CN105563135A - Automatic steel pipe chamfering mantle fiber machining equipment - Google Patents

Automatic steel pipe chamfering mantle fiber machining equipment Download PDF

Info

Publication number
CN105563135A
CN105563135A CN201610055418.1A CN201610055418A CN105563135A CN 105563135 A CN105563135 A CN 105563135A CN 201610055418 A CN201610055418 A CN 201610055418A CN 105563135 A CN105563135 A CN 105563135A
Authority
CN
China
Prior art keywords
steel pipe
steel
jack
mantle fiber
chamfering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610055418.1A
Other languages
Chinese (zh)
Other versions
CN105563135B (en
Inventor
刘孟伟
刘培安
孔令国
何滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Maike Pipeline Technology Co ltd
Original Assignee
Jinan Mike Pipeline Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Mike Pipeline Technology Co Ltd filed Critical Jinan Mike Pipeline Technology Co Ltd
Priority to CN201610055418.1A priority Critical patent/CN105563135B/en
Publication of CN105563135A publication Critical patent/CN105563135A/en
Application granted granted Critical
Publication of CN105563135B publication Critical patent/CN105563135B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus

Abstract

The invention discloses automatic steel pipe chamfering mantle fiber machining equipment. The equipment comprises a chassis; and the top surface of the chassis is rectangular. The equipment is characterized by further comprising a steel pipe stepper transfer system mounted on the chassis and steel pipe chamfering mantle fiber machining systems staggered at two ends of the chassis, and further comprises electric appliance control and hydraulic system systems. The equipment realizes automatic transportation of steel pipe chamfering mantle fibers and automatic machining of the steel pipe chamfering mantle fibers, reduces the steel pipe reshipment working difficulty, reduces the operation difficulty, the labor intensity and the danger of operators, and improves the production efficiency of the steel pipe chamfering mantle fibers.

Description

A kind of steel pipe automatic chamfering mantle fiber process equipment
Technical field
The invention belongs to a kind of steel pipe process equipment, particularly belong to a kind of steel pipe automatic chamfering mantle fiber process equipment.
Background technology
Current straight seam welded steel pipe chamfering mantle fiber processing adopts manual equipment more, because the general length of straight seam welded steel pipe is 6 meters, the straight seam welded steel pipe rolled off the production line will be had bad luck to steel tube chamfering mantle fiber machining area by worker, need through operations such as transport, broken bundles, then manual operation steel tube chamfering equipment and mantle fiber equipment carry out steel tube chamfering mantle fiber, because straight seam welded steel pipe is longer, cause execute-in-place dangerous large, have bad luck that difficulty is large, operating difficulties degree is large, worker's labour intensity is large, have a strong impact on steel tube chamfering mantle fiber production efficiency.How to realize the automatic chamfering mantle fiber processing of the automatic transport of steel tube chamfering mantle fiber, steel pipe, reduce steel pipe and have bad luck work difficulty, reduce the operation easier of operator and labour intensity and danger, improving steel tube chamfering mantle fiber production efficiency is the technical issues that need to address.
Summary of the invention
Technical problem to be solved by this invention is: provide a kind of steel pipe automatic chamfering mantle fiber process equipment.Use this steel pipe automatic chamfering mantle fiber process equipment can not only realize steel tube chamfering mantle fiber automatic transport, the processing of steel pipe automatic chamfering mantle fiber, and steel pipe can also be reduced have bad luck work difficulty, reduce the operation easier of operator and labour intensity and danger, steel tube chamfering mantle fiber production efficiency can also be improved.
The technical scheme that the present invention solves the problems of the technologies described above is: a kind of steel pipe automatic chamfering mantle fiber process equipment, comprise chassis, the end face on described chassis is rectangle, it is characterized in that: the steel tube chamfering mantle fiber system of processing also comprising the wrong contraposition installation of steel pipe stepping transmission system and two ends, chassis that chassis is installed, also comprises electrical equipment control and hydraulic control system;
Described steel pipe stepping transmission system comprises the steel pipe transverse traversing carriage be installed on this chassis, the steel pipe installed in steel pipe transverse traversing carriage vertically moves power set along the steel pipe that chassis longitudinal direction moves and steel pipe vertically moves jacking and tourelle, the steel pipe transverse mobile device moved along chassis horizontal direction installed in steel pipe transverse traversing carriage, also comprises the steel pipe storage bracket with sloped top face that steel pipe transverse traversing carriage both sides are installed with respectively and chamfering mantle fiber tube product accepts support;
Described steel pipe transverse traversing carriage is enclosed formed by two parallel terraced facade supports, a parallel terraced support in bottom surface terraced end face support parallel with, and described parallel terraced end face support is provided with at least 14 crossbeams, described steel pipe vertically moves power set and is made up of at least 5 steel pipes longitudinal live-rollers group unit, and described steel pipe longitudinal live-rollers group unit is made up of the V-type roller group of 2 band reducing motors that the bracing frame that base, base are installed and bracing frame are installed, described steel pipe vertically moves jacking and tourelle vertically moves jacking by least 6 steel pipes and rolling unit is formed, described steel pipe vertically move jacking and rolling unit by the both sides that the bracing frame that base, base are installed and bracing frame are installed respectively successively the movable gripper shoe being installed with 2 rollers form, this gripper shoe is disposed with 4 V-shaped grooves, the both sides of 4 V-shaped grooves that 4 rollers use turning cylinder to be movably arranged on successively gripper shoe is arranged respectively, at least 6 steel pipes that described steel pipe vertically moves jacking and tourelle vertically move adjacent beams that base that jacking and rolling unit and described steel pipe vertically move at least 5 steel pipes longitudinal live-rollers group unit of power set is arranged on this parallel terraced end face support respectively successively and are projected on the side away from steel pipe storage bracket on described chassis face, this steel pipe vertically moves jacking and rolling unit is that described parallel terraced end face support adjacent beams is projected on 4/5 of lateral length on described chassis face with the lateral length of steel pipe longitudinal live-rollers group unit, the end face that the adjacent beams of the parallel terraced end face support of 2 steel pipes longitudinal live-rollers group unit inside of the steel tube chamfering mantle fiber system of processing of wherein installing near the wrong contraposition in this two ends, chassis is respectively projected on described chassis is also installed with steel pipe transverse mobile device respectively, the gripper shoes that the V-type roller group of 2 band reducing motors of described steel pipe longitudinal live-rollers group unit and this steel pipe vertically move jacking and rolling unit are arranged 4 V-shaped grooves respectively phase one_to_one corresponding be straight line, described steel pipe transverse mobile device comprises steel pipe jack-up bracket, steel pipe jack-up oil cylinder, the steel pipe jack-up axis of guide, steel pipe transverse Shift cylinder, the bottom surface of the parallel terraced support in bottom surface of described steel pipe transverse traversing carriage use at least respectively 3 steel pipe transverse shifting rollers be arranged at least 3 guide rails of corresponding horizontally set on this chassis, at least 3 steel pipe transverse Shift cylinders correspond to steel pipe transverse traversing carriage and are arranged on this chassis successively, and the lever of steel pipe transverse Shift cylinder is fixedly connected with the parallel terraced support in bottom surface of steel pipe transverse traversing carriage, described steel pipe jack-up bracket uses the steel pipe jack-up axis of guide be arranged on steel pipe transverse traversing carriage to be arranged on steel pipe transverse traversing carriage, and the lever being arranged on the steel pipe jack-up oil cylinder on steel pipe transverse traversing carriage is fixedly connected with described steel pipe jack-up bracket, the both sides of described steel pipe jack-up bracket have the part of stretching out steel pipe transverse traversing carriage, the gripper shoe that this steel pipe jack-up bracket is installed is disposed with 5 V-shaped grooves, it is consistent that the distance between two between V-shaped groove that the gripper shoe that described steel pipe jack-up bracket is installed is arranged and this steel pipe vertically move the distance between two between V-shaped groove that the gripper shoe of jacking and rolling unit is arranged, when steel pipe jack-up oil cylinder jack-up steel pipe jack-up bracket, outermost V-shaped groove that steel pipe jack-up bracket support plate is arranged can be received in steel pipe storage bracket and be arranged in an outermost steel pipe,
Described steel tube chamfering mantle fiber system of processing comprises lathe bed and is arranged on steel tube chamfering power set on lathe bed and steel pipe mantle fiber power set and steel pipe clamping device, also comprises the steel pipe positioner be arranged on respectively on front side of steel tube chamfering power set and steel pipe mantle fiber power set on lathe bed;
Described steel tube chamfering power set comprise steel tube chamfering unit head, described steel tube chamfering unit head is arranged in steel tube chamfering unit head mounting seat, the steel tube chamfering unit head be arranged in steel tube chamfering unit head mounting seat uses line slideway to be arranged on described lathe bed, and this steel tube chamfering unit head comprises rose reamer, the rose reamer extension adjustment device of installing rose reamer, motor and the transmission motor power transmission device to rose reamer;
Described steel pipe mantle fiber power set comprise the main spindle box being installed with mantle fiber screw die, main spindle box backing plate bottom main spindle box is fixed wtih the straight-line guide rail slide block that can slide on line slideway, be fixed on and the oil cylinder installing rack on lathe bed be equipped with main spindle box and advance oil cylinder, motor and decelerator are equipped with by sprocket wheel and chain drive main axis in described main spindle box top, this main spindle box are also equipped with the mantle fiber screw die folding control device that cylinder is power;
Described steel pipe clamping device comprises the well subrack be arranged on lathe bed, steel pipe clamping promotes oil cylinder, steel pipe clamping base, former and later two crossbeams of this well subrack are installed with 2 steel pipe clampings and promote oil cylinder installing rack, the facade that described 2 steel pipe clampings promote oil cylinder installing rack respectively with the axis of this steel tube chamfering power set unit head and the axis of steel pipe mantle fiber power set main shaft on 2 vertical planes, these two steel pipe clampings promote oil cylinder installing rack to be installed with respectively steel pipe clamping and promote oil cylinder, the lever that described 2 steel pipe clampings promote oil cylinder uses connector to be installed with the steel pipe briquetting that bottom surface is arc surface respectively, this bottom surface is that lathe bed that 2 steel pipe briquettings of arc surface are corresponding is also installed with steel pipe clamping base respectively, the end face of this steel pipe clamping base is be the arc surface that the steel pipe briquetting of arc surface matches with bottom surface,
Described steel pipe positioner comprises steel pipe positional cylinder and steel pipe location slide plate, in the steel pipe location slide plate mounting groove that these 2 pieces of steel pipes location slide plates use pulley to be arranged on front side of steel tube chamfering power set and steel pipe mantle fiber power set, lathe bed to be arranged respectively, the lever being arranged on 2 steel pipe positional cylinders outside these 2 steel pipes location slide plate mounting grooves on lathe bed is located slide plate with 2 steel pipes respectively and is fixedly connected with;
Described hydraulic pressure, electric apparatus control apparatus adopt PLC programme-control, adopt prior art; Described mantle fiber screw die folding control device adopts prior art.
The course of work of the present invention is:
A, in steel pipe storage bracket, arrange the steel pipe that need process;
B, steel pipe jack-up oil cylinder jack-up steel pipe jack-up bracket, steel pipe jack-up bracket receives first steel pipe to be processed near steel pipe storage bracket outermost number the 1st V groove;
The lever of C, steel pipe transverse Shift cylinder stretches out the steel pipe jack-up bracket transverse shifting promoting steel pipe transverse traversing carriage and steel pipe transverse traversing carriage are installed, the lever of steel pipe jack-up oil cylinder is retracted, steel pipe to be processed falls on the roller that gripper shoe that longitudinal live-rollers group unit outermost number the 1st the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit arranges and installs outermost number the 1st V-shaped groove side, and the lever of steel pipe transverse Shift cylinder is retracted and pulled the steel pipe jack-up bracket that steel pipe transverse traversing carriage and steel pipe transverse traversing carriage are installed to set back;
D, start steel pipe and vertically move the reducing motor of the V-type roller of the band reducing motor of power set, steel pipe to be processed vertically moves along the V-type roller of steel pipe longitudinal live-rollers group unit and steel pipe roller that in jacking and rolling unit gripper shoe, V-shaped groove side is installed and is transported to steel tube chamfering power set and completes steel tube chamfering processing;
E, steel tube chamfering machines, the reducing motor of the V-type roller with reducing motor rotates backward, complete the steel pipe counter motion of steel tube chamfering processing, receive outermost number the 2nd V-shaped groove of the steel pipe jack-up bracket of the 2nd steel pipe to be processed jack-up the steel pipe completing steel tube chamfering processing is sent into longitudinal live-rollers group unit outermost number the 2nd the V-type roller of steel pipe and steel pipe under the lever pushing of steel pipe transverse Shift cylinder and vertically move and the roller outermost number the 2nd V-shaped groove side that the gripper shoe of jacking and rolling unit is arranged installed is transported to steel pipe mantle fiber power set completes the processing of steel pipe mantle fiber again simultaneously,
F, steel pipe mantle fiber machines, the reducing motor of the V-type roller with reducing motor rotates backward again, receive simultaneously outermost number the 3rd V-shaped groove of the steel pipe jack-up bracket of the 3rd steel pipe to be processed again jack-up under the lever pushing of steel pipe transverse Shift cylinder, the steel pipe of the mantle fiber processing completing steel pipe being sent into the roller that gripper shoe that longitudinal live-rollers group unit outermost number the 3rd the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit arranges and installs outermost number the 3rd V-shaped groove side is transported to the other end chamfer machining that steel tube chamfering power set that this chassis opposite side installs complete steel pipe,
G, steel pipe other end chamfer machining complete, the reducing motor of the V-type roller with reducing motor rotates backward, complete the steel pipe counter motion of the other end chamfer machining of steel pipe, receive simultaneously outermost number the 4th V-shaped groove of the steel pipe jack-up bracket of the 4th steel pipe to be processed again jack-up under the lever pushing of steel pipe transverse Shift cylinder, the steel pipe completing the other end chamfer machining of steel pipe being sent into the roller that gripper shoe that longitudinal live-rollers group unit outermost number the 4th the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit arranges and installs outermost number the 4th V-shaped groove side is transported to the other end mantle fiber processing that steel pipe mantle fiber power set that this chassis opposite side installs complete steel pipe,
H, steel pipe other end mantle fiber machine, the reducing motor of the V-type roller with reducing motor rotates backward again, receive outermost number the 5th V-shaped groove of the steel pipe jack-up bracket of the 5th steel pipe to be processed jack-up under the lever pushing of steel pipe transverse Shift cylinder, the steel pipe completing the processing of steel pipe other end mantle fiber is sent into this chamfering mantle fiber tube product and accepted on support again, the chamfering mantle fiber at the 1st steel pipe two ends to be processed machines simultaneously; 2nd, the 3rd, the work of N root steel tube chamfering to be processed mantle fiber repeats above-mentioned conveying and chamfering mantle fiber procedure of processing.
The invention has the beneficial effects as follows: because the present invention is provided with steel pipe stepping transmission system and steel tube chamfering mantle fiber system of processing.Achieve the automatic transport of steel tube chamfering mantle fiber, the processing of steel pipe automatic chamfering mantle fiber, also reduce steel pipe and have bad luck work difficulty, reduce the operation easier of operator and labour intensity and danger, improve steel tube chamfering mantle fiber production efficiency.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described;
Fig. 1 is the combining structure schematic diagram of the steel tube chamfering mantle fiber system of processing that the wrong contraposition in steel pipe stepping transmission system of the present invention and two ends, chassis is installed;
Fig. 2 is the top view of the combining structure of the steel tube chamfering mantle fiber system of processing that the wrong contraposition in steel pipe stepping transmission system of the present invention and two ends, chassis is installed;
Fig. 3 is steel tube chamfering mantle fiber system of processing structural representation of the present invention;
Fig. 4 is steel tube chamfering mantle fiber system of processing right view of the present invention;
Fig. 5 is steel tube chamfering mantle fiber system of processing top view of the present invention;
Fig. 6 is the structural representation of steel pipe transverse mobile device of the present invention;
Fig. 7 is the structural representation of steel pipe of the present invention longitudinal live-rollers group unit;
Fig. 8 is the left view of steel pipe of the present invention longitudinal live-rollers group unit;
Fig. 9 is the top view of steel pipe of the present invention longitudinal live-rollers group unit;
In accompanying drawing: 1. chassis, 2. steel pipe transverse traversing carriage, 3. steel pipe storage bracket, 4. chamfering mantle fiber tube product accepts support, 5. parallel terraced end face support, 6. steel pipe longitudinal live-rollers group unit, 61. bases, 62. bracing frames, the V-type roller group of 63. band reducing motors, 7. steel pipe vertically moves jacking and rolling unit, 71. rollers, 72. gripper shoes, 8. steel pipe jack-up bracket, 9. steel pipe jack-up oil cylinder, 10. the steel pipe jack-up axis of guide, 11. steel pipe transverse Shift cylinders, 12. steel pipe transverse shifting rollers, 13. lathe beds, 14. chamfering unit heads, 15. rose reamers, 16. mantle fiber screw die, 17. main spindle boxes, 18. well subracks, 19. steel pipe clampings promote oil cylinder, 20. steel pipe clamping bases, 21. steel pipe clampings promote oil cylinder installing rack, 22. bottom surfaces are the steel pipe briquetting of arc surface, 23. steel pipe positional cylinders, 24. steel pipe location slide plates.
Detailed description of the invention
Below by specific embodiment, the present invention is described in further detail.
Embodiment 1
As shown in Figures 1 to 9, a kind of steel pipe automatic chamfering mantle fiber process equipment, comprise chassis 1, the end face on described chassis 1 is rectangle, it is characterized in that: the steel tube chamfering mantle fiber system of processing also comprising the wrong contraposition installation of steel pipe stepping transmission system and two ends, chassis 1 that chassis 1 is installed, also comprises electrical equipment control and hydraulic control system;
Described steel pipe stepping transmission system comprises and is installed on this One On The Chassis steel pipe transverse traversing carriage 2, the steel pipe installed in steel pipe transverse traversing carriage 2 vertically moves power set along the steel pipe that chassis 1 longitudinal direction moves and steel pipe vertically moves jacking and tourelle, the steel pipe transverse mobile device moved along chassis 1 horizontal direction installed in steel pipe transverse traversing carriage 2, also comprises the steel pipe storage bracket 3 with sloped top face that steel pipe transverse traversing carriage 1 both sides are installed with respectively and chamfering mantle fiber tube product accepts support 4;
Described steel pipe transverse traversing carriage is enclosed formed by two parallel terraced facade supports, a parallel terraced support in bottom surface terraced end face support 5 parallel with, and described parallel terraced end face support 5 is provided with 14 crossbeams, described steel pipe vertically moves power set and is made up of 5 steel pipes longitudinal live-rollers group unit 6, and described steel pipe longitudinal live-rollers group unit 6 is made up of the V-type roller group 63 of 2 band reducing motors that the bracing frame 62 that base 61, base 61 are installed and bracing frame 62 are installed, described steel pipe vertically moves jacking and tourelle vertically moves jacking by 6 steel pipes and rolling unit 7 is formed, described steel pipe vertically move jacking and rolling unit 7 by the both sides that the bracing frame that base, base are installed and bracing frame are installed respectively successively the movable gripper shoe 72 being installed with 2 rollers 71 form, this gripper shoe 72 is disposed with 4 V-shaped grooves, 4 rollers 71 use turning cylinder to be movably arranged on the both sides of 4 V-shaped grooves that gripper shoe 72 is arranged successively respectively, 6 steel pipes that described steel pipe vertically moves jacking and tourelle vertically move the side away from steel pipe storage bracket 3 on end face that adjacent beams that base that jacking and rolling unit 7 and described steel pipe vertically move 5 steel pipes longitudinal live-rollers group unit 6 of power set is arranged on this parallel terraced end face support 5 respectively is successively projected on described chassis 1, this steel pipe vertically move jacking and rolling unit 7 and the lateral length of steel pipe longitudinal live-rollers group unit 6 be described parallel terraced end face support 5 adjacent beams be projected on described chassis 1 end face on lateral length 4/5, the end face that the adjacent beams of the parallel terraced end face support 5 inside 2 steel pipes longitudinal live-rollers group unit 6 of the steel tube chamfering mantle fiber system of processing of wherein installing near the wrong contraposition in this two ends, chassis 1 is respectively projected on described chassis 1 is also installed with steel pipe transverse mobile device respectively, the gripper shoes 72 that the V-type roller group 63 of 2 band reducing motors of described steel pipe longitudinal live-rollers group unit 6 and this steel pipe vertically move jacking and rolling unit 7 are arranged 4 V-shaped grooves respectively phase one_to_one corresponding be straight line, described steel pipe transverse mobile device comprises steel pipe jack-up bracket 8, steel pipe jack-up oil cylinder 9, the steel pipe jack-up axis of guide 10, steel pipe transverse Shift cylinder 11, the bottom surface of the parallel terraced support in bottom surface of described steel pipe transverse traversing carriage 2 use respectively 3 steel pipe transverse shifting rollers 12 be arranged on 3 guide rails of corresponding horizontally set on this chassis 1,3 steel pipe transverse Shift cylinders 11 correspond to steel pipe transverse traversing carriage 2 and are arranged on this chassis 1 successively, and the lever of steel pipe transverse Shift cylinder 11 is fixedly connected with the parallel terraced support in bottom surface of steel pipe transverse traversing carriage 2, described steel pipe jack-up bracket 8 uses the steel pipe jack-up axis of guide 10 be arranged on steel pipe transverse traversing carriage 2 to be movably arranged on steel pipe transverse traversing carriage 2, and the lever being arranged on the steel pipe jack-up oil cylinder 9 on steel pipe transverse traversing carriage 2 is fixedly connected with described steel pipe jack-up bracket 8, the both sides of described steel pipe jack-up bracket 8 have the part of stretching out steel pipe transverse traversing carriage 2, the gripper shoe that this steel pipe jack-up bracket 8 is installed is disposed with 5 V-shaped grooves, it is consistent that the distance between two between V-shaped groove that the gripper shoe that described steel pipe jack-up bracket 8 is installed is arranged and this steel pipe vertically move the distance between two between V-shaped groove that the gripper shoe 72 of jacking and rolling unit 7 is arranged, when 9 the steel pipe jack-up brackets 8 in steel pipe jack-up oil cylinder top, outermost V-shaped groove that the gripper shoe that steel pipe jack-up bracket 8 is installed is arranged can be received in steel pipe storage bracket 3 and be arranged in an outermost steel pipe,
Described steel tube chamfering mantle fiber system of processing comprises lathe bed 13 and the steel tube chamfering power set that are arranged on lathe bed 13 and steel pipe mantle fiber power set and steel pipe clamping device, also comprises the steel pipe positioner be arranged on respectively on front side of steel tube chamfering power set and steel pipe mantle fiber power set on lathe bed 13;
Described steel tube chamfering power set comprise steel tube chamfering unit head 14, described steel tube chamfering unit head 14 is arranged in steel tube chamfering unit head mounting seat, the steel tube chamfering unit head 14 be arranged in steel tube chamfering unit head mounting seat uses line slideway to be arranged on described lathe bed 13, and this steel tube chamfering unit head 14 comprises rose reamer 15, the rose reamer extension adjustment device of installing rose reamer 15, motor and the transmission motor power transmission device to rose reamer 15;
Described steel pipe mantle fiber power set comprise the main spindle box 17 being installed with mantle fiber screw die 16, main spindle box backing plate bottom main spindle box 17 is fixed wtih the straight-line guide rail slide block that can slide on line slideway, be fixed on and the oil cylinder installing rack on lathe bed 13 be equipped with main spindle box and advance oil cylinder, motor and decelerator are equipped with by sprocket wheel and chain drive main axis in described main spindle box top, this main spindle box 17 are also equipped with mantle fiber screw die 16 folding control device that cylinder is power;
Described steel pipe clamping device comprises the well subrack 18 be arranged on lathe bed 13, steel pipe clamping promotes oil cylinder 19, steel pipe clamping base 20, former and later two crossbeams of this well subrack 18 are installed with 2 steel pipe clampings and promote oil cylinder installing rack 21, the facade that described 2 steel pipe clampings promote oil cylinder installing rack 21 respectively with the axis of this steel tube chamfering power set unit head 14 and the axis of steel pipe mantle fiber power set main shaft on 2 vertical planes, these two steel pipe clampings promote oil cylinder installing rack 21 to be installed with respectively steel pipe clamping and promote oil cylinder 19, the lever that described 2 steel pipe clampings promote oil cylinder 19 uses connector to be installed with the steel pipe briquetting 22 that bottom surface is arc surface respectively, this bottom surface be 2 steel pipe briquetting 22 correspondences of arc surface lathe bed 13 on also steel pipe clamping base 20 is installed respectively, the end face of this steel pipe clamping base 20 is be the arc surface that the steel pipe briquetting 22 of arc surface matches with bottom surface.
The using method of described a kind of steel pipe automatic chamfering mantle fiber process equipment, is characterized in that: comprise the steps:
A, in steel pipe storage bracket 3, arrange the steel pipe that need process;
B, steel pipe jack-up oil cylinder 9 jack-up steel pipe jack-up bracket 8, steel pipe jack-up bracket 8 receives first steel pipe to be processed near steel pipe storage bracket 3 outermost number the 1st V groove;
C, the lever of steel pipe transverse Shift cylinder 11 stretches out steel pipe jack-up bracket 8 transverse shifting promoting steel pipe transverse traversing carriage 2 and steel pipe transverse traversing carriage 2 are installed, the lever of steel pipe jack-up oil cylinder 9 is retracted, steel pipe to be processed falls into longitudinal live-rollers group unit 6 outermost number the 1st the V-type roller of steel pipe and steel pipe vertically moves on the roller 71 of outermost number the 1st the V-shaped groove side installation that the gripper shoe 72 of jacking and rolling unit 7 is arranged, the lever of steel pipe transverse Shift cylinder 11 is retracted and is pulled the steel pipe jack-up bracket 8 that steel pipe transverse traversing carriage 2 and steel pipe transverse traversing carriage 2 are installed to set back,
D, start steel pipe and vertically move the reducing motor of the V-type roller of power set band reducing motor, steel pipe to be processed vertically moves along the V-type roller of steel pipe longitudinal live-rollers group unit 6 and steel pipe roller 71 that in jacking and rolling unit 7 gripper shoe 72, V-shaped groove side is installed and is transported to steel tube chamfering power set and completes steel tube chamfering processing;
E, steel tube chamfering machines, the reducing motor of the V-type roller with reducing motor rotates backward, complete the steel pipe counter motion of steel tube chamfering processing, receive outermost number the 2nd V-shaped groove of the steel pipe jack-up bracket 8 of the 2nd steel pipe to be processed jack-up the steel pipe completing steel tube chamfering processing is sent into longitudinal live-rollers group unit 6 outermost number the 2nd the V-type roller of steel pipe and steel pipe under the lever pushing of steel pipe transverse Shift cylinder 11 and vertically move and the roller 71 outermost number the 2nd V-shaped groove side that the gripper shoe 72 of jacking and rolling unit 7 is arranged installed is transported to steel pipe mantle fiber power set completes the processing of steel pipe mantle fiber again simultaneously,
F, steel pipe mantle fiber machines, the reducing motor of the V-type roller with reducing motor rotates backward again, receive simultaneously outermost number the 3rd V-shaped groove of the steel pipe jack-up bracket 8 of the 3rd steel pipe to be processed again jack-up under the lever pushing of steel pipe transverse Shift cylinder 11, the steel pipe of the mantle fiber processing completing steel pipe being sent into the roller 71 that gripper shoe 72 that longitudinal live-rollers group unit 6 outermost number the 3rd the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit 7 arranges and installs outermost number the 3rd V-shaped groove side is transported to the other end chamfer machining that steel tube chamfering power set that this chassis opposite side installs complete steel pipe,
G, steel pipe other end chamfer machining complete, the reducing motor of the V-type roller with reducing motor rotates backward, complete the steel pipe counter motion of the other end chamfer machining of steel pipe, receive simultaneously outermost number the 4th V-shaped groove of the steel pipe jack-up bracket 8 of the 4th steel pipe to be processed again jack-up under the lever pushing of steel pipe transverse Shift cylinder 11, the steel pipe completing the other end chamfer machining of steel pipe being sent into the roller 71 that gripper shoe 72 that longitudinal live-rollers group unit 6 outermost number the 4th the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit 7 arranges and installs outermost number the 4th V-shaped groove side is transported to the other end mantle fiber processing that steel pipe mantle fiber power set that this chassis opposite side installs complete steel pipe,
H, steel pipe other end mantle fiber machine, the reducing motor of the V-type roller with reducing motor rotates backward again, receive outermost number the 5th V-shaped groove of the steel pipe jack-up bracket 8 of the 5th steel pipe to be processed jack-up under the lever pushing of steel pipe transverse Shift cylinder 11, the steel pipe completing the processing of steel pipe other end mantle fiber is sent into this chamfering mantle fiber tube product and accepted on support 4 again, the chamfering mantle fiber at the 1st steel pipe two ends to be processed machines simultaneously; 2nd, the 3rd, the work of N root steel tube chamfering to be processed mantle fiber repeats above-mentioned conveying and chamfering mantle fiber procedure of processing.
Embodiment 2
As shown in Figures 1 to 9, a kind of steel pipe automatic chamfering mantle fiber process equipment, comprise chassis 1, the end face on described chassis 1 is rectangle, it is characterized in that: the steel tube chamfering mantle fiber system of processing also comprising the wrong contraposition installation of steel pipe stepping transmission system and two ends, chassis 1 that chassis 1 is installed, also comprises electrical equipment control and hydraulic control system;
Described steel pipe stepping transmission system comprises and is installed on this One On The Chassis steel pipe transverse traversing carriage 2, the steel pipe installed in steel pipe transverse traversing carriage 2 vertically moves power set along the steel pipe that chassis 1 longitudinal direction moves and steel pipe vertically moves jacking and tourelle, the steel pipe transverse mobile device moved along chassis 1 horizontal direction installed in steel pipe transverse traversing carriage 2, also comprises the steel pipe storage bracket 3 with sloped top face that steel pipe transverse traversing carriage 1 both sides are installed with respectively and chamfering mantle fiber tube product accepts support 4;
Described steel pipe transverse traversing carriage is enclosed formed by two parallel terraced facade supports, a parallel terraced support in bottom surface terraced end face support 5 parallel with, and described parallel terraced end face support 5 is provided with 14 crossbeams, described steel pipe vertically moves power set and is made up of 5 steel pipes longitudinal live-rollers group unit 6, and described steel pipe longitudinal live-rollers group unit 6 is made up of the V-type roller group 63 of 2 band reducing motors that the bracing frame 62 that base 61, base 61 are installed and bracing frame 62 are installed, described steel pipe vertically moves jacking and tourelle vertically moves jacking by 6 steel pipes and rolling unit 7 is formed, described steel pipe vertically move jacking and rolling unit 7 by the both sides that the bracing frame that base, base are installed and bracing frame are installed respectively successively the movable gripper shoe 72 being installed with 2 rollers 71 form, this gripper shoe 72 is disposed with 4 V-shaped grooves, 4 rollers 71 use turning cylinder to be movably arranged on the both sides of 4 V-shaped grooves that gripper shoe 72 is arranged successively respectively, 6 steel pipes that described steel pipe vertically moves jacking and tourelle vertically move adjacent beams that base that jacking and rolling unit 7 and described steel pipe vertically move 5 steel pipes longitudinal live-rollers group unit 6 of power set is arranged on this parallel terraced end face support 5 respectively successively and are projected on side away from steel pipe storage bracket 3 on the end face of described chassis 1, this steel pipe vertically move jacking and rolling unit 7 and the lateral length of steel pipe longitudinal live-rollers group unit 6 be described parallel terraced end face support 5 adjacent beams be projected on described chassis 1 end face on lateral length 4/5, the end face that the adjacent beams of the parallel terraced end face support 5 inside 2 steel pipes longitudinal live-rollers group unit 6 of the steel tube chamfering mantle fiber system of processing of wherein installing near the wrong contraposition in this two ends, chassis 1 is respectively projected on described chassis 1 is also installed with steel pipe transverse mobile device respectively, the gripper shoes 72 that the V-type roller group 63 of 2 band reducing motors of described steel pipe longitudinal live-rollers group unit 6 and this steel pipe vertically move jacking and rolling unit 7 are arranged 4 V-shaped grooves respectively phase one_to_one corresponding be straight line, described steel pipe transverse mobile device comprises steel pipe jack-up bracket 8, steel pipe jack-up oil cylinder 9, the steel pipe jack-up axis of guide 10, steel pipe transverse Shift cylinder 11, the bottom surface of the parallel terraced support in bottom surface of described steel pipe transverse traversing carriage 2 use respectively 3 steel pipe transverse shifting rollers 12 be arranged on 3 guide rails of corresponding horizontally set on this chassis 1,3 steel pipe transverse Shift cylinders 11 correspond to steel pipe transverse traversing carriage 2 and are arranged on this chassis 1 successively, and the lever of steel pipe transverse Shift cylinder 11 is fixedly connected with the parallel terraced support in bottom surface of steel pipe transverse traversing carriage 2, described steel pipe jack-up bracket 8 uses the steel pipe jack-up axis of guide 10 be arranged on steel pipe transverse traversing carriage 2 to be movably arranged on steel pipe transverse traversing carriage 2, and the lever being arranged on the steel pipe jack-up oil cylinder 9 on steel pipe transverse traversing carriage 2 is fixedly connected with described steel pipe jack-up bracket 8, the both sides of described steel pipe jack-up bracket 8 have the part of stretching out steel pipe transverse traversing carriage 2, the gripper shoe that this steel pipe jack-up bracket 8 is installed is disposed with 5 V-shaped grooves, it is consistent that the distance between two between V-shaped groove that the gripper shoe that described steel pipe jack-up bracket 8 is installed is arranged and this steel pipe vertically move the distance between two between V-shaped groove that the gripper shoe 72 of jacking and rolling unit 7 is arranged, when 9 the steel pipe jack-up brackets 8 in steel pipe jack-up oil cylinder top, outermost V-shaped groove that the gripper shoe that steel pipe jack-up bracket 8 is installed is arranged can be received in steel pipe storage bracket 3 and be arranged in an outermost steel pipe,
Described steel tube chamfering mantle fiber system of processing comprises lathe bed 13 and the steel tube chamfering power set that are arranged on lathe bed 13 and steel pipe mantle fiber power set and steel pipe clamping device, also comprises the steel pipe positioner be arranged on respectively on front side of steel tube chamfering power set and steel pipe mantle fiber power set on lathe bed 13;
Described steel tube chamfering power set comprise steel tube chamfering unit head 14, described steel tube chamfering unit head 14 is arranged in steel tube chamfering unit head mounting seat, the steel tube chamfering unit head 14 be arranged in steel tube chamfering unit head mounting seat uses line slideway to be arranged on described lathe bed 13, and this steel tube chamfering unit head 14 comprises rose reamer 15, the rose reamer extension adjustment device of installing rose reamer 15, motor and the transmission motor power transmission device to rose reamer 15;
Described steel pipe mantle fiber power set comprise the main spindle box 17 being installed with mantle fiber screw die 16, main spindle box backing plate bottom main spindle box 17 is fixed wtih the straight-line guide rail slide block that can slide on line slideway, be fixed on and the oil cylinder installing rack on lathe bed 13 be equipped with main spindle box and advance oil cylinder, motor and decelerator are equipped with by sprocket wheel and chain drive main axis in described main spindle box top, this main spindle box 17 are also equipped with mantle fiber screw die 16 folding control device that cylinder is power;
Described steel pipe clamping device comprises the well subrack 18 be arranged on lathe bed 13, steel pipe clamping promotes oil cylinder 19, steel pipe clamping base 20, former and later two crossbeams of this well subrack 18 are installed with 2 steel pipe clampings and promote oil cylinder installing rack 21, the facade that described 2 steel pipe clampings promote oil cylinder installing rack 21 respectively with the axis of this steel tube chamfering power set unit head 14 and the axis of steel pipe mantle fiber power set main shaft on 2 vertical planes, these two steel pipe clampings promote oil cylinder installing rack 21 to be installed with respectively steel pipe clamping and promote oil cylinder 19, the lever that described 2 steel pipe clampings promote oil cylinder 19 uses connector to be installed with the steel pipe briquetting 22 that bottom surface is arc surface respectively, this bottom surface be 2 steel pipe briquetting 22 correspondences of arc surface lathe bed 13 on also steel pipe clamping base 20 is installed respectively, the end face of this steel pipe clamping base 20 is be the arc surface that the steel pipe briquetting 22 of arc surface matches with bottom surface,
Described steel pipe positioner comprises steel pipe positional cylinder 23 and steel pipe location slide plate 24, in the steel pipe location slide plate mounting groove that these 2 pieces of steel pipes location slide plates 24 use pulley to be arranged on front side of steel tube chamfering power set and steel pipe mantle fiber power set, lathe bed 13 to be arranged respectively, the lever being arranged on 2 steel pipe positional cylinders 23 that these 2 steel pipes are located outside slide plate mounting grooves on lathe bed 13 is located slide plate 24 with 2 steel pipes respectively and is fixedly connected with.
The using method of described a kind of steel pipe automatic chamfering mantle fiber process equipment, is characterized in that: comprise the steps:
A, in steel pipe storage bracket 3, arrange the steel pipe that need process;
B, steel pipe jack-up oil cylinder 9 jack-up steel pipe jack-up bracket 8, steel pipe jack-up bracket 8 receives first steel pipe to be processed near steel pipe storage bracket 3 outermost number the 1st V groove;
C, the lever of steel pipe transverse Shift cylinder 11 stretches out steel pipe jack-up bracket 8 transverse shifting promoting steel pipe transverse traversing carriage 2 and steel pipe transverse traversing carriage 2 are installed, the lever of steel pipe jack-up oil cylinder 9 is retracted, steel pipe to be processed falls into longitudinal live-rollers group unit 6 outermost number the 1st the V-type roller of steel pipe and steel pipe vertically moves on the roller 71 of outermost number the 1st the V-shaped groove side installation that the gripper shoe 72 of jacking and rolling unit 7 is arranged, the lever of steel pipe transverse Shift cylinder 11 is retracted and is pulled the steel pipe jack-up bracket 8 that steel pipe transverse traversing carriage 2 and steel pipe transverse traversing carriage 2 are installed to set back,
D, start steel pipe and vertically move the reducing motor of the V-type roller of power set band reducing motor, steel pipe to be processed vertically moves along the V-type roller of steel pipe longitudinal live-rollers group unit 6 and steel pipe roller 71 that in jacking and rolling unit 7 gripper shoe 72, V-shaped groove side is installed and is transported to steel tube chamfering power set and completes steel tube chamfering processing;
E, steel tube chamfering machines, the reducing motor of the V-type roller with reducing motor rotates backward, complete the steel pipe counter motion of steel tube chamfering processing, receive outermost number the 2nd V-shaped groove of the steel pipe jack-up bracket 8 of the 2nd steel pipe to be processed jack-up the steel pipe completing steel tube chamfering processing is sent into longitudinal live-rollers group unit 6 outermost number the 2nd the V-type roller of steel pipe and steel pipe under the lever pushing of steel pipe transverse Shift cylinder 11 and vertically move and the roller 71 outermost number the 2nd V-shaped groove side that the gripper shoe 72 of jacking and rolling unit 7 is arranged installed is transported to steel pipe mantle fiber power set completes the processing of steel pipe mantle fiber again simultaneously,
F, steel pipe mantle fiber machines, the reducing motor of the V-type roller with reducing motor rotates backward again, receive simultaneously outermost number the 3rd V-shaped groove of the steel pipe jack-up bracket 8 of the 3rd steel pipe to be processed again jack-up under the lever pushing of steel pipe transverse Shift cylinder 11, the steel pipe of the mantle fiber processing completing steel pipe being sent into the roller 71 that gripper shoe 72 that longitudinal live-rollers group unit 6 outermost number the 3rd the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit 7 arranges and installs outermost number the 3rd V-shaped groove side is transported to the other end chamfer machining that steel tube chamfering power set that this chassis opposite side installs complete steel pipe,
G, steel pipe other end chamfer machining complete, the reducing motor of the V-type roller with reducing motor rotates backward, complete the steel pipe counter motion of the other end chamfer machining of steel pipe, receive simultaneously outermost number the 4th V-shaped groove of the steel pipe jack-up bracket 8 of the 4th steel pipe to be processed again jack-up under the lever pushing of steel pipe transverse Shift cylinder 11, the steel pipe completing the other end chamfer machining of steel pipe being sent into the roller 71 that gripper shoe 72 that longitudinal live-rollers group unit 6 outermost number the 4th the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit 7 arranges and installs outermost number the 4th V-shaped groove side is transported to the other end mantle fiber processing that steel pipe mantle fiber power set that this chassis opposite side installs complete steel pipe,
H, steel pipe other end mantle fiber machine, the reducing motor of the V-type roller with reducing motor rotates backward again, receive outermost number the 5th V-shaped groove of the steel pipe jack-up bracket 8 of the 5th steel pipe to be processed jack-up under the lever pushing of steel pipe transverse Shift cylinder 11, the steel pipe completing the processing of steel pipe other end mantle fiber is sent into this chamfering mantle fiber tube product and accepted on support 4 again, the chamfering mantle fiber at the 1st steel pipe two ends to be processed machines simultaneously; 2nd, the 3rd, the work of N root steel tube chamfering to be processed mantle fiber repeats above-mentioned conveying and chamfering mantle fiber procedure of processing.
By above-mentioned description, those skilled in the art in the scope not departing from this invention technological thought, can carry out various change and revise within protection scope of the present invention completely.Unaccomplished matter of the present invention, belongs to the common practise of those skilled in the art.

Claims (3)

1. a steel pipe automatic chamfering mantle fiber process equipment, comprise chassis, the end face on described chassis is rectangle, it is characterized in that: the steel tube chamfering mantle fiber system of processing also comprising the wrong contraposition installation of steel pipe stepping transmission system and two ends, chassis that chassis is installed, also comprises electrical equipment control and hydraulic control system;
Described steel pipe stepping transmission system comprises the steel pipe transverse traversing carriage be installed on this chassis, the steel pipe installed in steel pipe transverse traversing carriage vertically moves power set along the steel pipe that chassis longitudinal direction moves and steel pipe vertically moves jacking and tourelle, the steel pipe transverse mobile device moved along chassis horizontal direction installed in steel pipe transverse traversing carriage, also comprises the steel pipe storage bracket with sloped top face that steel pipe transverse traversing carriage both sides are installed with respectively and chamfering mantle fiber tube product accepts support;
Described steel pipe transverse traversing carriage is enclosed formed by two parallel terraced facade supports, a parallel terraced support in bottom surface terraced end face support parallel with, and described parallel terraced end face support is provided with at least 14 crossbeams, described steel pipe vertically moves power set and is made up of at least 5 steel pipes longitudinal live-rollers group unit, and described steel pipe longitudinal live-rollers group unit is made up of the V-type roller group of 2 band reducing motors that the bracing frame that base, base are installed and bracing frame are installed, described steel pipe vertically moves jacking and tourelle vertically moves jacking by least 6 steel pipes and rolling unit is formed, described steel pipe vertically move jacking and rolling unit by the both sides that the bracing frame that base, base are installed and bracing frame are installed respectively successively the movable gripper shoe being installed with 2 rollers form, this gripper shoe is disposed with 4 V-shaped grooves, the both sides of 4 V-shaped grooves that 4 rollers use turning cylinder to be movably arranged on successively gripper shoe is arranged respectively, at least 6 steel pipes that described steel pipe vertically moves jacking and tourelle vertically move adjacent beams that base that jacking and rolling unit and described steel pipe vertically move at least 5 steel pipes longitudinal live-rollers group unit of power set is arranged on this parallel terraced end face support respectively successively and are projected on side away from steel pipe storage bracket on described chassis face, this steel pipe vertically moves jacking and rolling unit is that described parallel terraced end face support adjacent beams is projected on 4/5 of lateral length on described chassis face with the lateral length of steel pipe longitudinal live-rollers group unit, the end face that the adjacent beams of the parallel terraced end face support of 2 steel pipes longitudinal live-rollers group unit inside of the steel tube chamfering mantle fiber system of processing of wherein installing near the wrong contraposition in this two ends, chassis is respectively projected on described chassis is also installed with steel pipe transverse mobile device respectively, the gripper shoes that the V-type roller group of 2 band reducing motors of described steel pipe longitudinal live-rollers group unit and this steel pipe vertically move jacking and rolling unit are arranged 4 V-shaped grooves respectively phase one_to_one corresponding be straight line, described steel pipe transverse mobile device comprises steel pipe jack-up bracket, steel pipe jack-up oil cylinder, the steel pipe jack-up axis of guide, steel pipe transverse Shift cylinder, the bottom surface of the parallel terraced support in bottom surface of described steel pipe transverse traversing carriage use at least respectively 3 steel pipe transverse shifting rollers be arranged at least 3 guide rails of corresponding horizontally set on this chassis, at least 3 steel pipe transverse Shift cylinders correspond to steel pipe transverse traversing carriage and are arranged on this chassis successively, and the lever of steel pipe transverse Shift cylinder is fixedly connected with the parallel terraced support in bottom surface of steel pipe transverse traversing carriage, described steel pipe jack-up bracket uses the steel pipe jack-up axis of guide be arranged on steel pipe transverse traversing carriage to be arranged on steel pipe transverse traversing carriage, and the lever being arranged on the steel pipe jack-up oil cylinder on steel pipe transverse traversing carriage is fixedly connected with described steel pipe jack-up bracket, the both sides of described steel pipe jack-up bracket have the part of stretching out steel pipe transverse traversing carriage, the gripper shoe that this steel pipe jack-up bracket is installed is disposed with 5 V-shaped grooves, it is consistent that the distance between two between V-shaped groove that the gripper shoe that described steel pipe jack-up bracket is installed is arranged and this steel pipe vertically move the distance between two between V-shaped groove that the gripper shoe of jacking and rolling unit is arranged, when steel pipe jack-up oil cylinder jack-up steel pipe jack-up bracket, outermost V-shaped groove that steel pipe jack-up bracket support plate is arranged can be received in steel pipe storage bracket and be arranged in an outermost steel pipe,
Described steel tube chamfering mantle fiber system of processing comprises lathe bed and is arranged on steel tube chamfering power set on lathe bed and steel pipe mantle fiber power set and steel pipe clamping device, also comprises the steel pipe positioner be arranged on respectively on front side of steel tube chamfering power set and steel pipe mantle fiber power set on lathe bed;
Described steel tube chamfering power set comprise steel tube chamfering unit head, described steel tube chamfering unit head is arranged in steel tube chamfering unit head mounting seat, the steel tube chamfering unit head be arranged in steel tube chamfering unit head mounting seat uses line slideway to be arranged on described lathe bed, and this steel tube chamfering unit head comprises rose reamer, the rose reamer extension adjustment device of installing rose reamer, motor and the transmission motor power transmission device to rose reamer;
Described steel pipe mantle fiber power set comprise the main spindle box being installed with mantle fiber screw die, main spindle box backing plate bottom main spindle box is fixed wtih the straight-line guide rail slide block that can slide on line slideway, be fixed on and the oil cylinder installing rack on lathe bed be equipped with main spindle box and advance oil cylinder, motor and decelerator are equipped with by sprocket wheel and chain drive main axis in described main spindle box top, this main spindle box are also equipped with the mantle fiber screw die folding control device that cylinder is power;
Described steel pipe clamping device comprises the well subrack be arranged on lathe bed, steel pipe clamping promotes oil cylinder, steel pipe clamping base, former and later two crossbeams of this well subrack are installed with 2 steel pipe clampings and promote oil cylinder installing rack, the facade that described 2 steel pipe clampings promote oil cylinder installing rack respectively with the axis of this steel tube chamfering power set unit head and the axis of steel pipe mantle fiber power set main shaft on 2 vertical planes, these two steel pipe clampings promote oil cylinder installing rack to be installed with respectively steel pipe clamping and promote oil cylinder, the lever that described 2 steel pipe clampings promote oil cylinder uses connector to be installed with the steel pipe briquetting that bottom surface is arc surface respectively, this bottom surface is that lathe bed that 2 steel pipe briquettings of arc surface are corresponding is also installed with steel pipe clamping base respectively, the end face of this steel pipe clamping base is be the arc surface that the steel pipe briquetting of arc surface matches with bottom surface.
2. a kind of steel pipe automatic chamfering mantle fiber process equipment according to claim 1, it is characterized in that: described steel pipe positioner comprises steel pipe positional cylinder and steel pipe location slide plate, in the steel pipe location slide plate mounting groove that these 2 pieces of steel pipes location slide plates use pulley to be arranged on front side of steel tube chamfering power set and steel pipe mantle fiber power set, lathe bed to be arranged respectively, the lever being arranged on 2 steel pipe positional cylinders outside these 2 steel pipes location slide plate mounting grooves on lathe bed is located slide plate with 2 steel pipes respectively and is fixedly connected with.
3. the using method of a kind of steel pipe automatic chamfering mantle fiber process equipment as claimed in claim 1 or 2, is characterized in that: comprise the steps:
A, in steel pipe storage bracket, arrange the steel pipe that need process;
B, steel pipe jack-up oil cylinder jack-up steel pipe jack-up bracket, steel pipe jack-up bracket receives first steel pipe to be processed near steel pipe storage bracket outermost number the 1st V groove;
The lever of C, steel pipe transverse Shift cylinder stretches out the steel pipe jack-up bracket transverse shifting promoting steel pipe transverse traversing carriage and steel pipe transverse traversing carriage are installed, the lever of steel pipe jack-up oil cylinder is retracted, steel pipe to be processed falls on the roller that gripper shoe that longitudinal live-rollers group unit outermost number the 1st the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit arranges and installs outermost number the 1st V-shaped groove side, and the lever of steel pipe transverse Shift cylinder is retracted and pulled the steel pipe jack-up bracket that steel pipe transverse traversing carriage and steel pipe transverse traversing carriage are installed to set back;
D, start steel pipe and vertically move the reducing motor of the V-type roller of the band reducing motor of power set, steel pipe to be processed vertically moves along the V-type roller of steel pipe longitudinal live-rollers group unit and steel pipe roller that in jacking and rolling unit gripper shoe, V-shaped groove side is installed and is transported to steel tube chamfering power set and completes steel tube chamfering processing;
E, steel tube chamfering machines, the reducing motor of the V-type roller with reducing motor rotates backward, complete the steel pipe counter motion of steel tube chamfering processing, receive outermost number the 2nd V-shaped groove of the steel pipe jack-up bracket of the 2nd steel pipe to be processed jack-up the steel pipe completing steel tube chamfering processing is sent into longitudinal live-rollers group unit outermost number the 2nd the V-type roller of steel pipe and steel pipe under the lever pushing of steel pipe transverse Shift cylinder and vertically move and the roller outermost number the 2nd V-shaped groove side that the gripper shoe of jacking and rolling unit is arranged installed is transported to steel pipe mantle fiber power set completes the processing of steel pipe mantle fiber again simultaneously,
F, steel pipe mantle fiber machines, the reducing motor of the V-type roller with reducing motor rotates backward again, receive simultaneously outermost number the 3rd V-shaped groove of the steel pipe jack-up bracket of the 3rd steel pipe to be processed again jack-up under the lever pushing of steel pipe transverse Shift cylinder, the steel pipe of the mantle fiber processing completing steel pipe being sent into the roller that gripper shoe that longitudinal live-rollers group unit outermost number the 3rd the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit arranges and installs outermost number the 3rd V-shaped groove side is transported to the other end chamfer machining that steel tube chamfering power set that this chassis opposite side installs complete steel pipe,
G, steel pipe other end chamfer machining complete, the reducing motor of the V-type roller with reducing motor rotates backward, complete the steel pipe counter motion of the other end chamfer machining of steel pipe, receive simultaneously outermost number the 4th V-shaped groove of the steel pipe jack-up bracket of the 4th steel pipe to be processed again jack-up under the lever pushing of steel pipe transverse Shift cylinder, the steel pipe completing the other end chamfer machining of steel pipe being sent into the roller that gripper shoe that longitudinal live-rollers group unit outermost number the 4th the V-type roller of steel pipe and steel pipe vertically move jacking and rolling unit arranges and installs outermost number the 4th V-shaped groove side is transported to the other end mantle fiber processing that steel pipe mantle fiber power set that this chassis opposite side installs complete steel pipe,
H, steel pipe other end mantle fiber machine, the reducing motor of the V-type roller with reducing motor rotates backward again, receive outermost number the 5th V-shaped groove of the steel pipe jack-up bracket of the 5th steel pipe to be processed jack-up under the lever pushing of steel pipe transverse Shift cylinder, the steel pipe completing the processing of steel pipe other end mantle fiber is sent into this chamfering mantle fiber tube product and accepted on support again, the chamfering mantle fiber at the 1st steel pipe two ends to be processed machines simultaneously; 2nd, the 3rd, the work of N root steel tube chamfering to be processed mantle fiber repeats above-mentioned conveying and chamfering mantle fiber procedure of processing.
CN201610055418.1A 2016-01-27 2016-01-27 A kind of steel pipe automatic chamfering mantle fiber process equipment and its application method Active CN105563135B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610055418.1A CN105563135B (en) 2016-01-27 2016-01-27 A kind of steel pipe automatic chamfering mantle fiber process equipment and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610055418.1A CN105563135B (en) 2016-01-27 2016-01-27 A kind of steel pipe automatic chamfering mantle fiber process equipment and its application method

Publications (2)

Publication Number Publication Date
CN105563135A true CN105563135A (en) 2016-05-11
CN105563135B CN105563135B (en) 2017-07-25

Family

ID=55874051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610055418.1A Active CN105563135B (en) 2016-01-27 2016-01-27 A kind of steel pipe automatic chamfering mantle fiber process equipment and its application method

Country Status (1)

Country Link
CN (1) CN105563135B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106002400A (en) * 2016-06-23 2016-10-12 沈富强 Circular tube placing and fixing mechanism
CN106475843A (en) * 2016-12-23 2017-03-08 济南迈科管道科技股份有限公司 A kind of coupling mantle fiber chamfering automatic charging device
CN110711884A (en) * 2019-09-26 2020-01-21 宝钢特钢韶关有限公司 Bar chamfering mechanism and chamfering method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201483237U (en) * 2009-09-07 2010-05-26 旭东机械(昆山)有限公司 Automatic machining machine for pipe fitting
CN201483234U (en) * 2009-08-31 2010-05-26 庄添财 Reaming chamfering machine
KR20140061207A (en) * 2013-05-08 2014-05-21 효준정밀(주) Segment roll manufacturing apparatus
CN105252276A (en) * 2015-11-17 2016-01-20 山东华民钢球股份有限公司 Automatic chamfering mechanism of steel milled rod
CN205520457U (en) * 2016-01-27 2016-08-31 济南迈克管道科技股份有限公司 Automatic silk of falling corner suite processing equipment of steel pipe

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201483234U (en) * 2009-08-31 2010-05-26 庄添财 Reaming chamfering machine
CN201483237U (en) * 2009-09-07 2010-05-26 旭东机械(昆山)有限公司 Automatic machining machine for pipe fitting
KR20140061207A (en) * 2013-05-08 2014-05-21 효준정밀(주) Segment roll manufacturing apparatus
CN105252276A (en) * 2015-11-17 2016-01-20 山东华民钢球股份有限公司 Automatic chamfering mechanism of steel milled rod
CN205520457U (en) * 2016-01-27 2016-08-31 济南迈克管道科技股份有限公司 Automatic silk of falling corner suite processing equipment of steel pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106002400A (en) * 2016-06-23 2016-10-12 沈富强 Circular tube placing and fixing mechanism
CN106475843A (en) * 2016-12-23 2017-03-08 济南迈科管道科技股份有限公司 A kind of coupling mantle fiber chamfering automatic charging device
CN110711884A (en) * 2019-09-26 2020-01-21 宝钢特钢韶关有限公司 Bar chamfering mechanism and chamfering method

Also Published As

Publication number Publication date
CN105563135B (en) 2017-07-25

Similar Documents

Publication Publication Date Title
CN103394916B (en) Adopt uncoiling blanking production equipment and the processing method of laser cutting technique
CN105537347A (en) Automatic groove pressing equipment for steel pipes
CN205519135U (en) Automatic indent processing equipment of steel pipe
CN103786024B (en) Full-automatic advertisement and identifier bender
CN105563135A (en) Automatic steel pipe chamfering mantle fiber machining equipment
CN104128736A (en) Longitudinal seam welding machine suitable for thin-wall small-diameter suspended single-face welding and double-face forming
CN105479182A (en) Forming equipment for hairpin pipes and operation method thereof
CN103612012A (en) Engineering machine differential housing surfacing welding machine
CN107584357A (en) A kind of pipe fitting pipe orifice deburring device
CN207205431U (en) A kind of rod iron cutter device
CN205520457U (en) Automatic silk of falling corner suite processing equipment of steel pipe
CN105397498A (en) Indoor flower stand processing and production line
CN105880846A (en) Continuous laser cutting machine for long pipe
CN104907361A (en) Straightening machine and roller replacing device thereof
CN210378598U (en) Roll-in forming machine for cable production
CN103302540A (en) Multifunctional and full-automatic steel pipe transfer operation machine
CN104226845A (en) Automation distribution equipment and control method thereof
CN203696241U (en) Build-up welding machine for differential housing of engineering machine
CN206795054U (en) Laser cutting machine mobile work platform
CN216576259U (en) Welding gun conveying device of double-gun automatic welding machine
CN102198463A (en) Double flanging machine
CN206296723U (en) A kind of steel pipe transfer device
CN105537299A (en) Automatic cycle type copper bar wiredrawing machine
CN217045250U (en) Fixed and rotary integrated pipe fitting welding platform
CN110756882A (en) Automatic cutting and blanking equipment for long pipe of steel pipe joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 250400 Pingyin Industrial Park, Shandong Province rose area

Applicant after: JINAN MAIKE PIPELINE TECHNOLOGY CO.,LTD.

Address before: 250400 Pingyin Industrial Park, Shandong Province rose area

Applicant before: JINAN MIKE PIPELINE TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 250400 Rose Block of Pingyin Industrial Park, Jinan City, Shandong Province

Patentee after: Jinan Maike Pipeline Technology Co.,Ltd.

Address before: 250400 Rose Block of Pingyin Industrial Park, Jinan City, Shandong Province

Patentee before: JINAN MAIKE PIPELINE TECHNOLOGY CO.,LTD.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An automatic chamfering and threading equipment for steel pipes and its use method

Effective date of registration: 20230202

Granted publication date: 20170725

Pledgee: Shandong Pingyin Rural Commercial Bank Co.,Ltd.

Pledgor: Jinan Maike Pipeline Technology Co.,Ltd.

Registration number: Y2023980031971

PE01 Entry into force of the registration of the contract for pledge of patent right