CN105483357B - A kind of steel wire water quenching production line - Google Patents

A kind of steel wire water quenching production line Download PDF

Info

Publication number
CN105483357B
CN105483357B CN201511024187.XA CN201511024187A CN105483357B CN 105483357 B CN105483357 B CN 105483357B CN 201511024187 A CN201511024187 A CN 201511024187A CN 105483357 B CN105483357 B CN 105483357B
Authority
CN
China
Prior art keywords
seat
steel wire
mounting seat
heating group
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511024187.XA
Other languages
Chinese (zh)
Other versions
CN105483357A (en
Inventor
金雷
寿新涛
戚少君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201511024187.XA priority Critical patent/CN105483357B/en
Publication of CN105483357A publication Critical patent/CN105483357A/en
Application granted granted Critical
Publication of CN105483357B publication Critical patent/CN105483357B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/52Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length
    • C21D9/525Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length for wire, for rods
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • C21D1/667Quenching devices for spray quenching

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Cleaning In General (AREA)
  • Wire Processing (AREA)

Abstract

The invention discloses a kind of steel wire water quenching production line, including unwinding device, feeding coalignment, Quench heating group, some quenching spray blow-dry devices, it is tempered heating group, clean blow-dry device, shear, transition frame and two wrap-ups, the unwinding device, feeding coalignment, clean blow-dry device, Quench heating group, it is tempered heating group, shear and transition frame are arranged in order from front to back, provided with quenching spray blow-dry device between the Quench heating group and tempering heating group, provided with quenching spray blow-dry device between the tempering heating group and shear, the rear of the transition frame is provided with two wrap-ups, compared with prior art, can continuously it unreel, save electric energy, suspender is reduced to take for a long time, and alignment is simple to operate, improve operating efficiency, reduce labor intensity, also Steel Wire Surface can be cleaned, reduce site environment pollution, and when being adjusted according to steel wire diameter, it is easy to adjust.

Description

A kind of steel wire water quenching production line
【Technical field】
The present invention relates to the technical field of steel wire processing, particularly a kind of technical field of steel wire water quenching production line.
【Background technology】
In the prior art, spring need to unreel steel wire coil used before manufacture, alignment, cleaning, quenching etc. Reason, existing steel wire coil typically uses rotary draw drum, and the good steel wire coil level of disk is set on rotary draw drum, leads to The rotation for crossing rotary draw drum is processed to extract steel wire.Rotary draw drum is after a roll of steel wire coil is discharged, Cai Nengzai Upper another volume steel wire coil, then passes through follow-up equipment in traction steel wire, so as to can not continuously unreel, loses time;On the other hand, The disk weight of steel wire coil is heavier, and rotary pay off rack rotation needs to drive overall steel wire coil to rotate.So as to need the work(of motor Rate is larger.
Existing straightener need to adjust the position of roller during alignment metal wire rod, if scroll wheel positions are leaned on very much Closely, easily cause accommodative excess, if scroll wheel positions leave too remote, cause metal wire rod school not straight, and number of rollers compared with It is many, how there are a suitable scroll wheel positions to need operator to be slowly adjusted, for the gold of different size diameter Belong to wire rod, same adjustment work is carried out every time, cumbersome, inefficiency, labor intensity are big.
In alkaline cleaning procedure, due to there is many dust-like impurity on steel wire, it can be precipitated in alkaline cleaning procedure, cause alkali Wash rubbish in cylinder more and more, to clear up, need to stop on whole steel wire streamline, and manually cleared up, i.e., it is time-consuming Take manpower again.
【The content of the invention】
The purpose of the present invention is exactly to solve the problems of the prior art, proposes a kind of steel wire water quenching production line, can be continuous Unreel, save electric energy, reduce suspender and take for a long time, and alignment is simple to operate, improve operating efficiency, reduction works strong Degree, can also clean to Steel Wire Surface, save manpower and time, and reduce site environment pollution, and straight according to steel wire It is easy to adjust when footpath is adjusted.
To achieve the above object, the present invention proposes a kind of steel wire water quenching production line, including unwinding device, feeding alignment dress Put, Quench heating group, some quenchings spray blow-dry device, tempering heating group, cleaning blow-dry device, shear, transition frame and Two wrap-ups, the unwinding device, feeding coalignment, cleaning blow-dry device, Quench heating group, tempering heating group, cut Cutting apparatus and transition frame are arranged in order from front to back, provided with quenching spray drying between the Quench heating group and tempering heating group Device, provided with quenching spray blow-dry device between the tempering heating group and shear, the rear of the transition frame is provided with two Individual wrap-up, the unwinding device includes the first motor, first support, rotating shaft, placing body, thread guide mechanism, some support machines Structure, wire vent hole, guide wheel, the first disk roller and pushing mechanism, the first support are provided with rotatable rotating shaft, after the rotating shaft End is provided with wire vent hole, and input end of the rotating shaft in wire vent hole is provided with guide wheel and the first disk roller, first motor and rotating shaft Drive connection, the rotating shaft is provided with thread guide mechanism, and the front end of the rotating shaft, which is rotatably connected, placing body, the supporting mechanism On be supported by placing body, pushing mechanism is provided with the placing body, the pushing mechanism includes the second motor, screw rod and stop Screw rod and the second motor are provided with seat, the placing body, the front end of the screw rod is connected with the rotary shaft of the second motor, the spiral shell Blocking seat of the bar provided with threaded connection, the upper end of the placing body is provided with the chute hole for being available for blocking seat to slide, described to shelve Body is equipped with the first bearing in the both sides of chute hole, and the upper end of first bearing is arc, and the upper end of the blocking seat exceeds The upper end of first bearing, the feeding coalignment include set gradually from front to back feed mechanism, vertically arranged alignment Mechanism and horizontally disposed aligning mechanism, the aligning mechanism include support body, lower mounting seat, upper mounting seat, some straightening-wheels, the Three cylinders, rotary shaft, some cams, linking arm, push away seat, some guide rods and the first spring, the upper end of the following body of the support body Provided with lower mounting seat, the upper-end front of the lower mounting seat and rear portion are equipped with guide rod, the guide rod and are provided with upper mounting seat, The first spring is cased with guide rod between the lower mounting seat and upper mounting seat, some straightening-wheels are lined up in upper mounting seat One row, some straightening-wheels are arranged in a row in lower mounting seat, and the lower end of the top body of the support body is provided with rotary shaft, described The two ends of rotary shaft are equipped with cam, and the upper end of the upper mounting seat pushes away seat provided with what is be engaged with cam, the rotary shaft Centre is provided with linking arm, and the piston rod of the 3rd cylinder is connected with linking arm, and the cleaning blow-dry device is included from front to back Ash removing mechanism, wiper mechanism and the second dry body set gradually, the ash removing mechanism include the 5th motor, two second Cleaning mechanism is installed, the 5th motor is driven with cleaning mechanism in frame, cleaning mechanism and dust collection mechanism, the second support Connection, the cleaning mechanism includes preceding rotation seat, rear rotation seat, two brush plates, some first mounting seats, adjusting screw rod, the Two springs and clamp nut, the preceding rotation seat may be rotatably mounted at the lower end of fore-stock, and the rear rotation seat is rotatably mounted In the lower end of after-poppet, the rear end of the preceding rotation seat and the front end of rear rotation seat be equipped with above and below two the first mounting seats, institute State and adjusting screw rod is equipped with the first mounting seat, covered on the adjusting screw rod between the cap body of the adjusting screw rod and the first mounting seat There is second spring, the adjusting screw rod is provided with clamp nut, the preceding rotation seat and rear rotation seat in the inner side of the first mounting seat On upper mounting seat on adjusting screw rod on be provided with the lower mounting seat on a brush plate, the preceding rotation seat and rear rotation seat Adjusting screw rod on be provided with another brush plate, the preceding rotation seat and rear rotation seat and be equipped be available for steel wire to pass through first Through hole, the dust collection mechanism includes being provided with housing, pipeline, dust collecting box, blower fan, filtering bodies, discharging opening and valve, the housing Cleaning mechanism, the bottom of the housing is connected by pipeline with dust collecting box, and the bottom of the dust collecting box is provided with discharging opening, it is described go out Material mouth is provided with valve, and the input of the blower fan is connected with dust collecting box, and the inwall of the dust collecting box is defeated provided with cover lid blower fan Enter the filtering bodies at end, the filtering bodies are arcuate shape, and the housing is provided with openable maintenance door, the maintenance door and shell Sealed between body by sealing strip, the bottom of the housing is conical by its shape.
Preferably, the feed mechanism includes second base, some lower drawing-inrollers, some second cylinders, some four Motor, some upper drawing-inrollers and some slides, the second base are provided with transversely arranged lower drawing-inroller, it is described it is each under give Material wheel correspondence is connected with the 4th motor, and the second base is provided with transversely arranged slide, and the slide is provided with upper Drawing-inroller, the upper end of the second base is provided with the second transversely arranged cylinder, and second cylinder is corresponded simultaneously with slide Connection, the lower drawing-inroller is corresponded with upper drawing-inroller.
Preferably, the Quench heating group and tempering heating group are constituted by some Quench heating inductors.
Preferably, the quenching spray blow-dry device includes spraying mechanism and the first dry body, the spraying mechanism Including the first cell body, the first water pipe and some first shower nozzles, it is equipped with the inside of the upper cell wall of first cell body and lower cell wall First water pipe, first water pipe be provided with the first shower nozzle, if first dry body include the second cell body, the first airduct and Dry first cuts a smart figure, and is equipped with the inside of the upper cell wall of second cell body and lower cell wall on the first airduct, first airduct Cut a smart figure provided with first.
Preferably, the wiper mechanism includes the 3rd cell body, the second water pipe and some second shower nozzles, the 3rd cell body Upper cell wall and lower cell wall on the inside of be equipped with the second water pipe, second water pipe is provided with the second shower nozzle;Second drying Mechanism includes the 4th cell body, the second airduct and some second and cut a smart figure, the upper cell wall of the 4th cell body and the inner side of lower cell wall The second airduct is equipped with, second airduct is cut a smart figure provided with second.
Preferably, the shear includes the 3rd cylinder, Cut Block, slides stripping and slicing and some second through holes, it is described Cut Block is connected provided with stripping and slicing, the piston rod of the 3rd cylinder is slided with sliding stripping and slicing, and the Cut Block is provided with two The second horizontally arranged through hole, the slip stripping and slicing is provided with the second through hole.
Preferably, the transition frame is provided with two silk rolling grooves, described two silk rolling grooves are set into splayed, described every Rear end one wrap-up of correspondence of individual silk rolling groove.
Preferably, the wrap-up includes the second bearing, the 3rd motor and coiled frame, second bearing is provided with Rotatable coiled frame, the 3rd motor is connected with coiled frame, and the front end of the coiled frame is provided with dismountable baffle plate, Fixation with steel wire body is mounted by means of screws with the axle of the coiled frame, the upper end of the baffle plate is provided with suspension ring.
Preferably, the thread guide mechanism includes balanced body, fixed seat, upper supporting column, lower supporting rod, some second disk rollers and the The fixed seat being fixedly connected is arranged with two mounting seats, the rotating shaft, the upper end of the fixed seat is provided with upper supporting column, the upper branch The upper end of post is provided with balanced body, and the lower end of the fixed seat is provided with lower supporting rod, and the lower end of the lower supporting rod is provided with the second mounting seat, The front portion of second mounting seat is provided with two provided with two up and down the second disk rollers be arrangeding in parallel, the rear portion of second mounting seat Individual the second vertically arranged disk roller.
Preferably, the quantity of the supporting mechanism is two, the supporting mechanism includes first base, supporter, the One cylinder and pedestal, the first base are provided with supporter and the first cylinder, and first cylinder is located at the front of supporter, The upper end of the supporter is provided with the pedestal being rotatably connected, and the piston rod of first cylinder is rotatably connected with pedestal, institute State placing body to be shelved on pedestal, the pedestal is provided with some adjustment seats, the adjustment seat includes carrying bolt and fixed spiral shell Mother, the carrying bolt is threadedly coupled with pedestal, and the carrying bolt is provided with fixing nut.
Beneficial effects of the present invention:The present invention by the first motor by driving axis of rotation, and rotating shaft drives thread guide mechanism to turn Dynamic, thread guide mechanism drives the steel wire being enclosed on placing body to unreel, because motor only needs to drive axis of rotation, it is not necessary to drive steel Silk volume is rotated, so as to reduce the power of motor;When needing continuous unreel, another steel wire coil is enclosed on placing body by suspender, preceding Supporting mechanism falls to not being supported placing body, and then steel wire coil is pushed between two supporting mechanisms by pushing mechanism On placing body, then the end of the steel wire coil unreeled and the top of another steel wire coil be welded together, front support machine Structure rises to be supported to placing body, and then supporting mechanism falls to not being supported placing body, then passes through pushing mechanism handle Steel wire coil shifts to the steel wire coil unreeled, and rear support mechanism rises again to be supported to placing body, is continuously unreeled so as to realize, And reduce suspender and take for a long time;5th motor drives forward to move seat and rotated, and preceding rotation seat drives brush plate to rotate, and works as steel wire During by between two brush plates, effectively the dust on steel wire can be removed, can be effectively to brushing off by dust collection mechanism Dust impurity reclaimed, it is to avoid dust diffuses, reduce site environment pollution, when steel wire diameter conversion need regulation when, can Turn clamp nut manually the spacing of two brush plates is adjusted as needed, Steel Wire Surface can be cleaned, saved Human-saving and time, and when being adjusted according to steel wire diameter, it is easy to adjust;Linking arm is promoted by the 3rd cylinder, even Connect arm and cam rotation is driven by rotary shaft, cam pushes away seat and drive upper mounting seat to move downward to pushing away a down force, upper peace Dress seat drives row's straightening-wheel to move downward, and steel wire between upper row's straightening-wheel and lower row's straightening-wheel by carrying out alignment, Neng Goucao Make simple, improve operating efficiency, reduce labor intensity.
The feature and advantage of the present invention will be described in detail by embodiment combination accompanying drawing.
【Brief description of the drawings】
Fig. 1 is a kind of structural representation of steel wire water quenching production line of the invention;
Fig. 2 is the structural representation of supporting mechanism;
Fig. 3 is the structural representation of feeding coalignment;
Fig. 4 is the structural representation of aligning mechanism;
Fig. 5 is the structural representation of quenching spray blow-dry device;
Fig. 6 is the structural representation for cleaning blow-dry device;
Fig. 7 is the structural representation of shear;
Fig. 8 is the structural representation of ash removing mechanism;
Fig. 9 is the structural representation of wrap-up.
In figure:1- unwinding devices, 2- feedings coalignment, 3- Quench heatings group, 4- quenching sprays blow-dry device, 5- tempering Heating group, 6- cleaning blow-dry device, 7- shears, 8- transition frames, 9- wrap-ups, the motors of 11- first, 12- first supports, 13- rotating shafts, 14- placing bodies, 15- thread guide mechanisms, 16- supporting mechanisms, 17- wire vents hole, 18- guide wheels, the disk rollers of 19- first, 20- are pushed away Motivation structure, the motors of 201- second, 202- screw rods, 203- blocking seats, 151- balanced bodies, 152- fixed seats, 153- upper supporting columns, 154- Lower supporting rod, the disk rollers of 155- second, 156- mounting seats, 161- first bases, 162- supporters, the cylinders of 163- first, 164- pedestals, 165- adjustment seats, 1651- carrying bolts, 1652- fixing nuts, 141- chute holes, the bearings of 142- first, 21- feed mechanisms, Drawing-inroller under 22- aligning mechanisms, 211- second bases, 212-, the cylinders of 213- second, the motors of 214- the 4th, the upper drawing-inrollers of 215-, 216- slides, 221- support bodys, 222- lower mounting seats, 223- upper mounting seats, 224- straightening-wheels, the cylinders of 225- the 3rd, 226- are rotated Axle, 227- cams, 228- linking arms, 229- push away seat, 2210- guide rods, the springs of 2211- first, 41- spraying mechanisms, 42- first and blown Dry mechanism, the cell bodies of 411- first, the water pipes of 412- first, the shower nozzles of 413- first, the cell bodies of 421- second, the airducts of 422- first, 423- First cuts a smart figure, 61- ash removing mechanisms, 62- wiper mechanisms, the dry bodies of 63- second, the motors of 611- the 5th, 612- second supports, Rotation seat, 6133- brush plates, 6134- are installed after rotation seat, 6132- before 613- cleaning mechanisms, 614- dust collection mechanisms, 6131- Seat, 6135- adjusting screw rods, 6136- second springs, 6137- clamp nuts, 6138- first through hole, 6141- housings, 6142- pipe Road, 6143- dust collecting boxes, 6144- blower fans, 6145- filtering bodies, 6146- discharging openings, 6147- valves, 6148- maintenance doors, 621- Three cell bodies, the water pipes of 622- second, the shower nozzles of 623- second, the cell bodies of 631- the 4th, the airducts of 632- second, 633- second cut a smart figure, 71- 3rd cylinder, 72- Cut Blocks, 73- slide stripping and slicing, the through holes of 74- second, 81- silk rollings groove, 91- bearings, the motors of 92- the 3rd, 93- Coiled frame, 94- baffle plates, 95- fixed bodies, 96- suspension ring.
【Embodiment】
Refering to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8 and Fig. 9, a kind of steel wire water quenching production line of the invention, bag Include unwinding device 1, feeding coalignment 2, Quench heating group 3, some quenching spray blow-dry devices 4, tempering heating group 5, cleaning Blow-dry device 6, shear 7, transition frame 8 and two wrap-ups 9, the unwinding device 1, feeding coalignment 2, cleaning are blown Equipment for drying 6, Quench heating group 3, tempering heating group 5, shear 7 and transition frame 8 are arranged in order from front to back, and the quenching adds Provided with quenching spray blow-dry device 4 between heat group 3 and tempering heating group 5, set between the tempering heating group 5 and shear 7 There is quenching spray blow-dry device 4, the rear of the transition frame 8 is provided with two wrap-ups 9, and the unwinding device 1 includes first Motor 11, first support 12, rotating shaft 13, placing body 14, thread guide mechanism 15, some supporting mechanisms 16, wire vent hole 17, guide wheel 18, First disk roller 19 and pushing mechanism 20, the first support 12 are provided with rotatable rotating shaft 13, and the rear end of the rotating shaft 13 is set There is wire vent hole 17, input end of the rotating shaft 13 in wire vent hole 17 is provided with the disk roller 19 of guide wheel 18 and first, first motor 11 are connected with rotating shaft 13, and the rotating shaft 13 is provided with thread guide mechanism 15, and the front end of the rotating shaft 13, which is rotatably connected, puts Put and placing body 14 is supported by body 14, the supporting mechanism 16, pushing mechanism 20, the promotion machine are provided with the placing body 14 Structure 20 includes being provided with the motor of screw rod 202 and second in the second motor 201, screw rod 202 and blocking seat 203, the placing body 14 201, the front end of the screw rod 202 is connected with the rotary shaft of the second motor 201, resistance of the screw rod 202 provided with threaded connection Block seat 203, the upper end of the placing body 14 is provided with the chute hole 141 for being available for blocking seat 203 to slide, and the placing body 14 is in chute The both sides in hole 141 are equipped with the first bearing 142, and the upper end of first bearing 142 is arc, the upper end of the blocking seat 203 It is feed mechanism 21 that the feeding coalignment 2 includes setting gradually from front to back, vertical beyond the upper end of the first bearing 142 The aligning mechanism 22 and horizontally disposed aligning mechanism 22 of setting, the aligning mechanism 22 include support body 221, lower mounting seat 222, Upper mounting seat 223, some straightening-wheels 224, the 3rd cylinder 225, rotary shaft 226, some cams 227, linking arm 228, push away seat 229th, some springs 2211 of guide rod 2210 and first, the upper end of the following body of the support body 221 is provided with lower mounting seat 222, described The upper-end front of lower mounting seat 222 and rear portion are equipped with guide rod 2210, the guide rod 2210 and are provided with upper mounting seat 223, institute State and the first spring 2211 is cased with the guide rod 2210 between lower mounting seat 222 and upper mounting seat 223, some straightening-wheels 224 It is arranged in a row in upper mounting seat 223, some straightening-wheels 224 are arranged in a row in lower mounting seat 222, the support body 221 Top body lower end be provided with rotary shaft 226, the two ends of the rotary shaft 226 are equipped with cam 227, the upper mounting seat 223 Upper end be provided be engaged with cam 227 push away seat 229, the centre of the rotary shaft 226 is provided with linking arm 228, the described 3rd The piston rod of cylinder 225 is connected with linking arm 228, and the cleaning blow-dry device 6 includes the Machine for cleaning-out ash set gradually from front to back Structure 61, the dry body 63 of wiper mechanism 62 and second, the ash removing mechanism 61 include the 5th motor 611, two second supports Cleaning mechanism 613, the 5th motor are installed in the 612nd, cleaning mechanism 613 and dust collection mechanism 614, the second support 612 611 are connected with cleaning mechanism 613, and the cleaning mechanism 613 includes preceding rotation seat 6131, rear rotation seat 6132, two hairs Brush board 6133, some first mounting seats 6134, adjusting screw rod 6135, second spring 6136 and clamp nut 6137, the forward Dynamic seat 6131 may be rotatably mounted at the lower end of fore-stock, and the rear rotation seat 6132 may be rotatably mounted at the lower end of after-poppet, institute State the rear end of preceding rotation seat 6131 and the front end of rear rotation seat 6132 be equipped with above and below two the first mounting seats 6134, described first Adjusting screw rod 6135, the tune between the cap body of the adjusting screw rod 6135 and the first mounting seat 6134 are equipped with mounting seat 6134 Second spring 6136 is cased with section screw rod 6135, the adjusting screw rod 6135 is in the inner side of the first mounting seat 6134 provided with fastening spiral shell One mao is provided with the adjusting screw rod 6135 in upper mounting seat on mother 6137, the preceding rotation seat 6131 and rear rotation seat 6132 It is provided with the adjusting screw rod 6135 in lower mounting seat on brush board 6133, the preceding rotation seat 6131 and rear rotation seat 6132 another The first through hole for being available for steel wire to pass through is equipped with one brush plate 6133, the preceding rotation seat 6131 and rear rotation seat 6132 6138, the dust collection mechanism 614 includes housing 6141, pipeline 6142, dust collecting box 6143, blower fan 6144, filtering bodies 6145, discharging Cleaning mechanism 613 is provided with mouth 6146 and valve 6147, the housing 6141, the bottom of the housing 6141 passes through pipeline 6142 Connected with dust collecting box 6143, the bottom of the dust collecting box 6143 is provided with discharging opening 6146, and the discharging opening 6146 is provided with valve 6147, the input of the blower fan 6144 is connected with dust collecting box 6143, and the inwall of the dust collecting box 6143 is provided with cover lid blower fan The filtering bodies 6145 of 6144 input, the filtering bodies 6145 are arcuate shape, and the housing 6141 is provided with openable Maintenance door 6148, is sealed between the maintenance door 6148 and housing 6141 by sealing strip, and the bottom of the housing 6141 is cone Shape shape, the feed mechanism 21 includes second base 211, some lower drawing-inrollers 212, some second cylinders 213, some four Motor 214, some upper drawing-inrollers 215 and some slides 216, the second base 211 are provided with transversely arranged lower drawing-inroller 212, each lower correspondence of drawing-inroller 212 is connected with the 4th motor 214, and the second base 211 is provided with laterally row The slide 216 of row, the slide 216 is provided with upper drawing-inroller 215, and the upper end of the second base 211 is provided with transversely arranged Second cylinder 213, second cylinder 213 is corresponded and is connected with slide 216, the lower drawing-inroller 212 and upper drawing-inroller 215 are corresponded, and the Quench heating group 3 and tempering heating group 5 are constituted by some Quench heating inductors, the quenching spray Drenching blow-dry device 4 includes the dry body 42 of spraying mechanism 41 and first, and the spraying mechanism 41 includes the first cell body 411, first The first water pipe is equipped with the inside of water pipe 412 and some first shower nozzles 413, the upper cell wall of first cell body 411 and lower cell wall 412, first water pipe 412 is provided with the first shower nozzle 413, and first dry body 42 includes the second cell body 421, the first wind Pipe 422 and some first cuts a smart figure 423, and the first airduct is equipped with the inside of the upper cell wall of second cell body 421 and lower cell wall 422, first airduct 422 cuts a smart figure 423 provided with first, and the wiper mechanism 62 includes the 3rd cell body 621, the second water pipe 622 and some second shower nozzles 623, the second water pipe 622 is equipped with the inside of the upper cell wall and lower cell wall of the 3rd cell body 621, Second water pipe 622 is provided with the second shower nozzle 623;Second dry body 63 includes the 4th cell body 631, the second airduct 632 and some second cut a smart figure 633, and the second airduct is equipped with the inside of the upper cell wall and lower cell wall of the 4th cell body 631 632, second airduct 632 cuts a smart figure 633 provided with second, the shear 7 include the 3rd cylinder 71, Cut Block 72, Stripping and slicing 73 and some second through holes 74 are slided, the Cut Block 72 is provided with slip stripping and slicing 73, the piston of the 3rd cylinder 71 Bar is connected with sliding stripping and slicing 73, and the Cut Block 72 is provided with two the second horizontally arranged through holes 74, the slip stripping and slicing 73 The second through hole 74 is provided with, the transition frame 8 is set provided with two silk rolling grooves 81, described two silk rolling grooves 81 into splayed, Rear end one wrap-up 9 of correspondence of each silk rolling groove 81, the wrap-up 9 includes the second bearing 91, the 3rd motor 92 and coiled frame 93, second bearing 91 is passed provided with rotatable coiled frame 93, the 3rd motor 92 with coiled frame 93 Dynamic connection, the front end of the coiled frame 93, which is provided with to fix by screw on dismountable baffle plate 94, the axle of the coiled frame 93, pacifies Equipped with fixation with steel wire body 95, the upper end of the baffle plate 94 is provided with suspension ring 96, and the thread guide mechanism 15 includes balanced body 151, fixed It is arranged with seat 152, upper supporting column 153, lower supporting rod 154, the mounting seat 156 of some second disk rollers 155 and second, the rotating shaft 13 solid Surely the fixed seat 152 connected, the upper end of the fixed seat 152 is provided with upper supporting column 153, and the upper end of the upper supporting column 153 is provided with flat Weigh body 151, and the lower end of the fixed seat 152 is provided with lower supporting rod 154, and the lower end of the lower supporting rod 154 is provided with the second mounting seat 156, the front portion of second mounting seat 156 is provided with two up and down the second disk rollers 155 be arrangeding in parallel, second mounting seat 156 rear portion is provided with two the second vertically arranged disk rollers 155, and the quantity of the supporting mechanism 16 is two, the support machine Structure 16 includes first base 161, supporter 162, the first cylinder 163 and pedestal 164, and the first base 161 is provided with support The cylinder 163 of body 162 and first, first cylinder 163 is located at the front of supporter 162, and the upper end of the supporter 162 is provided with The pedestal 164 being rotatably connected, piston rod and the pedestal 164 of first cylinder 163 are rotatably connected, and the placing body 14 is put Put on pedestal 164, the pedestal 164 is provided with some adjustment seats 165, the adjustment seat 165 includes the He of carrying bolt 1651 Fixing nut 1652, the carrying bolt 1651 is threadedly coupled with pedestal 164, and the carrying bolt 1651 is provided with fixing nut 1652。
The course of work of the present invention:
In the course of the work, unwinding device 1 carries out steel wire coil and unreeled a kind of steel wire water quenching production line of the present invention, after unreeling Steel wire sequentially passes through feeding coalignment 2, cleaning blow-dry device 6, Quench heating group 3, the preceding spray blow-dry device, tempering of quenching and added Heat group 5, rear quenching spray blow-dry device, shear 7 and transition frame 8, it is then coiled by wrap-up 9, with prior art Compare, can continuously unreel, save electric energy, reduce suspender and take for a long time, and alignment is simple to operate, improve work effect Rate, reduction labor intensity, can also clean to Steel Wire Surface, save manpower and time, and reduce site environment pollution, and It is easy to adjust when being adjusted according to steel wire diameter.
Above-described embodiment is the description of the invention, is not limitation of the invention, it is any to simple transformation of the present invention after Scheme belong to protection scope of the present invention.

Claims (10)

1. a kind of steel wire water quenching production line, it is characterised in that:Including unwinding device (1), feeding coalignment (2), Quench heating Group (3), some quenching spray blow-dry devices (4), tempering heating group (5), cleaning blow-dry device (6), shear (7), transition Frame (8) and two wrap-ups (9), the unwinding device (1), feeding coalignment (2), cleaning blow-dry device (6), quenching add Hot group (3), tempering heating group (5), shear (7) and transition frame (8) are arranged in order from front to back, the Quench heating group (3) provided with quenching spray blow-dry device (4), the tempering heating group (5) and shear (7) between tempering heating group (5) Between provided with quenching spray blow-dry device (4), the rear of the transition frame (8) is described to unreel dress provided with two wrap-ups (9) Putting (1) includes the first motor (11), first support (12), rotating shaft (13), placing body (14), thread guide mechanism (15), some supports Set on mechanism (16), wire vent hole (17), guide wheel (18), the first disk roller (19) and pushing mechanism (20), the first support (12) There is rotatable rotating shaft (13), the rear end of the rotating shaft (13) is provided with wire vent hole (17), and the rotating shaft (13) is in wire vent hole (17) Input end be provided with guide wheel (18) and the first disk roller (19), first motor (11) and rotating shaft (13) drive connection are described Rotating shaft (13) is provided with thread guide mechanism (15), and the front end of the rotating shaft (13), which is rotatably connected, placing body (14), the support It is supported by mechanism (16) in placing body (14), the placing body (14) and is provided with pushing mechanism (20), the pushing mechanism (20) Including the second motor (201), screw rod (202) and blocking seat (203), screw rod (202) and second are provided with the placing body (14) Motor (201), the front end of the screw rod (202) is connected with the rotary shaft of the second motor (201), and the screw rod (202) is provided with The blocking seat (203) of threaded connection, the upper end of the placing body (14) is provided with the chute hole for being available for blocking seat (203) to slide (141), the placing body (14) is equipped with the first bearing (142), first bearing (142) in the both sides of chute hole (141) Upper end be arc, the upper end of the blocking seat (203) exceeds the upper end of the first bearing (142), the feeding coalignment (2) Including feed mechanism (21), the vertically arranged aligning mechanism (22) and horizontally disposed aligning mechanism set gradually from front to back (22), the aligning mechanism (22) includes support body (221), lower mounting seat (222), upper mounting seat (223), some straightening-wheels (224), the 3rd cylinder (225), rotary shaft (226), some cams (227), linking arm (228), push away seat (229), some guide rods (2210) and the first spring (2211), the upper end of the following body of the support body (221) is provided with lower mounting seat (222), the lower peace The upper-end front of dress seat (222) and rear portion are equipped with guide rod (2210), the guide rod (2210) and are provided with upper mounting seat (223) the first spring (2211), institute, are cased with the guide rod (2210) between the lower mounting seat (222) and upper mounting seat (223) State some straightening-wheels (224) to be arranged in a row in upper mounting seat (223), some straightening-wheels (224) are in lower mounting seat (222) On be arranged in a row, the lower end of the top body of the support body (221) is provided with rotary shaft (226), and the two ends of the rotary shaft (226) are equal Provided with cam (227), the upper end of the upper mounting seat (223) pushes away seat (229), described turn provided with what is be engaged with cam (227) The centre of moving axis (226) is provided with linking arm (228), and the piston rod of the 3rd cylinder (225) is connected with linking arm (228), institute State ash removing mechanism (61), wiper mechanism (62) and the second hair dryer that cleaning blow-dry device (6) includes setting gradually from front to back Structure (63), the ash removing mechanism (61) includes the 5th motor (611), two second supports (612), cleaning mechanisms (613) and inhaled Cleaning mechanism (613), the 5th motor (611) and cleaner are installed on dirt mechanism (614), the second support (612) Structure (613) is connected, and the cleaning mechanism (613) includes preceding rotation seat (6131), rear rotation seat (6132), two brush plates (6133), some first mounting seats (6134), adjusting screw rod (6135), second spring (6136) and clamp nut (6137), institute The lower end that preceding rotation seat (6131) may be rotatably mounted at fore-stock is stated, the rear rotation seat (6132) may be rotatably mounted at after-poppet Lower end, the rear end of the preceding rotation seat (6131) and the front end of rear rotation seat (6132) be equipped with above and below two the first mounting seats (6134), be equipped with adjusting screw rod (6135) on first mounting seat (6134), the cap body of the adjusting screw rod (6135) with Second spring (6136) is cased with adjusting screw rod (6135) between first mounting seat (6134), the adjusting screw rod (6135) exists The inner side of first mounting seat (6134) is provided with clamp nut (6137), the preceding rotation seat (6131) and rear rotation seat (6132) Upper mounting seat on adjusting screw rod (6135) on a brush plate (6133) is installed, the preceding rotation seat (6131) and rear rotate Another brush plate (6133), the preceding rotation seat are installed on the adjusting screw rod (6135) in lower mounting seat on seat (6132) (6131) first through hole (6138) for being available for steel wire to pass through, the dust collection mechanism (614) and are equipped with rear rotation seat (6132) Including housing (6141), pipeline (6142), dust collecting box (6143), blower fan (6144), filtering bodies (6145), discharging opening (6146) and Cleaning mechanism (613) is provided with valve (6147), the housing (6141), the bottom of the housing (6141) passes through pipeline (6142) connected with dust collecting box (6143), the bottom of the dust collecting box (6143) is provided with discharging opening (6146), the discharging opening (6146) valve (6147) is provided with, the input of the blower fan (6144) is connected with dust collecting box (6143), the dust collecting box (6143) filtering bodies (6145) of input of the inwall provided with cover lid blower fan (6144), the filtering bodies (6145) are arc shape Shape, the housing (6141) is provided with openable maintenance door (6148), between the maintenance door (6148) and housing (6141) Sealed by sealing strip, the bottom of the housing (6141) is conical by its shape.
2. a kind of steel wire water quenching production line as claimed in claim 1, it is characterised in that:The feed mechanism (21) includes second Base (211), some lower drawing-inrollers (212), some second cylinders (213), some 4th motors (214), some upper drawing-inrollers (215) and some slides (216), the second base (211) is provided with transversely arranged lower drawing-inroller (212), described each Lower drawing-inroller (212) correspondence is connected with the 4th motor (214), and the second base (211) is provided with transversely arranged cunning Seat (216), the slide (216) is provided with upper drawing-inroller (215), and the upper end of the second base (211) is provided with transversely arranged The second cylinder (213), second cylinder (213) and slide (216) are corresponded and are connected, the lower drawing-inroller (212) Corresponded with upper drawing-inroller (215).
3. a kind of steel wire water quenching production line as claimed in claim 1, it is characterised in that:The Quench heating group (3) and tempering Heating group (5) is constituted by some Quench heating inductors.
4. a kind of steel wire water quenching production line as claimed in claim 1, it is characterised in that:The quenching spray blow-dry device (4) Including spraying mechanism (41) and the first dry body (42), the spraying mechanism (41) includes the first cell body (411), the first water pipe (412) and some first shower nozzles (413), it is equipped with the first water on the inside of the upper cell wall and lower cell wall of first cell body (411) Manage (412), first water pipe (412) is provided with the first shower nozzle (413), first dry body (42) includes the second cell body (421), the first airduct (422) and some first is cut a smart figure (423), the upper cell wall of second cell body (421) and lower cell wall Inner side is equipped with the first airduct (422), and first airduct (422) is cut a smart figure (423) provided with first.
5. a kind of steel wire water quenching production line as claimed in claim 1, it is characterised in that:The wiper mechanism (62) includes the 3rd Cell body (621), the second water pipe (622) and some second shower nozzles (623), the upper cell wall and lower cell wall of the 3rd cell body (621) Inner side be equipped with the second water pipe (622), second water pipe (622) is provided with the second shower nozzle (623);Second hair dryer Structure (63) includes the 4th cell body (631), the second airduct (632) and some second and cut a smart figure (633), the 4th cell body (631) Upper cell wall and lower cell wall on the inside of be equipped with the second airduct (632), second airduct (632) is cut a smart figure provided with second (633)。
6. a kind of steel wire water quenching production line as claimed in claim 1, it is characterised in that:The shear (7) includes the 3rd Cylinder (71), Cut Block (72), slip stripping and slicing (73) and some second through holes (74), the Cut Block (72) are cut provided with slip Block (73), the piston rod of the 3rd cylinder (71) is connected with sliding stripping and slicing (73), and the Cut Block (72) is provided with two water The second through hole (74) of flat raft row, the slip stripping and slicing (73) is provided with the second through hole (74).
7. a kind of steel wire water quenching production line as claimed in claim 1, it is characterised in that:The transition frame (8) is provided with two Silk rolling groove (81), described two silk rolling grooves (81) are set into splayed, one receipts of rear end correspondence of each silk rolling groove (81) Winding apparatus (9).
8. a kind of steel wire water quenching production line as claimed in claim 1, it is characterised in that:The wrap-up (9) includes second Bearing (91), the 3rd motor (92) and coiled frame (93), second bearing (91) is provided with rotatable coiled frame (93), institute State the 3rd motor (92) to be connected with coiled frame (93), the front end of the coiled frame (93) is provided with dismountable baffle plate (94), Fixation with steel wire body (95) is mounted by means of screws with the axle of the coiled frame (93), the upper end of the baffle plate (94), which is provided with, hangs Ring (96).
9. a kind of steel wire water quenching production line as claimed in claim 1, it is characterised in that:The thread guide mechanism (15) includes balance Body (151), fixed seat (152), upper supporting column (153), lower supporting rod (154), some second disk rollers (155) and the second mounting seat (156) fixed seat (152) being fixedly connected, is arranged with the rotating shaft (13), the upper end of the fixed seat (152) is provided with upper branch Post (153), the upper end of the upper supporting column (153) is provided with balanced body (151), and the lower end of the fixed seat (152) is provided with lower supporting rod (154), the lower end of the lower supporting rod (154) is provided with the second mounting seat (156), and the front portion of second mounting seat (156) is provided with Two the second disk rollers (155) for be arrangeding in parallel up and down, the rear portion of second mounting seat (156) is provided with two vertically arranged the Two disk rollers (155).
10. a kind of steel wire water quenching production line as claimed in any one of claims 1-9 wherein, it is characterised in that:The supporting mechanism (16) quantity is two, and the supporting mechanism (16) includes first base (161), supporter (162), the first cylinder (163) With pedestal (164), the first base (161) is provided with supporter (162) and the first cylinder (163), first cylinder (163) front of supporter (162) is located at, the upper end of the supporter (162) is provided with the pedestal (164) being rotatably connected, institute The piston rod and pedestal (164) for stating the first cylinder (163) are rotatably connected, and the placing body (14) is shelved on pedestal (164), The pedestal (164) is provided with some adjustment seats (165), and the adjustment seat (165) includes carrying bolt (1651) and fixed spiral shell Female (1652), the carrying bolt (1651) is threadedly coupled with pedestal (164), and the carrying bolt (1651) is provided with fixed spiral shell Female (1652).
CN201511024187.XA 2015-12-30 2015-12-30 A kind of steel wire water quenching production line Active CN105483357B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511024187.XA CN105483357B (en) 2015-12-30 2015-12-30 A kind of steel wire water quenching production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511024187.XA CN105483357B (en) 2015-12-30 2015-12-30 A kind of steel wire water quenching production line

Publications (2)

Publication Number Publication Date
CN105483357A CN105483357A (en) 2016-04-13
CN105483357B true CN105483357B (en) 2017-09-08

Family

ID=55670628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511024187.XA Active CN105483357B (en) 2015-12-30 2015-12-30 A kind of steel wire water quenching production line

Country Status (1)

Country Link
CN (1) CN105483357B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107058696A (en) * 2017-06-02 2017-08-18 张子和 Quenching Treatment device is used in a kind of aluminium strip processing
CN110331262B (en) * 2019-08-16 2020-04-07 三门前庭机械科技有限公司 Heat treatment device for steel sectional strengthening
CN110629006B (en) * 2019-09-30 2021-07-13 聊城市飓风工业设计有限公司 Industrial production takes out arm with quenching piece
CN114953520A (en) * 2022-05-17 2022-08-30 厦门双瑞风电科技有限公司 Automatic laying device for lightning conductor of wind power blade

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2133288C1 (en) * 1997-12-04 1999-07-20 Открытое акционерное общество "Автонормаль" Coiled steel thermal treatment apparatus
WO2004092424A1 (en) * 2003-04-16 2004-10-28 Katsuhiko Yamada Heat treating method for steel wire
CN2613489Y (en) * 2003-04-17 2004-04-28 杨关楼 Induction heating equipment
CN102174671B (en) * 2011-01-31 2013-03-20 中国钢研科技集团有限公司 Thermal treatment production line of high-strength stirrup
CN102181621A (en) * 2011-04-26 2011-09-14 大连东非特钢制品有限公司 Quenching and tempering treatment method of steel slender axle type part
CN204638763U (en) * 2015-04-24 2015-09-16 天津市捷地工贸有限公司 A kind of five roller frenulum steel surface treatment line equipment
CN205295417U (en) * 2015-12-30 2016-06-08 浙江华纬弹簧有限公司 Improvement shaped steel silk shrend production line

Also Published As

Publication number Publication date
CN105483357A (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN105483357B (en) A kind of steel wire water quenching production line
CN206871822U (en) A kind of Furniture panel conveying device with dedusting function
CN108856575B (en) Bearing pressure straight steel wire straightener
CN207774461U (en) A kind of easy-to-dismount agricultural production water bag curler
CN208913684U (en) A kind of cutting debris collection device of bolt forming machine
CN105506266B (en) A kind of spring steel wire water quenching production line
CN207463744U (en) A kind of automatic washing system for blank tubing
CN207157036U (en) A kind of flowers transport vehicle with cleaning device
CN205295417U (en) Improvement shaped steel silk shrend production line
CN110802057A (en) Crops belt cleaning device
CN216048929U (en) Impurity removing and drying device for steel bar production
CN212114721U (en) Deicing device for high-voltage line
CN207087660U (en) A kind of cloth base processing system of emery cloth
CN115722368A (en) Steel construction paint spraying apparatus
CN109047550A (en) A kind of ramming waste material automatic Installation
CN212485987U (en) Power distribution network line construction wiring threading apparatus
CN212977096U (en) Reinforcement cage supporting device of seam welder
CN208898202U (en) Convenient for cutting the clot equipment of cloth
CN208549436U (en) A kind of municipal works trees snow removing snow melting device
CN207641757U (en) A kind of steel pipe plastic-blasting device
CN206951747U (en) Glass processing device
CN207044308U (en) A kind of sizing saw machine wood chip collection device
CN216881138U (en) Multi-roller combined curve roller type steel pipe straightening machine
CN205295418U (en) Novel spring wire shrend production line
CN110219228A (en) A kind of road repair grooving apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 311800 Zhejiang city of Shaoxing province Zhuji City Tao Street Millennium Road No. 26

Applicant after: HWAWAY TECHNOLOGY Corp.,Ltd.

Address before: 311800 Zhejiang city of Shaoxing province Zhuji City Tao Street Millennium Road No. 26

Applicant before: Huawei Technology Co.,Ltd.

Address after: 311800 Zhejiang city of Shaoxing province Zhuji City Tao Street Millennium Road No. 26

Applicant after: Huawei Technology Co.,Ltd.

Address before: 311800 Zhejiang city of Shaoxing province Zhuji City Tao Street Millennium Road No. 26

Applicant before: ZHEJIANG HUAWEI SPRING Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant