treatment;
The 6th step, digs out the temporary plugging structure of caisson surrounding, completes the installation of caisson.
2. the installation method of a kind of caisson according to claim 5, is characterized in that: describedly caisson surrounding is carried out to temporary plugging adopt piece stone and bagged concrete.
CN201610023784.9A 2016-01-15 2016-01-15 Installation method of caisson Pending CN105604078A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610023784.9A CN105604078A (en) 2016-01-15 2016-01-15 Installation method of caisson

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610023784.9A CN105604078A (en) 2016-01-15 2016-01-15 Installation method of caisson

Publications (1)

Publication Number Publication Date
CN105604078A true CN105604078A (en) 2016-05-25

Family

ID=55984385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610023784.9A Pending CN105604078A (en) 2016-01-15 2016-01-15 Installation method of caisson

Country Status (1)

Country Link
CN (1) CN105604078A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759495A (en) * 2016-11-10 2017-05-31 南京鲁坚科智能科技有限公司 A kind of caisson, tunnel and the method that tunnel is built using caisson
CN108914958A (en) * 2018-07-24 2018-11-30 青岛长永机械工程有限公司 A kind of existing building installation elevator Assembled caisson basis and its construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130991A (en) * 2006-08-24 2008-02-27 中船第九设计研究院 Caisson cofferdam based on prepacked foundation bed
KR20080063722A (en) * 2008-03-04 2008-07-07 주식회사 동아지질 Caisson with shield curtain and method of preventing grout leak using the caisson
CN103669379A (en) * 2013-12-04 2014-03-26 中交一航局第二工程有限公司 Island constructing caisson without leveling of foundation bed and construction method
CN103669383A (en) * 2013-12-13 2014-03-26 中交第一航务工程局有限公司 Method for installing and leveling caisson on seabed ground

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130991A (en) * 2006-08-24 2008-02-27 中船第九设计研究院 Caisson cofferdam based on prepacked foundation bed
KR20080063722A (en) * 2008-03-04 2008-07-07 주식회사 동아지질 Caisson with shield curtain and method of preventing grout leak using the caisson
CN103669379A (en) * 2013-12-04 2014-03-26 中交一航局第二工程有限公司 Island constructing caisson without leveling of foundation bed and construction method
CN103669383A (en) * 2013-12-13 2014-03-26 中交第一航务工程局有限公司 Method for installing and leveling caisson on seabed ground

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759495A (en) * 2016-11-10 2017-05-31 南京鲁坚科智能科技有限公司 A kind of caisson, tunnel and the method that tunnel is built using caisson
CN106759495B (en) * 2016-11-10 2019-07-16 甘东 A kind of caisson, tunnel and the method for building tunnel using caisson
CN108914958A (en) * 2018-07-24 2018-11-30 青岛长永机械工程有限公司 A kind of existing building installation elevator Assembled caisson basis and its construction method

Similar Documents

Publication Publication Date Title
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN103573274B (en) Soft foundation shield tunnel subsidence controls steel sleeve grouting and reinforcing device
CN105780779A (en) Externally arranged, compacted and grouted Larsen steel sheet pile composite retaining structure and use method thereof
CN101793023A (en) Foundation pit construction method
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN107882042A (en) Supporting construction and its construction method are supportted before a kind of bellows
CN105239577A (en) Method for carrying out settlement of underground wall structure by means of high-pressure water guns
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN107386297B (en) Deep weathering stratum foundation pit water stopping structure
CN207362838U (en) A kind of tool-type soft soil foundation irrigates pile wall
CN104695456A (en) Construction method novel vertical shaft horizontal rotation jet grouting pile foundation pit lateral wall water stopping curtain
CN202440823U (en) Supporting structure of pipe jacking pit
CN206616565U (en) Door font double-row pile and double high-pressed spin-spewing water-stopping curtain combined retaining structure
CN105604078A (en) Installation method of caisson
CN105672351A (en) Construction method of buckling connection type prefabricated ribbed bar concrete comprehensive pipe rack structure
CN113668582B (en) Grouting type double-wall pressure-bearing water-reducing pipe well device and construction method thereof
CN102220764B (en) Construction method of deep foundation pit bracing system
CN105350575B (en) A kind of reversed construction method of diaphram wall
CN104074195B (en) A kind of method controlling the outer surface subsidence of foundation ditch by horizontal grouting
CN204059417U (en) A kind of complete inverse impervious node structure of method wall beam
CN203768925U (en) Seal device for dewatering well in foundation pit
CN203603927U (en) Grouting reinforcement device for soft foundation shield tunnel sedimentation control steel sleeve
CN212129150U (en) Deep basal pit precipitation well block structure
CN206220101U (en) A kind of support reinforcement structure of deep basal pit
CN107090828A (en) A kind of Larsen steel sheet pile construction method for buried cable pipeline protection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160525

RJ01 Rejection of invention patent application after publication