CN105544312B CN201610064759.5A CN201610064759A CN105544312B CN 105544312 B CN105544312 B CN 105544312B CN 201610064759 A CN201610064759 A CN 201610064759A CN 105544312 B CN105544312 B CN 105544312B
Authority
CN
China
Prior art keywords
concrete pile
embankment
stake
reinforced concrete
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610064759.5A
Other languages
Chinese (zh)
Other versions
CN105544312A (en
Inventor
郑刚
杨新煜
刁钰
孙佳羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201610064759.5A priority Critical patent/CN105544312B/en
Publication of CN105544312A publication Critical patent/CN105544312A/en
Application granted granted Critical
Publication of CN105544312B publication Critical patent/CN105544312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of box-like composite foundation of reinforced concrete pile plain concrete pile partition group, including outside stake and inner side stake, the region that the region of outside stake and inner side stake arrangement is covered by embankment, wherein, embankment includes the side slope of embankment of embankment top surface and embankment top surface both sides, to the distance of embankment cross-sectional width center line is A on embankment cross section, from the edge of side slope of embankment;The region of outside stake arrangement is to extend to the shared region in 1/5A to 3/4A places to embankment cross-sectional width center line from the side slope of embankment of both sides;Remaining region is the layout area of inner side stake;Outside stake uses reinforced concrete pile, and inner side stake uses plain concrete pile.Solve pile foundation on the outside of traditional Pure-Concrete-Pile Composite Subgrade and brittle fracture easily occurs under larger moment of flexure, there is brittle fracture successively so as to cause internal pile body, and then cause the engineering problem that destabilization, bearing capacity substantially reduce, clean steel reinforced concrete pile composite foundation cost is solved simultaneously higher, uneconomic problem.

Description

Reinforced concrete pile-box-like the composite foundation of plain concrete pile partition group
Technical field
The present invention relates to a kind of box-like composite foundation of partition group mixed using reinforced concrete pile and plain concrete pile, category In civil engineering ground field.
Background technology
In recent years, with the fast development of the construction such as China Express Railway, construction speed and sedimentation control for embankment System etc. proposes requirement higher.In China's Coastal Areas, topsoil is mostly saturated soft clay, the shearing of the soil body compared with Low, drainability is poor, thus embankment is susceptible to unstable failure.To adapt to the requirement of Fast Construction and settlement Control, rigidity Pile composite foundation has obtained increasingly being widely applied, and plain concrete pile has Compressive Bearing Capacity high, and elastic modelling quantity is big, cost phase To cheap, the characteristics of speed of application is fast, but its anti-bending bearing capacity is relatively low, easily because tension surpasses under bending load effect Cross its ultimate tensile stress and then produce brittle fracture, cause its rapid forfeiture bearing capacity, and then cause the unstable failure of embankment, steel Rib concrete pile has anti-bending bearing capacity and ductility very high, when it because larger bending load causes tension to reach capacity drawing During stress, plasticity can be entered and continue to carry, security is higher, but price is relatively expensive.
During embankment and use, with embankment constantly increase and embankment on load constantly increase, respectively The stress of stake also constantly increases, wherein inner side stake is to bear based on vertical axle power, outside pile is relatively small by axle power, but it holds By larger moment of flexure, under the collective effect of larger moment of flexure and smaller axle power, outside stake inboard portion is first close to its Ultimate Tensile Intensity, and now the bearing capacity of inner side stake is not fully used, if outside stake reaches capacity tension because of tensile strength There is the bending failure of fragility in intensity, after its destruction, internal force reduces rapidly, and the effect of contraction to the soil body weakens rapidly, the soil body Motion causes the interaction for occurring with the internal soil body, causes its stress to increase and then the bending failure of fragility occurs, so past Multiple, there is continuous bending failure successively in each stake, ultimately result in destabilization from the outside to the core, cause huge personnel, property loss.
In sum, how when rigid pile composite foundation is built, improve the ability of the continuous destruction of embankment resistance and control It is made and originally become a problem demanding prompt solution.
The content of the invention
In order to overcome the shortcoming of above-mentioned prior art, the present invention to provide a kind of reinforced concrete pile-plain concrete pile subregion Combined ground, its outside stake has anti-bending bearing capacity higher using reinforced concrete pile, can resist the first pile The generation of fragility bending failure, its inner side stake uses the plain concrete pile of cost relative moderate, so as to not reduce security In the case of meet the requirement of economy.
In order to solve the above-mentioned technical problem, a kind of reinforced concrete pile-plain concrete pile partition conbination proposed by the present invention The region that the region of formula composite foundation, including outside stake and inner side stake, the outside stake and inner side stake arrangement is covered by embankment, Wherein, the embankment includes the side slope of embankment of embankment top surface and embankment top surface both sides, on embankment cross section, from side slope of embankment Edge to the distance of embankment cross-sectional width center line is A;The region of outside stake arrangement be from the side slope of embankment of both sides to Embankment cross-sectional width center line extends to the shared region in 1/5A to 3/4A places;Remaining region is the arrangement area of inner side stake Domain;The outside stake uses reinforced concrete pile, and the inner side stake uses plain concrete pile.
Further, reinforced concrete pile of the present invention-box-like composite foundation of plain concrete pile partition group, wherein, the steel The stake footpath of rib concrete pile and the plain concrete pile is 300~800mm, between the reinforced concrete pile, the plain coagulation Pilespacing between native stake and between the reinforced concrete pile and the plain concrete pile is 1.5~3m.
The stake top of all reinforced concrete piles and plain concrete pile is concordant with the upper surface of foundation soil, above the foundation soil It is equipped with the thick mattress layers of 20~30cm.If being hard stratum below the foundation soil, all reinforced concrete piles and element are mixed The bottom of solidifying soil stake is located at the top surface or embedded hard stratum of hard stratum.
Compared with prior art, the beneficial effects of the invention are as follows:
Composite foundation of the present invention solves pile foundation on the outside of traditional Pure-Concrete-Pile Composite Subgrade and is easily issued in larger moment of flexure , there is brittle fracture successively so as to cause internal pile body, and then cause destabilization, bearing capacity to substantially reduce in raw brittle fracture Engineering problem, while it is higher to solve clean steel reinforced concrete pile composite foundation cost, uneconomic problem.Because the present invention is compound Outside stake in ground uses the reinforced concrete pile with anti-bending bearing capacity higher, can resist the first pile fragility curved The generation of song destruction, thus, inner side stake need not possess anti-bending bearing capacity too high, so using the plain coagulation of cost relative moderate Native stake can meet the requirement of economy in the case where security is not reduced.Composite foundation of the present invention is in the following model of side slope of embankment Stake in enclosing is substantially to use reinforced concrete pile, and the stake in the following scope of embankment top surface is substantially to use plain concrete Stake, the pilespacing between each stake is 1.5m to 3m, and each stake stake top is located at embankment bottom surface, if foundation region has hard stratum, each stake Stake bottom can obtain preferable wedge action in being against hard stratum or embedded hard stratum.
Composite foundation of the present invention has the advantages that simple, safe, good economy performance of constructing.
Brief description of the drawings
Fig. 1 is the vertical cross section figure of composite foundation of the present invention;
Fig. 2 is the plan of composite foundation of the present invention;
In figure:1- embankments, 2- foundation soils, 3- hard stratums, 4- reinforced concrete piles, 5- plain concrete piles.
Specific embodiment
Technical solution of the present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings, described is specific Embodiment is only explained to the present invention, is not intended to limit the invention.
As depicted in figs. 1 and 2, a kind of reinforced concrete pile-plain concrete pile partition group proposed by the present invention is box-like compound The region that the region of ground, including outside stake and inner side stake, the outside stake and inner side stake arrangement is covered by embankment 1, wherein, The embankment 1 includes the side slope of embankment of embankment top surface and embankment top surface both sides, on embankment cross section, from the edge of side slope of embankment Distance to embankment cross-sectional width center line is A, and the region that the outside stake is arranged is the side slope of embankment from both sides to embankment Cross-sectional width center line extends to the region shared by 1/5A (1/5th A) to 3/4A (3/4ths A) place;Remaining region It is the layout area of inner side stake;The outside stake uses reinforced concrete pile 4, and the inner side stake uses plain concrete pile 5, reinforcing bar Concrete-pile 4 has ductility and anti-bending bearing capacity very high, and plain concrete pile 5 has rigidity and vertical bearing capacity higher, The domatic following position of embankment sets reinforced concrete pile 4, and remaining position below embankment sets plain concrete pile 5, can be compared with The generation of continuous destruction is resisted well, the bearing capacity of embankment is improve, and saves certain engineering cost, with preferable Economy
The stake footpath of the reinforced concrete pile 4 and the plain concrete pile 5 is 300~800mm, the reinforced concrete pile Pilespacing between 4, between the plain concrete pile 5 and between the reinforced concrete pile 4 and the plain concrete pile 5 is 1.5~3m.The stake top of all reinforced concrete piles 4 and plain concrete pile 5 is concordant with the upper surface of foundation soil 2, the foundation soil 2 The thick mattress layers of 20~30cm are equipped with above.If below the foundation soil 2 being hard stratum 3, all reinforced concrete piles 4 With the top surface or embedded hard stratum 3 that the bottom of plain concrete pile 5 is located at hard stratum 3.
Reinforced concrete pile on the outside of composite foundation of the present invention has anti-bending bearing capacity very high, and is reached capacity at it There is ductility very high, after plasticity is entered, brittle fracture will not occur also will not suddenly lose bending resistance and vertical after stretching strain Bearing capacity, substantially increase the anti-bending bearing capacity and security of outside pile body, it is to avoid caused by because of local pile body bending failure Each stake is continuously destroyed, and effectively improves the ability of the continuous destruction of composite foundation resistance, greatly improves the security of embankment, meanwhile, Pile body on the inside of embankment bear moment of flexure it is smaller, to bear based on vertical axle power, use the relatively cheap element of cost at the position Concrete-pile, it has Compressive Bearing Capacity and elastic modelling quantity very high, can effectively undertake vertical load, the vertical change of control Shape, thus can on the basis of Embankment Subsidence is controlled effectively saving construction cost.
Although above in conjunction with figure, invention has been described, the invention is not limited in above-mentioned specific embodiment party Formula, above-mentioned specific embodiment is only schematical, and rather than restricted, one of ordinary skill in the art is in this hair Under bright enlightenment, without deviating from the spirit of the invention, many variations can also be made, these belong to guarantor of the invention Within shield.

Claims (4)

1. a kind of stake of reinforced concrete pile-box-like composite foundation of plain concrete pile partition group, including outside and inner side stake, it is described outer The region that the region of side stake and inner side stake arrangement is covered by embankment (1), wherein, the embankment (1) includes embankment top surface and road The side slope of embankment of levee crown face both sides, on embankment cross section, from the edge of side slope of embankment to embankment cross-sectional width center line Distance is A, it is characterised in that:
The region of the outside stake arrangement is to extend to 1/5A extremely to embankment cross-sectional width center line from the side slope of embankment of both sides Shared region at 3/4A;Remaining region is the layout area of inner side stake;The outside stake uses reinforced concrete pile (4), The inner side stake is using plain concrete pile (5).
2. reinforced concrete pile-box-like composite foundation of plain concrete pile partition group according to claim 1, it is characterised in that: The stake footpath of the reinforced concrete pile (4) and the plain concrete pile (5) is 300~800mm, the reinforced concrete pile (4) Between, between the plain concrete pile (5) and the pilespacing between the reinforced concrete pile (4) and the plain concrete pile (5) It is 1.5~3m.
3. reinforced concrete pile-box-like composite foundation of plain concrete pile partition group according to claim 1, it is characterised in that: The stake top of all reinforced concrete piles (4) and plain concrete pile (5) is concordant with the upper surface of foundation soil (2), the foundation soil (2) The thick mattress layers of 20~30cm are equipped with above.
4. reinforced concrete pile-box-like composite foundation of plain concrete pile partition group according to claim 3, it is characterised in that: It is hard stratum (3) below the foundation soil (2), the bottom of all reinforced concrete piles (4) and plain concrete pile (5) is located at pan soil The top surface of layer (3) or embedded hard stratum (3).
CN201610064759.5A 2016-01-29 2016-01-29 The box-like composite foundation of reinforced concrete pile plain concrete pile partition group Active CN105544312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610064759.5A CN105544312B (en) 2016-01-29 2016-01-29 The box-like composite foundation of reinforced concrete pile plain concrete pile partition group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610064759.5A CN105544312B (en) 2016-01-29 2016-01-29 The box-like composite foundation of reinforced concrete pile plain concrete pile partition group

Publications (2)

Publication Number Publication Date
CN105544312A CN105544312A (en) 2016-05-04
CN105544312B true CN105544312B (en) 2017-06-06

Family

ID=55823845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610064759.5A Active CN105544312B (en) 2016-01-29 2016-01-29 The box-like composite foundation of reinforced concrete pile plain concrete pile partition group

Country Status (1)

Country Link
CN (1) CN105544312B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758624A (en) * 2016-12-27 2017-05-31 天津大学 The box-like composite foundation of reinforced concrete pile cement earth pile partition group
CN106759394A (en) * 2016-12-27 2017-05-31 天津大学 The box-like composite foundation of composite pile cement earth pile partition group

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400469A (en) * 2011-08-02 2012-04-04 北京健安诚岩土工程有限公司 Secant pile drum type foundation and construction method thereof
CN102561384A (en) * 2012-01-31 2012-07-11 中天建设集团有限公司天津分公司 Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
DE102012201281A1 (en) * 2011-02-08 2012-08-09 Otto Drexler Reinforced concrete foundation pile structure used for roof, bridge or wall construction of gas station for e.g. electric vehicle, has reinforced concrete pile portions and spacing pile that are formed as three-pronged pile system
CN103726673A (en) * 2014-01-27 2014-04-16 龚金京 Novel after-rooting composite pile foundation
CN205347889U (en) * 2016-01-29 2016-06-29 天津大学 Concrete pile - plain concrete stake partition conbination formula composite foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012201281A1 (en) * 2011-02-08 2012-08-09 Otto Drexler Reinforced concrete foundation pile structure used for roof, bridge or wall construction of gas station for e.g. electric vehicle, has reinforced concrete pile portions and spacing pile that are formed as three-pronged pile system
CN102400469A (en) * 2011-08-02 2012-04-04 北京健安诚岩土工程有限公司 Secant pile drum type foundation and construction method thereof
CN102561384A (en) * 2012-01-31 2012-07-11 中天建设集团有限公司天津分公司 Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN103726673A (en) * 2014-01-27 2014-04-16 龚金京 Novel after-rooting composite pile foundation
CN205347889U (en) * 2016-01-29 2016-06-29 天津大学 Concrete pile - plain concrete stake partition conbination formula composite foundation

Also Published As

Publication number Publication date
CN105544312A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN103643656B (en) High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body
CN203373705U (en) Ecological slope protection
CN204401387U (en) A kind of seasonal frost region anti-freeze expansion road structure based on XPS warming plate and banket
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN203346750U (en) Long-short pile raft structure roadbed of deep spongy soil region
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
CN203129095U (en) Composite impervious face slab structure for rock-fill dam
CN112195703B (en) Calculation method for stability control of gravel pile and geogrid combined foundation
CN106120662B (en) A kind of part high-modulus rock-faced dam dam
CN103526721A (en) Permeable spur dike with pile foundations
CN106245595B (en) A kind of maintainable face dam of antiseepage wall bottom seepage control system
CN105544312B (en) The box-like composite foundation of reinforced concrete pile plain concrete pile partition group
CN209227507U (en) Punish the Rigid Flexible Piled Composite Foundation of superelevation embankment soft foundation
CN106758624A (en) The box-like composite foundation of reinforced concrete pile cement earth pile partition group
WO2022237082A1 (en) Method for treating longitudinal crack disease of soft rock roadbed
CN105975720B (en) A kind of Laminate construction thickness design method of composite base cement concrete pavement
CN205576637U (en) Processing closes on roadbed structure of existing line soft soil foundation
CN205347889U (en) Concrete pile - plain concrete stake partition conbination formula composite foundation
CN206529660U (en) A kind of water proof road structure
CN205776154U (en) A kind of high-strength prestressed concrete flute profile sheet pile
CN205934862U (en) Local high -modulus enrockment concrete -faced rockfill dam structure
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
CN203530921U (en) Water-permeable pile foundation spur dike
CN207484405U (en) A kind of concrete cut
CN202187253U (en) Roadbed structure of high-speed railway on unsaturated soil foundation in flat area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92