CN105603970B - A kind of building bar cage - Google Patents
A kind of building bar cage Download PDFInfo
- Publication number
- CN105603970B CN105603970B CN201510780385.2A CN201510780385A CN105603970B CN 105603970 B CN105603970 B CN 105603970B CN 201510780385 A CN201510780385 A CN 201510780385A CN 105603970 B CN105603970 B CN 105603970B
- Authority
- CN
- China
- Prior art keywords
- outer layer
- longitudinal reinforcement
- layer barrel
- barrel
- studs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention discloses a kind of building bar cage, including connector and through the longitudinal reinforcement of described connector, described connector includes hollow internal layer cylinder and the outer layer barrel being arranged on outside internal layer cylinder, connectivity slot is provided with the inwall of described outer layer barrel, the diameter parallel of described through hole is in the axis of described outer layer barrel, described longitudinal reinforcement extends through described connectivity slot, step trough is respectively arranged with described outer layer barrel upper and lower ends end face, transverse steel ring is provided with described step trough, described longitudinal reinforcement and described transverse steel ring are mutually permanently connected, studs is provided with the through hole, locking nut is respectively arranged with the studs two ends.The present invention realizes the fixation to longitudinal reinforcement by using the outer layer barrel for being provided with connectivity slot, is realized by internal layer cylinder and carries out compression positioning to longitudinal reinforcement, overall structure is constituted reinforcement cage structure.
Description
Technical field
The present invention relates to a kind of building bar cage.
Background technology
In bridges and culverts or high-building construction, may need to be driven piles as requested, method be using machine punching and
Water mill drills, and hole depth reaches design requirement, then transfers steel reinforcement cage to stake holes, is inserted into conduit and carries out concreting.
Steel reinforcement cage primarily serves drawing-resistant function, and existing steel reinforcement cage is mainly by the way that multiple reinforcing bars are carried out into stirrup according to design spacing,
Make reinforcing bar formation basket structure.During due to stirrup, mainly connected, structural instability, held by way of welding between adjacent reinforcing bar
Easily deform.
The content of the invention
Building bar cage, can improve the problem of prior art is present, by using the outer layer cylinder for being provided with link slot
Body, realizes the fixation to longitudinal reinforcement, is realized by internal layer cylinder and carries out compression positioning to longitudinal reinforcement, constitutes overall structure
Reinforcement cage structure, Stability Analysis of Structures, tensile strength is good.
The present invention is achieved through the following technical solutions:
A kind of building bar cage, including connector and the longitudinal reinforcement through described connector, described connector
Including hollow internal layer cylinder and the outer layer barrel being arranged on outside internal layer cylinder, set on the inwall of described outer layer barrel
There is a link slot, the diameter parallel of described through hole is in the axis of described outer layer barrel, and described link slot is along described outer
Circumferentially disposed several of layer cylinder, described longitudinal reinforcement extends through described link slot, on described outer layer barrel
It is respectively arranged with the end face of lower two ends in step trough, described step trough and is provided with transverse steel ring, described longitudinal reinforcement
End face outside is fitted on described transverse steel ring inwall respectively, and described longitudinal reinforcement and described transverse steel ring are mutual
It is fixedly connected, the through hole that to be respectively arranged with position on side wall of the described internal layer cylinder with described outer layer barrel corresponding,
It is provided with studs in described through hole, described studs two ends extend through described internal layer cylinder and described
Outer layer barrel, locking nut is respectively arranged with described studs two ends.
Further, for the present invention is better achieved, annular recess is being provided with outer wall in the middle part of described outer layer barrel,
The fixing hole for the link slot being respectively arranged with the inside of described annular recess described in connection, is provided with described annular recess
Ring-type retainer plate, described ring-type retainer plate inwall is fitted in described longitudinal reinforcement end face outside.
Further, for the present invention is better achieved, described longitudinal reinforcement is respectively by being arranged on described fixing hole
Interior solder joint is welded on described ring-type retainer plate inwall.
Further, for the present invention is better achieved, described studs is circumferentially uniform along described outer layer barrel
Spaced at least four.
Further, for the present invention is better achieved, described studs is axially uniform along described outer layer barrel
Spaced at least 3 groups.
The present invention compared with prior art, has the advantages that:
(1) present invention connects longitudinal reinforcement by using connector, it is possible to increase the intensity connected between reinforcing bar, helps
In the intensity for improving whole reinforcement cage;
(2) positioning and fixation of the present invention by using outer layer barrel and internal layer cylinder realization to reinforcing bar, can make reinforcing bar
Between structure more consolidate, it is not easy to there is the phenomenon of Joint failure, be favorably improved integrally-built quality.
Brief description of the drawings
Fig. 1 overall structure diagrams of the present invention.
Reference:101. longitudinal reinforcement, 102. link slots, 103. outer layer barrels, 104. step troughs, 105. transverse steels
Ring, 106. annular recess, 107. ring-type retainer plates, 108. internal layer cylinders, 110. studs, 111. locking nuts, 112. consolidate
Determine hole, 113. solder joints.
Embodiment
The present invention is described in further detail with reference to specific embodiment, but embodiments of the present invention are not limited to
This.
Embodiment 1:
As shown in figure 1, a kind of building bar cage, including connector and the longitudinal reinforcement 101 through described connector,
Described connector includes hollow internal layer cylinder 108 and the outer layer barrel 103 being arranged on outside internal layer cylinder 108, described
Outer layer barrel 103 inwall on be provided with link slot 102, the diameter parallel of described link slot 102 is in described outer layer cylinder
The axis of body 103, described link slot 102 is along circumferentially disposed several of described outer layer barrel 103, described longitudinal steel
Muscle 101 extends through described link slot 102, and ladder is respectively arranged with the described upper and lower ends end face of outer layer barrel 103
Transverse steel ring 105 is provided with groove 104, described step trough 104, the end face outside of described longitudinal reinforcement 101 is pasted respectively
Close on the described inwall of transverse steel ring 105, described longitudinal reinforcement 101 and described transverse steel ring 105 interfix
Connection, in logical corresponding with position is respectively arranged with the side wall of described outer layer barrel 103 of described internal layer cylinder 108
Hole, is provided with studs 110 in described through hole, and the described two ends of studs 110 extend through described internal layer cylinder
Body 108 and described outer layer barrel 103, locking nut 111 is respectively arranged with the described two ends of studs 110.
The structure being engaged by internal layer cylinder and outer layer barrel, can enable longitudinal reinforcement preferably be fixed on connection
In groove, it is used in combination by studs and locking nut, can be relatively fixed internal layer cylinder and outer layer barrel, so as to limits
Determining longitudinal reinforcement can not move radially.The present invention can be realized to adjacent longitudinal reinforcement by setting transverse steel ring
Connection, because upper and lower ends are respectively provided with horizontal line reinforced steel bar ring so that longitudinal reinforcement is not in axial movement, so that longitudinal reinforcement
Firm reinforcement cage structure is formed with connector.
Embodiment 2:
The present embodiment, in order to improve the bonding strength between longitudinal reinforcement, makes overall structure more on the basis of embodiment 1
Plus it is firm, it is described in the present embodiment, it is preferable that be provided with annular recess 106 on the described middle part outer wall of outer layer barrel 103
The inner side of annular recess 106 be respectively arranged with the fixing hole 112 of the link slot described in connection, in described annular recess 106
Ring-type retainer plate 107 is provided with, the described inwall of ring-type retainer plate 107 is fitted in the described end face outside of longitudinal reinforcement 101.
It is further preferred that in order that ring-type retainer plate preferably can interfix with longitudinal reinforcement, in the present embodiment,
Described longitudinal reinforcement 101 is welded on described ring-type by the solder joint 113 being arranged in described fixing hole 112 respectively and fixed
Enclose on 107 inwalls.
In order that internal layer cylinder preferably can be connected with each other with outer layer barrel, in the present embodiment, it is preferable that described is double
Header stud 110 is at least four set along the described circumferential uniform intervals of outer layer barrel 103.
In order that internal layer cylinder preferably can be connected with each other with outer layer barrel, in the present embodiment, it is preferable that described is double
Header stud 110 is at least 3 groups set along the described axial uniform intervals of outer layer barrel 103.
Claims (2)
1. a kind of building bar cage, it is characterised in that:Including connector and through the longitudinal reinforcement of described connector
(101), described connector is including hollow internal layer cylinder (108) and is arranged on the outside outer layer barrel of internal layer cylinder (108)
(103), it is provided with link slot (102) on the inwall of described outer layer barrel (103), the axis of described link slot (102)
Parallel to the axis of described outer layer barrel (103), described link slot (102) is circumferential along described outer layer barrel (103)
Set several, described longitudinal reinforcement (101) extends through described link slot (102), in described outer layer barrel
(103) it is respectively arranged with upper and lower ends end face in step trough (104), described step trough (104) and is provided with transverse steel ring
(105), the end face outside of described longitudinal reinforcement (101) is fitted on described transverse steel ring (105) inwall respectively, described
Longitudinal reinforcement (101) and described transverse steel ring (105) be mutually permanently connected, in described internal layer cylinder (108) and institute
The corresponding through hole in position is respectively arranged with the side wall for the outer layer barrel (103) stated, double end is provided with described through hole
Stud (110), described studs (110) two ends extend through described internal layer cylinder (108) and described outer layer barrel
(103), it is respectively arranged with locking nut (111) at described studs (110) two ends;
It is being provided with the middle part of described outer layer barrel (103) on outer wall in annular recess (106), described annular recess (106)
Side is respectively arranged with the fixing hole (112) of the link slot described in connection, and ring-type is provided with described annular recess (106) and is consolidated
Fixed circle (107), described ring-type retainer plate (107) inwall is fitted in described longitudinal reinforcement (101) end face outside;
Described longitudinal reinforcement (101) is welded on described by the solder joint (113) being arranged in described fixing hole (112) respectively
Ring-type retainer plate (107) inwall on;
Described studs (110) is at least four set along the circumferential uniform intervals of described outer layer barrel (103).
2. a kind of building bar cage according to claim 1, it is characterised in that:Described studs (110) is edge
At least 3 groups of the axial uniform intervals setting of described outer layer barrel (103).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510780385.2A CN105603970B (en) | 2015-11-13 | 2015-11-13 | A kind of building bar cage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510780385.2A CN105603970B (en) | 2015-11-13 | 2015-11-13 | A kind of building bar cage |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105603970A CN105603970A (en) | 2016-05-25 |
CN105603970B true CN105603970B (en) | 2017-08-29 |
Family
ID=55984277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510780385.2A Expired - Fee Related CN105603970B (en) | 2015-11-13 | 2015-11-13 | A kind of building bar cage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105603970B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107639188B (en) * | 2017-10-24 | 2019-03-12 | 广东南丰建设工程有限公司 | A kind of clamp assemblies prefabricated for stake holes ground steel reinforcement cage |
CN107803452B (en) * | 2017-10-24 | 2019-01-25 | 广州振中建设有限公司 | A kind of prefabricated application method with clamp assemblies of building lot steel reinforcement cage |
CN107696249A (en) * | 2017-11-10 | 2018-02-16 | 承德绿建建筑节能科技有限公司 | The dew muscle groove mould and forming method of wall |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4560559B2 (en) * | 2008-02-26 | 2010-10-13 | 株式会社タイヨー | Reinforcing bar reinforcement structure |
CN202080812U (en) * | 2011-05-05 | 2011-12-21 | 中交四航局第一工程有限公司 | Dedicated sling system for large-scaled reinforcing cage |
CN103452241B (en) * | 2013-09-03 | 2016-01-20 | 北京工业大学 | RC rectangular column bight is indulged muscle and is concentrated built-in profile steel to strengthen structure and preparation method |
CN204435359U (en) * | 2014-11-14 | 2015-07-01 | 中交路桥华南工程有限公司 | Reinforcing cage suspension bracket |
CN105033480A (en) * | 2015-07-29 | 2015-11-11 | 朱玉兵 | Support pillar reinforcement cage welder for municipal engineering |
CN205276255U (en) * | 2015-11-13 | 2016-06-01 | 重庆市合川区盐井建筑工程有限公司 | Reinforcing bar cage for building |
-
2015
- 2015-11-13 CN CN201510780385.2A patent/CN105603970B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105603970A (en) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105672491B (en) | The construction method of the round steel pipe constraint armored concrete steel girder frame node of the compound steel pipe in node area | |
CN108457372A (en) | A kind of steel core concrete column-steel plate concrete ring beam joint and its construction method | |
CN105603970B (en) | A kind of building bar cage | |
CN102677779B (en) | Assembled constructional reinforced concrete structural member | |
CN105888080A (en) | Assembly type steel pipe casing reinforced concrete combined joint and mounting method | |
CN104863271B (en) | A kind of steel core concrete column reinforced beam joint connecting method | |
CN107313557A (en) | Universal steel concrete supporting component | |
CN206769051U (en) | A kind of assembled integral column connected node | |
CN104594343B (en) | A kind of assembled stake and its construction method | |
CN106121055B (en) | A kind of steel box column and beams of concrete connecting node and its construction method | |
CN205276255U (en) | Reinforcing bar cage for building | |
CN114718059B (en) | Tubular pile connecting structure and pile splicing method thereof | |
CN213448916U (en) | Steel core concrete column and reinforced concrete beam node connection structure | |
CN106869320B (en) | The frame and its construction method that coupled column combination beam is constituted | |
CN207597586U (en) | A kind of prefabricated assembled beam-column steel pipe sleeve connecting node | |
CN208701911U (en) | A kind of high-strength split bolt of band to drawing node | |
CN110439108B (en) | Super high-rise building core tube beam column structure and construction method thereof | |
CN202482854U (en) | Pure mechanical connection structure between piles | |
CN102061747B (en) | Connection method of high-rise steel structure steel column base and bottom plate reinforcing steel bar | |
CN217679680U (en) | Ring beam node structure | |
FI127619B (en) | Pile point and method for producing a pile point | |
CN206143611U (en) | Chord tube package assembly of steel pipe concrete arch bridge | |
CN219931258U (en) | Truss round steel pipe chord member butt joint device | |
CN220414536U (en) | Assembled RCS combined node | |
CN204252127U (en) | A kind of assembling stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170829 Termination date: 20181113 |
|
CF01 | Termination of patent right due to non-payment of annual fee |