CN105525921A - Conjugate type mining preparation method - Google Patents

Conjugate type mining preparation method Download PDF

Info

Publication number
CN105525921A
CN105525921A CN201610090362.3A CN201610090362A CN105525921A CN 105525921 A CN105525921 A CN 105525921A CN 201610090362 A CN201610090362 A CN 201610090362A CN 105525921 A CN105525921 A CN 105525921A
Authority
CN
China
Prior art keywords
mining
drop shaft
conjugation
stope
ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610090362.3A
Other languages
Chinese (zh)
Inventor
刘玉勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610090362.3A priority Critical patent/CN105525921A/en
Publication of CN105525921A publication Critical patent/CN105525921A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor

Abstract

The invention relates to a mining preparation method capable of being combined with multiple mining methods. According to the mining preparation method, firstly, every two stopes share one ore drawing transportation transverse drift and one ore drawing draw shaft; secondly, every two stopes share a part of a stope linked roadway; thirdly, a main transportation roadway and segmented roadways are closer to ore, and engineering length of the transportation roadway and the segmented roadways is reduced; fourthly, under the condition that the total number of the stopes is not changed, the conjugate type mining preparation method has the advantages that cooperative win-win that one plus one is greater than two in the adjacent stopes is realized, the number of mining preparation systems is greatly reduced, the mining and development ratio is greatly reduced, the mining preparation period is greatly shortened and remarkable economic benefit and time benefit are achieved through pairwise grouping of the adjacent stopes and sharing of the ore drawing transverse drift, a raise and part of linked roadways; fifthly, the mining preparation method can be combined with multiple mining methods such as an upward cut-and-fill mining method and the like and has broad application prospect.

Description

Conjugation-type adopts accurate method
Technical field
The present invention relates to a kind of can combine with multiple mining methods adopt accurate method.Adopt the method adopt Barebone, can save nearly one times adopt accurate engineering quantity, improve to adopt and cut ratio.
Background technology
What stope independently adopted complete set adopts accurate engineering system, is that metal, the general tradition just adopted of non-metal mine mining adopt accurate method both at home and abroad at present.This traditional concrete engineering adopting accurate method is arranged, to determine according to concrete mining methods, but no matter adopt which kind of mining methods, its common trait of adopting Barebone is: each stope has the independently engineering such as ore removal Chuan Mai tunnel, independently drop shaft and ventilation drainage sump, independently Cai Zhunlian lane.For Upward drift, the method is on the basis of developing, by bottom main haulage roadway construction ore removal Chuan Mai tunnel, to construct each segmentation lane by adopting accurate ramp, by segmentation lane construct each stope join lane arrive ore body, again by main haulage roadway construct drop shaft, ventilation drainage sump and with stope UNICOM, formed and a set ofly adopt Barebone, and often Barebone adopted by cover is only the service of a nugget stope.
The shortcoming that tradition adopts accurate method is: adopt that accurate engineering quantity is many, engineering quantity is large, adopt accurate long in time limit, waste a large amount of financial resources, material resources, manpower; When production target is higher, easily a large amount of adopts accurate engineering because completing, and enough standby rooms of digging up mine cannot be provided, cause explored ore reserve unbalance, and then production capacity is reduced.
Summary of the invention
Problem to be solved by this invention:
There is provided a kind of can combine with multiple mining methods adopt accurate method, make every two stopes save an ore removal Chuan Mai tunnel, drop shaft, part connection lane engineering.The method can reduce to adopt accurate engineering quantity, reduces mining time, improves to adopt and cuts ratio, improves mining benefit.
Technical scheme provided by the invention is:
A kind of conjugation-type adopts accurate method, and wherein " conjugation " means a pair that matches according to certain rules.For upward horizon access back-filling method, it is characterized in that adopting standard containing following steps:
(1), be nugget stope by stage casing ore body division, and press 1# and 2#, 3# and 4#, 5# and 6# ... be numbered grouping;
(2), by the large lane of bottom level haulage, the ore removal transport Chuan Mai tunnel that stope is often organized in construction arrives ore body;
(3), arrive by a segmentation roadway construction " Y-shaped conjugation joins lane " ore body often organizing stope respectively;
(4), by main haulage roadway construct drop shaft, ventilation drainage sump, wherein drop shaft carries out brushing dilatation, and wherein ventilation drainage sump and stage casing, top ore removal wear arteries and veins roadway linking, forms ventilation circuit;
(5), by stope join lane construction drop shaft passage, ventilation drainage sump passage, form ore removal ability and ventilation discharging capacity;
(6), wearing arteries and veins base plate is left foundation to 7 meters, its top ore body, more than 7 meters formal stoping operations by a segmentation " Y " font joins lane.
Benefit of the present invention is:
1), by N number of stope, adopt Barebone with N/2 cover and carry out adopting standard, engineering quantity saves half, saves and adopts accurate investment in a large number;
2), by N number of stope, adopt Barebone with N/2 cover and carry out adopting standard, the duration saves half, greatly reduces mining time;
3), the invention enables transportation roadway, segmentation lane from ore body more close to, save transportation roadway, segmentation connection lane engineering length;
4), on technological layer, the present invention can combine with multiple mining methods, greatly improves adopting of mining methods and cuts ratio;
5), on construction investment, technical scheme provided by the invention improves the investment yield of mining, shortens the investment payback time of mining, has won economic benefit and Saving in time costs.
Accompanying drawing explanation
Fig. 1 is that the present invention indulges perspective view;
Fig. 2 is sectional drawing of the present invention;
Fig. 3 is plan view of the present invention;
Note: draw for conjugation-type Upward drift in figure.
Detailed description of the invention: further describe the present invention below in conjunction with accompanying drawing.As shown in Figure 1, to adopt the technique of Barebone engineering as follows for conjugation-type:
The first, wear arteries and veins 2 and arrive ore body by main haulage roadway 1 ore removal of constructing, construction drop shaft passage, and upwards to be constructed drop shaft 3 by drop shaft passage, construction ventilation drainage sump passage, and by ventilation drainage sump passage construction ventilation drainage sump 4,5, wear 14 through with stage casing, top ore removal;
The second, share connection lane 7 by segmentation lane construction " Y " font stope, at " Y " font crosspoint place, separately construction 1# stope joins lane 8 and 2# stope connection lane 9 respectively, and in good time by connection lane construction drop shaft passage and ventilation drainage sump passage;
Three, bottom ore is worn arteries and veins base plate and be left foundation to 7 meters, its top ore body, more than 7 meters formal stoping operations by a segmentation " Y " font joins lane.
Application conjugation-type mining methods carry out adopting accurate work arrangement, compared with adopting accurate method, greatly reduce nugget and adopt accurate engineering quantity with tradition, greatly reduce to adopt and are cut into this, considerably reduce to adopt and cut ratio, have obvious economic benefit and Saving in time costs.

Claims (2)

1. the formula of gripping adopts accurate method altogether, and its main implementation step is as follows:
(1), for newly opening stage casing, to deposit, geologic elements in conjunction with concrete mining methods, ore bodies, what provide by this patent adopts accurate method, and what other nuggets such as the development engineering of main haulage roadway and segmentation lane were arranged in planning adopts accurate engineering;
(2), for opening stage casing, conjugation-type can be carried out by this patent to follow-up nugget and adopting accurate work arrangement;
(3), be nugget stope by ore body division, and press 1# and 2#, 3# and 4#, 5# and 6# ... divide into groups;
(4), by bottom main haulage roadway construct and share ore removal Chuan Mai tunnel, position is preferentially arranged in the position, boundary line of two conjugation stope centers;
(5) ore body of this group two stopes, is arrived respectively by segmentation lane construction " Y-shaped conjugation joins lane ";
(6), by main haulage roadway construct drop shaft, ventilation drainage sump, wherein ventilation drainage sump and stage casing, top ore removal wear arteries and veins roadway linking;
(7), by stope join lane construction drop shaft passage, ventilation drainage sump passage, form ore removal ability and ventilation discharging capacity;
(8), after improving the technical safety measuress such as wind, water, electricity further, formally stoping operation is carried out.
2. the conjugation-type as described in right 1 adopts accurate method, is primarily characterized in that:
(1), three basic: basic thought is " sharing win-win ", and its general principle is " two or more stope share a set of adopt Barebone ", and basic object is " significant economic benefit and Saving in time costs ";
(2), conjugation adopt accurate formula mining codes pay close attention to center of gravity be adopt Barebone engineering optimization arrange, this is adopted accurate method and can combine with multiple mining methods, such as: 1. Upward drift; 2. to admission passage filling method under; 3. overhand cut and fill stoping; 4. underhand cut and fill stoping;
(3) after combining, the naming method of mining methods is " conjugation-type+former mining methods name ", as conjugation-type Upward drift;
(4) its core value be embodied in a N number of stope N/2 ore removal is worn, a N/2 drop shaft, a N/2 ventilation drainage sump and " Y-shaped conjugation connection lane " carry out nugget and adopt standard, engineering quantity saves half, duration saves half, has significant economic benefit and Saving in time costs;
(5) application " drop shaft brushing effect " is applicable to: 1) drop shaft brushing effect refers to drop shaft basal area and the drop shaft diameter exponentially phenomenon that increases of type; 2) its meaning is a diameter be the drop shaft brushing of 2m to be diameter is the drop shaft of 4m, and the diameter more adjacent than construction two is all the drop shaft of 2m, in duration, efficiency, capacity, have great advantage; 3) such as diameter is the round drop shaft basal area of 2m is 3.14 ㎡, and the round drop shaft basal area that diameter is 4m is 12.56 ㎡; 4) conjugation-type adopts accurate mining codes applicable application drop shaft brushing effect.
CN201610090362.3A 2016-02-18 2016-02-18 Conjugate type mining preparation method Pending CN105525921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610090362.3A CN105525921A (en) 2016-02-18 2016-02-18 Conjugate type mining preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610090362.3A CN105525921A (en) 2016-02-18 2016-02-18 Conjugate type mining preparation method

Publications (1)

Publication Number Publication Date
CN105525921A true CN105525921A (en) 2016-04-27

Family

ID=55768405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610090362.3A Pending CN105525921A (en) 2016-02-18 2016-02-18 Conjugate type mining preparation method

Country Status (1)

Country Link
CN (1) CN105525921A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106523014A (en) * 2016-11-28 2017-03-22 金诚信矿业管理股份有限公司 Ventilation system for underhand-cutting-and-filling-method high-temperature stope and method
CN110552701A (en) * 2019-10-10 2019-12-10 锡林郭勒盟山金阿尔哈达矿业有限公司 Partitioned combined filling mining method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010006304A1 (en) * 1999-12-17 2001-07-05 Cutting Edge Technology Pty Ltd Method of mining
RU2200839C2 (en) * 2000-06-16 2003-03-20 Открытое акционерное общество "Подмосковный научно-исследовательский и проектно-конструкторский угольный институт" Technique for development of deposit by system of chamber and column working
CN101526001A (en) * 2008-11-26 2009-09-09 枣庄矿业(集团)有限责任公司滨湖煤矿 Comprehensive mining opposite-pull working face coal excavating process for thin coal bed
CN102011589A (en) * 2010-10-29 2011-04-13 中钢集团马鞍山矿山研究院有限公司 Stope bottom structure suitable for underground two-step mining and production process thereof
CN202039860U (en) * 2011-04-29 2011-11-16 山西晋城无烟煤矿业集团有限责任公司 Parallel oppositely pulling full-mechanized face structure
CN102926754A (en) * 2012-11-17 2013-02-13 山东黄金矿业(莱州)有限公司三山岛金矿 Two-tunneling bidirectional stripping two-step pre-support mining method
CN103603665A (en) * 2013-10-25 2014-02-26 河北省矾山磷矿有限公司 Hanging wall side orebody extracting method in mine mining range
CN104234715A (en) * 2014-07-16 2014-12-24 天地科技股份有限公司 Large-mining-height dual-fully mechanized mining face stoping process

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010006304A1 (en) * 1999-12-17 2001-07-05 Cutting Edge Technology Pty Ltd Method of mining
RU2200839C2 (en) * 2000-06-16 2003-03-20 Открытое акционерное общество "Подмосковный научно-исследовательский и проектно-конструкторский угольный институт" Technique for development of deposit by system of chamber and column working
CN101526001A (en) * 2008-11-26 2009-09-09 枣庄矿业(集团)有限责任公司滨湖煤矿 Comprehensive mining opposite-pull working face coal excavating process for thin coal bed
CN102011589A (en) * 2010-10-29 2011-04-13 中钢集团马鞍山矿山研究院有限公司 Stope bottom structure suitable for underground two-step mining and production process thereof
CN202039860U (en) * 2011-04-29 2011-11-16 山西晋城无烟煤矿业集团有限责任公司 Parallel oppositely pulling full-mechanized face structure
CN102926754A (en) * 2012-11-17 2013-02-13 山东黄金矿业(莱州)有限公司三山岛金矿 Two-tunneling bidirectional stripping two-step pre-support mining method
CN103603665A (en) * 2013-10-25 2014-02-26 河北省矾山磷矿有限公司 Hanging wall side orebody extracting method in mine mining range
CN104234715A (en) * 2014-07-16 2014-12-24 天地科技股份有限公司 Large-mining-height dual-fully mechanized mining face stoping process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106523014A (en) * 2016-11-28 2017-03-22 金诚信矿业管理股份有限公司 Ventilation system for underhand-cutting-and-filling-method high-temperature stope and method
CN110552701A (en) * 2019-10-10 2019-12-10 锡林郭勒盟山金阿尔哈达矿业有限公司 Partitioned combined filling mining method

Similar Documents

Publication Publication Date Title
CN103557002B (en) A kind of mechanized concentrates drop shaft filling-up method
CN103089266B (en) Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN102392641B (en) Point pillar type full-ore-deposit middle-section-free upward high-layering continuous propelling fill mining method
CN104963705B (en) A kind of underground space tunneling construction method
CN103470262A (en) Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping
CN104863592A (en) Large-structure sublevel drilling stage ore removal mining method with delayed filling
CN102644464A (en) Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine
CN107829742A (en) Caving-filling-open stope-caving mining method
CN104100270A (en) Trackless mining method for gently inclined ore vein
CN108194084A (en) Outdoor end side ore deposit continuous miner end side recovery method
Li et al. Innovation for sustainable mining: Integrated planning of underground coal mining and mine reclamation
CN104653224A (en) Open pit tailing cemented filling treatment method
CN103557001B (en) A kind of low section high oper cylinler shrink afterwards filling mining method
CN103089268A (en) Intensive mining method of ore cluster in ore-concentrated area
CN105019715A (en) Structure jointly constructed by subway station and buildings
CN109339785A (en) A kind of intensive mining methods of gently inclined medium thick orebody multiple-unit combination
CN105525921A (en) Conjugate type mining preparation method
CN106121649A (en) Use the stoping method of the remained ore of block chambering method rooming
CN104179505B (en) A kind of underground mining method of phosphorus ore
CN102889083B (en) Method for confirming coal mining sunken surface soil peeling space time based on geographic information system (GIS) grid unit
CN103557029B (en) A kind of by sublevel caving method without sill pillar upwards to the method for horizontal cut and fill stoping transition
CN102877846A (en) Unit method based mined and reclaimed topsoil stripping time determining method
CN102817614A (en) Stope structure arrangement mode suitable for underground mine high productivity and low cost subsequent filling
CN106050235A (en) Rapid forming technique for cutting groove in large-structure stope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160427