CN105528495B - A kind of middle part transporting coal ditch shifting in suspension bucket pinch spalling separating process sets determining method - Google Patents

A kind of middle part transporting coal ditch shifting in suspension bucket pinch spalling separating process sets determining method Download PDF

Info

Publication number
CN105528495B
CN105528495B CN201511019071.7A CN201511019071A CN105528495B CN 105528495 B CN105528495 B CN 105528495B CN 201511019071 A CN201511019071 A CN 201511019071A CN 105528495 B CN105528495 B CN 105528495B
Authority
CN
China
Prior art keywords
transporting coal
shifting
part transporting
coal ditch
ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511019071.7A
Other languages
Chinese (zh)
Other versions
CN105528495A (en
Inventor
王桂林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Zhungeer Energy Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Zhungeer Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenhua Zhungeer Energy Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201511019071.7A priority Critical patent/CN105528495B/en
Publication of CN105528495A publication Critical patent/CN105528495A/en
Application granted granted Critical
Publication of CN105528495B publication Critical patent/CN105528495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Mining & Mineral Resources (AREA)
  • Health & Medical Sciences (AREA)
  • Geometry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Animal Husbandry (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Loading Or Unloading Of Vehicles (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the middle part transporting coal ditch shiftings in a kind of suspension bucket pinch spalling separating process to set determining method, includes the following steps:Step 1:Determine the quantities V that middle part transporting coal ditch shifting is sety;Step 2:It determines to set quantities V by automobile slidingyThe increased cost C of institute;Step 3:Determine the economic loss S that middle part transporting coal ditch shifting is setmy;Step 4:Work as SmyWhen=0, determine that best move of middle part transporting coal ditch sets distance.Quantities, increased cost and the economic damage set by determining middle part transporting coal ditch shifting, sets distance, the shifting setting tool for middle part transporting coal ditch has directive significance to determine most preferably to move.

Description

A kind of middle part transporting coal ditch shifting in suspension bucket pinch spalling separating process sets determining method
Technical field
The present invention relates to the middle part transporting coal ditches in technical field of coal exploitation more particularly to a kind of suspension bucket pinch spalling separating process to move If the method for determining.
Background technology
Suspension bucket heap stripping technology of slide tackling is a kind of advanced strip mining transformation technique, it collects three digging, transport and casting works Industry dumps the direct casting of overburden in outdoor internal dumping, in one with number of devices is few, unit bucket capacity is efficient, stripping From distinguishing features such as at low cost, production capacity is big, production reliability height.Pinpoint blasting technology shovels backcast stripping work for suspension bucket The overburden of 20%-50% is directly thrown into goaf by skill, so as to further improve charge stripping efficiency, be greatly lowered stripping into This.
In the construction process, the middle part transporting coal ditch between two production zones is needed to carry out shifting to set, and in how determining The shifting of portion's transporting coal ditch, which sets distance, becomes technical barrier.
Invention content
The purpose of the present invention is to provide the middle part transporting coal ditch shiftings in kind of suspension bucket pinch spalling separating process to set determining method.
The middle part transporting coal ditch shifting that technical solution of the present invention is provided in a kind of suspension bucket pinch spalling separating process sets determining method, including such as Lower step:
Step 1:Determine the quantities V that middle part transporting coal ditch shifting is sety
Step 2:It determines to set quantities V by automobile slidingyThe increased cost C of institute;
Step 3:Determine the economic loss S that middle part transporting coal ditch shifting is setmy
Step 4:Work as SmyWhen=0, determine that best move of middle part transporting coal ditch sets distance.
Further, following steps are further included in the step 1:
Set the width of middle part transporting coal ditch as D, to retrodict step internal dumping average height be Hxp, Automobile Transportation limitation slope The shifting of degree i and middle part transporting coal ditch set distance L, then:
Further, following steps are further included in the step 2:
Set the freight ton-km C of Automobile Transportationd, transporting coal amount M of the open coal mine through middle part transporting coal ditchc, then increased transport Cost C can be calculated by following formula:
Further, following steps are further included in the step 3:Unit price is constructed as q in setting ramp,
Then, Smy=qVy-C。
Further, as economic loss SmyWhen=0, obtain most preferably shifting and set distance:
Further, the width of a secondary pinpoint blasting step is set as K,
Such asAnd N is integer, then final move of middle part transporting coal ditch sets distance LEventually=L;
Such asAnd n.m is not integer, wherein n is integer part, and m is fractional part,
Then LEventually=(n+1) K.
Using above-mentioned technical proposal, have the advantages that:
Quantities, increased cost and the economic damage set by determining middle part transporting coal ditch shifting, come determine most preferably to move set away from From the shifting setting tool for middle part transporting coal ditch has directive significance.
Description of the drawings
Fig. 1 is the schematic diagram that transporting coal ditch shifting in middle part is set;
Fig. 2 is the flow chart that transporting coal ditch shifting in middle part sets determining method.
Specific embodiment
Specific embodiment to further illustrate the present invention below in conjunction with the accompanying drawings.
As shown in Figs. 1-2, the middle part transporting coal ditch shifting in the suspension bucket pinch spalling separating process that one embodiment of the invention provides sets determining Method includes the following steps:
Step 1:Determine that middle part transporting coal ditch 1 moves the quantities V sety
Step 2:It determines to set quantities V by automobile slidingyThe increased cost C of institute;
Step 3:Determine that middle part transporting coal ditch 1 moves the economic loss S setmy
Step 4:Work as SmyWhen=0, determine that best move of middle part transporting coal ditch 1 sets distance.
Quantities, increased cost and the economic damage set by determining middle part transporting coal ditch shifting, come determine most preferably to move set away from From economic loss is minimum at this time, and the shifting setting tool for middle part transporting coal ditch has directive significance.
Preferably, further include following steps in the step 1:
Set the width of middle part transporting coal ditch as D, to retrodict step internal dumping average height be Hxp, Automobile Transportation limitation slope The shifting of degree i and middle part transporting coal ditch set distance L, then:
Middle part transporting coal ditch 1, which is calculated, according to above-mentioned formula moves the quantities V that setsy, to carry out subsequent operation.
Preferably, following steps are further included in step 2:
Set the freight ton-km C of Automobile Transportationd, transporting coal amount M of the open coal mine through middle part transporting coal ditchc, then increased transport Cost C can be calculated by following formula:
Increased transportation cost C is calculated according to above-mentioned formula, to carry out subsequent operation.
Preferably, following steps are further included in step 3:Unit price is constructed as q in setting ramp,
Then, Smy=qVy-C。
Economic loss S is calculated according to above-mentioned formulamy, to carry out subsequent operation.
Preferably, as economic loss SmyWhen=0, obtain most preferably shifting and set distance:
It that is to say, when approach shift spacing is L, economic loss zero, best results.
Preferably, the width of a secondary pinpoint blasting step is set as K,
Such asAnd N is integer, then final move of middle part transporting coal ditch sets distance LEventually=L;
Such asAnd n.m is not integer, wherein n is integer part, and m is fractional part,
Then LEventually=(n+1) K.
It that is to say, set distance L=240m, K=80m if most preferably moving, then N=3, then LEventually=L=240m.
If best move sets distance L=216m, K=80m, then n.m=2.7, wherein n is integer part 2, LEventuallyIt needs for K Multiple, so to n.m roundings and add 1, that is, LEventually=(n+1) K=240m.
Through analyzing calculating above, consider engineering development requirement, often promoted three times according to suspension bucket shovel working face, form 3 width and throw After throwing explosion step, shifting sets primary middle part transporting coal ditch 1.When suspension bucket slide tackles the 3rd width pinpoint blasting step of heap, new middle part is reserved Ditch longitudinal direction ramp, then form new transporting coal raceway groove after adopting 5 width pinpoint blasting steps.
Assuming that the coal length of bench of open coal mine is S, fltting speed V, then the service time t=S/ of middle part transporting coal ditch 1 V。
As needed, above-mentioned each technical solution can be combined, to reach best-of-breed technology effect.
Above-described is only the principle of the present invention and preferred embodiment.It should be pointed out that the common skill for this field For art personnel, on the basis of the principle of the invention, several other modifications can also be made, also should be regarded as the protection model of the present invention It encloses.

Claims (2)

1. the middle part transporting coal ditch shifting in a kind of suspension bucket pinch spalling separating process sets determining method, which is characterized in that includes the following steps:
Step 1:Determine the quantities V that middle part transporting coal ditch shifting is sety
Set the width of middle part transporting coal ditch as D, to retrodict step internal dumping average height be Hxp, Automobile Transportation ruling grade i Shifting with middle part transporting coal ditch sets distance L, then:
Step 2:It determines to set quantities V by automobile slidingyThe increased cost C of institute;
Set the freight ton-km C of Automobile Transportationd, transporting coal amount M of the open coal mine through middle part transporting coal ditchc, then increased transportation cost C can be calculated by following formula:
Step 3:Determine the economic loss S that middle part transporting coal ditch shifting is setmy
Unit price is constructed as q in setting ramp, then, and Smy=qVy-C;
Step 4:Work as SmyWhen=0, determine that best move of middle part transporting coal ditch sets distance:
2. middle part transporting coal ditch shifting according to claim 1 sets determining method, which is characterized in that the secondary pinpoint blasting platform of setting one The width of rank is K,
Such asAnd N is integer, then final move of middle part transporting coal ditch sets distance LEventually=L;
Such asAnd n.m is not integer, wherein n is integer part, and m is fractional part,
Then LEventually=(n+1) K.
CN201511019071.7A 2015-12-30 2015-12-30 A kind of middle part transporting coal ditch shifting in suspension bucket pinch spalling separating process sets determining method Active CN105528495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511019071.7A CN105528495B (en) 2015-12-30 2015-12-30 A kind of middle part transporting coal ditch shifting in suspension bucket pinch spalling separating process sets determining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511019071.7A CN105528495B (en) 2015-12-30 2015-12-30 A kind of middle part transporting coal ditch shifting in suspension bucket pinch spalling separating process sets determining method

Publications (2)

Publication Number Publication Date
CN105528495A CN105528495A (en) 2016-04-27
CN105528495B true CN105528495B (en) 2018-07-03

Family

ID=55770717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511019071.7A Active CN105528495B (en) 2015-12-30 2015-12-30 A kind of middle part transporting coal ditch shifting in suspension bucket pinch spalling separating process sets determining method

Country Status (1)

Country Link
CN (1) CN105528495B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971609A (en) * 2016-06-03 2016-09-28 华能伊敏煤电有限责任公司 Ramp replacement mode for electric shovel excavation
CN107687342B (en) * 2017-08-21 2019-05-21 中国矿业大学 A kind of open coal mine drawing bucket shovel active line segmentation alternative expression exploiting field forward method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966355A (en) * 2012-12-06 2013-03-13 马钢集团设计研究院有限责任公司 Method for creating internal dumping conditions of strip mine
CN104200342A (en) * 2014-08-06 2014-12-10 中钢集团马鞍山矿山研究院有限公司 Method for determining joint position for switching automobile transportation to automobile-tape transportation of surface mine
CN104763429A (en) * 2015-03-11 2015-07-08 中国矿业大学(北京) Method and apparatus of adjusting opencast coal mine production stripping ratio

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966355A (en) * 2012-12-06 2013-03-13 马钢集团设计研究院有限责任公司 Method for creating internal dumping conditions of strip mine
CN104200342A (en) * 2014-08-06 2014-12-10 中钢集团马鞍山矿山研究院有限公司 Method for determining joint position for switching automobile transportation to automobile-tape transportation of surface mine
CN104763429A (en) * 2015-03-11 2015-07-08 中国矿业大学(北京) Method and apparatus of adjusting opencast coal mine production stripping ratio

Also Published As

Publication number Publication date
CN105528495A (en) 2016-04-27

Similar Documents

Publication Publication Date Title
US9494037B2 (en) Inclined layered solid-filling mining method in ultrathick coal layer
CN103216238B (en) A kind of Opencut coal mine mining technique
CN104481539B (en) From kerve tight-face blasting caved stopes
CN105781554B (en) A kind of open coal mine draws bucket shovel overcast stripping recovery method
CN103603665B (en) Upper dish side ore body stoping method in the scope of adopting of mine
CN103470262A (en) Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping
Sahu et al. Underground mining for meeting environmental concerns–a strategic approach for sustainable mining in future
CN104533416A (en) Large-scale mechanized non-sill-pillar sub-level caving mining method for extremely thick ore body
CN104358574B (en) The horizontal room-and-pillar stoping of gently inclined orebody
CN104863592A (en) Large-structure sublevel drilling stage ore removal mining method with delayed filling
CN105528495B (en) A kind of middle part transporting coal ditch shifting in suspension bucket pinch spalling separating process sets determining method
CN101892843A (en) Porous bottom-dump conveyer of solid-state filling material
CN104806247A (en) Transport method of building longitudinal composite bridge in middle of strip mine stope
CN109931064A (en) A kind of independent casting operational method of open coal mine drawing bucket shovel
CN104343453B (en) Thick mineral deposit filling mining method in a kind of low-angle dip
RU2528704C1 (en) Method of open working out of steep deposits of platform shape
Shimada et al. Application of highwall mining system to recover residual coal in end-walls
CN105565130A (en) Coal mine vertical shaft combined hoisting system
RU2559262C1 (en) Method of open development of deposits with use of combined transport
CN104179505A (en) Phosphorus ore underground mining method
Vilkul et al. Optimization of capacity and the number of crushing and transfer stations at the deep open pits
RU2553672C2 (en) Method of opened development of long steep dipping fields with internal dumping
CN113062740B (en) Small layered filling mining method for multi-directional ramp without ore pillar
CN105041315B (en) A kind of open air trestle Wall ore adopts strata control method
CN103939132B (en) A kind of mineral deposit underground mining transportation resources of continuous and automatic

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant