CN105569725A - 综采工作面运输工艺 - Google Patents

综采工作面运输工艺 Download PDF

Info

Publication number
CN105569725A
CN105569725A CN201510643510.5A CN201510643510A CN105569725A CN 105569725 A CN105569725 A CN 105569725A CN 201510643510 A CN201510643510 A CN 201510643510A CN 105569725 A CN105569725 A CN 105569725A
Authority
CN
China
Prior art keywords
conveyor
belt
coal mining
face
fully mechanized
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510643510.5A
Other languages
English (en)
Inventor
程元
王静
宋小平
王森
张向阳
李建伟
白春娥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201510643510.5A priority Critical patent/CN105569725A/zh
Publication of CN105569725A publication Critical patent/CN105569725A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/002Crushing devices specifically for conveying in mines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及一种对井下综采工作面接近收尾时运输工艺,具体为一种综采工作面运输工艺。达到了提高资源回收率,缓解衔接紧张压力、为安全生产创造有利条件的目的。本发明所述的方法,是在特定巷道下将运输顺槽转载机(破碎机)拆掉,铺设1部40T刮板输送机,将运输顺槽转载机(破碎机)安装在出煤横川内,形成转载机(破碎机)与工作面刮板输送机平行的运输系统,使工作面多推进90m,提高了煤炭的开采率。

Description

综采工作面运输工艺
技术领域
本发明涉及一种对井下综采工作面接近收尾时运输工艺,具体为一种综采工作面运输工艺。
背景技术
如图1所示意,目前,煤矿井下使用的综采运输工艺:采煤机落煤——刮板输送机——转载机(破碎机)——皮带输送机。该工艺表现为:由于皮带、开关小车、转载机、破碎机长度近100m,综采工作面停采线距两巷顺槽通常为100m,对于采掘衔接紧张、资源日益枯竭的老矿来讲,造成巨大的资源浪费和衔接压力。
发明内容
本发明为了达到提高资源回收率,缓解衔接紧张压力、为安全生产创造有利条件的目的,提供了一种综采工作面运输工艺。
本发明的技术方案是,一种综采工作面运输工艺,包括以下步骤:
(1)、当工作面推进至距停采线10到100m时,每天检修班开始收缩皮带大架,直至缩完卷带装置后所有大架,(通常为5—6架,每架3m);
(2)、将出煤横川内的小溜拆除,装车,运出。将顺槽巷道5内的皮带拆除、运出。
(3)、将转载机3、破碎机2、开关小车4装车运出。
(4)、在巷道5内直接设置40T刮板输送机11,在出煤横川7内安装装载机3和破碎机2,工作面刮板输送机1连接40T刮板输送机11,转载机3连接皮带巷8内的输送皮带。
本发明所述的方法,是在特定巷道下将运输顺槽转载机(破碎机)拆掉,铺设1部40T刮板输送机,将运输顺槽转载机(破碎机)安装在出煤横川内,形成转载机(破碎机)与工作面刮板输送机平行的运输系统,使工作面多推进90m,提高了煤炭的开采率。
附图说明
图1为现有布置结构示意图;
图2为本发明布置结构示意图。
具体实施方式
如图2所示意,一种综采工作面运输工艺,包括以下步骤:
(1)、当工作面推进至距停采线10到100m时,每天检修班开始收缩皮带大架,直至缩完卷带装置后所有大架,(通常为5—6架,每架3m);
(2)、将出煤横川内的小溜拆除,装车,运出。将顺槽巷道5内的皮带拆除、运出。
(3)、将转载机3、破碎机2、开关小车4装车运出。
(4)、在巷道5内直接设置40T刮板输送机11,在出煤横川7内安装装载机3和破碎机2,工作面刮板输送机1连接40T刮板输送机11,转载机3连接皮带巷8内的输送皮带。
本发明的有益效果是,通过合理布置设备形成了新的输送体系,使工作面多推进90m,以9#煤为例,合计储量34629t,极大的提高了资源回收率;综采工作面一个循环0.6m,以三八制为例,每班8个循环4.8m,综采队可以多干18.7个班,同时缓解了老矿采掘衔接紧张的压力。

Claims (1)

1.一种综采工作面运输工艺,其特征在于:包括以下步骤:
1)、当工作面推进至距停采线10到100m时,每天检修班开始收缩皮带大架,直至缩完卷带装置后所有大架,(通常为5—6架,每架3m);
2)、将出煤横川内的小溜拆除,装车,运出;将顺槽巷道5内的皮带拆除、运出;
3)、将转载机(3)、破碎机(2)、开关小车(4)装车运出;
4)、在巷道(5)内直接设置40T刮板输送机(11),在出煤横川(7)内安装装载机(3)和破碎机(2),工作面刮板输送机(1)连接40T刮板输送机(11),转载机(3)连接皮带巷(8)内的输送皮带。
CN201510643510.5A 2015-10-08 2015-10-08 综采工作面运输工艺 Pending CN105569725A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510643510.5A CN105569725A (zh) 2015-10-08 2015-10-08 综采工作面运输工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510643510.5A CN105569725A (zh) 2015-10-08 2015-10-08 综采工作面运输工艺

Publications (1)

Publication Number Publication Date
CN105569725A true CN105569725A (zh) 2016-05-11

Family

ID=55880281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510643510.5A Pending CN105569725A (zh) 2015-10-08 2015-10-08 综采工作面运输工艺

Country Status (1)

Country Link
CN (1) CN105569725A (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19511018A1 (de) * 1995-03-25 1996-09-26 Bochumer Eisen Heintzmann Anordnung zum Hereingewinnen sowie zum Abfördern von als Flöz abgelagerten Mineralien, insbesondere von Kohle
CN201391334Y (zh) * 2009-04-22 2010-01-27 兖州煤业股份有限公司 薄煤层综采刮板输送机
CN202882998U (zh) * 2012-08-31 2013-04-17 山西晋城无烟煤矿业集团有限责任公司 转载机加高支撑装置
EP2713006A1 (en) * 2011-05-17 2014-04-02 Shandong Xinmei Machinery Equipment Co., Ltd Technology and equipment for separating coal and gangue and refilling gangue.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19511018A1 (de) * 1995-03-25 1996-09-26 Bochumer Eisen Heintzmann Anordnung zum Hereingewinnen sowie zum Abfördern von als Flöz abgelagerten Mineralien, insbesondere von Kohle
CN201391334Y (zh) * 2009-04-22 2010-01-27 兖州煤业股份有限公司 薄煤层综采刮板输送机
EP2713006A1 (en) * 2011-05-17 2014-04-02 Shandong Xinmei Machinery Equipment Co., Ltd Technology and equipment for separating coal and gangue and refilling gangue.
CN202882998U (zh) * 2012-08-31 2013-04-17 山西晋城无烟煤矿业集团有限责任公司 转载机加高支撑装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邢世坤: "大采深工作面末采外延停采线的方法探讨与实践", 《科技创新导报》 *

Similar Documents

Publication Publication Date Title
CN104405437B (zh) 一种固体充填与综采混合式工作面开采方法
CN102155260B (zh) 一种急倾斜煤层采空区充填方法
CN103742148B (zh) 一种急倾斜煤层柔掩支护下行矸石充填的采煤法
CN103939102B (zh) 一种固体充填回收露天矿终帮下压煤的采煤方法
CN103104260B (zh) 复杂地质条件下综—机对拉面采煤方法
CN101349159A (zh) 一种单通道无轨胶轮车回撤综采工作面的方法
CN103016053A (zh) 一种采空区局部充填控制地表沉陷的方法
CN101187308A (zh) 薄煤层高效综采工艺
CN102418525B (zh) 软煤层长壁大采高综合机械化采煤末采方法
CN104775819A (zh) 一种深部倾斜煤层回采巷道矿压控制开采方法
CN106968671B (zh) 煤矿井下采煤工作面回撤通道充填回撤方法
CN104373126A (zh) 一种钻采法矸石充填方法及设备
CN104500069A (zh) 一种特厚煤层边角煤的连续采煤机放顶煤开采工艺
CN104695497B (zh) 大型土石方工程的上土机施工工艺
CN102865082A (zh) 煤矿t型巷道直角拐弯快速施工方法
CN105240012A (zh) 一种实现煤柱同采的f型区段采煤方法
CN105240016A (zh) 缓倾斜薄层状玉石矿矿块切割条带拖曳充填采矿方法
CN103821530A (zh) 一种巷道连续开挖设备及工艺
CN102943689A (zh) 一种煤矿散料充填开采的方法
CN105971607A (zh) 一种中厚煤层沿空留巷方法
CN103147757A (zh) 一种间歇式采煤方法
CN202039860U (zh) 平行对拉式综放面结构
CN104533417A (zh) 双系两硬短壁煤层开采方法
CN105569725A (zh) 综采工作面运输工艺
CN103899331B (zh) 高应力突出厚煤层放顶煤开采时掘进巷道布置方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511