CN105576555A - Special tool for power-cut or live replacement of 220kV spacer - Google Patents
Special tool for power-cut or live replacement of 220kV spacer Download PDFInfo
- Publication number
- CN105576555A CN105576555A CN201610079422.1A CN201610079422A CN105576555A CN 105576555 A CN105576555 A CN 105576555A CN 201610079422 A CN201610079422 A CN 201610079422A CN 105576555 A CN105576555 A CN 105576555A
- Authority
- CN
- China
- Prior art keywords
- hook
- trigger
- lower hook
- spacer
- conductor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The invention discloses a special tool for power-cut or live replacement of a 220kV spacer. The tool is characterized by comprising an upper hook and a lower hook, wherein a labor saving screw is respectively connected between the upper hook and the lower hook in a screw-thread fit manner; hook ends of the upper hook and the lower hook are respectively connected to a trigger locking hook; after trigger devices trigger, locking devices lock the trigger locking hooks, so that the upper hook and the corresponding trigger locking hook are closed to form a round structure, and the lower hook and the corresponding trigger locking hook are closed to form a round structure; one side of the upper hook is fixedly connected to a pulley, one side of the lower hook is fixedly connected to an insulating bar connecting piece, and a screw is fixed through screw locking devices. The tool has the following beneficial effects that the problems of tedious steps, long operation time, large working strength, high operating risk and the like of the previous operating method for replacement of the spacer can be solved, the working efficiency is greatly improved, and the working security of maintenance personnel is enhanced, so that the maintenance work for power-cut or live replacement of the 220kV spacer is more standardized and normalized.
Description
Technical field
The invention belongs to power industry, the specific purpose tool technical field of a kind of power failure or charged for replacement 220kV conductor spacer.
Background technology
On ultra-high-tension power transmission line, in order to reduce conductor corona electric discharge and the interference to communication, generally adopt bundle conductor.At present, the power transmission line of 220kV adopts double bundle conductor.In order to ensure that double bundle conductor wire harness spacing remains unchanged to meet electric property, reduce surface voltage gradient, and in a short-circuit situation, unlikely generation electromagnetic force between wire harness, cause the collision that attracts each other, though or cause the attraction collision of moment, accident can return to normal condition after eliminating, and thus separated by a distancely in span has installed conductor spacer.Double bundle conductor design pitch is 0.4m, and namely the installation length of conductor spacer is also 0.4m.
When conductor spacer on double bundle conductor is owing to installing originally, bolted is not in place or be in operation and be subject to the impacts such as conductor vibration for a long time, there will be the defect that loosening, damage etc. threatens line security to run.As processed not in time, conductor spacer long term wear wire will cause the major accidents such as broken string, bar.Have a power failure or charged installation, change conductor spacer and become a routine work of power transmission lines overhauling.
Charged for replacement or when installing new conductor spacer additional, employing be soft ladder busywork method.Rope ladder is suspended on a root wire, and when operating personnel arrives equipotential installation site by climbing rope ladder, the weight self adding rope ladder will make two root wires pull open larger distance up and down.If the distance of two root wires can not be remained on 0.4m, operating personnel cannot change, install new conductor spacer.The method in the past adopted is throwing empire silk rope, and empire silk rope was thrown the sub-conductor of eminence by the personnel on wire, after making the spacing of two root wires roughly reach 0.4m, fixes with the colligation of empire silk rope by pulling.This kind of method defect is obvious: 1. there is larger uncertainty, the method success rate of throwing empire silk rope is low, has that wind weather is more difficult to be completed; 2. throwing empire silk rope, stator wire duration, operating personnel's physical consumption is large, and whole maintenance process exists greater risk.Therefore, invent if can design and a kind ofly convenient and swiftly drag back sub-conductor and the distance of two root wires can be fixed on the specific purpose tool of 0.4m, operating personnel just saferly can complete power failure or charged installation efficiently, change the service work of conductor spacer.
Summary of the invention
In order to overcome defect that above-mentioned prior art exists, the energy designed is convenient and swift just drags back sub-conductor and the distance of two root wires can be fixed on a kind of power failure of 0.4m or the specific purpose tool of charged for replacement 220kV conductor spacer for object of the present invention.
The object of the invention is to realize by following technical solution.
A specific purpose tool for power failure or charged for replacement 220kV conductor spacer, is characterized in that, comprises one and rises to the bait and a lower hook, be connected respectively between upper and lower hook by a laborsaving screw mandrel with its threaded engagement; Rising to the bait, the chimoto of lower hook is connected to a trigger-type locking hook, and after trigger equipment triggers, locking device pins trigger-type locking hook, make to rise to the bait, lower hook closed with trigger-type locking hook respectively after forms a round structure; Rising to the bait, side is fixedly connected with pulley, is fixedly connected with insulating bar connector, fixes screw mandrel by screw mandrel locking device in lower hook side.
Beneficial effect
The present invention can solve problems such as changing conductor spacer operational method complex steps in the past, the activity duration is long, working strength is large, operating risk is high, substantially increase operating efficiency, enhance the fail safe of maintainer's work, make the upkeep operation standardization more of power failure or charged for replacement 220kV conductor spacer, standardization.
Accompanying drawing explanation
Fig. 1 is the left cutaway view of closure state of the present invention;
Fig. 2 is closure state front view of the present invention;
Fig. 3 is the right cutaway view of closure state of the present invention;
Fig. 4 is the left cutaway view of opening of the present invention;
Fig. 5 is opening front view of the present invention;
Fig. 6 is the right cutaway view of opening of the present invention.
Embodiment
See Fig. 1-Fig. 6, the specific purpose tool of a kind of power failure or charged for replacement 220kV conductor spacer, is characterized in that, comprises rise to the bait 2 and a lower hook 6, is connected respectively between upper and lower hook by a laborsaving screw mandrel 4 with its threaded engagement; Rising to the bait 2, the chimoto of lower hook 6 is connected to a trigger-type locking hook 1, and after trigger equipment 7 triggers, locking device 8 pins trigger-type locking hook 1, make to rise to the bait 2, lower hook 6 closed with trigger-type locking hook 1 respectively after forms one and justifies structure; Rising to the bait, 2 sides are fixedly connected with pulley 3, be fixedly connected with insulating bar connector 5, fix screw mandrel by screw mandrel locking device 9 in lower hook 6 side.
1. design principle
In live line working, the operating personnel being positioned at below sub-conductor wants to drag back top sub-conductor, can only use insulating tool, conventional insulating tool is except empire silk rope, be exactly insulating bar, insulating bar installs additional a hook, just tentatively can realize the function pulling top sub-conductor.And the spacing of two root wires will be zoomed in and be fixed to 0.4m, and need unclamp and take off hook after installing conductor spacer, the design that insulating bar installs hook additional just cannot meet, and needs to use tightening up and release function of laborsaving screw mandrel, installs hook additional just can realize at laborsaving screw mandrel two ends.So the instrument of primary prospect is made up of insulating bar, laborsaving screw mandrel, hook.Through more deep thinking and design, hook up for hook with trigger-type locking, eject to prevent wire in Renewal process; Instrument installs additional a pulley, with empire silk rope with the use of, operated the spacing of tightening up two root wires by ground electrician.We imagine after use specific purpose tool, can reduce the labour intensity of equal potential working personnel, greatly shorten the activity duration, thus realize reducing the risk in operating personnel's Equipotential live working process.
2. tool materials, structure technology requirement
(1) laborsaving screw mandrel
With rise to the bait, lower hook with the use of, shorten two sub-conductor spacing, screw mandrel middle part is regular hexagon, spanner can be used to be fixed rotation, and material is LuCr-60 aluminum alloy materials, and surface anticorrosion is treated to surface anodization, live load is 1KN, and coefficient of safety is 2.5 times.
(2) rise to the bait, lower hook, trigger-type locking hook
Rise to the bait, lower hook coordinates with laborsaving screw mandrel, be installed on laborsaving screw mandrel two ends, catch on two sub-conductors, and by touch trigger device, trigger-type locking is hooked dynamic, coordinate locking with locking device, prevent wire from ejecting, before this specific purpose tool of dismounting, wire is stuck in trigger-type locking hook closing structure all the time.Material is LuCr-40 aluminum alloy materials, and surface anticorrosion is treated to surface anodization, and live load is 1.5KN, and coefficient of safety is 2.5 times.
(3) trigger equipment
Coordinate with trigger-type locking hook, contact is touched when wire, and trigger-type locking hook ejects.Material is 45# Steel material, and surface anticorrosion is treated to surface anodization, and live load is 1.5KN, and coefficient of safety is 2.5 times.
(4) locking device
Coordinate with trigger-type locking hook, after trigger-type locking hook starts ejection, coupler body part card and locking device.Material is LuCr-40 aluminum alloy materials, and surface anticorrosion is treated to surface anodization, and live load is 1.5KN, and coefficient of safety is 2.5 times.
(5) screw mandrel locking device
Coordinate with laborsaving screw mandrel, by rotary screw locking device, binding thread position, fixing screw mandrel can not rotate.Material is high strength ABS engineering plastics.
(6) pulley and securing member, wrap attachment, empire silk rope
Coordinate with empire silk rope, empire silk rope is through pulley, one end connects wrap attachment, and one end is manipulated by surface personnel, and pulley is installed on this specific purpose tool rises to the bait, rise to the bait and catch on top sub-conductor, wrap attachment catches on below sub-conductor, and surface personnel manipulates empire silk rope, promotes below sub-conductor, tighten up reduction two sub-conductor spacing, enable lower hook catch on sub-conductor below also locking.Pulley material is high strength ABS engineering plastics, and securing member material is 45# Steel material, and wrap attachment material is LuCr-60 aluminum alloy materials, and surface anticorrosion is treated to surface anodization, and empire silk rope material is natural fiber insulation ropes (silk rope).Live load is 1.5KN, and coefficient of safety is 2.5 times.
(7) insulating bar and connector
Specific purpose tool overall co-ordination therewith, is positioned at the staff on the sub-conductor of below, is fixed on the sub-conductor of top the ratchet blocking system upper end of this specific purpose tool by insulating bar.Material is fiberglass epoxy resin, and live load is 0.2KN, and coefficient of safety is 2.5 times.
3. the assembling of the specific purpose tool of a power failure or charged for replacement 220kV conductor spacer
(1) laborsaving screw mandrel
For connect rise to the bait, lower hook, shorten two sub-conductor spacing, and after installing conductor spacer, unclamp and can open trigger-type locking hook.
(2) rise to the bait, lower hook
For connecting laborsaving screw mandrel, trigger equipment is loaded on coupler body open upper end portion, and locking device is loaded on coupler body open lower end portion, and screw mandrel locking device is loaded on coupler body part.Pulley, insulating bar connector dress and coupler body part of rising to the bait.
(3) trigger-type locking hook
Trigger-type locking hook is loaded on upper and lower chimoto, is connected with trigger equipment, starts after ejecting, and is connected closed with locking device.
(3) trigger equipment
Trigger equipment is loaded on coupler body open upper end portion.
(4) locking device
Locking device is loaded on coupler body open lower end portion.
(5) screw mandrel locking device
Screw mandrel locking device is loaded on coupler body part, contacts, fastening screw mandrel after rotating with screw mandrel.
(6) pulley and securing member, wrap attachment, empire silk rope
Coordinate with empire silk rope, empire silk rope is through pulley, periphysis rope one end connects wrap attachment, one end is manipulated by surface personnel, and pulley is installed on specific purpose tool upper hook section, rises to the bait and catches on top sub-conductor, wrap attachment catches on below sub-conductor, surface personnel manipulates empire silk rope, promotes below sub-conductor, tightens up reduction two sub-conductor spacing.、
(7) insulating bar connector
Connect insulating bar, be positioned at the staff on the sub-conductor of below, by insulating bar, the ratchet blocking system upper end of this specific purpose tool is fixed on the sub-conductor of top.
Claims (1)
1. the specific purpose tool of a power failure or charged for replacement 220kV conductor spacer, it is characterized in that, comprise one to rise to the bait (2) and a lower hook (6), be connected with its threaded engagement respectively by a laborsaving screw mandrel (4) between upper and lower hook; A trigger-type locking hook (1) is connected at the chimoto of rise to the bait (2), lower hook (6), after trigger equipment (7) triggers, locking device (8) pins trigger-type locking hook (1), make to rise to the bait (2), lower hook (6) closed with trigger-type locking hook (1) respectively after forms one and justifies structure; Rising to the bait, (2) side is fixedly connected with pulley (3), is fixedly connected with insulating bar connector (5) in lower hook (6) side, by the fixing screw mandrel of screw mandrel locking device (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610079422.1A CN105576555B (en) | 2016-02-04 | 2016-02-04 | A kind of power failure or the specific purpose tool of charged for replacement 220kV conductor spacers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610079422.1A CN105576555B (en) | 2016-02-04 | 2016-02-04 | A kind of power failure or the specific purpose tool of charged for replacement 220kV conductor spacers |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105576555A true CN105576555A (en) | 2016-05-11 |
CN105576555B CN105576555B (en) | 2018-06-15 |
Family
ID=55886402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610079422.1A Active CN105576555B (en) | 2016-02-04 | 2016-02-04 | A kind of power failure or the specific purpose tool of charged for replacement 220kV conductor spacers |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105576555B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107809091A (en) * | 2017-12-18 | 2018-03-16 | 国网河南省电力公司洛阳供电公司 | A kind of double bundle conductor conductor spacer installs auxiliary rod |
CN107968343A (en) * | 2017-11-28 | 2018-04-27 | 大唐东北电力试验研究所有限公司 | Can charged for replacement 10kVPT cartridge fuses insulating bar |
CN109155506A (en) * | 2016-05-12 | 2019-01-04 | 株式会社永木精机 | Indirect live working holding tool |
CN109217179A (en) * | 2018-10-15 | 2019-01-15 | 云南送变电工程有限公司 | Double bundle conductor conductor spacer installation tool |
CN110333132A (en) * | 2019-06-13 | 2019-10-15 | 国家电网有限公司 | 1000KV quadripartion lead spacing board installation special tool |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2125887U (en) * | 1992-06-03 | 1992-12-23 | 李景辉 | Ratchet type wire stretching device |
CN202225142U (en) * | 2011-07-11 | 2012-05-23 | 汉中天杰电力机具制造有限公司 | Double hook line tightening device |
CN203135324U (en) * | 2013-03-30 | 2013-08-14 | 国家电网公司 | Frapping tool used for power transmission line maintenance |
CN103779809A (en) * | 2014-02-20 | 2014-05-07 | 国家电网公司 | Tool special for electrically adjusting gap between double split sub-conductors and working method |
CN203871759U (en) * | 2014-06-13 | 2014-10-08 | 国网四川省电力公司双流县供电分公司 | Dual-hook wire gripping device |
CN104300435A (en) * | 2014-10-22 | 2015-01-21 | 国家电网公司 | Wire tightener used for replacing double insulator strings |
CN204732792U (en) * | 2015-05-17 | 2015-10-28 | 郭先观 | A kind of spanner wire grip device |
CN205385244U (en) * | 2016-02-04 | 2016-07-13 | 云南电网有限责任公司昆明供电局 | Have a power failure or electrified specialized tool who changes 220kV conductor spacer |
-
2016
- 2016-02-04 CN CN201610079422.1A patent/CN105576555B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2125887U (en) * | 1992-06-03 | 1992-12-23 | 李景辉 | Ratchet type wire stretching device |
CN202225142U (en) * | 2011-07-11 | 2012-05-23 | 汉中天杰电力机具制造有限公司 | Double hook line tightening device |
CN203135324U (en) * | 2013-03-30 | 2013-08-14 | 国家电网公司 | Frapping tool used for power transmission line maintenance |
CN103779809A (en) * | 2014-02-20 | 2014-05-07 | 国家电网公司 | Tool special for electrically adjusting gap between double split sub-conductors and working method |
CN203871759U (en) * | 2014-06-13 | 2014-10-08 | 国网四川省电力公司双流县供电分公司 | Dual-hook wire gripping device |
CN104300435A (en) * | 2014-10-22 | 2015-01-21 | 国家电网公司 | Wire tightener used for replacing double insulator strings |
CN204732792U (en) * | 2015-05-17 | 2015-10-28 | 郭先观 | A kind of spanner wire grip device |
CN205385244U (en) * | 2016-02-04 | 2016-07-13 | 云南电网有限责任公司昆明供电局 | Have a power failure or electrified specialized tool who changes 220kV conductor spacer |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109155506A (en) * | 2016-05-12 | 2019-01-04 | 株式会社永木精机 | Indirect live working holding tool |
CN107968343A (en) * | 2017-11-28 | 2018-04-27 | 大唐东北电力试验研究所有限公司 | Can charged for replacement 10kVPT cartridge fuses insulating bar |
CN107809091A (en) * | 2017-12-18 | 2018-03-16 | 国网河南省电力公司洛阳供电公司 | A kind of double bundle conductor conductor spacer installs auxiliary rod |
CN109217179A (en) * | 2018-10-15 | 2019-01-15 | 云南送变电工程有限公司 | Double bundle conductor conductor spacer installation tool |
CN110333132A (en) * | 2019-06-13 | 2019-10-15 | 国家电网有限公司 | 1000KV quadripartion lead spacing board installation special tool |
Also Published As
Publication number | Publication date |
---|---|
CN105576555B (en) | 2018-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105576555A (en) | Special tool for power-cut or live replacement of 220kV spacer | |
CN205385244U (en) | Have a power failure or electrified specialized tool who changes 220kV conductor spacer | |
CN102623926B (en) | Distant equipotential tackle and method for realizing charged equipotential access by using same | |
CN102820628A (en) | Special tool for replacing split conductor spacer rod | |
CN102412525A (en) | Anti-falling hook for power insulating protective umbrella | |
CN110098501A (en) | A kind of semi-automatic rapid-assembling/disassembling grounding hook and its operating method | |
CN103795005A (en) | Special tool for dual protection of wire of strain tower | |
CN213602299U (en) | Uninterrupted emergency treatment device for overhead ground wire strand breakage | |
CN107809091A (en) | A kind of double bundle conductor conductor spacer installs auxiliary rod | |
CN201153198Y (en) | Backup protection rope for combined double- and four-splitting wire | |
CN204190261U (en) | For preventing the removable instrument that electrical verification rod falls and earth rod swings | |
CN204615267U (en) | With the rope ladder head of self-locking device | |
CN204030026U (en) | Gravity self-locking formula Anti-dropping earthing clip | |
CN202373939U (en) | Live-working double-conductor lifting device | |
CN109361129A (en) | It is a kind of for assembling and disassembling the automatic impaction equipment of grounding hook | |
CN208955225U (en) | A kind of semi-automatic rapid-assembling/disassembling grounding hook | |
CN203135277U (en) | Nest dismantling apparatus | |
CN104348111A (en) | Lead backup protection device for live replacement of tension insulator string, and mounting method thereof | |
CN205882550U (en) | Wire hangs special processing tool of foreign matter | |
CN203911358U (en) | Special-purpose tool for replacing double-cleavage line spacer | |
CN204684579U (en) | Anti-slip type climbers | |
CN207530444U (en) | A kind of double bundle conductor conductor spacer installs auxiliary rod | |
CN202308922U (en) | Anti-dropping hook of electric insulation protection umbrella | |
CN203747300U (en) | Double protection special tool of tension tower wire | |
CN205985890U (en) | Insulating baffle of electric power |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |