CN105484512A - Method of repairing building cracks - Google Patents

Method of repairing building cracks Download PDF

Info

Publication number
CN105484512A
CN105484512A CN201410537488.1A CN201410537488A CN105484512A CN 105484512 A CN105484512 A CN 105484512A CN 201410537488 A CN201410537488 A CN 201410537488A CN 105484512 A CN105484512 A CN 105484512A
Authority
CN
China
Prior art keywords
tooth plate
cracks
building
fixed
steel bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410537488.1A
Other languages
Chinese (zh)
Inventor
谢牧驰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan No3 Construction And Engineering Co Ltd
Hunan Zhengchi Engineering Technology Consulting Co Ltd
Original Assignee
Hunan No3 Construction And Engineering Co Ltd
Hunan Zhengchi Engineering Technology Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan No3 Construction And Engineering Co Ltd, Hunan Zhengchi Engineering Technology Consulting Co Ltd filed Critical Hunan No3 Construction And Engineering Co Ltd
Priority to CN201410537488.1A priority Critical patent/CN105484512A/en
Publication of CN105484512A publication Critical patent/CN105484512A/en
Pending legal-status Critical Current

Links

Abstract

The present invention discloses a method of repairing building cracks and simultaneously reinforcing structures. The method is capable of effectively repairing the building cracks, particularly partial cracks and non-beam-surface cracks, and the cracks are effectively repaired and the structures are simultaneously reinforced by utilization of the method that anchoring toothed plates are cooperated with tensioning of steel bars. The method comprises the steps of establishing the anchoring toothed plates at two sides of a structural crack section, fixing the toothed plates through expansion bolts and structural adhesive, connecting one ends of the steel bars to the toothed plate at one side and welding and fixing the steel bars, and fixing the other ends of the steel bars to the corresponding positions of the toothed plate at the other side after the other ends of the steel bars are tensioned. According to the method, cost of repairing the cracks can be reduced, work amount is little, period is short, and the method can be suitable for most conditions of building cracks.

Description

A kind of method of repairing building cracks
Technical field
The present invention relates to the concrete structure reinforcement field of civil construction project, the method for a kind of building tear reparation structural strengthening simultaneously specifically.
Background technology
Fabric structure crack can be caused by many reasons, and comprise maintenance not in time, material is defective, and foundation settlement tilts, overweight and earthquake etc.Building tear may appear at metope, and floor is beam face even, and these situations can form serious threat to the safety of building.But demolition blasting is not a kind of way of economy, the technology of repairing crack can reduce the risk even got rid of construction cracking and topple over, and reaches good technology and economic benefit.
In current prior art, repairing the main way in crack is reinforcement, comprises the reinforcing bar with beam face at the bottom of supplement beam, expands beam section, and the method for outsourcing reinforcing bar reinforcing near beam support, is all adopt to reinforce beam.But the drawback of this method is that cost is huge, and engineering amount of reform is large, for residential building and commercial building, can impact in the use in strengthening construction process Zhong Dui building, and effect not obvious.Another deficiency is, because acting surface is large, the crack effect therefore for local (as corner) is poor.
The immediate cause producing structural cracks produced tension stress on the interface, crack of inside configuration, the confining pressure that therefore as long as applying one is contrary with tension stress equal and opposite in direction direction between crack, just can eliminate fracturing reason, promote both crannied rehabilitations.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind ofly repairs the method that building tear reinforces fabric structure simultaneously, can realize stitching reinforcement and repair effectively to building local cracks and non-beam facial cleft.
For achieving the above object, technical scheme of the present invention comprises the following steps: the first step, sets up anchoring tooth plate in the both sides in structural cracks interval, and tooth plate expansion bolt and structure glue are fixed; Second step, connects tooth plate with one end of reinforcing bar and is welded and fixed; 3rd step, after the other end stretch-draw of reinforcing bar, is fixed on the correspondence position of opposite side tooth plate.
In the aforesaid first step, only can occur that the one side in crack arranges tooth plate, also can at two-sided layout tooth plate.Effectively to apply Yue Bouquet power between crack, first must find an effective origin of force, therefore must set up the anchoring tooth plate bearing Zhe Yue Bouquet power.According to the difference of the character in crack, feature and the regularity of distribution, the arrangement of tooth plate is also different.For the not full face one side crack of communicating structure, only can occur that the one side in crack arranges tooth plate; For through full face two-sided crack, then can adopt two-sided layout tooth Sheet.
Aforesaid reparation building tear and structural strengthening method, the reinforcing bar in step 2 and step 3 also can adopt steel strand to replace, and carrys out the tooth plate that both sides are fixed in stretch-draw.
The method of the aforementioned reparation building tear stated and structural strengthening, the anchoring tooth plate described in it is T-shaped tooth plate or plane tooth plate.Aforesaid T-shaped tooth plate is a general T-shaped iron, and the base plate of tooth plate is holed, and web is carved tooth grain.
Compared with prior art, reparation building tear provided by the present invention reinforce simultaneously fabric structure method can for local little crack and non-beam facial cleft seam effectively repair, the effect of ruggedized construction can be realized, the supporting capacity of lift structure and shock resistance simultaneously.
Accompanying drawing explanation
This manual comprises 3 width accompanying drawings:
Fig. 1 is the floor map adopting method of the present invention to repair cracks on floor slab;
Fig. 2 is the sectional view of Fig. 1 along A-A.
Fig. 3 is the schematic diagram adopting method of the present invention to repair gable crack.
Component, component names and corresponding mark in figure: T-shaped tooth plate 1, plane tooth plate 2, reinforcing bar 3, crack 4, floor 5.
Detailed description of the invention
Embodiment 1: the building floor shown in accompanying drawing 1, the anti-negative reinforcement configured due to wall or the top surface of the beam at floor bearing place can not meet actual requirement, floor is caused to ftracture, floor is through tunneling boring bilateral cracking, therefore investigates the region in crack, according to method of the present invention, adopt the method for two-sided layout tooth plate: the first step, adopt plane tooth plate, by structure glue, plane tooth plate 2 is fixed on the collar tie beam side of gable, plane tooth plate is close to collar tie beam; In indoor, by the side, crack of expansion bolt just T-shaped tooth plate floor, every two T-shaped tooth plates 1 are corresponding, and the T-shaped tooth plate near gable side is corresponding with the plane tooth plate be fixed on gable; The tooth plate of identical correspondence is arranged too at the another side of floor.Second step, adopts reinforcing bar 3, the two ends of reinforcing bar are embedded in the teeth groove of two corresponding tooth plates, and one end is fixed with solid welding, configuration 7 reinforcing bars between every two corresponding tooth plates.3rd step, does not have the other end stretch-draw of fixing reinforcing bar, is welded and fixed after crack is recovered.
Embodiment 2: shown in accompanying drawing 2 is building shear wall inner wall surface crack, fracture strike is vertical, and crack closeness is large, but the degree of depth is also little, therefore according to method of the present invention, adopt one side to arrange the method for anchoring tooth plate: the first step, arrange two vertical T-shaped tooth plates in the both sides of crack area, all fix with expansion bolt and structure glue.Second step, adopts steel strand, and steel strand one end is embedded in the teeth groove of corresponding two tooth plates, configures 5 steel strand altogether, and steel strand left end is first fixed on the tooth plate in left side.3rd step, the other end stretch-draw that steel strand are not fixed, be metope split a point compound, to be then fixed on other end tooth plate fixing.

Claims (4)

1. repair a building tear ruggedized construction method simultaneously, it comprises the steps: the first step, sets up anchoring tooth plate in the both sides in structural cracks interval, and tooth plate expansion bolt and structure glue are fixed; Second step, connects tooth plate with one end of reinforcing bar and is welded and fixed; 3rd step, after the other end stretch-draw of reinforcing bar, is fixed on the correspondence position of opposite side tooth plate.
2. the method for reparation building tear according to claim 1 and structural strengthening, in its first step, only can occur that the one side in crack arranges tooth plate, also can at two-sided layout tooth plate.
3. reparation building tear according to claim 1 and 2 and structural strengthening method, also can adopt steel strand to carry out the tooth plate that both sides are fixed in stretch-draw.
4. the method for reparation building tear according to claim 1 and structural strengthening, the anchoring tooth plate belonging to it is T-shaped tooth plate or plane tooth plate.
CN201410537488.1A 2014-10-13 2014-10-13 Method of repairing building cracks Pending CN105484512A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410537488.1A CN105484512A (en) 2014-10-13 2014-10-13 Method of repairing building cracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410537488.1A CN105484512A (en) 2014-10-13 2014-10-13 Method of repairing building cracks

Publications (1)

Publication Number Publication Date
CN105484512A true CN105484512A (en) 2016-04-13

Family

ID=55671760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410537488.1A Pending CN105484512A (en) 2014-10-13 2014-10-13 Method of repairing building cracks

Country Status (1)

Country Link
CN (1) CN105484512A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025338A (en) * 2018-06-30 2018-12-18 南宁学院 A kind of reinforced concrete wall crack repairing method
CN112663985A (en) * 2020-12-14 2021-04-16 昆山圣康建设工程安装有限公司 Construction method for reinforcing structure of old building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01299963A (en) * 1988-04-05 1989-12-04 Ortega Beltran Jorge Method of re-clamping or repairing and reinforcing or load-reducing deformed existing structure
CN1576497A (en) * 2003-07-07 2005-02-09 M&S工业株式会社 Reinforced material for concrete building repairing ,repairing and reinforcing technology for concrete building
CN101832033A (en) * 2010-04-08 2010-09-15 李青松 Strengthening method for armoured concrete slab
CN101886478A (en) * 2010-06-30 2010-11-17 西南科技大学 Repairing and reinforcing process of construction cracking member
CN202391150U (en) * 2011-12-16 2012-08-22 贵州中建建筑科研设计院有限公司 Strengthened structure of existing building floor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01299963A (en) * 1988-04-05 1989-12-04 Ortega Beltran Jorge Method of re-clamping or repairing and reinforcing or load-reducing deformed existing structure
CN1576497A (en) * 2003-07-07 2005-02-09 M&S工业株式会社 Reinforced material for concrete building repairing ,repairing and reinforcing technology for concrete building
CN101832033A (en) * 2010-04-08 2010-09-15 李青松 Strengthening method for armoured concrete slab
CN101886478A (en) * 2010-06-30 2010-11-17 西南科技大学 Repairing and reinforcing process of construction cracking member
CN202391150U (en) * 2011-12-16 2012-08-22 贵州中建建筑科研设计院有限公司 Strengthened structure of existing building floor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025338A (en) * 2018-06-30 2018-12-18 南宁学院 A kind of reinforced concrete wall crack repairing method
CN109025338B (en) * 2018-06-30 2021-01-26 南宁学院 Method for repairing reinforced concrete wall crack
CN112663985A (en) * 2020-12-14 2021-04-16 昆山圣康建设工程安装有限公司 Construction method for reinforcing structure of old building

Similar Documents

Publication Publication Date Title
CN204530418U (en) A kind of steel plate combination beam bridge
CN102587689B (en) Repairing and strengthening method for existing reinforced concrete beam-column joints
CN103075020B (en) A kind of steel tray supports actuating system
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN103741881B (en) Assembling frame post and construction method
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN203834682U (en) Exposed type column base with shear key
CN102650127B (en) Precast U-shaped plate pile with mixed structure of steel and concrete
CN102747735A (en) Treatment method for abnormal deformation of deep foundation pit concrete support piling
CN104947684B (en) Construction method based on assembled recyclable process soil nailing wall support
CN104060542B (en) Compound beam cable stayed bridge direction across bridge prestress application device and applying method thereof
RU165764U1 (en) REINFORCED CONCRETE BASE FOR THE ROCKING MACHINE
CN204662455U (en) Foundation pit support device reinforced by a kind of adjustable diagonal brace
CN103924667A (en) Prefabricated assembly type anti-buckling steel plate shear wall tall building structure system
CN105756365B (en) A kind of method of rapid reinforcement beams of concrete
CN203684439U (en) Supporting device for construction of installing shock insulation support on building by cutting columns
CN107130983A (en) A kind of large cross-section tunnel tunneling construction grillage strengthening supporting method
CN104499608A (en) Method for designing and constructing prestressed section steel reinforced shear wall
CN103614974B (en) Prestress sectional steel reinforcing system of reinforced concrete arch shell bridge body
CN105484512A (en) Method of repairing building cracks
CN202913337U (en) Prestress combination box girder composed of concrete frange plates and corrugated steel webs
CN106703073B (en) Super High building hoist exempts from return back to top steel beam foundation and its construction method
CN103790176A (en) Embedded short strut structure and construction method thereof
CN105604342A (en) Comprehensive reinforcing method for T-shaped beam of reinforced concrete frame
CN105040726A (en) Method for applying circular prestress on fan foundation connection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160413