CN105576555A - A special tool for replacing 220kV spacer rods when power is off or live - Google Patents

A special tool for replacing 220kV spacer rods when power is off or live Download PDF

Info

Publication number
CN105576555A
CN105576555A CN201610079422.1A CN201610079422A CN105576555A CN 105576555 A CN105576555 A CN 105576555A CN 201610079422 A CN201610079422 A CN 201610079422A CN 105576555 A CN105576555 A CN 105576555A
Authority
CN
China
Prior art keywords
hook
replacing
lower hook
spacer
trigger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610079422.1A
Other languages
Chinese (zh)
Other versions
CN105576555B (en
Inventor
周自更
陈海东
刘文涛
王宾
黄双得
普忠
王如春
史江航
孙思航
王涛
吕熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Power Grid Co Ltd
Original Assignee
Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Power Grid Co Ltd filed Critical Yunnan Power Grid Co Ltd
Priority to CN201610079422.1A priority Critical patent/CN105576555B/en
Publication of CN105576555A publication Critical patent/CN105576555A/en
Application granted granted Critical
Publication of CN105576555B publication Critical patent/CN105576555B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

A special tool for replacing a 220kV spacer in power failure or electrification is characterized by comprising an upper hook and a lower hook, wherein the upper hook and the lower hook are respectively in threaded fit connection through a labor-saving lead screw; the hook end parts of the upper hook and the lower hook are respectively connected with a triggering type locking hook, and after the triggering device is triggered, the locking device locks the triggering type locking hook to enable the upper hook and the lower hook to be respectively closed with the triggering type locking hook to form a circular structure; the pulley is fixedly connected to one side of the upper hook, the insulating operating rod connecting piece is fixedly connected to one side of the lower hook, and the screw rod is fixed through the screw rod locking device. The invention has the beneficial effects that: the problems of complex steps, long operation time, high working strength, high operation risk and the like of the conventional spacer replacing operation method can be solved, the working efficiency is greatly improved, the working safety of maintainers is enhanced, and the maintenance operation of replacing the 220kV spacer in a power failure or electrified mode is more standardized and normalized.

Description

一种停电或带电更换220kV间隔棒的专用工具A special tool for replacing 220kV spacer rods when power is off or live

技术领域technical field

本发明属电力行业,一种停电或带电更换220kV间隔棒的专用工具技术领域。The invention belongs to the electric power industry, and belongs to the technical field of a special tool for replacing 220kV spacer rods during power failure or live charging.

背景技术Background technique

在高压输电线路上,为了减少导线电晕放电和对通讯的干扰,普遍采用分裂导线。目前,220kV的输电线采用双分裂导线。为了保证双分裂导线线束间距保持不变以满足电气性能,降低表面电位梯度,及在短路情况下,导线线束间不致产生电磁力,造成相互吸引碰撞,或虽引起瞬间的吸引碰撞,但事故消除后即能恢复到正常状态,因而在档距中相隔一定距离安装了间隔棒。双分裂导线设计间距是0.4m,即间隔棒的安装长度也为0.4m。On high-voltage transmission lines, in order to reduce wire corona discharge and interference to communication, split wires are generally used. At present, the 220kV transmission line uses double-split conductors. In order to ensure that the distance between the double-split wire harnesses remains unchanged to meet the electrical performance, reduce the surface potential gradient, and in the case of a short circuit, the electromagnetic force will not be generated between the wire harnesses, causing mutual attraction and collision, or even causing an instantaneous attraction collision, but the accident is eliminated. After that, it can return to the normal state, so spacers are installed at a certain distance in the span. The design spacing of the double-split conductors is 0.4m, that is, the installation length of the spacer is also 0.4m.

双分裂导线上的间隔棒由于当初安装时螺栓紧固不到位或在运行中长期受到导线振动等影响,会出现松动、损坏等威胁线路安全运行的缺陷。如不及时处理,间隔棒长期磨损导线就会造成断线、倒杆等重大事故。停电或带电安装、更换间隔棒已成为输电线路检修的一项日常工作。The spacer rods on the double-split conductors will loosen, be damaged and other defects that threaten the safe operation of the line because the bolts are not fastened in place during the original installation or are affected by conductor vibration for a long time during operation. If it is not handled in time, the long-term wear and tear of the spacer will cause major accidents such as broken wires and inverted rods. Installation and replacement of spacer rods during power outage or live has become a routine work of transmission line maintenance.

带电更换或加装新的间隔棒时,采用的是软梯作业法。软梯悬挂在一根子导线上,作业人员通过攀爬软梯到达等电位安装位置时,自身加软梯的重量就会使两根子导线上下拉开较大的距离。如果不能将两根子导线的距离保持在0.4m,作业人员将无法更换、安装新的间隔棒。以往采用的方法是抛掷绝缘丝绳,导线上的人员将绝缘丝绳抛过高处的子导线,通过拉拽使两根子导线的间距大致达到0.4m后,用绝缘丝绳绑扎固定。此种方法缺陷比较明显:1.存在较大不确定性,抛掷绝缘丝绳的方法成功率低,有风天气更难完成;2.抛掷绝缘丝绳、固定子导线用时长,作业人员体能消耗大,整个检修过程存在较大风险。因此,若能设计发明出一种方便快捷拽回子导线且能将两根子导线的距离固定在0.4m的专用工具,作业人员便能更安全高效的完成停电或带电安装、更换间隔棒的检修工作。When replacing or installing a new spacer with electricity, the soft ladder operation method is adopted. The soft ladder is suspended on a sub-conductor. When the operator reaches the equipotential installation position by climbing the soft ladder, the weight of the soft ladder will make the two sub-conductors pull up and down for a larger distance. If the distance between the two sub-conductors cannot be kept at 0.4m, the operator will not be able to replace and install new spacers. The method used in the past is to throw the insulating wire rope. The personnel on the wire throw the insulating wire rope over the sub-conductor at a high place. After pulling the distance between the two sub-conductors to approximately 0.4m, they are bound and fixed with the insulating wire rope. The disadvantages of this method are obvious: 1. There is a large uncertainty, the success rate of throwing the insulating wire rope is low, and it is more difficult to complete in windy weather; 2. It takes a long time to throw the insulating wire rope and the stator wire, and the physical energy of the operators is exhausted. Large, the whole overhaul process has a relatively high risk. Therefore, if a special tool for pulling back the sub-conductors conveniently and quickly can be designed and invented, and the distance between the two sub-conductors can be fixed at 0.4m, the operators will be able to more safely and efficiently complete power failure or electrified installation, and replace spacer maintenance. Work.

发明内容Contents of the invention

本发明的目的正是为了克服上述现有技术存在的缺陷而设计出的能方便快捷拽回子导线且能将两根子导线的距离固定在0.4m的一种停电或带电更换220kV间隔棒的专用工具。The purpose of the present invention is to overcome the defects of the above-mentioned prior art and design a special-purpose device for replacing the 220kV spacer when the power is off or live, which can conveniently and quickly pull back the sub-conductors and can fix the distance between the two sub-conductors at 0.4m. tool.

本发明的目的是通过如下技术方案来实现的。The purpose of the present invention is achieved through the following technical solutions.

一种停电或带电更换220kV间隔棒的专用工具,其特征在于,包括一个上钩和一个下钩,在上、下钩之间通过一省力丝杆分别与其螺纹配合连接;在上钩、下钩的钩端部分别连接有一触发式闭锁钩,触发装置触发后,闭锁装置锁住触发式闭锁钩,使上钩、下钩分别与触发式闭锁钩闭合后形成一圆结构;在上钩一侧固定连接有滑轮,在下钩一侧固定连接有绝缘操作杆连接件,通过丝杆闭锁装置固定丝杆。A special tool for replacing 220kV spacer rods when the power is off or on, and it is characterized in that it includes an upper hook and a lower hook, and the upper and lower hooks are respectively connected to the threads by a labor-saving screw rod; the hooks of the upper and lower hooks are The ends are respectively connected with a trigger-type locking hook. After the trigger device is triggered, the locking device locks the trigger-type locking hook, so that the upper hook and the lower hook are respectively closed with the trigger-type locking hook to form a circular structure; a pulley is fixedly connected to the side of the upper hook , an insulating operating rod connector is fixedly connected to one side of the lower hook, and the screw rod is fixed by the screw rod locking device.

有益效果Beneficial effect

本发明能解决以前更换间隔棒作业方法步骤繁琐、作业时间长、工作强度大、作业风险高等问题,大大提高了工作效率,增强了检修人员工作的安全性,使停电或带电更换220kV间隔棒的检修作业更加标准化、规范化。The invention can solve the problems of cumbersome steps, long operation time, high work intensity and high operation risk in the previous operation method of replacing the spacer, greatly improves the work efficiency, enhances the safety of the maintenance personnel, and makes the replacement of the 220kV spacer in a power failure or live Maintenance operations are more standardized and normalized.

附图说明Description of drawings

图1为本发明闭合状态左剖视图;Fig. 1 is a left sectional view of the closed state of the present invention;

图2为本发明闭合状态主视图;Fig. 2 is the front view of the closed state of the present invention;

图3为本发明闭合状态右剖视图;Fig. 3 is a right sectional view of the closed state of the present invention;

图4为本发明开启状态左剖视图;Fig. 4 is a left sectional view of the open state of the present invention;

图5为本发明开启状态主视图;Fig. 5 is the front view of the open state of the present invention;

图6为本发明开启状态右剖视图。Fig. 6 is a right sectional view of the present invention in an open state.

具体实施方式detailed description

见图1-图6,一种停电或带电更换220kV间隔棒的专用工具,其特征在于,包括一个上钩2和一个下钩6,在上、下钩之间通过一省力丝杆4分别与其螺纹配合连接;在上钩2、下钩6的钩端部分别连接有一触发式闭锁钩1,触发装置7触发后,闭锁装置8锁住触发式闭锁钩1,使上钩2、下钩6分别与触发式闭锁钩1闭合后形成一圆结构;在上钩2一侧固定连接有滑轮3,在下钩6一侧固定连接有绝缘操作杆连接件5,通过丝杆闭锁装置9固定丝杆。See Fig. 1-Fig. 6, a special tool for replacing 220kV spacer with power off or live, it is characterized in that it includes an upper hook 2 and a lower hook 6, and a labor-saving screw rod 4 is passed between the upper and lower hooks and its thread respectively Cooperate with the connection; the hook ends of the upper hook 2 and the lower hook 6 are connected with a trigger locking hook 1 respectively. A round structure is formed after the type locking hook 1 is closed; a pulley 3 is fixedly connected to one side of the upper hook 2, and an insulating operating rod connector 5 is fixedly connected to one side of the lower hook 6, and the screw rod is fixed by a screw locking device 9 .

1.设计原理1. Design principle

带电作业中,位于下方子导线的作业人员想要拽回上方子导线,只能使用绝缘工具,常用的绝缘工具除了绝缘丝绳,就是绝缘操作杆,在绝缘操作杆上加装一个钩子,便能初步实现拉拽上方子导线的功能。而要将两根子导线的间距收小并固定到0.4m,且在安装好间隔棒后需松开并取下钩子,绝缘操作杆加装钩子的设计便无法满足,需要利用到省力丝杆的收紧和松开功能,在省力丝杆两端加装钩子便能实现。所以,初步设想的工具是由绝缘操作杆、省力丝杆、钩子组成。经过更深入的思考和设计,用触发式闭锁钩取代钩子,以防止更换过程中导线弹出;在工具上加装一个滑轮,与绝缘丝绳配合使用,由地面电工操作来收紧两根子导线的间距。我们设想在使用专用工具后,能降低等电位作业人员的劳动强度,大大缩短作业时间,从而实现降低作业人员等电位带电作业过程中的风险。During live work, if the operator at the lower sub-conductor wants to pull back the upper sub-conductor, he can only use insulated tools. In addition to the insulating wire rope, the commonly used insulating tool is an insulating operating rod. A hook is added to the insulating operating rod to facilitate It can preliminarily realize the function of pulling the upper sub-conductor. However, to reduce the distance between the two sub-conductors and fix it to 0.4m, and to loosen and remove the hook after installing the spacer rod, the design of adding a hook to the insulating operating rod cannot meet the requirements, and it is necessary to use the labor-saving screw rod. The function of tightening and loosening can be realized by adding hooks at both ends of the labor-saving screw rod. Therefore, the initially conceived tool is composed of an insulating operating rod, a labor-saving screw, and a hook. After more in-depth thinking and design, the hook is replaced by a trigger-type locking hook to prevent the wire from popping out during the replacement process; a pulley is added to the tool, which is used in conjunction with the insulating wire rope, and is operated by the ground electrician to tighten the two sub-wires spacing. We envisage that after using special tools, the labor intensity of equipotential workers can be reduced, and the working time can be greatly shortened, so as to reduce the risk of workers in the process of equipotential live work.

2.工具材料、结构技术要求2. Technical requirements for tool materials and structures

(1)省力丝杆(1) labor-saving screw rod

与上钩、下钩配合使用,缩短两子导线间距,丝杆中间部位为正六边形,可使用扳手进行固定旋转,材质为LuCr-60铝合金材料,表面防腐处理为表面阳极氧化,工作负荷为1KN,安全系数为2.5倍。It is used in conjunction with the upper hook and the lower hook to shorten the distance between the two wires. The middle part of the screw rod is a regular hexagon, which can be fixed and rotated with a wrench. The material is LuCr-60 aluminum alloy, and the surface anti-corrosion treatment is surface anodic oxidation. The working load is 1KN, the safety factor is 2.5 times.

(2)上钩、下钩,触发式闭锁钩(2) Upper hook, lower hook, trigger locking hook

上钩、下钩与省力丝杆配合,安装于省力丝杆两端,勾住两子导线,并且通过触碰触发装置,使触发式闭锁钩起动,与闭锁装置配合闭锁,防止导线弹出,在拆除此专用工具前,导线始终卡在触发式闭锁钩闭合结构内。材质为LuCr-40铝合金材料,表面防腐处理为表面阳极氧化,工作负荷为1.5KN,安全系数为2.5倍。The upper hook and the lower hook cooperate with the labor-saving screw rod, installed at both ends of the labor-saving screw rod, hook the two wires, and touch the trigger device to activate the trigger locking hook, and cooperate with the locking device to prevent the wire from popping out. Before this special tool, the wire is always stuck in the trigger latch hook closure structure. The material is LuCr-40 aluminum alloy, the surface anti-corrosion treatment is surface anodic oxidation, the working load is 1.5KN, and the safety factor is 2.5 times.

(3)触发装置(3) Trigger device

与触发式闭锁钩配合,触点触碰于导线时,触发式闭锁钩弹出。材质为45#钢材料,表面防腐处理为表面阳极氧化,工作负荷为1.5KN,安全系数为2.5倍。Cooperate with the trigger locking hook, when the contact touches the wire, the trigger locking hook pops out. The material is 45# steel, the surface anti-corrosion treatment is surface anodic oxidation, the working load is 1.5KN, and the safety factor is 2.5 times.

(4)闭锁装置(4) Locking device

与触发式闭锁钩配合,触发式闭锁钩启动弹出后,钩体部分卡与闭锁装置。材质为LuCr-40铝合金材料,表面防腐处理为表面阳极氧化,工作负荷为1.5KN,安全系数为2.5倍。Cooperate with the trigger-type locking hook, after the trigger-type locking hook starts to pop up, the part of the hook body is stuck with the locking device. The material is LuCr-40 aluminum alloy, the surface anti-corrosion treatment is surface anodic oxidation, the working load is 1.5KN, and the safety factor is 2.5 times.

(5)丝杆闭锁装置(5) screw locking device

与省力丝杆配合,通过旋转丝杆闭锁装置,紧固螺纹部位,固定丝杆不能旋转。材质为高强度ABS工程塑料。Cooperate with the labor-saving screw rod, by rotating the screw rod locking device, the threaded part is fastened, and the fixed screw rod cannot be rotated. The material is high-strength ABS engineering plastics.

(6)滑轮及紧固件、吊线装置、绝缘丝绳(6) Pulleys and fasteners, hanging wire devices, insulating wire ropes

与绝缘丝绳配合,绝缘丝绳穿过滑轮,一端连接吊线装置,一端由地面工作人员操控,滑轮安装于此专用工具上钩上,上钩勾住上方子导线,吊线装置勾住下方子导线,地面工作人员操控绝缘丝绳,提升下方子导线,收紧减小两子导线间距,使下钩能够勾住并闭锁下方子导线。滑轮材质为高强度ABS工程塑料,紧固件材质为45#钢材料,吊线装置材质为LuCr-60铝合金材料,表面防腐处理为表面阳极氧化,绝缘丝绳材料为天然纤维绝缘绳索(蚕丝绳)。工作负荷为1.5KN,安全系数为2.5倍。Cooperate with the insulating wire rope, the insulating wire rope passes through the pulley, one end is connected to the hanging wire device, and the other end is controlled by the ground staff. The staff controls the insulating wire rope, lifts the lower sub-conductor, tightens and reduces the distance between the two sub-conductors, so that the lower hook can catch and lock the lower sub-conductor. The pulley is made of high-strength ABS engineering plastic, the fastener is made of 45# steel, the hanging wire device is made of LuCr-60 aluminum alloy, the surface anti-corrosion treatment is anodized, and the insulating wire rope is made of natural fiber insulating rope (silk rope ). The working load is 1.5KN, and the safety factor is 2.5 times.

(7)绝缘操作杆及连接件(7) Insulated operating rod and connectors

与此专用工具整体配合,位于下方子导线上的工作人员,通过绝缘操作杆将此专用工具的棘轮闭锁装置上端固定在上方子导线上。材质为玻璃钢环氧树脂,工作负荷为0.2KN,安全系数为2.5倍。Cooperating with the special tool as a whole, the staff on the lower sub-conductor fixes the upper end of the ratchet locking device of the special tool on the upper sub-conductor through the insulating operating rod. The material is fiberglass epoxy resin, the working load is 0.2KN, and the safety factor is 2.5 times.

3.一种停电或带电更换220kV间隔棒的专用工具的组装3. Assembly of a special tool for replacing 220kV spacer rods when power is off or live

(1)省力丝杆(1) labor-saving screw rod

用于连接上钩、下钩,缩短两子导线间距,且在安装好间隔棒后,松开方能打开触发式闭锁钩。It is used to connect the upper hook and the lower hook, shorten the distance between the two wires, and after the spacer is installed, release it to open the trigger locking hook.

(2)上钩、下钩(2) Upper hook, lower hook

用于连接省力丝杆,触发装置装于钩体开口上端部,闭锁装置装于钩体开口下端部,丝杆闭锁装置装于钩体部分。滑轮、绝缘操作杆连接件装与上钩钩体部分。It is used to connect the labor-saving screw rod, the trigger device is installed at the upper end of the hook body opening, the locking device is installed at the lower end of the hook body opening, and the screw rod locking device is installed at the hook body part. The pulley, the connecting piece of the insulating operating rod are installed and the hook body part of the upper hook.

(3)触发式闭锁钩(3) Trigger locking hook

触发式闭锁钩装于上、下钩端部,与触发装置连接,启动弹出后,与闭锁装置连接闭合。The trigger-type locking hook is mounted on the ends of the upper and lower hooks and connected with the trigger device. After being activated and ejected, it is connected and closed with the locking device.

(3)触发装置(3) Trigger device

触发装置装于钩体开口上端部。The trigger device is mounted on the upper end of the opening of the hook body.

(4)闭锁装置(4) Locking device

闭锁装置装于钩体开口下端部。The locking device is installed at the lower end of the opening of the hook body.

(5)丝杆闭锁装置(5) screw locking device

丝杆闭锁装置装于钩体部分,旋转后与丝杆接触,紧固丝杆。The locking device of the screw rod is installed on the hook body, and contacts with the screw rod after rotation to fasten the screw rod.

(6)滑轮及紧固件、吊线装置、绝缘丝绳(6) Pulleys and fasteners, hanging wire devices, insulating wire ropes

与绝缘丝绳配合,绝缘丝绳穿过滑轮,缘丝绳一端连接吊线装置,一端由地面工作人员操控,滑轮安装于专用工具上钩部分,上钩勾住上方子导线,吊线装置勾住下方子导线,地面工作人员操控绝缘丝绳,提升下方子导线,收紧减小两子导线间距。、Cooperate with the insulating wire rope, the insulating wire rope passes through the pulley, one end of the edge wire rope is connected to the hanging wire device, and the other end is controlled by the ground staff, the pulley is installed on the hook part of the special tool, the hook hooks the upper sub-conductor, and the hanging wire device hooks the lower sub-conductor , the ground staff controls the insulating wire rope, lifts the lower sub-conductor, tightens and reduces the distance between the two sub-conductors. ,

(7)绝缘操作杆连接件(7) Insulated lever connector

连接绝缘操作杆,位于下方子导线上的工作人员,通过绝缘操作杆将此专用工具的棘轮闭锁装置上端固定在上方子导线上。Connect the insulated operating rod, and the staff on the lower sub-conductor fix the upper end of the ratchet locking device of the special tool on the upper sub-conductor through the insulated operating rod.

Claims (1)

1. the specific purpose tool of a power failure or charged for replacement 220kV conductor spacer, it is characterized in that, comprise one to rise to the bait (2) and a lower hook (6), be connected with its threaded engagement respectively by a laborsaving screw mandrel (4) between upper and lower hook; A trigger-type locking hook (1) is connected at the chimoto of rise to the bait (2), lower hook (6), after trigger equipment (7) triggers, locking device (8) pins trigger-type locking hook (1), make to rise to the bait (2), lower hook (6) closed with trigger-type locking hook (1) respectively after forms one and justifies structure; Rising to the bait, (2) side is fixedly connected with pulley (3), is fixedly connected with insulating bar connector (5) in lower hook (6) side, by the fixing screw mandrel of screw mandrel locking device (9).
CN201610079422.1A 2016-02-04 2016-02-04 Special tool for replacing 220kV spacer in power failure or electrification Active CN105576555B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610079422.1A CN105576555B (en) 2016-02-04 2016-02-04 Special tool for replacing 220kV spacer in power failure or electrification

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610079422.1A CN105576555B (en) 2016-02-04 2016-02-04 Special tool for replacing 220kV spacer in power failure or electrification

Publications (2)

Publication Number Publication Date
CN105576555A true CN105576555A (en) 2016-05-11
CN105576555B CN105576555B (en) 2018-06-15

Family

ID=55886402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610079422.1A Active CN105576555B (en) 2016-02-04 2016-02-04 Special tool for replacing 220kV spacer in power failure or electrification

Country Status (1)

Country Link
CN (1) CN105576555B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107809091A (en) * 2017-12-18 2018-03-16 国网河南省电力公司洛阳供电公司 A kind of double bundle conductor conductor spacer installs auxiliary rod
CN107968343A (en) * 2017-11-28 2018-04-27 大唐东北电力试验研究所有限公司 Can charged for replacement 10kVPT cartridge fuses insulating bar
CN109155506A (en) * 2016-05-12 2019-01-04 株式会社永木精机 Indirect live working holding tool
CN109217179A (en) * 2018-10-15 2019-01-15 云南送变电工程有限公司 Double bundle conductor conductor spacer installation tool
CN110333132A (en) * 2019-06-13 2019-10-15 国家电网有限公司 1000KV quadripartion lead spacing board installation special tool

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2125887U (en) * 1992-06-03 1992-12-23 李景辉 Ratchet type wire stretching device
CN202225142U (en) * 2011-07-11 2012-05-23 汉中天杰电力机具制造有限公司 Double hook line tightening device
CN203135324U (en) * 2013-03-30 2013-08-14 国家电网公司 Frapping tool used for power transmission line maintenance
CN103779809A (en) * 2014-02-20 2014-05-07 国家电网公司 Tool special for electrically adjusting gap between double split sub-conductors and working method
CN203871759U (en) * 2014-06-13 2014-10-08 国网四川省电力公司双流县供电分公司 Dual-hook wire gripping device
CN104300435A (en) * 2014-10-22 2015-01-21 国家电网公司 Wire tightener used for replacing double insulator strings
CN204732792U (en) * 2015-05-17 2015-10-28 郭先观 A kind of spanner wire grip device
CN205385244U (en) * 2016-02-04 2016-07-13 云南电网有限责任公司昆明供电局 A special tool for replacing 220kV spacer rods when power is off or live

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2125887U (en) * 1992-06-03 1992-12-23 李景辉 Ratchet type wire stretching device
CN202225142U (en) * 2011-07-11 2012-05-23 汉中天杰电力机具制造有限公司 Double hook line tightening device
CN203135324U (en) * 2013-03-30 2013-08-14 国家电网公司 Frapping tool used for power transmission line maintenance
CN103779809A (en) * 2014-02-20 2014-05-07 国家电网公司 Tool special for electrically adjusting gap between double split sub-conductors and working method
CN203871759U (en) * 2014-06-13 2014-10-08 国网四川省电力公司双流县供电分公司 Dual-hook wire gripping device
CN104300435A (en) * 2014-10-22 2015-01-21 国家电网公司 Wire tightener used for replacing double insulator strings
CN204732792U (en) * 2015-05-17 2015-10-28 郭先观 A kind of spanner wire grip device
CN205385244U (en) * 2016-02-04 2016-07-13 云南电网有限责任公司昆明供电局 A special tool for replacing 220kV spacer rods when power is off or live

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109155506A (en) * 2016-05-12 2019-01-04 株式会社永木精机 Indirect live working holding tool
CN107968343A (en) * 2017-11-28 2018-04-27 大唐东北电力试验研究所有限公司 Can charged for replacement 10kVPT cartridge fuses insulating bar
CN107809091A (en) * 2017-12-18 2018-03-16 国网河南省电力公司洛阳供电公司 A kind of double bundle conductor conductor spacer installs auxiliary rod
CN109217179A (en) * 2018-10-15 2019-01-15 云南送变电工程有限公司 Double bundle conductor conductor spacer installation tool
CN110333132A (en) * 2019-06-13 2019-10-15 国家电网有限公司 1000KV quadripartion lead spacing board installation special tool

Also Published As

Publication number Publication date
CN105576555B (en) 2018-06-15

Similar Documents

Publication Publication Date Title
CN105576555B (en) Special tool for replacing 220kV spacer in power failure or electrification
CN201490669U (en) Overhead Lightning Line Anti-vibration Hammer Resetter
AU2017201903B2 (en) General closed type clamp means for replacing uhv insulators and use method thereof
CN205385244U (en) A special tool for replacing 220kV spacer rods when power is off or live
CN102832567B (en) Arc-extinguishing device for live disconnection lead wire and method for live disconnection lead wire
CN110098501A (en) A kind of semi-automatic rapid-assembling/disassembling grounding hook and its operating method
CN103474909B (en) Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string
CN207183925U (en) Power distribution network uninterrupted operation insulating bar working system Special hanging bridge
CN205509371U (en) Bird ware external member is driven in electrified installation
CN204424477U (en) Can the part flow arrangement of charged installation
CN210041124U (en) Device for removing foreign matters on overhead transmission line conductor
CN203398349U (en) Auxiliary device of ground wire installation
CN204251724U (en) A kind of aluminium cell Multi-function equipments twists the anti-small box fastener dropping device of head member
CN204179568U (en) Live line working prevents wire dropping backup protection equipment
CN204205413U (en) A kind of link rod of Electrified fastening screw
CN206022675U (en) Universal shaped cable clamp earth lead
CN205846583U (en) A universal conversion joint for live work
CN204349394U (en) A kind of protection rope for conductor cross arm connecting device
CN204680557U (en) From impact insulating bar
CN204290154U (en) A kind of replacing insulator under electrified specific purpose tool
CN104158118B (en) A kind of conductors on quad bundled protects line hook
CN206834353U (en) Ultra-high-tension power transmission line assembly and disassembly ground wire servicing unit
CN221428015U (en) Lead wire grounding combined device
CN105811303A (en) Kit for electric installation of bird repeller
CN204030430U (en) A kind of conductors on quad bundled protects line hook

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant