CN104890106B - The pre-buried more combination building block moulds of wall line box - Google Patents

The pre-buried more combination building block moulds of wall line box Download PDF

Info

Publication number
CN104890106B
CN104890106B CN201510262251.1A CN201510262251A CN104890106B CN 104890106 B CN104890106 B CN 104890106B CN 201510262251 A CN201510262251 A CN 201510262251A CN 104890106 B CN104890106 B CN 104890106B
Authority
CN
China
Prior art keywords
mould
building block
line box
side plate
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510262251.1A
Other languages
Chinese (zh)
Other versions
CN104890106A (en
Inventor
秦孟良
陈阁琳
唐建英
杨玺
李晓英
周永禄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING FIRST CONSTRUCTION GROUP Co Ltd
Original Assignee
CHONGQING FIRST CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING FIRST CONSTRUCTION GROUP Co Ltd filed Critical CHONGQING FIRST CONSTRUCTION GROUP Co Ltd
Priority to CN201510262251.1A priority Critical patent/CN104890106B/en
Publication of CN104890106A publication Critical patent/CN104890106A/en
Application granted granted Critical
Publication of CN104890106B publication Critical patent/CN104890106B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/02Moulds with adjustable parts specially for modifying at will the dimensions or form of the moulded article
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/18Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article
    • B28B7/183Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article for building blocks or similar block-shaped objects

Abstract

The invention belongs to construction wall technical field of construction, more particularly to a kind of pre-buried more combination building block moulds of wall line box.It includes bed die, side form, side mould, split bolt, groove, side plate, mould of leaving blank, U-shaped mould, bed die front and rear side installs side form and two termination installation end side forms along upper, form the building block of opening, connected between two side forms by split bolt, side form is provided with neck, side plate coordinates with neck separates building block, and side plate is provided with the groove of fixed line box;Vertically-mounted mould of leaving blank between two neighboring side plate, U-shaped mould stacks above bed die and mould of leaving blank runs through U-shaped mould, and mould of leaving blank is hollow cylindrical structural.Using above-mentioned technical proposal, can quick assembly jig, while the building block of different size can also be made according to different demands.

Description

The pre-buried more combination building block moulds of wall line box
Technical field
The invention belongs to construction wall technical field of construction, more particularly to a kind of pre-buried more assembled building blocks moulds of wall line box Tool.
Background technology
At present, construction and installation worker is in the line box such as concealed installation socket, switch and dark deposited connection spool, often in filling wall Slotted after the completion of building by laying bricks or stones punching, then lay spool, line box, smeared at fluting using mortar mending levelling.Traditional construction method causes The common quality defects such as filling wall outward appearance is ugly, wall is easy to crack, line box easily loosens, and increase engineering time and labor intensity, production Raw building waste causes environmental pollution.Also development has prefabricated concealed installation line box construction technology at present, although solving parts of traditional work The shortcomings that skill, but its installation is more complicated, and connecting tube installs pre-buried inconvenience, needs clip (cutting brick) to reserve pipeline position, can produce First portion builds slag, uneconomical, and efficiency of construction is not high.
The content of the invention
The problem to be solved in the present invention is existing prefabricated concealed installation line box construction technology, and installation is more complicated, and connecting tube is pacified Pre-buried inconvenience is filled, needs clip to reserve pipeline position.
In order to solve the above-mentioned technical problem, the present invention provides following scheme:The pre-buried more combination building block moulds of wall line box, bag Include bed die, side form, side mould, split bolt, groove, side plate, mould of leaving blank, U-shaped mould, bed die front and rear side is along upper installation side form And two termination installation end side forms, the building block of opening is formed, is connected between two side forms by split bolt, side form is provided with card Groove, side plate coordinates with neck separates building block, and side plate is provided with the groove of fixed line box;It is vertically-mounted between two neighboring side plate to stay Empty mould, U-shaped mould stacks above bed die and mould of leaving blank runs through U-shaped mould, and mould of leaving blank is hollow cylindrical structural.Adopt With above-mentioned technical proposal, can quick assembly jig, while the building block of different size can also be made according to different demands.This Mould is made of cast iron or high-strength engineering plastic, has flexible spelling performance, is adapted to by different spellings described The building block of different size is prefabricated, and installing/dismounting is convenient, rapidly.Mold bottom die is hinged with side form, deployable;Side mould is used to drawing Bolt is quickly fixed;Side plate can be arranged in side form according to the size grafting of building block;Side form termination is fastened with split bolt;Side plate On according to line box dimensions, provided with fixed groove, fixed spool connecting tube and mould of leaving blank are provided between two neighboring side plate. Can solve common quality defect caused by traditional handicraft using this built-in line capsule building block, improve construction quality, make outside filling wall See neat and artistic, reduction construction safety hidden danger, the labor intensity for the person of lightening one's labor, raising operating efficiency;Using this building block also Slag can be built using building site, reach solid waste recycling, energy-saving and emission-reduction, green purpose.
Further, the diameter range of the mould of leaving blank is 3~6cm, in addition to mitigating the deadweight of building block, by mould of leaving blank The diameter range of tool is 3~6cm.
Further, the A/F of the U-shaped mould is 3~8cm, in order to be further ensured that the stability of pre-embedded pipe, Its opening width range is set to 3~8cm.
Further, a diameter of 3cm of the mould of leaving blank.
Further, due to finally needing concreting in a mold, and because U-shaped mould structure is unstable, so Multiple baffle plates are provided with U-shaped mould inner wall, adjacent screen forms three-legged structure, can stablize its structure and be unlikely to deform.
Line box and disengaging spool can be embedded in building block by such scheme, and coordinate supporting U-shaped building block to reserve secretly The passage of Sunken wire tube.This construction method not only ensure that line box surrounding will not be ftractureed, firmly installed, and without slotting, not having to Repairing, has prevented the common quality defect of spool box concealed installation so that filling wall outward appearance is neat and artistic, completely without the use of machines such as cutting machines Tool equipment, eliminates safe hidden trouble, and the labor intensity for the person of lightening one's labor, operating efficiency greatly improves, and built-in line capsule building block exists Scene is made thick bone fines mixing and carries out into concrete prefabricated using structural concrete clout or qualified inorganic slag of building through broken, is saved Energy emission reduction, it is green.Simultaneously ensure the size of pre-embedded pipe and consolidating for structure, protected using U-shaped building block Come.In addition to mitigating the deadweight of building block, reserved at building block geometric center and match somebody with somebody repeated hole, 3~6cm of its diameter range.We adopt Built-in line capsule building block specification is mainly 190*90*90,190*140*90,190*190*90,240*115*90, line box Specification is containing the conventional simply connected of lid, duplex, three and the line box such as tetrad.Prefabricated pre-buried line box is wanted according to actual masonry size selection Assemble the specification of building block.When the built-in line capsule building block is prefabricated, pre-buried it must reserve the spool being connected with line box and is exporting Place sets connector so that follow-up spool connects.
Brief description of the drawings
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description:
Fig. 1 is the structural representation of the pre-buried more combination building block mould embodiments of wall line box of the present invention;
Fig. 2 is the structural representation of U-shaped mould in the pre-buried more combination building block mould embodiments of wall line box of the present invention;
Fig. 3 is the structural representation of the pre-buried more combination building block mould embodiment latus inframediums of wall line box of the present invention.
Embodiment
Embodiment 1
As shown in Figure 1, 2, 3:The pre-buried more combination building block moulds of wall line box, including bed die 3, side form 1, side mould 2, to drawing Bolt 4, groove, side plate 6, mould 7 of leaving blank, U-shaped mould 8, the front and rear side of bed die 3 install side form 1 and two termination installation ends along upper Side form 2, the building block of opening is formed, is connected between two side forms 1 by split bolt 4, side form 1 is provided with neck 5, side plate 6 and card Groove 5, which coordinates, separates building block, and side plate 6 is provided with the groove of fixed line box;Vertically-mounted mould 7 of leaving blank between two neighboring side plate 6, U-shaped mould 8 stacks the top of bed die 3 and mould 7 of leaving blank runs through U-shaped mould 8, and mould 7 of leaving blank is hollow cylindrical structural.Leave blank The diameter range of mould 7 is 3~6cm, and the A/F of U-shaped mould 8 is 3~8cm, and the U-shaped inwall of mould 8 is provided with multiple baffle plates, Adjacent screen forms three-legged structure.
During processing, can quick assembly jig, while the building block of different size can also be made according to different demands.This Mould is made of cast iron or high-strength engineering plastic, has flexible spelling performance, is adapted to by different spellings described The building block of different size is prefabricated, and installing/dismounting is convenient, rapidly.Mold bottom die 3 is be hinged with side form 1, deployable;Side mould 2 uses Split bolt 4 is quickly fixed;Side plate 6 can be arranged in side form 1 according to the size grafting of building block;The termination of side form 1 split bolt 4 Against solid;According to line box dimensions on side plate 6, it is provided with fixed spool provided with fixed groove, between two neighboring side plate 6 and connects Manage and leave blank mould 7.Can solve common quality defect caused by traditional handicraft using this built-in line capsule building block, improve engineering matter Amount, makes filling wall outward appearance neat and artistic, reduces construction safety hidden danger, the labor intensity for the person of lightening one's labor, improves operating efficiency;Adopt Slag can also be built using building site with this building block, reach solid waste recycling, energy-saving and emission-reduction, green purpose.It is described to leave blank The diameter range of mould is 3~6cm, is 3~6cm by the diameter range for mould 7 of leaving blank in addition to mitigating the deadweight of building block.U The A/F of pattern tool 8 is 3~8cm, and in order to be further ensured that the stability of pre-embedded pipe, its opening width range is set to 3~8cm.Due to finally needing concreting in a mold, and due to the U-shaped structural instability of mould 8, so in U-shaped mould Have 8 inwalls and be provided with multiple baffle plates, adjacent screen forms three-legged structure, can stablize its structure and be unlikely to deform.
Such scheme, poured in mould with concrete, it is possible to obtain the building block of different size, while pass through U Pattern tool 8 obtains U-shaped building block after pouring.Pour while line box and disengaging spool can be embedded in building block, and coordinate supporting U-shaped building block reserve the passage of dark Sunken wire tube.This construction method not only ensure that line box surrounding will not be ftractureed, firmly installed, And do not have to fluting, without repairing, prevent the common quality defect of spool box concealed installation so that filling wall outward appearance is neat and artistic, completely Without the use of plant equipment such as cutting machines, eliminating safe hidden trouble, the labor intensity for the person of lightening one's labor, operating efficiency greatly improves, The building block of built-in line capsule makees thick bone fines mixing using structural concrete clout or qualified inorganic slag of building through broken at the scene Prefabricated, energy-saving and emission-reduction are carried out into concrete, it is green.Simultaneously ensure the size of pre-embedded pipe and firm, the profit of structure Protected with U-shaped building block.In addition to mitigating the deadweight of building block, reserved at building block geometric center and match somebody with somebody repeated hole, its is straight Footpath 3~6cm of scope.The built-in line capsule building block specification that we use is mainly 190*90*90,190*140*90,190* 190*90,240*115*90, line box specification is containing the conventional simply connected of lid, duplex, three and the line box such as tetrad.According to actual masonry chi The specification of prefabricated built-in line capsule building block is wanted in very little selection.When the built-in line capsule building block is prefabricated, pre-buried must reserve with The spool of line box connection simultaneously sets connector in exit so that follow-up spool connects.
Embodiment 2
As shown in Figure 1, 2, 3:The pre-buried more combination building block moulds of wall line box, including bed die 3, side form 1, side mould 2, to drawing Bolt 4, groove, side plate 6, mould 7 of leaving blank, U-shaped mould 8, the front and rear side of bed die 3 install side form 1 and two termination installation ends along upper Side form 2, the building block of opening is formed, is connected between two side forms 1 by split bolt 4, side form 1 is provided with neck 5, side plate 6 and card Groove 5, which coordinates, separates building block, and side plate 6 is provided with the groove of fixed line box;Vertically-mounted mould 7 of leaving blank between two neighboring side plate 6, U-shaped mould 8 stacks the top of bed die 3 and mould 7 of leaving blank runs through U-shaped mould 8, and mould 7 of leaving blank is hollow cylindrical structural.Leave blank The diameter range of mould 7 is 3~6cm, and the A/F of U-shaped mould 8 is 3~8cm, and the U-shaped inwall of mould 8 is provided with multiple baffle plates, Adjacent screen forms three-legged structure.
During processing, can quick assembly jig, while the building block of different size can also be made according to different demands.This Mould is made of cast iron or high-strength engineering plastic, has flexible spelling performance, is adapted to by different spellings described The building block of different size is prefabricated, and installing/dismounting is convenient, rapidly.Mold bottom die 3 is be hinged with side form 1, deployable;Side mould 2 uses Split bolt 4 is quickly fixed;Side plate 6 can be arranged in side form 1 according to the size grafting of building block;The termination of side form 1 split bolt 4 Against solid;According to line box dimensions on side plate 6, it is provided with fixed spool provided with fixed groove, between two neighboring side plate 6 and connects Manage and leave blank mould 7.Can solve common quality defect caused by traditional handicraft using this built-in line capsule building block, improve engineering matter Amount, makes filling wall outward appearance neat and artistic, reduces construction safety hidden danger, the labor intensity for the person of lightening one's labor, improves operating efficiency;Adopt Slag can also be built using building site with this building block, reach solid waste recycling, energy-saving and emission-reduction, green purpose.It is described to leave blank The diameter range of mould is 3cm, is 3~6cm by the diameter range for mould 7 of leaving blank in addition to mitigating the deadweight of building block.It is U-shaped The A/F of mould 8 is preferably 8cm, and in order to be further ensured that the stability of pre-embedded pipe, its opening width range is set into 3 ~8cm.Due to finally needing concreting in a mold, and due to the U-shaped structural instability of mould 8, so in U-shaped mould 8 inwalls are provided with multiple baffle plates, and adjacent screen forms three-legged structure, can stablize its structure and be unlikely to deform.
Such scheme, poured in mould with concrete, it is possible to obtain the building block of different size, while pass through U Pattern tool 8 obtains U-shaped building block after pouring.Pour while line box and disengaging spool can be embedded in building block, and coordinate supporting U-shaped building block reserve the passage of dark Sunken wire tube.This construction method not only ensure that line box surrounding will not be ftractureed, firmly installed, And do not have to fluting, without repairing, prevent the common quality defect of spool box concealed installation so that filling wall outward appearance is neat and artistic, completely Without the use of plant equipment such as cutting machines, eliminating safe hidden trouble, the labor intensity for the person of lightening one's labor, operating efficiency greatly improves, The building block of built-in line capsule makees thick bone fines mixing using structural concrete clout or qualified inorganic slag of building through broken at the scene Prefabricated, energy-saving and emission-reduction are carried out into concrete, it is green.Simultaneously ensure the size of pre-embedded pipe and firm, the profit of structure Protected with U-shaped building block.In addition to mitigating the deadweight of building block, reserved at building block geometric center and match somebody with somebody repeated hole, its is straight Footpath 3~6cm of scope.The built-in line capsule building block specification that we use is mainly 190*90*90,190*140*90,190* 190*90,240*115*90, line box specification is containing the conventional simply connected of lid, duplex, three and the line box such as tetrad.According to actual masonry chi The specification of prefabricated built-in line capsule building block is wanted in very little selection.When the built-in line capsule building block is prefabricated, pre-buried must reserve with The spool of line box connection simultaneously sets connector in exit so that follow-up spool connects.
Embodiment 3
As shown in Figure 1, 2, 3:The pre-buried more combination building block moulds of wall line box, including bed die 3, side form 1, side mould 2, to drawing Bolt 4, groove 9, side plate 6, mould 7 of leaving blank, U-shaped mould 8, the front and rear side of bed die 3 install side form 1 and two termination installation ends along upper Side form 2, the building block of opening is formed, is connected between two side forms 1 by split bolt 4, side form 1 is provided with neck 5, side plate 6 and card Groove 5, which coordinates, separates building block, and side plate 6 is provided with the groove of fixed line box;Vertically-mounted mould 7 of leaving blank between two neighboring side plate 6, U-shaped mould 8 stacks the top of bed die 3 and mould 7 of leaving blank runs through U-shaped mould 8, and mould 7 of leaving blank is hollow cylindrical structural.Leave blank The diameter range of mould 7 is 3~6cm, and the A/F of U-shaped mould 8 is 3~8cm, and the U-shaped inwall of mould 8 is provided with multiple baffle plates, Adjacent screen forms three-legged structure.
During processing, can quick assembly jig, while the building block of different size can also be made according to different demands.This Mould is made of cast iron or high-strength engineering plastic, has flexible spelling performance, is adapted to by different spellings described The building block of different size is prefabricated, and installing/dismounting is convenient, rapidly.Mold bottom die 3 is be hinged with side form 1, deployable;Side mould 2 uses Split bolt 4 is quickly fixed;Side plate 6 can be arranged in side form 1 according to the size grafting of building block;The termination of side form 1 split bolt 4 Against solid;According to line box dimensions on side plate 6, it is provided with fixed spool provided with fixed groove, between two neighboring side plate 6 and connects Manage and leave blank mould 7.Can solve common quality defect caused by traditional handicraft using this built-in line capsule building block, improve engineering matter Amount, makes filling wall outward appearance neat and artistic, reduces construction safety hidden danger, the labor intensity for the person of lightening one's labor, improves operating efficiency;Adopt Slag can also be built using building site with this building block, reach solid waste recycling, energy-saving and emission-reduction, green purpose.It is described to leave blank The diameter range of mould is 5cm, is 3~6cm by the diameter range for mould 7 of leaving blank in addition to mitigating the deadweight of building block.It is U-shaped The A/F of mould 8 is preferably 5cm, and in order to be further ensured that the stability of pre-embedded pipe, its opening width range is set into 3 ~8cm.Due to finally needing concreting in a mold, and due to the U-shaped structural instability of mould 8, so in U-shaped mould 8 inwalls are provided with multiple baffle plates, and adjacent screen forms three-legged structure, can stablize its structure and be unlikely to deform.
Such scheme, poured in mould with concrete, it is possible to obtain the building block of different size, while pass through U Pattern tool 8 obtains U-shaped building block after pouring.Pour while line box and disengaging spool can be embedded in building block, and coordinate supporting U-shaped building block reserve the passage of dark Sunken wire tube.This construction method not only ensure that line box surrounding will not be ftractureed, firmly installed, And do not have to fluting, without repairing, prevent the common quality defect of spool box concealed installation so that filling wall outward appearance is neat and artistic, completely Without the use of plant equipment such as cutting machines, eliminating safe hidden trouble, the labor intensity for the person of lightening one's labor, operating efficiency greatly improves, The building block of built-in line capsule makees thick bone fines mixing using structural concrete clout or qualified inorganic slag of building through broken at the scene Prefabricated, energy-saving and emission-reduction are carried out into concrete, it is green.Simultaneously ensure the size of pre-embedded pipe and firm, the profit of structure Protected with U-shaped building block.In addition to mitigating the deadweight of building block, reserved at building block geometric center and match somebody with somebody repeated hole, its is straight Footpath 3~6cm of scope.The built-in line capsule building block specification that we use is mainly 190*90*90,190*140*90,190* 190*90,240*115*90, line box specification is containing the conventional simply connected of lid, duplex, three and the line box such as tetrad.According to actual masonry chi The specification of prefabricated built-in line capsule building block is wanted in very little selection.When the built-in line capsule building block is prefabricated, pre-buried must reserve with The spool of line box connection simultaneously sets connector in exit so that follow-up spool connects.
Above-described is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, Without departing from the structure of the invention, various modifications and improvements can be made, the protection model of the present invention should be also considered as Enclose, these effects and practical applicability for implementing all without the influence present invention.

Claims (5)

1. the pre-buried more combination building block moulds of wall line box, it is characterised in that including bed die, side form, side mould, split bolt, recessed Groove, side plate, mould of leaving blank, U-shaped mould, bed die front and rear side form opening along upper installation side form and two termination installation end side forms Building block, connected by split bolt between two side forms, side form is provided with neck, and side plate coordinates with neck and separates building block, side plate It is provided with the groove of fixed line box;Vertically-mounted mould of leaving blank between two neighboring side plate, U-shaped mould are stacked above bed die and stayed Empty mould runs through U-shaped mould, and mould of leaving blank is hollow cylindrical structural.
2. the pre-buried more combination building block moulds of wall line box according to claim 1, it is characterised in that the mould of leaving blank Diameter range is 3~6cm.
3. the pre-buried more combination building block moulds of wall line box according to claim 1, it is characterised in that the U-shaped mould A/F is 3~8cm.
4. the pre-buried more combination building block moulds of wall line box according to claim 2, it is characterised in that the mould of leaving blank A diameter of 3cm.
5. the pre-buried more combination building block moulds of wall line box according to claim 3, it is characterised in that in the U-shaped mould Wall is provided with multiple baffle plates, and adjacent screen forms three-legged structure.
CN201510262251.1A 2015-05-22 2015-05-22 The pre-buried more combination building block moulds of wall line box Expired - Fee Related CN104890106B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510262251.1A CN104890106B (en) 2015-05-22 2015-05-22 The pre-buried more combination building block moulds of wall line box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510262251.1A CN104890106B (en) 2015-05-22 2015-05-22 The pre-buried more combination building block moulds of wall line box

Publications (2)

Publication Number Publication Date
CN104890106A CN104890106A (en) 2015-09-09
CN104890106B true CN104890106B (en) 2018-02-23

Family

ID=54023267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510262251.1A Expired - Fee Related CN104890106B (en) 2015-05-22 2015-05-22 The pre-buried more combination building block moulds of wall line box

Country Status (1)

Country Link
CN (1) CN104890106B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105365034A (en) * 2015-09-30 2016-03-02 苏州新协力特种工业模板有限公司 Drawing type template set
CN108818896A (en) * 2018-07-16 2018-11-16 浙江省二建建设集团有限公司 The clout reuse means and its processing method of fine concrete
CN109853832A (en) * 2019-01-18 2019-06-07 江苏南通六建建设集团有限公司 A kind of construction method of filling wall masonry and electrical pre-embedded pipe synchronous construction
CN111745795A (en) * 2020-07-07 2020-10-09 汪成立 Prefabricated mould of hollow environmental protection brick

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1394285A (en) * 1920-05-27 1921-10-18 D Avy Yves Brick-machine
CN2220499Y (en) * 1994-11-16 1996-02-21 杨振 Concrete porous hollow building blocks and its mould
US20080047219A1 (en) * 2006-07-19 2008-02-28 E.K.B. Designs, Ltd. Molded construction blocks having integrally molded knock-outs for creation of openings for electrical blocks and associated methods
CN201634072U (en) * 2010-04-12 2010-11-17 中国地质大学(武汉) Prefabricating and carrying mould for geologic model test building blocks
CN202318544U (en) * 2011-11-07 2012-07-11 长沙学院 Adjustable wall building block forming mould for test
CN203141638U (en) * 2013-03-13 2013-08-21 仇心金 Self-heat-preserving concrete composite building block mold
CN103817777B (en) * 2014-03-14 2015-11-25 吉林大学 For making the assembling die of heat-insulation wall plate
CN204772919U (en) * 2015-05-22 2015-11-18 重庆一建建设集团有限公司 Pre -buried multiunit of wall body line box closes building block mould

Also Published As

Publication number Publication date
CN104890106A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN104890106B (en) The pre-buried more combination building block moulds of wall line box
CN106320706A (en) Masonry-wall line-pipe, line-groove and line-box burying construction method
CN103321436B (en) Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN102758451A (en) Concrete cable channel construction process
CN104989099A (en) Pre-embedded wire box construction method
CN102966121A (en) Integrally movable mould frame for pipe rack cast-in-site construction
CN101691772B (en) Fabricated novel installation process for drain pipe
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN108695794A (en) Box installation method is electrically reserved in a kind of secondary structure wall
CN108468348B (en) The porous piping lane construction technology of box quick assembly and disassembly mould
CN104810744A (en) Free pre-burying construction method of wall pipeline
CN204235676U (en) L-shaped door buttress prefabricated section sizing punching block
CN210950229U (en) Embedded device for gas inlet pipe sleeve in indoor shear wall
CN204772919U (en) Pre -buried multiunit of wall body line box closes building block mould
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN111535482A (en) Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN205400051U (en) Pre -buried mould of electric wire tube in structure floor
CN208792746U (en) A kind of expansion joint regularization same tool steel plate template
CN208310221U (en) A kind of fixed device of side mode
CN106381999A (en) Fair-faced concrete wall intaglio character die plate construction method
CN205604287U (en) Highway tunnel portal wall
CN204941567U (en) A kind of structure accelerating construction of tunnel vault pouring concrete speed
CN209294573U (en) A kind of water sealing structure of self-stabilization type building standpipe antiseepage leak-stopping
CN209350486U (en) A kind of constructional column reinforcing prefabricated section through walls and mold
CN208105649U (en) Prefabricated plus pipe autoclave aerated concrete building block and blockwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

CF01 Termination of patent right due to non-payment of annual fee