CN105544993B CN201510945232.9A CN201510945232A CN105544993B CN 105544993 B CN105544993 B CN 105544993B CN 201510945232 A CN201510945232 A CN 201510945232A CN 105544993 B CN105544993 B CN 105544993B
Authority
CN
China
Prior art keywords
slide rail
carrier
line slide
cell board
pallet fork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510945232.9A
Other languages
Chinese (zh)
Other versions
CN105544993A (en
Inventor
费文桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jiaze Construction Co Ltd
Original Assignee
Jiangsu Jiaze Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jiaze Construction Co Ltd filed Critical Jiangsu Jiaze Construction Co Ltd
Priority to CN201510945232.9A priority Critical patent/CN105544993B/en
Publication of CN105544993A publication Critical patent/CN105544993A/en
Application granted granted Critical
Publication of CN105544993B publication Critical patent/CN105544993B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Abstract

A kind of construction method and carrier, by installing line slide rail and sliding mat piece additional on carrier, existing operating personnel are substituted to assist the operating process of cell board in, cell board is extremely tilted again into vertical transient process by horizontal, persistently by line slide rail and the support force of sliding mat piece, avoid the operating risk that operating personnel come too close to lifting layer marginal belt, it slow down pendular movement caused by traditional hoisting process operating personnel's abrupt release simultaneously, make cell board hoisting process stable, it is convenient and reliable.

Description

Construction method
Technical field
The present invention relates to a kind of construction method, more particularly to a kind of construction method of type unitized curtain wall installation.
Background technology
Type unitized curtain wall, refer to complete curtain wall construction is made in factory with scaffold by various shingle nails substantially single Position.As building is increasingly toward high-rise development, type unitized curtain wall is produced in batches with its factory's centralization and the convenience of installation, More and more applied.
In the prior art, outside floor the construction method of installation unit formula curtain wall as shown in Figures 1 to 4, by cell board b1 heaps The safety zone of job site is placed on, now ground is lifting layer b2, and cell board b1 is transported into lifting place by fork truck, and It is erected on support b21, it is in skewed, the mounting hanger b31 outside suspender layer b3 flooring of top upward to make it, will be from suspender The lifting rope b32 that b31 stretches out is fixedly connected on the connection hangers at the top of cell board b1, two drift angles difference of cell board b1 bottoms An anticollision stream rope b22 is respectively fixedly connected with, lifting starts, and suspender b31 is by lifting rope b32 pull-up unit plates b1 top, now Two bit manipulation personnel while two works of anticollision stream rope b22, cell board b1 in both ends pulling force of pulling back positioned at cell board b1 rears With lower rising and depart from ground and support b21, the operating personnel in front of cell board b1 take support b21 away immediately, and manipulation is anti- Hitting stream rope b22 operating personnel will ensure that cell board b1 is not overturn being lifted moment, while coordinate suspender b31's to sling speed Degree, make cell board b1 in the air stably rise and it is close to flooring at leisure, it is impossible to occur acutely wave or collide flooring etc., After transporting to mounting layer b4, cell board b1 is adjusted in place, releasing lifting rope b32 and anticollision stream rope b22 by operating personnel, and Carry out follow-up installation.
But above-mentioned construction method is only applicable to the installation of the type unitized curtain wall of shorter floor, for the modular of higher floor Then obvious long, high-altitude application, difficulty height, danger coefficient are big for the operation lines of the installation of curtain wall, lifting rope and anticollision stream rope composition.
The installation of the type unitized curtain wall of high-storey need to be by the way of installing in floor, its work progress such as Fig. 5 to 9 institutes Show, cell board b1 is deposited in floor, when construction starts, cell board b1 is placed on carrier b5 pallet fork, and pass through Carrier b5 transports cell board b1 at lifting layer b2 edge, and the mounting hanger b31 outside suspender layer b3 flooring will be from suspender The lifting rope b32 that b31 stretches out is fixedly connected on the connection hangers at the top of lifting layer b2 cell board b1, and suspender b31 passes through At the top of lifting rope b32 pull-up unit plates b1, being now placed in the operating personnel of manual transport trolley b5 both sides needs cooperation to prop up cell board B1, the operating personnel at rear then need to have stablized carrier b5, cell board b1 is gradually erected from horizontality inclined, Cell board b1, which is further pulled up, departs from carrier b5 and the vertical state that more levels off to, and operating personnel are until apart from building side The extreme position of edge, i.e., when cell board b1 is closest to vertical state, just release is assisted in cell board b1, treats that cell board b1 exists After hovering is stable, cell board b1 is transported mounting layer b4 by suspender b31 again, is adjusted cell board b1 just by operating personnel Position, lifting rope b32 is released, and carry out follow-up installation.
The construction method equally exists drawback, and it is, to ensure that the cell board of handling can freely up and down transport, unit Plate does not collide with flooring, and suspender is necessarily mounted at the position with a certain distance from from flooring, and operating personnel can only stand and lift by crane Cell board is assisted in layer, therefore the suspension centre at the top of cell board a little has water with operating personnel to assisting in for cell board bottom Flat distance, therefore the extreme position release even in operating personnel close to floor edge is assisted in cell board, cell board is still Moment loses the horizontal holding power of operating personnel in an inclined state, and outwards pendulum is gone under gravity, does pendulum in the air Motion, this causes operating personnel close to the edge of lifting layer, adds potential risk of falling down from the building, while cell board Pendular movement is difficult to overcome, exist cell board collision flooring, fall equivalent risk, add the potential safety hazard of work high above the ground.
The content of the invention
The purpose of the present invention one is to provide a kind of construction method, can weaken the pendulum that cell board occurs in lifting and transport It is dynamic, reduce operating risk.
The purpose of the present invention two is to provide a kind of carrier, facilitates the steady lifting of cell board.
The present invention above-mentioned purpose one technical scheme is that:
A kind of construction method,
Step 1: one carrier of configuration, the one end of the pallet fork of the carrier outwardly is front end, and one end inwardly is rear end, Carrier is lifted by crane outside layer with front end direction and pallet fork is pushed into front end close to lifting layer margin location perpendicular to lifting layer edge direction Put, using rear end position as anchor point, measure anchor point with lifting by crane the vertical range L1 at layer edge;
Step 2: the mounting hanger outside the flooring of suspender layer, measures the lifting rope entry and exit point of suspender and the vertical range of flooring L2;
Step 3: measure the vertical range L3 between the suspension centre at the top of cell board and outside wall surface;
Step 4: making line slide rail, the length of the line slide rail is L1, L2, L3 sum, by the line slide rail parallel to The length direction of the pallet fork of the carrier is fixedly connected on pallet fork, and the one end of the line slide rail outwardly is head, the other end For afterbody, afterbody aligns with the rear end of pallet fork, and head is stretched out outside pallet fork and closed by limited block, makes a sliding mat piece, will It, which slides, is connected in line slide rail and is slid onto afterbody;
Step 5: the cell board for taking a plan to install, the orientation of adjustment unit plate, makes its outer wall face-down, by cell board Bottom be placed on sliding mat piece on, then cell board is lain on line slide rail, by the lifting rope stretched out from suspender fix connect It is connected on the suspension centre at the top of cell board;
Step 6: outside with head direction lifting layer and line slide rail and lifting layer edge-perpendicular direction, carrier is pushed into The afterbody of line slide rail and anchor point aligned position, fixed carrier;
Step 7: suspender lifts by crane.
By using such scheme, suspender is by the slow lifting unit plate of lifting rope, and the top of cell board is by lifting rope pull-up Rising makes horizontal cell board gradually tilt, while is moved in direction to outside lifting layer in the center of gravity of lifting rope traction lower unit plate, unit The bottom of plate outwards slides under the support of sliding mat piece along line slide rail, and the length of line slide rail is anchor point to suspender The horizontal range of lifting rope entry and exit point and the summation of suspension centre at the top of cell board to outside wall surface distance, i.e., until cell board is transitioned into completely Vertical state, cell board bottom are moved to the head of line slide rail by sliding mat piece just, are thus lifted in cell board de- From line slide rail moment, cell board is smoothly lifted to approach the support that vertical state departs from sliding mat piece, eliminates operation Personnel's assists in, slow down the larger pendular movement of release moment arrival caused by being limited by operating space, reduces unit Plate falls or smashed the potential safety hazard brought, while it is dangerous close to the operation that the marginal belt of floor comes to avoid operating personnel.
Further, in step 6, the fixed form of carrier is by operating personnel's control or jams on fixation.
By using such scheme, although the part gravity of cell board is undertaken by lifting rope, the line slide rail on carrier It is still to bear part gravity, at head of the bottom of cell board closer to line slide rail, the head that line slide rail be present is pressurized Make the risk that carrier is tumbled to outside floor, for the cell board of lighter in weight, in afterbody positioned in alignment point position, by operator Member's control jams on fixed carrier.
Further, in step 6, the fixed form of carrier is that fixture is set at the anchor point of lifting layer, will be carried Car is connected with fixture.
By using such scheme, the larger cell board of reply weight, fix carrier by operating personnel and be difficult to support list First plate or when larger operational risk be present, sets fixture at the anchor point of lifting layer, and carrier is connected with fixture, Relatively reliable support is provided for cell board, while ensures that carrier is not outwards tumbled, ensures operating personnel and operation process Security.
Further, the mode for setting fixture is that a Z-shaped hook tabs is fixedly connected on into ground at the anchor point of lifting layer.
By using such scheme, Z-shaped hook tabs is connected light and fast with ground, and is formed after connecting between ground spacious Mouthful, it is convenient to it is inserted in by rope sling, chain etc. in Z-shaped hook tabs, then connects carrier, it is easy to operate.
Further, carrier is consolidated with the connected mode of fixture for the tail position for the line slide rail that alignd in the side of pallet fork Surely a clamp is connected, carrier is pushed into afterbody aligns simultaneously with anchor point, clamp is connected in Z-shaped hook tabs.
By using such scheme, anchor point is combined with fixture, by the afterbody of cell board push to line slide rail When being alignd with anchor point, clamp need to be only caught in Z-shaped hook tabs, once-through operation realizes positioning, fixes two purposes, operates It is convenient and swift.
Further, in step 7, when the bottom for being lifted to cell board reaches the head of line slide rail, suspender stalling, make Cell board is made 3 to 5 seconds to continue to lift by crane after stopping with vertical state.
By using such scheme, vertical state is transitioned into by heeling condition completely in cell board, due to the presence of inertia, Vertical moment, the horizontal direction speed of cell board bottom is not wholly absent, and micro- shock limited block, makes carrier and unit Plate produces rocking slightly, therefore makees the stop of 3 to 5 seconds at this moment, treats that this micro- rocks disappearances, continuation after cell board is stable Lifting.
The present invention above-mentioned purpose two technical scheme is that:
A kind of carrier, including pallet fork, the one end of the pallet fork outwardly are front end, and one end inwardly is rear end, on pallet fork Line slide rail is connected with, the line slide rail is parallel to the length direction of pallet fork, and the one end of line slide rail outwardly is head, inwardly One end is afterbody, and afterbody aligns with rear end, and head is provided with limited block, is slid in line slide rail and is connected with sliding mat piece.
By using above-mentioned technical proposal, sliding mat piece is slid onto into afterbody in advance, is intended to the bottom of the cell board of lifting Portion is placed in sliding mat piece, is then lain against on line slide rail, the top suspension centre connection lifting rope of cell board, is thus being lifted by crane Cheng Zhong, cell board top, which rises, makes body gradually tilt, and sliding mat piece support unit plate bottom progressively slides to head, coordinates list First plate is from level to inclination, by being tilted towards vertical state smooth transition, until sliding mat piece slides onto head, cell board be in or Close to vertical state, sliding mat piece is hung, facilitates the steady lifting of cell board.
Further, the sliding mat piece includes chassis, and roller is provided with below chassis, pad is provided with above chassis.
By using above-mentioned technical proposal, sliding mat piece is rolled by roller and is connected in line slide rail, realized in straight line Sliding in slide rail, the frictional force slid between mat piece and line slide rail is small, and slip is more smooth, and engagement unit plate is sling more In place.
Further, the pad is L-shaped, is hinged at its knuckle with chassis.
By using above-mentioned technical proposal, the pad of L-shaped closes with the match profiles of cell board bottom, cell board gradually by It is horizontal to tilting again to during vertical, pad is coordinated by its jointed shaft to be rotated, and makes the hoisting process of cell board stable smooth.
Further, the tail position of the side alignment line slide rail of the pallet fork is fixedly connected with a clamp.
It by using above-mentioned technical proposal, can be connected to by clamp on the fixture on ground, fixed carrier, make unit Plate hoisting process is more steady.
In summary, the invention has the advantages that:Cell board is extremely tilted again to vertical transient process by horizontal In, persistently by line slide rail and the support force of sliding mat piece, avoid operating personnel and come too close to lifting layer marginal belt Operating risk, while pendular movement caused by slow down traditional hoisting process operating personnel's abrupt release hangs cell board Process stabilization is played, it is convenient and reliable.
Brief description of the drawings
Fig. 1 to Fig. 4 is the process schematic constructed in the prior art outside floor;
Fig. 5 to Fig. 9 is the process schematic constructed in the prior art in floor;
Figure 10 is LI, L2, L3 equivalent schematic;
Figure 11 is the structural representation of carrier;
Figure 12 is that carrier transports cell board to view during the preparation lifting of lifting layer edge;
Figure 13 to Figure 17 is cell board hoisting process schematic diagram.
In figure, b1, cell board;B2, lifting layer;B21, support;B22, anticollision stream rope;B3, suspender layer;B31, suspender; B32, lifting rope;B4, mounting layer;B5, carrier;1st, pallet fork;11st, front end;12nd, rear end;2nd, line slide rail;21st, head;22nd, tail Portion;23rd, limited block;3rd, mat piece is slid;31st, chassis;32nd, roller;33rd, pad;4th, rubber blanket;5th, clamp;6th, anchor point;61、Z Shape hook tabs;7th, lifting rope entry and exit point;8th, suspension centre.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment one
As shown in Figure 10, a carrier b5 is configured, the one end of pallet fork 1 outwardly is front end 11, and one end inwardly is rear end 12, Carrier b5 is pushed into lift by crane layer b2 marginal positions, front end 11 outwardly and pallet fork 1 and edge-perpendicular, while is equal to front end 11 Hang layer b2 marginal positions or exceed or less than 10cm in the range of, now the lateral position in the rear end 12 of pallet fork 1 records positioning Point 6, to the vertical range at lifting layer b2 edges and L1 is recorded as with tape measure anchor point 6.
As shown in figure 13, the mounting hanger b31 outside suspender layer b3 flooring, suspender b31 can use electric block or loop wheel machine, Measurement suspender b31 lifting rope entry and exit point 7 is simultaneously recorded as L2 with the vertical range of flooring, illustrated in Figure 10 vertical state hanging in Aerial cell board b1, then L2 be equivalent to the suspension centre 8 of lifting rope b32 at the top of cell board b1 and arrive the vertical range of flooring.
Measure the vertical range between suspension centre 8 and outside wall surface at the top of cell board b1 and be recorded as L3.
Reference picture 11, two identical line slide rails 2 are made, the length of line slide rail 2 is L1, L2, L3 sum, by straight line Slide rail 2 is respectively fixedly connected with two pallet forks 1 parallel to the length direction of the pallet fork 1 of the carrier b5, the line slide rail 2 One end outwardly is head 21, and the other end is afterbody 22, and afterbody 22 aligns with the rear end 12 of pallet fork 1, head 21 stretch out pallet fork 1 it Closed outside and by limited block 23, the top of limited block 23 extends to more than the upper surface of line slide rail 2, can be horizontal in cell board b1 During placement, there is provided support, set rubber blanket 4 to prevent wear unit plate b1 outside wall surfaces at the top of limited block 23, line slide rail 2 Transverse shape is spill, and the bottom of line slide rail 2 is bolted to connection on pallet fork 1, according to the big of line slide rail 2 It is small, the sliding mat piece 3 to match is made, sliding mat piece 3 wraps chassis 31, and the lower section of chassis 31 is provided with roller 32, and the top of chassis 31 is set There is a l shaped gasket 33, the upper end at the knuckle of pad 33 with chassis 31 is hinged, and same pad 33 contacts inner face paving with cell board b1 There is rubber blanket 4, prevent wear unit plate b1 bottom, pad 33 should be use up while proof strength together with the thickness of rubber blanket 4 Possibly gross thickness is done small, reduce it when sliding onto the head 21 of line slide rail 2, its thickness takes L3 length, to list First plate b1 reaches influence caused by vertical state, and sliding mat piece 3 is placed in line slide rail 2, and sliding mat piece 3 can pass through roller 32 Moved freely in line slide rail 2, will slide mat piece 3 and slide onto the afterbody 22 of line slide rail 2 is original state, the side of pallet fork 1 A clamp 5 is bolted to connection in face of the position of afterbody 22 of neat line slide rail 2, the clamp 5 is L-shaped.
Reference picture 12, ground is bolted to connection a Z-shaped hook tabs 61 at anchor point 6, its connect after with ground it Between formed it is open.The cell board b1 for taking a plan to install, adjustment unit plate b1 orientation, makes its outer wall face-down, by cell board B1 bottom is placed on the l shaped gasket 33 of sliding mat piece 3, is then lain in cell board b1 on line slide rail 2, cell board b1 Middle front part by the top braces of limited block 23, the lifting rope b32 stretched out from suspender b31 is fixedly connected at the top of cell board b1 On suspension centre 8, with head 21 towards outside lifting layer b2 and line slide rail 2 and lifting layer b2 edge-perpendiculars direction, carrier b5 is pushed away To the afterbody 22 and the aligned position of anchor point 6 of line slide rail 2, clamp 5 is caught in the opening that Z-shaped hook tabs 61 is formed with ground immediately It is interior, while realize carrier b5 positioning and fix two purposes, subsequent suspender b31 liftings.
Figure 13 to 17 illustrates the process that cell board b1 is gradually sling, and suspender b31 lifting speed needs slowly, with to the greatest extent Cell board b1 is possibly set smoothly to transit to vertical state again by horizontal transition to inclination, when cell board b1 is reached such as Figure 16 institutes During the vertical state shown, suspender b31 is stalled, the stop for making cell board b1 make 3 to 5 seconds with the state, reduces cell board b1 bottoms Due to being vibrated caused by the micro- collision limited block 23 of inertia, continue slowly lifting after it is stable, until cell board b1 departs from sliding After mat piece 3, state as shown in figure 17, operating personnel retract carrier b5 in floor, and operating personnel can continue follow-up hang Fortune and installation exercise.
Embodiment two
The difference of embodiment two and embodiment one is, carrier b5 fixed form by operating personnel's control or can jam on It is fixed, in the cell board b1 lighter in weight of plan installation, the embodiment can be used
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (10)

1. a kind of construction method, it is characterized in that:
Step 1: one carrier of configuration(b5), the carrier(b5)Pallet fork(1)One end outwardly is front end(11), inwardly One end is rear end(12), by carrier(b5)With front end(11)Towards lifting layer(b2)Outer and pallet fork(1)Perpendicular to lifting layer (b2)Edge direction is pushed into front end(11)Close to lifting layer(b2)Marginal position, with rear end(12)Position is anchor point(6), Measure anchor point(6)With lifting by crane layer(b2)The vertical range L1 at edge;
Step 2: in suspender layer(b3)The outer mounting hanger of flooring(b31), measure suspender(b31)Lifting rope entry and exit point(7)With building The vertical range L2 in face;
Step 3: measure cell board(b1)The suspension centre at top(8)Vertical range L3 between outside wall surface;
Step 4: make line slide rail(2), the line slide rail(2)Length be L1, L2, L3 sum, by the line slide rail(2) Parallel to the carrier(b5)Pallet fork(1)Length direction be fixedly connected on pallet fork(1)On, the line slide rail(2)Outwardly One end be head(21), the other end is afterbody(22), afterbody(22)With pallet fork(1)Rear end(12)Alignment, head(21)Stretch Go out pallet fork(1)Outside and by limited block(23)Closing, make a sliding mat piece(3), slid and be connected to line slide rail(2)It is interior And slid onto afterbody(22);
Step 5: take the cell board that a plan is installed(b1), adjustment unit plate(b1)Orientation, make its outer wall face-down, will be single First plate(b1)Bottom be placed on sliding mat piece(3)On, then by cell board(b1)Lie in line slide rail(2)On, it will hang certainly Tool(b31)The lifting rope of stretching(b32)It is fixedly connected on cell board(b1)The suspension centre at top(8)On;
Step 6: with head(21)Towards lifting layer(b2)Outer and line slide rail(2)With lifting by crane layer(b2)Edge-perpendicular direction, will Carrier(b5)It is pushed into line slide rail(2)Afterbody(22)With anchor point(6)Aligned position, fixed carrier(b5);
Step 7: suspender(b31)Lifting.
2. construction method according to claim 1, it is characterized in that:In step 6, carrier(b5)Fixed form serve as reasons Operating personnel's control jams on fixation.
3. construction method according to claim 1, it is characterized in that:In step 6, carrier(b5)Fixed form be Lift by crane layer(b2)Anchor point(6)Place sets fixture, by carrier(b5)It is connected with fixture.
4. construction method according to claim 3, it is characterized in that:The mode for setting fixture is by a Z-shaped hook tabs(61) It is fixedly connected on lifting layer(b2)Anchor point(6)Locate ground.
5. construction method according to claim 4, it is characterized in that:Carrier(b5)Connected mode with fixture is in goods Fork(1)Side alignment line slide rail(2)Afterbody(22)Position is fixedly connected with a clamp(5), by carrier(b5)It is pushed into tail Portion(22)With anchor point(6)Alignment simultaneously, makes clamp(5)It is connected in Z-shaped hook tabs(61)It is interior.
6. construction method according to claim 1, it is characterized in that:In step 7, when being lifted to cell board(b1)Bottom Reach line slide rail(2)Head(21)When, suspender(b31)Stalling, makes cell board(b1)Make to stop for 3 to 5 seconds with vertical state After continue to lift by crane.
7. a kind of carrier, including pallet fork(1), the pallet fork(1)One end outwardly is front end(11), one end inwardly is rear end (12), it is characterized in that:Pallet fork(1)On be connected with line slide rail(2), the line slide rail(2)Parallel to pallet fork(1)Length side To line slide rail(2)One end outwardly is head(21), one end inwardly is afterbody(22), afterbody(22)With rear end(12)It is right Together, head(21)Provided with limited block(23), line slide rail(2)Interior sliding is connected with sliding mat piece(3).
8. carrier according to claim 7, it is characterized in that:The sliding mat piece(3)Including chassis(31), chassis(31) Lower section is provided with roller(32), chassis(31)Top is provided with pad(33).
9. carrier according to claim 8, it is characterized in that:The pad(33)It is L-shaped, at its knuckle and chassis(31) It is be hinged.
10. carrier according to claim 7, it is characterized in that:The pallet fork(1)Side alignment line slide rail(2)'s Afterbody(22)Position is fixedly connected with a clamp(5).
CN201510945232.9A 2015-12-16 2015-12-16 Construction method Active CN105544993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510945232.9A CN105544993B (en) 2015-12-16 2015-12-16 Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510945232.9A CN105544993B (en) 2015-12-16 2015-12-16 Construction method

Publications (2)

Publication Number Publication Date
CN105544993A CN105544993A (en) 2016-05-04
CN105544993B true CN105544993B (en) 2017-12-12

Family

ID=55824507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510945232.9A Active CN105544993B (en) 2015-12-16 2015-12-16 Construction method

Country Status (1)

Country Link
CN (1) CN105544993B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884543A (en) * 2017-04-10 2017-06-23 江苏鑫宇装饰有限公司 A kind of curtain wall lifting and transporting device
CN110616900A (en) * 2019-10-16 2019-12-27 深圳广田集团股份有限公司 Large-scale curtain wall large panel material and turning method of unit plate
CN111962880B (en) * 2020-07-06 2021-08-24 广州中穗建设有限公司 Automatic multi-functional assembly platform in assembly type structure field
CN112942847B (en) * 2021-02-04 2022-12-20 广东世纪达建设集团有限公司 Construction method for mounting decorative plate outside old curtain wall by crossing bottom barrier

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11343741A (en) * 1998-05-29 1999-12-14 National House Ind Co Ltd Construction method for building unit
CN2580025Y (en) * 2002-11-19 2003-10-15 武汉凌云建筑装饰工程有限公司 Mounting car for curtain wall plate block
CN1793591A (en) * 2006-01-05 2006-06-28 北京市机械施工有限公司 Supporting displacement method for lifting component and supporting system thereof
CN202248940U (en) * 2011-09-05 2012-05-30 沈阳远大铝业工程有限公司 Turnover device for unitized curtain wall
CN102493666A (en) * 2011-12-22 2012-06-13 北京首钢建设集团有限公司 High-altitude translation installation and construction method for super-large super-heavy member
CN102747841A (en) * 2012-06-27 2012-10-24 浙江宝业幕墙装饰有限公司 Curtain wall assembly, turnover and hoisting equipment and construction method thereof
CN103821379A (en) * 2014-01-20 2014-05-28 中亿丰建设集团股份有限公司 Glass curtain transport cart
CN104818787A (en) * 2015-04-17 2015-08-05 常州汇森电子有限公司 Installation and construction method for large suspension glass curtain walls

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11343741A (en) * 1998-05-29 1999-12-14 National House Ind Co Ltd Construction method for building unit
CN2580025Y (en) * 2002-11-19 2003-10-15 武汉凌云建筑装饰工程有限公司 Mounting car for curtain wall plate block
CN1793591A (en) * 2006-01-05 2006-06-28 北京市机械施工有限公司 Supporting displacement method for lifting component and supporting system thereof
CN202248940U (en) * 2011-09-05 2012-05-30 沈阳远大铝业工程有限公司 Turnover device for unitized curtain wall
CN102493666A (en) * 2011-12-22 2012-06-13 北京首钢建设集团有限公司 High-altitude translation installation and construction method for super-large super-heavy member
CN102747841A (en) * 2012-06-27 2012-10-24 浙江宝业幕墙装饰有限公司 Curtain wall assembly, turnover and hoisting equipment and construction method thereof
CN103821379A (en) * 2014-01-20 2014-05-28 中亿丰建设集团股份有限公司 Glass curtain transport cart
CN104818787A (en) * 2015-04-17 2015-08-05 常州汇森电子有限公司 Installation and construction method for large suspension glass curtain walls

Also Published As

Publication number Publication date
CN105544993A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105544993B (en) Construction method
CN106744170A (en) A kind of vertical soft Stady On The Auxiliary Transportation Systems for skyscraper
CN109335949A (en) The method of scale beam type counter-jib suspender and its hoisting steel beam component
US20160332852A1 (en) Arrangement and a method for transporting material in an elevator shaft
CN206447449U (en) A kind of vertical soft Stady On The Auxiliary Transportation Systems for skyscraper
US20230322522A1 (en) Construction arrangement of an elevator and method
KR20040097542A (en) Carrier for curtain-wall panel establishing use and curtain-wall establishing method using the same
CN104444977B (en) Adjustable vertical material transporting cableway system and construction method thereof
KR100761472B1 (en) Temporary installation balcony for building garbage
JPH0673892A (en) Fitting method for outer facing plate material of building and device therefor
CN109534221A (en) A kind of installing/dismounting method and its installing and dismounting special-purpose vehicle of hoist falling-proof device
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN208883352U (en) A kind of dismountable hanging device
CN107814318A (en) Loop wheel machine
CN209024127U (en) A kind of installing and dismounting special-purpose vehicle of hoist falling-proof device
CN113213315A (en) Transfer method for building partition board
CN106584397A (en) Parts placement rack for elevator
CN206521946U (en) A kind of dolly for installing metope radiation proof stereotype
CN211338440U (en) Temporary attachment device for construction lifter
JP2001354374A (en) Lifting device in hoistway of elevator
JPH0437168Y2 (en)
JPH0628548Y2 (en) Lifting device for self-propelled work platform
JPS6320709Y2 (en)
CN108557631A (en) A kind of maintenance lifting device and its application method
JP2000044161A (en) Hoisting jig with telpher

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant