CN105471107B - A kind of timesharing task acquisition method of electric power over power network metering system - Google Patents

A kind of timesharing task acquisition method of electric power over power network metering system Download PDF

Info

Publication number
CN105471107B
CN105471107B CN201510991029.5A CN201510991029A CN105471107B CN 105471107 B CN105471107 B CN 105471107B CN 201510991029 A CN201510991029 A CN 201510991029A CN 105471107 B CN105471107 B CN 105471107B
Authority
CN
China
Prior art keywords
collection
acquisition tasks
acquisition
subtask
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510991029.5A
Other languages
Chinese (zh)
Other versions
CN105471107A (en
Inventor
李明
谢芝东
杨宁
赵二保
洪福生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
Original Assignee
ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd filed Critical ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
Priority to CN201510991029.5A priority Critical patent/CN105471107B/en
Publication of CN105471107A publication Critical patent/CN105471107A/en
Application granted granted Critical
Publication of CN105471107B publication Critical patent/CN105471107B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0017
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Abstract

The invention discloses a kind of timesharing task acquisition method of electric power over power network metering system, comprise the following steps:S1, obtain the acquisition tasks that main website issues;S2, set interval value, and time interval value is less than the corresponding acquisition time of acquisition tasks;S3, according to time interval value split acquisition tasks, obtains the collection subtask in multiple continuous times sections;S4, come most preceding collection subtask according to the time sequencing execution time started, and whether the current collection subtask of judgement succeeds;S5, current collection subtask successfully complete, then judge whether acquisition tasks are completed.This method is by establishing timesharing task; acquisition strategies are distributed in different tasks; the completion of collection is controlled by the control of task; even if there is abnormal situations such as (network interruption, substation device is abnormal) also without human intervention; only after the abnormal restoring such as need, the collection of data is continued to complete.

Description

A kind of timesharing task acquisition method of electric power over power network metering system
Technical field
The present invention relates to electric network data acquisition technique field, more particularly to a kind of timesharing of electric power over power network metering system to appoint Business acquisition method.
Background technology
Electric power over power network metering system becomes after SCADA (Supervisory Control And Data Acquisition, data acquisition and supervisor control), AGC (Automatic Generation Control, automatic generation Control) power network schedule automation after function another basic function, and in electric energy moves towards the process in market as commodity Play an important role, electric power over power network metering system mainly using modern communication technology, the information processing technology, storage and Distribution technology, realizes that measuring point data to critical point, power plant, substation, distribution transforming transformer, large user etc. realizes that remote auto is adopted Collection.At the same time interconnect with realizations such as load control system, dispatching management information system, Electric Power Marketing System, energy managements, establish with Data center's platform based on electric energy data, by processing and mining data on data center's platform, realizes electric flux Programming count, examining computation, the function such as the whole network line losses management and analysis, marketing decision-making.Electric power over power network metering system is general It is divided into main website side and substation side, main website and substation generally carry out electric quantity data transmission by various communication protocols.
Since electric power over power network metering system is generally divided into main website side and substation side (the general physical bit in main website side and substation side Put and be not together, it is necessary to pass through network transmission), and the acquisition target of substation side include many types for example electric energy meter, collector, RTU (Remote Terminal Unit, remote-terminal unit) etc., further includes the data access of third party system.Main website and son The communication modes stood include a variety of national standard stipulations, self-defined stipulations etc., since main website and substation communication are electric quantity data acquisition When, it may appear that many abnormal conditions situations such as (network interruption, substation device is abnormal), cause that charge transport is abnormal, loses.So With regard to bringing very big problem to data integrity.Main website sends data request data frame to substation side, son by certain acquisition strategies Lateral root of standing replies data according to request of data frame type, sends and returns to frame.If occur in transmitting procedure abnormal, it is necessary to artificially go It is abnormal, it is necessary to which human intervention, so brings very big work to maintenance staff to check that those substations, those time datas occur Amount and difficulty.
The content of the invention
Based on technical problem existing for background technology, the present invention proposes a kind of timesharing of electric power over power network metering system and appoints Business acquisition method.
A kind of timesharing task acquisition method of electric power over power network metering system proposed by the present invention, comprises the following steps:
S1, obtain the acquisition tasks that main website issues;
S2, set interval value, and time interval value is less than the corresponding acquisition time of acquisition tasks;
S3, according to time interval value split acquisition tasks, obtains the collection subtask in multiple continuous times sections;
S4, come most preceding collection subtask, and the current collection subtask of judgement according to the time sequencing execution time started Whether succeed;
S5, current collection subtask successfully complete, then judge whether acquisition tasks are completed;
S51, acquisition tasks do not complete, then update job start time, are then back to step S4;
S52, acquisition tasks are completed, then the next acquisition tasks of poll start to perform;
S6, the failure of current collection subtask, then judge that current collection subtask performs whether number reaches default collection Number upper limit value;
S61, current collection subtask perform number and have reached default times of collection upper limit value, then judge that current collection is appointed Business failure, the next acquisition tasks of poll start to perform;
S62, current collection subtask perform the not up to default times of collection upper limit value of number, then return to step S4.
Preferably, in step S2, time interval value is configured according to the time duration of acquisition tasks.
Preferably, in step S2, the time duration of acquisition tasks is the integral multiple of time interval value.
Preferably, in step S6, times of collection upper limit value is inversely proportional with time interval value.
Preferably, it is specially:Set interval value, and sets times of collection upper limit value according to time interval value.
Preferably, times of collection upper limit value can on section [3,5] value.
Preferably, times of collection upper limit value is 3.
Preferably, step S52 is specially:Acquisition tasks are completed, then the next acquisition tasks of poll start to perform, and delete Current acquisition tasks.
Preferably, step S61 is specially:Current collection subtask performs number and has reached the default times of collection upper limit Value, then judge current acquisition tasks failure, the next acquisition tasks of poll start to perform, and current acquisition tasks are preserved Wait poll next time.
Preferably, step S7 is further included:The execution sequence of each acquisition tasks is set, and execution sequence can be adjusted.
The timesharing task acquisition method of electric power over power network metering system provided by the invention, by the value that sets interval, Acquisition tasks are divided into multiple collection subtasks, and collection subtask is performed one by one and detects performance, so as to fulfill Automatic detection to acquisition tasks, is conducive to find the existing exception gone out in data transmission procedure in time, avoids data appearance When abnormal, data at the time of can only artificially going to check abnormal substation and occur abnormal, reduce the work of maintenance staff Measure and work difficulty.
In the present invention, investigated one by one by splitting to acquisition tasks, and to collection subtask, that is, ensure that and adopt The levels of precision that set task is completed, turn avoid acquisition tasks it is excessive when the difficulty investigated, be conducive to improve acquisition tasks and complete Accuracy and high efficiency.In the present invention, times of collection upper limit value is set according to time interval value, that is, ensure that the fault-tolerant of system Ability, further through the circle collection number of limitation collection subtask, ensure that the completion efficiency of collection subtask, so as to improve The completion efficiency of whole acquisition tasks.
Needed present method solves electric power over power network metering system when occurring abnormal during charge transport by artificial Interfere to solve the problems, such as, acquisition strategies are distributed in different tasks by establishing timesharing task, pass through task by this method Control control the completion of collection, even if there is abnormal situations such as (network interruption, substation device is abnormal) also without artificial Intervene, only after the abnormal restoring such as need, continue to complete the collection of data.
Brief description of the drawings
Fig. 1 is a kind of timesharing task acquisition method flow chart of electric power over power network metering system proposed by the present invention.
Embodiment
Reference Fig. 1, a kind of timesharing task acquisition method of electric power over power network metering system proposed by the present invention, including it is following Step.
S1, obtain the acquisition tasks that main website issues.
S2, set interval value, and time interval value is less than the corresponding acquisition time of acquisition tasks;And according to time interval Value sets times of collection upper limit value, and times of collection upper limit value is inversely proportional with time interval value.
S3, according to time interval value split acquisition tasks, obtains the collection subtask in multiple continuous times sections.
In present embodiment, for the ease of the segmentation to acquisition tasks, in step S2, time interval value is according to acquisition tasks Time duration be configured, for example, the time duration of acquisition tasks be time interval value integral multiple, so as to will Acquisition tasks are divided into the equal collection subtask of multiple time durations, so that more reasonably to acquisition tasks into professional etiquette It is whole.
For example, the corresponding acquisition time of acquisition tasks is 08:00 to 09:00, i.e. acquisition tasks time duration is small for 1 When.At this time, time interval value can be arranged to half an hour, then acquisition tasks can be divided into two collection subtasks, two are adopted It is respectively 8 to collect the corresponding acquisition time in subtask:00 to 08:30、08:30 to 09:00.
S4, come most preceding collection subtask, and the current collection subtask of judgement according to the time sequencing execution time started Whether succeed.Between being changed between at the beginning of first collection subtask for starting to perform at the beginning of acquisition tasks, such as more than In embodiment, at the beginning of acquisition tasks between be 8:00, then it is first carried out 8:00 to 08:Collection subtask on 30 periods. In this step, according to time sequencing, perform a collection subtask successively, advantageously ensure that be connected between collection subtask from So, ensure that acquisition tasks smoothly complete.
S5, current collection subtask successfully complete, then judge whether acquisition tasks are completed.In present embodiment, judge to adopt Whether set task is completed, and can complete number according to collection subtask and be judged.For example, with reference to above example, acquisition tasks According to time interval value and be divided into two collection subtasks, then, can be current complete by judging when completing collection subtask Into the number of collection subtask judge whether acquisition tasks are completed, if only completing a collection subtask, illustrate to gather Task does not complete;If having completed two collection subtasks, illustrate, acquisition tasks have been completed.When it is implemented, may be used also Judge whether acquisition tasks are completed by gathering the subtask corresponding time started, such as in above example, last is adopted It is 08 to collect the subtask corresponding time started:30, then, it is current gather at the beginning of subtask between earlier than 08:30, illustrate to also have surplus Remaining unfinished collection subtask, i.e. acquisition tasks do not complete;If it is 08 between at the beginning of currently gathering subtask:30, say Bright collection subtask has been fully completed, i.e., acquisition tasks are completed.
S51, acquisition tasks do not complete, then update job start time, are then back to step S4.With reference to above example, When 08:00 to 08:Collection subtask on 30 is completed, then by the way that job start time is revised as 08:30, then it can perform 08:30 to 09:Collection subtask on 00 period.
S52, acquisition tasks are completed, then the next acquisition tasks of poll start to perform, and delete current acquisition tasks.
S6, the failure of current collection subtask, then judge that current collection subtask performs whether number reaches default collection Number upper limit value.The set-up mode of times of collection upper limit value is illustrated in step S2.Specifically, the times of collection upper limit Value can on section [3,5] value, in above example, when time interval value be half an hour, it is 3 to set times of collection upper limit value It is secondary.
S61, current collection subtask perform number and have reached default times of collection upper limit value, then judge that current collection is appointed Business failure, the next acquisition tasks of poll start to perform, and current acquisition tasks preserve and wait poll next time.This step Rapid setting so that gathering the collection subtask of failure can't go on always, avoid endless loop, appoint relative to collection Directly terminate acquisition tasks after business failure, further through the setting of times of collection upper limit value, for collection subtask provide Multiple chance so that system has certain fault-tolerant ability, and cushion space is provided for the automatic error-correcting adjustment of system.
S62, current collection subtask perform the not up to default times of collection upper limit value of number, then return to step S4.
In present embodiment, times of collection upper limit value is set according to time interval value, that is, ensure that system survivability, Further through the circle collection number of limitation collection subtask, the completion efficiency of collection subtask ensure that, so as to improve whole The completion efficiency of acquisition tasks.
S7, the execution sequence that each acquisition tasks are set, and execution sequence can be adjusted.Specifically, can manually adjust The execution sequence of each acquisition tasks, so as to improve the flexibility of collection.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. the timesharing task acquisition method of a kind of electric power over power network metering system, it is characterised in that comprise the following steps:
S1, obtain the acquisition tasks that main website issues;
S2, set interval value, and time interval value is less than the corresponding acquisition time of acquisition tasks;And time interval value is according to adopting The time duration of set task is configured;
S3, according to time interval value split acquisition tasks, obtains the collection subtask in multiple continuous times sections;
S4, perform according to time sequencing the time started and come most preceding collection subtask, and whether judges current collection subtask Success;
S5, current collection subtask successfully complete, then judge whether acquisition tasks are completed;
S51, acquisition tasks do not complete, then update job start time, are then back to step S4;
S52, acquisition tasks are completed, then the next acquisition tasks of poll start to perform;
S6, the failure of current collection subtask, then judge that current collection subtask performs whether number reaches default times of collection Upper limit value;
S61, current collection subtask perform number and have reached default times of collection upper limit value, then judge that current acquisition tasks are lost Lose, the next acquisition tasks of poll start to perform;
S62, current collection subtask perform the not up to default times of collection upper limit value of number, then return to step S4.
2. the timesharing task acquisition method of electric power over power network metering system as claimed in claim 1, it is characterised in that step S2 In, the time duration of acquisition tasks is the integral multiple of time interval value.
3. the timesharing task acquisition method of electric power over power network metering system as claimed in claim 1, it is characterised in that step S6 In, times of collection upper limit value is inversely proportional with time interval value.
4. the timesharing task acquisition method of electric power over power network metering system as claimed in claim 3, it is characterised in that specific For:Set interval value, and sets times of collection upper limit value according to time interval value.
5. the timesharing task acquisition method of electric power over power network metering system as claimed in claim 4, it is characterised in that collection time Number upper limit values can on section [3,5] value.
6. the timesharing task acquisition method of electric power over power network metering system as claimed in claim 1, it is characterised in that collection time Number upper limit value is 3.
7. the timesharing task acquisition method of electric power over power network metering system as claimed in claim 1, it is characterised in that step S52 is specially:Acquisition tasks are completed, then the next acquisition tasks of poll start to perform, and delete current acquisition tasks.
8. the timesharing task acquisition method of electric power over power network metering system as claimed in claim 1, it is characterised in that step S61 is specially:Current collection subtask performs number and has reached default times of collection upper limit value, then judges current acquisition tasks Failure, the next acquisition tasks of poll start to perform, and current acquisition tasks preserve and wait poll next time.
9. the timesharing task acquisition method of electric power over power network metering system as claimed in claim 1, it is characterised in that further include Step S7:The execution sequence of each acquisition tasks is set, and execution sequence can be adjusted.
CN201510991029.5A 2015-12-24 2015-12-24 A kind of timesharing task acquisition method of electric power over power network metering system Active CN105471107B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510991029.5A CN105471107B (en) 2015-12-24 2015-12-24 A kind of timesharing task acquisition method of electric power over power network metering system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510991029.5A CN105471107B (en) 2015-12-24 2015-12-24 A kind of timesharing task acquisition method of electric power over power network metering system

Publications (2)

Publication Number Publication Date
CN105471107A CN105471107A (en) 2016-04-06
CN105471107B true CN105471107B (en) 2018-04-17

Family

ID=55608543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510991029.5A Active CN105471107B (en) 2015-12-24 2015-12-24 A kind of timesharing task acquisition method of electric power over power network metering system

Country Status (1)

Country Link
CN (1) CN105471107B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022500722A (en) * 2018-06-29 2022-01-04 センサーボット ピーティーイー. エルティーディー. Task management method and its system
CN109217474B (en) * 2018-10-17 2021-11-05 安徽立卓智能电网科技有限公司 New energy grid-connected data time-sharing acquisition method based on wireless channel transmission
CN111221324B (en) * 2020-01-09 2022-03-25 深圳市东深电子股份有限公司 Multi-interface data acquisition method for water conservancy RTU
CN112131280B (en) * 2020-09-29 2023-10-27 杭州东方通信软件技术有限公司 Data acquisition method based on time scheduling

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104123134A (en) * 2014-07-07 2014-10-29 四川中电启明星信息技术有限公司 Intelligent electricity use data management method and system based on AMI and J2EE

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10110003B2 (en) * 2009-11-24 2018-10-23 James R. Stalker Energy optimization system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104123134A (en) * 2014-07-07 2014-10-29 四川中电启明星信息技术有限公司 Intelligent electricity use data management method and system based on AMI and J2EE

Also Published As

Publication number Publication date
CN105471107A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN105471107B (en) A kind of timesharing task acquisition method of electric power over power network metering system
CN109446041B (en) Server pressure early warning method and system and terminal equipment
CN112332404B (en) Intelligent management system and method for heating service
CN107612045A (en) A kind of Power Plant generated energy intelligent dispensing system and method
CN108099641A (en) The energy control method and device of charging station
CN111563764A (en) Electricity price calculation method and device, shared electricity utilization system and storage medium
CN113872228A (en) Electric vehicle scheduling method and device applied to power grid peak shaving frequency modulation
CN106570585B (en) A kind of method for scheduling task and energy management apparatus towards self-power supply system
CN109713679B (en) Power grid emergency load method based on demand response participation degree
CN110197299A (en) A kind of intelligent management system
CN102571481B (en) Method and system for analyzing monitoring state of client
CN108738117A (en) A kind of optimization method and terminal of application program consumption electricity
CN210640693U (en) Digital controller device for micro-grid
CN114492975A (en) Edge side intelligent decision making system of power distribution internet of things
CN209357108U (en) A kind of industrial park comprehensive energy interaction systems
CN113570241A (en) Power transmission line inspection robot task optimal allocation method and device
CN106817280A (en) The control end clocking method and system of a kind of internet of things equipment
US20180324625A1 (en) Wi-fi adoption index
CN111145015A (en) Reservation-free withdrawal amount determining method and device
CN212780990U (en) Meter reading system for full electric quantity data
CN109217380A (en) A kind of abandonment is rationed the power supply method and device
CN109117262A (en) A kind of baseband processing chip CPU dynamic frequency method and wireless terminal
CN109649212A (en) The charging method and charging unit of the vehicles
CN109389523A (en) A kind of management method and system of smart grid
CN107704948A (en) A kind of data processing method based on demand response resource

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant