CN105591401A - 一种含无功电流注入的光伏低电压穿越方法 - Google Patents
一种含无功电流注入的光伏低电压穿越方法 Download PDFInfo
- Publication number
- CN105591401A CN105591401A CN201610057166.6A CN201610057166A CN105591401A CN 105591401 A CN105591401 A CN 105591401A CN 201610057166 A CN201610057166 A CN 201610057166A CN 105591401 A CN105591401 A CN 105591401A
- Authority
- CN
- China
- Prior art keywords
- photovoltaic
- voltage
- sequence
- power
- output
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01J—ELECTRIC DISCHARGE TUBES OR DISCHARGE LAMPS
- H01J3/00—Details of electron-optical or ion-optical arrangements or of ion traps common to two or more basic types of discharge tubes or lamps
- H01J3/14—Arrangements for focusing or reflecting ray or beam
- H01J3/16—Mirrors
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01J—ELECTRIC DISCHARGE TUBES OR DISCHARGE LAMPS
- H01J3/00—Details of electron-optical or ion-optical arrangements or of ion traps common to two or more basic types of discharge tubes or lamps
- H01J3/14—Arrangements for focusing or reflecting ray or beam
- H01J3/20—Magnetic lenses
- H01J3/24—Magnetic lenses using permanent magnets only
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Inverter Devices (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
本发明涉及一种含无功电流注入的光伏低电压穿越方法。现有的光伏低电压穿越方法有很多,然而并未充分利用光伏逆变器对功率的控制作用。本发明在电压跌落不严重情况下,保持光伏有功功率输出不变,尽量提供无功功率;在电压跌落较严重情况下,光伏不输出有功功率,全部输出无功功率。同时在电网不对称故障下,引入负序控制消除由负序分量引起的有功功率波动,并推导出最大无功功率设定值计算公式。本发明能根据电压跌落情况充分利用光伏对有功功率和无功功率的控制能力,在一定情况下保证有功功率输出又能最大限度的提供无功功率,有助于并网点电压的恢复。
Description
技术领域
本发明属于电力系统技术领域,具体涉及一种含无功电流注入的光伏低电压穿越方法。
背景技术
当今环境问题日益严重,发展新能源的是缓解环境问题的一种有效手段,而光伏作为新能源的一种因此越来越受到人们的关注,光伏产业也在最近几年迅速发展。当大规模光伏电源接入电网以后,在电网发生故障时,光伏电源不能简单的被切除,应具备一定的低电压穿越能力,否则由于光伏电源的切除,导致功率的缺失,进一步导致电压的下降,可能会引起相邻光伏电源的脱网,进一步造成电网是故障范围扩展,甚至引起电网崩溃。除此之外,光伏电源在低电压时不仅仅需要保持不脱网允许一段时间,同时需要光伏向电网注入一定的无功电流以支撑电网电压。
发明内容
本发明的目的在于根据光伏低电压穿越要求,提供一种含无功电流注入的光伏低电压穿越方法。
在满足上述要求和考虑电网有功功率平衡的情况下,基于正负负序电网电压定向PI控制提出了如下控制策略:光伏并网点电压跌落后还不低于阀值时,优先保证光伏有功功率输出不变,利用光伏并网逆变器过流能力提供最大无功功率输出;当并网点电压跌落后低于阀值时,切除光伏并网逆变器有功功率输入,光伏全部提供无功功率输出,以最大限度对并网点电压提供支撑作用。上述策略在光伏低电压穿越时光伏输出的有功功率P和无功功率Q按公式下面设定:
Q=Qmax
其中,Vpcc为光伏并网点电压的正序电压标幺值;Vref为切除光伏并网逆变器有功功率输入的电压阀值。P0为故障前光伏输出有功功率;Qmax为在不同Vpcc跌落情况下考虑光伏逆变器最大电流限制能提供的最大无功功率,该值需要计算。
本发明有益效果:本发明在电压跌落不严重情况下,保持光伏有功功率输出不变,尽量提供无功功率;在电压跌落较严重情况下,光伏不输出有功功率,全部输出无功功率。同时在电网不对称故障下,引入负序控制消除由负序分量引起的有功功率波动,并推导出最大无功功率设定值计算公式。本发明能根据电压跌落情况充分利用光伏对有功功率和无功功率的控制能力,在一定情况下保证有功功率输出,又能最大限度的提供无功功率,有助于并网点电压的恢复。
附图说明
图1为本发明方法流程图。
图2为本发明方法整体控制策略图。
图3为滞环控制环节示意图。
具体实施方式
以下结合附图对本发明作进一步说明。如附图1所示,本发明有几个关键步骤:
1)若未监测到并网点电压跌落,则光伏逆变器以功率因数为1并网运行;若检测到并网点电压跌落,则判断电压跌落程度。
2)若电压跌落程度较小(测量到的光伏并网点的正序电压标幺值大于等于阈值Vref),则设定输出有功功率P为P0,并根据有功功率P0及光伏逆变器电流约束条件计算出能输出的最大无功功率Qmax,并设为Q;否则光伏并网逆变器全部输出无功,不输出有功功率,即P=0,Qmax。
3)根据P、Q设定值计算内环参考电流。
如图2所示,对光伏采用T/4延时法将并网点电压和电流坐标变换到静止αβ坐标系下的正、负序电压和正、负序电流再变换到同步旋转dq坐标下,最后得到正序d轴电压正序q轴电压负序d轴电压负序q轴电压和正序d轴电流正序q轴电流负序d轴电流负序q轴电流
根据跌落程度判断是否输出有功功率。如公式所示:
根据P和逆变器能运行流过的最大电流Imax(一般情况下Imax为额定电流IN的1.5倍)计算光伏能输出的最大无功功率。
其中Vref应满足
其中n为不对称度,定义为
Vref整定需要对电网各种故障进行模拟,确定其最小值,然后根据电网实际需求进行整定,只要其大于整个电网的最小值即可。
其中:
由于光伏输出功率和电流满足关系:
P(t)=P1+Pc2cos(2ωt)+Ps2sin(2ωt)
Q(t)=Q1+Qc2cos(2ωt)+Qs2sin(2ωt)
其中
其中,ω为电网角频率;Pc2、Ps2、Qc2、Qs2均是由系统电压不平衡引起的有功和无功二倍频波动。P1和Q1是光伏输出的有功功率和无功功率。为消除有功功率的二倍频波动,即令Pc2=0、Ps2=0。同时根据计算得到的P和Q,令P1=P、Q1=Q,然后据下面公式计算内环正序d轴参考值正序q轴参考值负序d轴参考值负序q轴参考值
步骤(4):根据步骤(3)计算得到的和再与并网点电流和相减,其偏差通过正负序内环PI控制器后生成SVPWM调制信号控制光伏并网逆变器,从而实现光伏在不对称故障下的低电压穿越。
当电网电压在无功电流注入的情况下得到支撑或者故障切除导致电压升高时,应满足滞环控制环节如附图3所示。
当Vpcc从高降低时,只要低于Vref,控制改为全部提供无功方式,但当Vpcc从低升高时,需升高Vref+ΔV到以后,控制才改为优先提供有功方式。调节ΔV大小可以有效防止因为控制方式的改变引起的电压跳变问题。
本发明在满足光伏低压穿越要求的前提下,根据并网点电压跌落情况,在接入点电压跌落不严重时优先提供有功,电压跌落严重时全部提供无功支持。电网不对称故障时,消除光伏输出的有功二倍频波动,保证系统有功平衡,进一步,提出了滞环控制环节,消除光伏低电压穿越控制方法可能出现的电压跳变问题。该光伏低电压穿越方法根据并网点电压跌落情况合理分配光伏输出的有功功率和无功功率能对并网点电压有较明显提升作用。
Claims (2)
1.一种含无功电流注入的光伏低电压穿越方法,其特征在于:在电网发生故障后引起光伏接入点电压下降,执行以下步骤:
步骤(1):对光伏采用T/4延时法将并网点电压和电流坐标变换到静止αβ坐标系下的正、负序电压和正、负序电流再变换到同步旋转dq坐标下,最后得到正序d轴电压正序q轴电压负序d轴电压负序q轴电压和正序d轴电流正序q轴电流负序d轴电流负序q轴电流
步骤(2):判断跌落程度,根据跌落程度判断是否输出有功功率P;
令Vpcc为光伏并网点电压的正序电压标幺值;Vref为切除光伏并网逆变器有功功率输入的电压阀值,若Vpcc≥Vref,则设定输出有功功率P为P0,并根据有功功率P0及光伏逆变器电流约束条件计算出能输出的最大无功功率Qmax,并设为Q;否则光伏并网逆变器全部输出无功;其中P0为故障前光伏输出功率
步骤(3):由于光伏输出功率和电流满足关系:
P(t)=P1+Pc2cos(2ωt)+Ps2sin(2ωt)
Q(t)=Q1+Qc2cos(2ωt)+Qs2sin(2ωt)
其中
其中,ω为电网角频率;Pc2、Ps2、Qc2、Qs2均是由系统电压不平衡引起的有功和无功二倍频波动;P1和Q1是光伏输出的有功功率和无功功率;为消除有功功率的二倍频波动,即令Pc2=0、Ps2=0;同时根据步骤
(2)中计算得到的P和Q,令P1=P、Q1=Q,然后据下面公式计算内环正序d轴参考值正序q轴参考值负序d轴参考值负序q轴参考值
步骤(4):根据步骤(3)计算得到的和再与并网点电流和相减,其偏差通过正负序内环PI控制器后生成SVPWM调制信号控制光伏并网逆变器,从而实现光伏在不对称故障下的低电压穿越。
2.根据权利要求1所述的一种含无功电流注入的光伏低电压穿越方法,其特征在于:
切除光伏并网逆变器有功功率输入的电压阀值Vref应满足
其中n为不对称度,定义为
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610057166.6A CN105591401B (zh) | 2016-01-27 | 2016-01-27 | 一种含无功电流注入的光伏低电压穿越方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610057166.6A CN105591401B (zh) | 2016-01-27 | 2016-01-27 | 一种含无功电流注入的光伏低电压穿越方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105591401A true CN105591401A (zh) | 2016-05-18 |
CN105591401B CN105591401B (zh) | 2018-05-29 |
Family
ID=55930737
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610057166.6A Expired - Fee Related CN105591401B (zh) | 2016-01-27 | 2016-01-27 | 一种含无功电流注入的光伏低电压穿越方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105591401B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108923456A (zh) * | 2018-07-03 | 2018-11-30 | 重庆大学 | 基于电网不对称故障的并网逆变器控制方法及系统 |
CN109103886A (zh) * | 2018-09-28 | 2018-12-28 | 济南大学 | 一种可抑制输出功率二次谐波的光伏并网逆变器低电压穿越控制方法 |
CN109713711A (zh) * | 2018-04-02 | 2019-05-03 | 河海大学 | 一种电压跌落下分布式光伏逆变器无功协调控制策略 |
CN110535189A (zh) * | 2019-09-05 | 2019-12-03 | 国网冀北电力有限公司秦皇岛供电公司 | 分布式电源低电压穿越控制方法及系统 |
CN110649647A (zh) * | 2019-08-23 | 2020-01-03 | 广东电网有限责任公司 | 基于配网对称故障下无功电流边界条件的光伏逆变器低电压穿越控制 |
CN114172212A (zh) * | 2021-08-20 | 2022-03-11 | 华北电力大学(保定) | 一种提升低电压穿越期间光伏机组暂态有功功率输出的方法 |
WO2023097478A1 (zh) * | 2021-11-30 | 2023-06-08 | 华为数字能源技术有限公司 | 供电系统以及变流方法 |
CN116436043A (zh) * | 2023-06-13 | 2023-07-14 | 国网江西省电力有限公司电力科学研究院 | 一种多台变流器不对称故障穿越控制方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103066624A (zh) * | 2013-01-22 | 2013-04-24 | 四川科陆新能电气有限公司 | 一种光伏并网逆变器低电压穿越控制方法 |
-
2016
- 2016-01-27 CN CN201610057166.6A patent/CN105591401B/zh not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103066624A (zh) * | 2013-01-22 | 2013-04-24 | 四川科陆新能电气有限公司 | 一种光伏并网逆变器低电压穿越控制方法 |
Non-Patent Citations (2)
Title |
---|
XIAOQIANG GUO ET AL: "Asymmetrical Grid Fault Ride-Through Strategy of Three-Phase Grid-Connected Inverter Considering Network Impedance Impact in Low-Voltage Grid", 《IEEE TRANSACTIONS ON POWER ELECTRONICS》 * |
王迎昌: "三相光伏并网发电系统的关键技术研究", 《CNKI硕士学位论文》 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109713711A (zh) * | 2018-04-02 | 2019-05-03 | 河海大学 | 一种电压跌落下分布式光伏逆变器无功协调控制策略 |
CN109713711B (zh) * | 2018-04-02 | 2022-07-26 | 河海大学 | 一种电压跌落下分布式光伏逆变器无功协调控制策略 |
CN108923456A (zh) * | 2018-07-03 | 2018-11-30 | 重庆大学 | 基于电网不对称故障的并网逆变器控制方法及系统 |
CN108923456B (zh) * | 2018-07-03 | 2021-07-23 | 重庆大学 | 基于电网不对称故障的并网逆变器控制方法及系统 |
CN109103886A (zh) * | 2018-09-28 | 2018-12-28 | 济南大学 | 一种可抑制输出功率二次谐波的光伏并网逆变器低电压穿越控制方法 |
CN110649647A (zh) * | 2019-08-23 | 2020-01-03 | 广东电网有限责任公司 | 基于配网对称故障下无功电流边界条件的光伏逆变器低电压穿越控制 |
CN110535189B (zh) * | 2019-09-05 | 2021-08-03 | 国网冀北电力有限公司秦皇岛供电公司 | 分布式电源低电压穿越控制方法及系统 |
CN110535189A (zh) * | 2019-09-05 | 2019-12-03 | 国网冀北电力有限公司秦皇岛供电公司 | 分布式电源低电压穿越控制方法及系统 |
CN114172212A (zh) * | 2021-08-20 | 2022-03-11 | 华北电力大学(保定) | 一种提升低电压穿越期间光伏机组暂态有功功率输出的方法 |
CN114172212B (zh) * | 2021-08-20 | 2023-08-18 | 华北电力大学(保定) | 一种提升低电压穿越期间光伏机组暂态有功功率输出的方法 |
WO2023097478A1 (zh) * | 2021-11-30 | 2023-06-08 | 华为数字能源技术有限公司 | 供电系统以及变流方法 |
CN116436043A (zh) * | 2023-06-13 | 2023-07-14 | 国网江西省电力有限公司电力科学研究院 | 一种多台变流器不对称故障穿越控制方法 |
CN116436043B (zh) * | 2023-06-13 | 2023-10-20 | 国网江西省电力有限公司电力科学研究院 | 一种多台变流器不对称故障穿越控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105591401B (zh) | 2018-05-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105591401A (zh) | 一种含无功电流注入的光伏低电压穿越方法 | |
CN106532744B (zh) | 一种基于自抗扰控制的光伏电站抑制电网低频振荡的方法 | |
CN103064023B (zh) | 用于风电和光伏的并网测试装置及其测试方法 | |
CN106953595A (zh) | 控制光伏电站运行的方法和设备 | |
CN103414204B (zh) | 采用动态电压补偿风力发电系统输出无功功率的控制方法 | |
CN104638668A (zh) | 一种光伏发电并网控制方法及系统 | |
CN105633997A (zh) | 风力发电机组电压穿越控制方法和装置 | |
CN104111406B (zh) | 一种基于频率反馈扰动的孤岛检测方法与装置 | |
CN105281366A (zh) | 一种同时实现低电压穿越和孤岛检测的方法 | |
CN104779640B (zh) | 防分布式发电系统向电网倒灌电功率的系统及控制方法 | |
CN106787878A (zh) | 一种基于虚拟环流分量的单相mmc环流抑制器及抑制方法 | |
CN106712094A (zh) | 一种光伏并网逆变器 | |
Kumawat et al. | Using AI Techniques to Improve the Power Quality of Standalone Hybrid Renewable Energy Systems | |
CN107069797B (zh) | 一种含双馈型风力发电机的分散式风电场并网方法 | |
CN110034584A (zh) | 一种计及无功充裕性的光伏电站自适应无功电压控制方法 | |
CN107453389A (zh) | 一种组串式光伏逆变器机电暂态模型建模方法 | |
CN104426160A (zh) | 光伏并网逆变器兼容低电压穿越的正负序解耦控制方法 | |
CN103972921B (zh) | 一种基于功率平衡的永磁同步风电场低电压穿越协调控制方法 | |
CN109713711A (zh) | 一种电压跌落下分布式光伏逆变器无功协调控制策略 | |
CN103606965A (zh) | 一种基于准实时同步信号的储能逆变器的联网控制方法 | |
CN103606950B (zh) | 一种分布式风电变流器的孤岛检测方法 | |
CN103532520B (zh) | 一种防御大规模风电机组连锁脱网的无功补偿装置控制方法 | |
Subburaja et al. | Battery connected DFIG wind system analysis for strong/weak grid scenarios | |
Wu et al. | Frequency control in microgrids using electric springs | |
CN105449721A (zh) | 对变流器的功率电流进行控制的方法和装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180529 Termination date: 20220127 |
|
CF01 | Termination of patent right due to non-payment of annual fee |