CN105569334A - In-structural-floor wire conduit pre-buried mold and construction method thereof - Google Patents
In-structural-floor wire conduit pre-buried mold and construction method thereof Download PDFInfo
- Publication number
- CN105569334A CN105569334A CN201610103319.6A CN201610103319A CN105569334A CN 105569334 A CN105569334 A CN 105569334A CN 201610103319 A CN201610103319 A CN 201610103319A CN 105569334 A CN105569334 A CN 105569334A
- Authority
- CN
- China
- Prior art keywords
- wire pipe
- plate
- structure floor
- built
- electric wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
- E04G15/063—Re-usable forms
- E04G15/068—Re-usable forms for channels open towards the surface
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Installation Of Indoor Wiring (AREA)
Abstract
The invention discloses an in-structural-floor wire conduit pre-buried mold. The in-structural-floor wire conduit pre-buried mold comprises a tank and insertion plates. The tank comprises vertical plates and supporting rods. The supporting rods are arranged in the middles of the vertical plates. Slots are formed in the ends of the vertical plates. The insertion plates are arranged in the slots and provided with groove holes. Pre-buried wire conduits penetrate through the insertion holes. According to the in-structural-floor wire conduit pre-buried mold and a construction method, operation is convenient, secondary protection processing is avoided, and construction efficiency is improved; a structural formwork can not be damaged; the pre-buried mold can be recycled, construction cost is saved, and construction waste is reduced; the pre-buried mold is safe and environmentally friendly, building rubbish is avoided, and the building construction environment is improved.
Description
Technical field
The present invention relates to architectural electricity installing area, particularly relate to wire pipe pre-embedding mould and construction method in structure floor.
Background technology
At the realm of building construction, complete in main structure construction, when entering decoration stage, then build secondary structure body of wall by laying bricks or stones.But, need to arrange conduit, as lamp switch, electrical socket, telecommunications outlet etc. between structure wall and secondary body of wall.In structure floor, the traditional method of wiring pipe has following two kinds:
(1) concealed wiring conduit on structural floor or underfloor reserve the length of 300mm ~ 500mm, in time building secondary structure or finishing body of wall by laying bricks or stones, then received corresponding position and height;
(2) when structure floor assembling reinforcement, the conduit polyphenyl plate that will access secondary body of wall superscribes, and twines adhesive plaster outward, treat that structural concrete has been built, after having torn template open, empty or burn polyphenyl plate, expose reserved conduit, then received corresponding position and height.
There is following problem in traditional construction method:
(1) the conduit length reserving ground is different in size, and malalignment affects the appearance effect of construction works;
(2) conduit reserving ground needs secondary protection process, waste of manpower, material resources;
(3) conduit basseted affects site operation road in structure, causes obstruction to personnel, trolley etc.;
(4) polyphenyl plate for wrapping up conduit does not have degradation property, forms a large amount of building waste, is unfavorable for environmental protection;
(5), when adopting the mode emptied or burn to remove polyphenyl plate, can have an impact to building structure outward appearance, impact building visual effect;
(6), when reserving the conduit of underfloor, need perforate on stay in place formwork, template is damaged.
Summary of the invention
The object of the invention is for above-mentioned technical problem, provide wire pipe pre-embedding mould and construction method in structure floor, it is easy to operate, without the need to secondary protection process, improves efficiency of construction; Pre-buried mould can be recycled, and saves construction cost, reduces construction waste; Pre-buried mould safety and environmental protection, does not produce building waste, improves building operations environment.
Technical scheme of the present invention
For solving the problems of the technologies described above, wire pipe pre-embedding mould in structure floor provided by the invention, comprises tank and plate; Tank comprises riser and support bar, and support bar is arranged on the middle part of riser, and the end of riser is provided with slot, and plate is arranged in slot; Plate is provided with slotted eye, and built-in electric wire pipe runs through jack and arranges.
Further, described riser is that angle is arranged, and its angle is acute angle.
Further, described plate is trapezoidal, and it is wide at the top and narrow at the bottom; Angle between the appearance and size of plate and riser is equipped with.
Further, described slotted eye is the U-type groove hole of single-ended opening, and external diameter and the quantity of the size of slotted eye and quantity and built-in electric wire pipe are equipped with.
Further, the top of described tank is provided with case body handle, and the top of plate is provided with plate handle.
The construction method of wire pipe pre-embedding mould in structure floor, comprises the following steps:
S1, assembling tank, according to external diameter and the quantity of structure floor built-in electric wire pipe, arranges size and the quantity of the slotted eye on plate;
S2, when structure floor reinforcing bar binding is constructed, determines the position of built-in electric wire pipe, carries out mark;
S3, at the lateral surface smearing release agent of tank, plate;
S4, is placed on the mark position in S2 by tank;
S5, along the slot of riser end, is arranged on plate in slot;
S6, inserts built-in electric wire pipe in slotted eye, is fixed on by built-in electric wire pipe on the reinforcing bar in structure floor;
S7, the concrete of pouring structure floor;
S8, lift case body handle, plate handle, propose the concrete of structure floor by casing and plate;
S9, before building secondary structure or finishing body of wall by laying bricks or stones, uses sleeve pipe to be connected with switching conduit by built-in electric wire pipe, receives corresponding position and height;
S10, the notch that plugging structure floor reserves.
Further, in step s 2, there is gap in the vertical direction of built-in electric wire pipe and support bar.
Beneficial effect of the present invention:
Wire pipe pre-embedding mould and construction method in structure floor provided by the invention, it is easy to operate, without the need to secondary protection process, improves efficiency of construction; Pre-buried mould can be recycled, and saves construction cost, reduces construction waste; Can not damage stay in place formwork; Pre-buried mould safety and environmental protection, does not produce building waste, improves building operations environment.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is stereogram of the present invention;
Fig. 3 is transverse sectional view of the present invention;
Fig. 4 is construction schematic diagram of the present invention.
Wherein:
1. tank; 2. riser; 3. plate; 4. support bar; 5. tank handle; 6. slotted eye; 7. switching conduit; 8. structure floor; 9. notch; 10. sleeve pipe; 11. slots; 12. plate handles; 13. built-in electric wire pipes.
Detailed description of the invention
Below in conjunction with specific embodiments and the drawings, wire pipe pre-embedding mould and construction method in structure floor of the present invention are described in detail:
In structure floor shown in Fig. 1, wire pipe pre-embedding mould comprises tank 1 and plate 3.
Tank 1 comprises riser 2 and support bar 4, and support bar 4 is arranged on the middle part of riser 2, and the end of riser 2 is provided with slot 11; Riser 2 is arranged in angle, and its angle is acute angle.
Plate 3 is arranged in slot 11, plate 3 is provided with slotted eye 6, and the top of plate 3 is provided with plate handle 12, and built-in electric wire pipe 13 runs through jack 6 and arranges, and Fig. 2 is stereogram of the present invention.
Described plate 3 is trapezoidal, and it is wide at the top and narrow at the bottom; Angle between the appearance and size of plate 3 and riser 2 is equipped with.
Described slotted eye 6 is the U-type groove hole of single-ended opening, and external diameter and the quantity of the size of slotted eye 6 and quantity and built-in electric wire pipe 13 are equipped with.In the present embodiment, plate 3 is arranged two slotted eyes 6.
Fig. 3 is transverse sectional view of the present invention, and case body handle 5 is arranged on the top of tank 1.
Fig. 4 is the construction schematic diagram of wire pipe pre-embedding mould in structure floor, and its construction method comprises the following steps:
S1, assembling tank 1, according to external diameter and the quantity of structure floor built-in electric wire pipe 13, arranges size and the quantity of the slotted eye 6 on plate 3;
S2, when structure floor 8 reinforcing bar binding is constructed, determines the position of built-in electric wire pipe 13, carries out mark;
In step s 2, there is gap with the vertical direction of support bar 4 in built-in electric wire pipe 13.
S3, at the lateral surface smearing release agent of tank 1, plate 3;
In this step, release agent is conducive to the lift of tank 1 and riser 3, facilitates execute-in-place.
S4, is placed on the mark position in S2 by tank 1;
S5, along the slot 11 of riser 2 end, is arranged on plate 3 in slot 11;
S6, inserts built-in electric wire pipe 13 in slotted eye 6, is fixed on by built-in electric wire pipe 13 on the reinforcing bar in structure floor 8;
S7, the concrete of pouring structure floor 8;
S8, lift case body handle 5, plate handle 12, propose the concrete of structure floor 8 by casing 1 and plate 3;
S9, before building secondary structure or finishing body of wall by laying bricks or stones, uses sleeve pipe 10 to be connected with switching conduit 7 by built-in electric wire pipe 13, receives corresponding position and height;
In the present embodiment, switching conduit 7 is drawn, respectively for other purposes of building in the upper and lower of structure floor 8.
S10, the notch 9 that plugging structure floor 8 reserves.
Wire pipe pre-embedding mould and construction method in structure floor provided by the invention, it is easy to operate, without the need to secondary protection process, improves efficiency of construction; Pre-buried mould can be recycled, and saves construction cost, reduces construction waste; Can not damage stay in place formwork; Pre-buried mould safety and environmental protection, does not produce building waste, improves building operations environment.
The present invention is not limited to above-mentioned embodiment; anyone can draw other various forms of products under enlightenment of the present invention; though but any change is done in its shape or structure, every have identical with the application or akin technical scheme, all drops within protection scope of the present invention.
Claims (7)
1. wire pipe pre-embedding mould in structure floor, is characterized in that, comprises tank (1) and plate (3); Tank (1) comprises riser (2) and support bar (4), and support bar (4) is arranged on the middle part of riser (2), and the end of riser (2) is provided with slot (11); Plate (3) is arranged in slot (11), is provided with slotted eye (6); Built-in electric wire pipe (13) runs through jack (6) and arranges.
2. wire pipe pre-embedding mould in structure floor according to claim 1, is characterized in that, described riser (2) is arranged in angle, and its angle is acute angle.
3. wire pipe pre-embedding mould in structure floor according to claim 1, is characterized in that, described plate (3) is for trapezoidal, and it is wide at the top and narrow at the bottom; Angle between the appearance and size of plate (3) and riser (2) is equipped with.
4. wire pipe pre-embedding mould in structure floor according to claim 1, is characterized in that, the U-type groove hole that described slotted eye (6) is single-ended opening, and external diameter and the quantity of the size of slotted eye (6) and quantity and built-in electric wire pipe (13) are equipped with.
5. wire pipe pre-embedding mould in structure floor according to claim 1, is characterized in that, the top of described tank (1) is provided with case body handle (5), and the top of plate (3) is provided with plate handle (12).
6. the construction method of wire pipe pre-embedding mould in structure floor described in any one in Claims 1 to 5, is characterized in that, comprise the following steps:
S1, assembling tank (1), according to external diameter and the quantity of structure floor built-in electric wire pipe (13), arranges size and the quantity of the slotted eye (6) on plate (3);
S2, when structure floor (8) reinforcing bar binding is constructed, determines the position of built-in electric wire pipe (13), carries out mark;
S3, at the lateral surface smearing release agent of tank (1), plate (3);
S4, is placed on the mark position in S2 by tank (1);
S5, along the slot (11) of riser (2) end, is arranged on plate (3) in slot (11);
S6, inserts built-in electric wire pipe (13) in slotted eye (6), is fixed on by built-in electric wire pipe (13) on the reinforcing bar in structure floor (8);
S7, the concrete of pouring structure floor (8);
S8, lift case body handle (5), plate handle (12), propose the concrete of structure floor (8) by casing (1) and plate (3);
S9, before building secondary structure or finishing body of wall by laying bricks or stones, uses sleeve pipe (10) to be connected with switching conduit (7) by built-in electric wire pipe (13), receives corresponding position and height;
S10, the notch (9) that plugging structure floor (8) reserves.
7. wire pipe pre-embedding mould construction method in structure floor according to claim 6, is characterized in that, in step s 2, built-in electric wire pipe (13) exists gap with the vertical direction of support bar (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610103319.6A CN105569334A (en) | 2016-02-25 | 2016-02-25 | In-structural-floor wire conduit pre-buried mold and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610103319.6A CN105569334A (en) | 2016-02-25 | 2016-02-25 | In-structural-floor wire conduit pre-buried mold and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105569334A true CN105569334A (en) | 2016-05-11 |
Family
ID=55879905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610103319.6A Pending CN105569334A (en) | 2016-02-25 | 2016-02-25 | In-structural-floor wire conduit pre-buried mold and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105569334A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114837409A (en) * | 2022-03-28 | 2022-08-02 | 五冶集团上海有限公司 | Water and electricity wire pipe pre-embedding and fixing method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001173230A (en) * | 1999-12-14 | 2001-06-26 | Fujita Corp | Synthetic resin form unit and synthetic resin form |
CN202702374U (en) * | 2012-07-20 | 2013-01-30 | 中国建筑股份有限公司 | Plastic mould for formed concrete shrinkage test piece |
CN103174289A (en) * | 2012-10-20 | 2013-06-26 | 中国二十二冶集团有限公司 | Construction method for cave entrance reservation of strong and weak electricity distribution box |
EP2728232A1 (en) * | 2012-10-30 | 2014-05-07 | Hauff-Technik GmbH & Co. KG | Feed-through for installation in a wall or floor element |
CN203669378U (en) * | 2013-12-09 | 2014-06-25 | 广州市第一建筑工程有限公司 | Casting device used for necking of constructional column top and large-section beam column |
CN203821844U (en) * | 2014-04-30 | 2014-09-10 | 浙江广厦建设职业技术学院 | Reserved transverse pipeline mold in cast-in-place concrete plate |
CN204282820U (en) * | 2014-11-26 | 2015-04-22 | 重庆三江机械厂 | A kind of novel unwrapping wire punch die |
CN204571288U (en) * | 2015-04-17 | 2015-08-19 | 李卫国 | Floor slab preformed hole mould |
CN204992465U (en) * | 2015-10-19 | 2016-01-20 | 山西省工业设备安装有限公司 | Pre -buried structure of pre -buried piping of electric construction main part |
CN205400051U (en) * | 2016-02-25 | 2016-07-27 | 北京城建亚泰中天建筑安装工程有限公司 | Pre -buried mould of electric wire tube in structure floor |
-
2016
- 2016-02-25 CN CN201610103319.6A patent/CN105569334A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001173230A (en) * | 1999-12-14 | 2001-06-26 | Fujita Corp | Synthetic resin form unit and synthetic resin form |
CN202702374U (en) * | 2012-07-20 | 2013-01-30 | 中国建筑股份有限公司 | Plastic mould for formed concrete shrinkage test piece |
CN103174289A (en) * | 2012-10-20 | 2013-06-26 | 中国二十二冶集团有限公司 | Construction method for cave entrance reservation of strong and weak electricity distribution box |
EP2728232A1 (en) * | 2012-10-30 | 2014-05-07 | Hauff-Technik GmbH & Co. KG | Feed-through for installation in a wall or floor element |
CN203669378U (en) * | 2013-12-09 | 2014-06-25 | 广州市第一建筑工程有限公司 | Casting device used for necking of constructional column top and large-section beam column |
CN203821844U (en) * | 2014-04-30 | 2014-09-10 | 浙江广厦建设职业技术学院 | Reserved transverse pipeline mold in cast-in-place concrete plate |
CN204282820U (en) * | 2014-11-26 | 2015-04-22 | 重庆三江机械厂 | A kind of novel unwrapping wire punch die |
CN204571288U (en) * | 2015-04-17 | 2015-08-19 | 李卫国 | Floor slab preformed hole mould |
CN204992465U (en) * | 2015-10-19 | 2016-01-20 | 山西省工业设备安装有限公司 | Pre -buried structure of pre -buried piping of electric construction main part |
CN205400051U (en) * | 2016-02-25 | 2016-07-27 | 北京城建亚泰中天建筑安装工程有限公司 | Pre -buried mould of electric wire tube in structure floor |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114837409A (en) * | 2022-03-28 | 2022-08-02 | 五冶集团上海有限公司 | Water and electricity wire pipe pre-embedding and fixing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104032869B (en) | A kind of Prefabricated stacking floor and precast construction method thereof | |
CN103321436A (en) | Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof | |
CN106088148B (en) | Pipe gallery template and its application | |
CN102535519A (en) | I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure | |
CN205400051U (en) | Pre -buried mould of electric wire tube in structure floor | |
CN104890106B (en) | The pre-buried more combination building block moulds of wall line box | |
CN105569334A (en) | In-structural-floor wire conduit pre-buried mold and construction method thereof | |
KR20140037308A (en) | Precast concrete box sewage closed conduit with subsidiary conduit | |
CN201817958U (en) | Plastic brick with pipe/line groove | |
CN102352690B (en) | Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube | |
CN110306396A (en) | A kind of assembly concrete road surface and construction method | |
CN204098061U (en) | Wall led by steel plate | |
CN204354275U (en) | A kind of cable duct list ditch mould | |
CN205314558U (en) | Cave mould is used to prestress wire | |
CN216819356U (en) | PVC spool rubber protection stopper | |
CN202712778U (en) | Novel wire box | |
CN206673539U (en) | A kind of cable laying piping lane | |
CN103032628A (en) | Construction method of pipeline in difficult construction environment | |
CN208870498U (en) | A kind of enclosing basis and enclosing | |
CN203452335U (en) | Water and electricity installation structure for constructional engineering | |
CN205090097U (en) | Brickwork wall poling line structure | |
CN206542144U (en) | A kind of prefabricated integrated line box building element | |
CN110847414A (en) | Electric box equipment supporting device, wall body comprising same and integral pouring method thereof | |
CN107304566B (en) | A kind of detachable soil nailing wall board structure | |
CN206922396U (en) | A kind of cable channel cover plate unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160511 |
|
RJ01 | Rejection of invention patent application after publication |