CN207597586U - A kind of prefabricated assembled beam-column steel pipe sleeve connecting node - Google Patents

A kind of prefabricated assembled beam-column steel pipe sleeve connecting node Download PDF

Info

Publication number
CN207597586U
CN207597586U CN201621275773.1U CN201621275773U CN207597586U CN 207597586 U CN207597586 U CN 207597586U CN 201621275773 U CN201621275773 U CN 201621275773U CN 207597586 U CN207597586 U CN 207597586U
Authority
CN
China
Prior art keywords
steel pipe
pipe sleeve
column
prepared screw
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621275773.1U
Other languages
Chinese (zh)
Inventor
张延年
常磊
海洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201621275773.1U priority Critical patent/CN207597586U/en
Application granted granted Critical
Publication of CN207597586U publication Critical patent/CN207597586U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of prefabricated assembled beam column steel pipe sleeve connecting node, composition include:Steel pipe sleeve, beam-ends pre-embedded steel slab, column, beam and high-strength bolt, welding cross is put more energy into web in the steel pipe sleeve;The upper and lower ends of the steel pipe sleeve side are respectively arranged with multiple sleeve prepared screw-bolt holes;The beam-ends pre-embedded steel slab is square plate, and both sides and the sleeve prepared screw-bolt hole corresponding position of steel pipe sleeve are provided with steel plate prepared screw-bolt hole above and below beam-ends pre-embedded steel slab, and ribbed stiffener is correspondingly provided at the left and right sides of each steel plate prepared screw-bolt hole;It is provided in the beam in beam and indulges muscle in stirrup and beam;The steel pipe sleeve is mounted on column;The beam-ends pre-embedded steel slab welds together with indulging muscle in beam;The beam-ends pre-embedded steel slab passes through sleeve prepared screw-bolt hole and steel plate prepared screw-bolt hole and steel pipe sleeve connection using high-strength bolt.The utility model improves the stability of prefabricated assembled frame structure entirety, reinforced assembly formula structural elements switching performance.

Description

A kind of prefabricated assembled beam-column steel pipe sleeve connecting node
Technical field
The utility model belongs to building field, and in particular to a kind of prefabricated assembled beam-column steel pipe sleeve connecting node dress It puts.
Background technology
The construction of China's building construction at present uses cast-in-situ construction method more.Although cast-in-place system structural integrity is strong, resist The superiority such as shock stability is good use this form more in the design.But there is many difficulties in engineering construction:Cast-in-place structural Construction includes live formwork, assembling reinforcement, casting concrete, maintenance, form removal, these work all need manual operations, it is difficult to use machine Tool replaces completing, and does not also find out other methods at present to replace these processes, when not only causing big hand labor consuming, process Between persistently, engineering cost is high, the construction quality engineering problems such as big affected by environment, and causes a series of environmental pollution, makes an uproar The social concerns such as sound pollution and the wasting of resources, it is difficult to realize comprehensive industrialized production, hinder industrial sustainable development.With showing It pours integral frame structure to compare, the main reason for overall structure of prefabricated construction is poor is since there are one at node Fixed gap is not connected, and causes fabricated construction component switching performance poor.In prefabricated assembled frame structure, structure The node connection of part plays the overall stability of structure critical effect, design of node whether rationally and construction quality whether It is guaranteed and determines the intensity and globality of entire frame.Especially in the multiple area of earthquake, assembling frame structure node Connecting influences greatly the anti-seismic performance in entire house.In recent years, assembling frame joint form is carried out both at home and abroad extensively General research, and the reformed AHP constantly on original node, node connectivity is continuously improved can be with the shock resistance of fabricated construction Energy.
Invention content
The purpose of this utility model is to provide a kind of prefabricated assembled frame structure overall stability of raising, and enhancing component connects Connect prefabricated assembled beam-column steel pipe sleeve connecting node of performance.
A kind of prefabricated assembled beam-column steel pipe sleeve connecting node, composition include:Steel pipe sleeve, beam-ends pre-embedded steel slab, Column, beam and high-strength bolt;Certain thickness steel pipe sleeve is replaced to encrypt stirrup at node, operative constraint joint cores are mixed Solidifying soil;Welding cross is put more energy into web in the steel pipe sleeve, and cross web of putting more energy into increases steel pipe sleeve and concrete Between friction bond, and coagulation earth cooperation shearing resistance improves the axial compression resistance of steel pipe sleeve and meets the transmission of bucket internal force;Described The upper and lower ends of steel pipe sleeve side are respectively arranged with multiple sleeve prepared screw-bolt holes, are installed when facilitating construction;The beam-ends Pre-embedded steel slab is square plate, and its middle part is equipped with square hole, both sides and the sleeve of steel pipe sleeve above and below beam-ends pre-embedded steel slab Prepared screw-bolt hole corresponding position is provided with steel plate prepared screw-bolt hole, is correspondingly provided with and adds at the left and right sides of each steel plate prepared screw-bolt hole Strength rib, ribbed stiffener can increase depth of section of the beam-ends at node, and improving beam-ends section rigidity at node makes beam-ends node Locate plastic hinge, so as to increase the bearing capacity of node and ductility;It is provided in the beam in beam and indulges muscle in stirrup and beam;It is described Steel pipe sleeve is mounted on column, is provided in column in column and is indulged muscle, and steel pipe sleeve takes the form of welding to be connected with indulging muscle in column; The beam-ends pre-embedded steel slab welds together with indulging muscle in beam, strengthens the bonding with concrete;Novel joint beam at node End bar need not go deep into node, simplify node construction, facilitate concrete vibrating;The beam-ends pre-embedded steel slab uses high intensity Bolt passes through sleeve prepared screw-bolt hole and steel plate prepared screw-bolt hole and steel pipe sleeve connection.
The thickness of the steel pipe sleeve is 20mm.
The cross puts more energy into and is uniformly distributed hole on web, and concrete vibrates when facilitating construction, can be better The bonding of steel pipe sleeve and concrete is improved, improves the synergistic effect of steel pipe sleeve and concrete, so as to improve node carrying energy Power.
Existing prefabricated construction bean column node can be divided by its construction method:
(1)Wet type node, i.e. cast-in-place node, during construction, in order to strengthen at node intensity and ensure beam column it Between load transmission, using at node stirrup encryption and beam-ends, styletable Bar Anchorage or binding the methods of, so that at node Construction is complicated, and difficulty of construction is big, it is difficult to ensure node quality.
(2)Dry type node is typically referred to weld, is bolted, firm nose suspension type connection etc., although this type of attachment is wetter Formula is easy to connect and environmentally friendly, but due to construction method is more complicated in work progress and is susceptible to mistake or inconsummate technology Lead to mistake, it is difficult to ensure that between the intensity of node and beam column load transmission.
Compared with prior art, it is had the beneficial effect that possessed by the utility model:
(1)Certain thickness steel pipe sleeve is replaced to encrypt stirrup at node, operative constraint joint cores concrete, The cross web of putting more energy into of welding in plate sleeve, and ribbed stiffener is added in weld, improve steel pipe sleeve axial compression resistance and Meet the transmission of cylinder internal force.
(2)Steel pipe sleeve on column at node is attached with beam-ends pre-embedded steel slab by high-strength bolt or welding form, Facilitate and construct and can effectively ensure that construction quality.Under violent earthquake effect, using the node structure of high-strength bolt type of attachment Part such as forms hinge mechanisms damage in beam-ends, need to only replace the precast beam after shake is ruined, realize the recycling of component.
(3)Steel pipe sleeve replaces encryption stirrup, and beam-ends reinforcing bar need not be inserted at node, solved traditional node and asked Topic-joint structure is complicated, and concrete vibrating is difficult.
(4)Beam column component all can in factory using industrialized production, at node the welding of component can also be completed in processing factory, Construction welding job is reduced, quality is easily controllable, greatly speeds up the fast progress of construction.
(5)Beam-ends pre-embedded steel slab is indulged muscle with beam and is welded together, and strengthens the bonding with concrete.
Description of the drawings:
The utility model is further described below in conjunction with attached drawing:
Fig. 1 is prefabricated assembled beam column node connection device schematic diagram;
Fig. 2 is prefabricated assembled beam column node connection device side view;
Fig. 3 is steel pipe sleeve vertical view;
Fig. 4 is steel pipe sleeve front view;
Fig. 5 is beam-ends pre-embedded steel slab schematic diagram;
Fig. 6 is the connection diagram of steel pipe sleeve and column;
Fig. 7 is the organigram of column upper end at node;
Fig. 8 is the organigram of column lower end at node;
The sectional view of Fig. 9 columns and steel pipe sleeve connection;
Figure 10 is the connection diagram sectional view of beam-ends pre-embedded steel slab and beam-ends;
Figure 11 is beam-ends pre-embedded steel slab side view;
Figure 12 is the connection diagram of steel pipe sleeve and pre-embedded steel slab;
Figure 13 is the connection side view of steel pipe sleeve and pre-embedded steel slab;
Wherein:1 is steel pipe sleeve;1-1 puts more energy into web for cross;1-2 is the sleeve prepared screw-bolt hole on steel pipe sleeve; 2 be beam-ends pre-embedded steel slab;2-1 is the ribbed stiffener on pre-embedded steel slab;2-2 is the steel plate prepared screw-bolt hole on pre-embedded steel slab;3 are Column;3-1 is indulges muscle in column;4 be beam;4-1 is stirrup in beam;4-2 is indulges muscle in beam;5 be high-strength bolt.
Specific embodiment
It is described in detail below in conjunction with Fig. 1-13 pairs of the technical solution of the utility model specific embodiments:
A kind of prefabricated assembled beam-column steel pipe sleeve connection node device, the thickness of steel pipe sleeve 1 are 20mm, steel pipe socket Welding cross is put more energy into web 1-1 in cylinder 1, and cross puts more energy into and is uniformly distributed hole on web 1-1;1 side of steel pipe sleeve Upper and lower ends are respectively arranged with multiple sleeve prepared screw-bolt hole 1-2;Beam-ends pre-embedded steel slab 2 is square plate, and its middle part is equipped with Square hole is provided with steel plate in both sides and the sleeve prepared screw-bolt hole 1-2 corresponding positions of steel pipe sleeve 1 in beam-ends pre-embedded steel slab about 2 Prepared screw-bolt hole 2-2 is correspondingly provided with ribbed stiffener 2-1 at the left and right sides of each steel plate prepared screw-bolt hole 2-2;It is provided in beam 4 In beam muscle 4-2 is indulged in stirrup 4-1 and beam;Steel pipe sleeve 1 is mounted on column 3, is provided in column 3 in column and is indulged muscle 3-1, steel pipe sleeve 1 takes the form of welding to be connected with indulging muscle 3-1 in column;Beam-ends pre-embedded steel slab 2 welds together with indulging muscle 4-2 in beam;Beam-ends Pre-embedded steel slab 2 is connected using high-strength bolt 5 by sleeve prepared screw-bolt hole 1-2 and steel plate prepared screw-bolt hole 2-2 with steel pipe sleeve 1 It connects.

Claims (3)

1. a kind of prefabricated assembled beam-column steel pipe sleeve connecting node, composition includes:Steel pipe sleeve(1), beam-ends pre-embedded steel slab (2), column(3), beam(4)And high-strength bolt(5);It is characterized in that:The steel pipe sleeve(1)Welding cross is put more energy into web (1-1);The steel pipe sleeve(1)The upper and lower ends of side are respectively arranged with multiple sleeve prepared screw-bolt holes(1-2);Described Beam-ends pre-embedded steel slab(2)For square plate, and its middle part is equipped with square hole, in beam-ends pre-embedded steel slab(2)Upper and lower both sides and steel pipe Sleeve(1)Sleeve prepared screw-bolt hole(1-2)Corresponding position is provided with steel plate prepared screw-bolt hole(2-2), bolt is reserved in each steel plate Ribbed stiffener is correspondingly provided at the left and right sides in hole (2-2);Stirrup in beam is provided in the beam(4-1)With muscle vertical in beam(4-2); The steel pipe sleeve(1)Mounted on column(3)On, column(3)It is inside provided in column and indulges muscle(3-1), steel pipe sleeve(1)With indulging muscle in column (3-1)The form of welding is taken to be connected;The beam-ends pre-embedded steel slab(2)With indulging muscle in beam(4-2)Weld together;The beam Hold pre-embedded steel slab(2)Using high-strength bolt (5) by sleeve prepared screw-bolt hole (1-2) and steel plate prepared screw-bolt hole (2-2) with Steel pipe sleeve(1)Connection.
2. a kind of prefabricated assembled beam according to claim 1-column steel pipe sleeve connecting node, it is characterized in that:Described Steel pipe sleeve(1)Thickness be 20mm.
3. a kind of prefabricated assembled beam according to claim 1-column steel pipe sleeve connecting node, it is characterized in that:Described Cross is put more energy into web(1-1)On be uniformly distributed hole.
CN201621275773.1U 2016-11-25 2016-11-25 A kind of prefabricated assembled beam-column steel pipe sleeve connecting node Withdrawn - After Issue CN207597586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621275773.1U CN207597586U (en) 2016-11-25 2016-11-25 A kind of prefabricated assembled beam-column steel pipe sleeve connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621275773.1U CN207597586U (en) 2016-11-25 2016-11-25 A kind of prefabricated assembled beam-column steel pipe sleeve connecting node

Publications (1)

Publication Number Publication Date
CN207597586U true CN207597586U (en) 2018-07-10

Family

ID=62751673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621275773.1U Withdrawn - After Issue CN207597586U (en) 2016-11-25 2016-11-25 A kind of prefabricated assembled beam-column steel pipe sleeve connecting node

Country Status (1)

Country Link
CN (1) CN207597586U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113173A (en) * 2018-08-01 2019-01-01 河海大学 The assembling type steel structure bean column node and its manufacturing method that can be consumed energy in earthquake
CN110924526A (en) * 2019-11-13 2020-03-27 中国矿业大学 Arc-shaped steel plate interface connection structure and connection method for reinforced concrete beam and column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113173A (en) * 2018-08-01 2019-01-01 河海大学 The assembling type steel structure bean column node and its manufacturing method that can be consumed energy in earthquake
CN110924526A (en) * 2019-11-13 2020-03-27 中国矿业大学 Arc-shaped steel plate interface connection structure and connection method for reinforced concrete beam and column

Similar Documents

Publication Publication Date Title
CN106149873B (en) Prefabricated assembled concrete frame construction and preparation method thereof
CN106049691B (en) A kind of fully-prefabricated assembled steel tube confinement frame joint
CN105863074B (en) A kind of assembled wave webs beam column node connection device
CN206844314U (en) A kind of new prefabricated assembled bean column node
CN106638955A (en) Prefabricated assembly type beam-column steel pipe sleeve connection node
CN105133791A (en) Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure
CN104032864B (en) The web perforate H section steel connecting node that buckling-restrained steel plate wall is connected with concrete frame
CN104963415B (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure
CN206941858U (en) Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework
CN105863075B (en) A kind of cover board weakening type assembled wave webs beam column node connection device
CN203174771U (en) Annular plate node of steel pipe concrete column and bonded prestress steel bar concrete beam
CN105863051A (en) Function-restorable assembly type end plate connection joint connection device
WO2020181794A1 (en) Fabricated self-restoration pitch point
CN106988551A (en) Attached frame reinforcing structure and method outside the full assembled of Bolted angle connection
CN206737118U (en) A kind of prefabricated regeneration concrete bean column node of reinforcement
CN107152097A (en) Band attached prestressing force assembled outside plate framework of encorbelmenting consumes energy the structure of frame strengthening
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN106917470A (en) The steel tube confinement concrete-filled rectangular steel tube component and its processing method of a kind of sandwich
CN207597586U (en) A kind of prefabricated assembled beam-column steel pipe sleeve connecting node
CN201539106U (en) Beam-column joint reinforced structure adopting enlarging section method
CN103821234A (en) Joint construction for steel-reinforced concrete column and reinforced concrete beam
CN208023713U (en) A kind of prefabrication and assembly construction steel reinforced concrete beam column connection structure
CN107419810A (en) A kind of rectangular steel-tube concrete column and beam and slab type superstructure attachment means and its construction technology
CN105863048A (en) Connection structure of prefabricated frame support structure beam column node
CN206521768U (en) A kind of shear connector in the double-deck box hat concrete combined structure of immersed tube tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180710

Effective date of abandoning: 20181130

AV01 Patent right actively abandoned