CN209357108U - A kind of industrial park comprehensive energy interaction systems - Google Patents
A kind of industrial park comprehensive energy interaction systems Download PDFInfo
- Publication number
- CN209357108U CN209357108U CN201920469318.2U CN201920469318U CN209357108U CN 209357108 U CN209357108 U CN 209357108U CN 201920469318 U CN201920469318 U CN 201920469318U CN 209357108 U CN209357108 U CN 209357108U
- Authority
- CN
- China
- Prior art keywords
- industrial park
- distributed local
- load
- local monitor
- monitor terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003993 interaction Effects 0.000 title claims abstract description 106
- 230000007246 mechanism Effects 0.000 claims abstract description 27
- 238000004891 communication Methods 0.000 claims description 20
- 230000009467 reduction Effects 0.000 claims description 11
- 230000005611 electricity Effects 0.000 claims description 10
- 230000004044 response Effects 0.000 abstract description 24
- 230000002452 interceptive effect Effects 0.000 abstract description 23
- 230000000694 effects Effects 0.000 abstract description 10
- 230000001105 regulatory effect Effects 0.000 abstract description 8
- 238000000034 method Methods 0.000 description 11
- 238000006722 reduction reaction Methods 0.000 description 10
- 230000008569 process Effects 0.000 description 8
- 238000004519 manufacturing process Methods 0.000 description 7
- 230000005540 biological transmission Effects 0.000 description 6
- 230000008901 benefit Effects 0.000 description 5
- 230000006870 function Effects 0.000 description 5
- 238000004146 energy storage Methods 0.000 description 3
- 240000002853 Nelumbo nucifera Species 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 2
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000013519 translation Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 206010062575 Muscle contracture Diseases 0.000 description 1
- 244000131316 Panax pseudoginseng Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000002776 aggregation Effects 0.000 description 1
- 238000004220 aggregation Methods 0.000 description 1
- 210000004556 brain Anatomy 0.000 description 1
- 208000006111 contracture Diseases 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000009795 derivation Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005485 electric heating Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000005619 thermoelectricity Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses a kind of industrial park comprehensive energy interaction systems, comprising: the heat energy measurer positioned at the electric energy meter of electric energy device side and positioned at thermal hardware side;It is connected with dispatching of power netwoks mechanism or power exchange, cuts down the industrial park complex energy management equipment of index for receiving the load that dispatching of power netwoks mechanism or power exchange are sent;It is connected with industrial park complex energy management equipment, the operation information for obtaining electric energy device and thermal hardware, and multiple distributed local monitor terminals that index is decomposed is cut down to load;It corresponds with distributed local monitor terminal and is connected with distributed local monitor terminal, cut down for receiving the load after decomposing, and upload the human-computer interaction interface that can participate in period and interactive model that load is cut down to distributed local monitor terminal.The regulating power of demand response can be improved in above-mentioned technical proposal disclosed in the present application, to improve the flexibility adjusted, and the effect of interaction can be improved.
Description
Technical field
The utility model relates to industrial park integrated energy systems, more specifically to a kind of comprehensive energy in industrial park
Source interaction systems.
Background technique
Industrial park is a variety of production capacities of aggregation and the integrated energy system with energy main body, and workload demand amount is big, use can be tied
The problems such as structure is complicated, and generally existing energy utilization rate is low, energy resource structure is unreasonable.With expansion production-scale in industrial park
Greatly, the power supply pressure of garden internal loading peak period further increases, and the power supply inside garden can be enhanced in effective peak clipping means
Reliability.In addition, the load boom period when bulk power grid comes temporarily, it, will if industrial park is able to cooperate the peak clipping for participating in external electrical network
Be conducive to the safe and reliable operation of power grid.Interaction optimization is carried out to industrial park integrated energy system, on the one hand can excavate garden
The demand response potentiality of main body are respectively participated in area, are enhanced the good interaction between user and power grid, on the other hand can are user
Better comprehensive energy supply service is provided.Wherein, interaction refers to that user side resource can be certainly when power supply pressure in garden is larger
Mainly, power load is directly or indirectly reduced, power grid power supply pressure is reduced, at the same time, user obtains corresponding compensation.
Currently, in existing industrial park, only relied on when carrying out demand response and interaction in industrial park electric energy from
The adjusting of body carries out between each user to realize when carrying out electric energy adjusting independently of each other, this to only rely on electricity
The regulating power for being able to achieve demand response is poor, and flexibility is not high, and each user independently carries out will cause the effect of interaction
It is poor.
In conclusion how to improve the regulating power of demand response, the flexibility of adjusting is improved, and improves the effect of interaction
Fruit is current those skilled in the art technical problem urgently to be resolved.
Utility model content
In view of this, being needed the purpose of the utility model is to provide a kind of industrial park comprehensive energy interaction systems with improving
The regulating power for asking response, improves the flexibility of adjusting, and improves the effect of interaction.
To achieve the goals above, the utility model provides the following technical solutions:
A kind of industrial park comprehensive energy interaction systems, comprising:
Heat energy measurer positioned at the electric energy meter of electric energy device side and positioned at thermal hardware side;
It is connected with dispatching of power netwoks mechanism or power exchange, is handed over for receiving the dispatching of power netwoks mechanism or the electric power
The load that easy center is sent cuts down the industrial park complex energy management equipment of index;
It is connected with the industrial park complex energy management equipment, for obtaining the electric energy device and the thermal hardware
Operation information, and multiple distributed local monitor terminals for being decomposed of index are cut down to the load;
It corresponds with the distributed local monitor terminal and is connected, with the distributed local monitor terminal for connecing
Load after contracture solution cuts down index, and report to the distributed local monitor terminal period that can participate in load reduction and
The human-computer interaction interface of interactive model.
Preferably, module is connected the distributed local monitor terminal by wireless communication with the human-computer interaction interface.
Preferably, the human-computer interaction interface is integrated in mobile phone or computer.
Preferably, the dispatching of power netwoks mechanism or the power exchange are set with the industrial park complex energy management
Between standby, between the industrial park complex energy management equipment and the distributed local monitor terminal by wireless communication
Module is connected.
Preferably, the dispatching of power netwoks mechanism or the power exchange are set with the industrial park complex energy management
Pass through communication cable between standby, between the industrial park complex energy management equipment and the distributed local monitor terminal
It is connected.
Preferably, the electric energy meter and the heat energy measurer are integrated in the distributed local monitor terminal.
Preferably, further includes:
It is connected with the distributed local monitor terminal, the alarm for being sounded an alarm when emergency case occurs.
Preferably, the alarm is combined aural and visual alarm.
Preferably, further includes:
Be connected with the industrial park complex energy management equipment, for acquisition operation information and the human-computer interaction
The memory that the information that interface reports is stored.
Preferably, the memory is nonvolatile memory.
The utility model provides a kind of industrial park comprehensive energy interaction systems, comprising: the electricity positioned at electric energy device side
It can gauge table and the heat energy measurer positioned at thermal hardware side;It is connected with dispatching of power netwoks mechanism or power exchange, for connecing
Receive the industrial park complex energy management equipment of the load reduction index of dispatching of power netwoks mechanism or power exchange transmission;With work
Industry garden complex energy management equipment be connected, the operation information for obtaining electric energy device and thermal hardware, and to load cut down
Multiple distributed local monitor terminals that index is decomposed;Just with distributed local monitor terminal one-to-one correspondence and with distribution
Ground monitor terminal is connected, cuts down index for receiving the load after decomposing, and can join to the upload of distributed local monitor terminal
The human-computer interaction interface of the period and interactive model cut down with load.
Above-mentioned technical proposal disclosed in the present application, the distributed local prison being connected with industrial park complex energy management equipment
Control terminal obtains the operation information of electric energy device and thermal hardware by electric energy meter and heat energy measurer, to allow electric energy and heat
It can both participate in interaction adjusting, to improve the regulating power of demand response, improve the flexibility of adjusting, and set
The multiple distributed local monitor terminals being connected with industrial park complex energy management equipment receive load cut down index it
After index can be cut down to load and decompose, and the human-computer interaction interface being attached thereto is sent to, by human-computer interaction interface
Report can participate in period and the interactive model of load reduction, in order to pass through human-computer interaction interface, distributed local monitor terminal
And industrial park complex energy management equipment realizes interconnecting between user, to improve the effect of interaction.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also
Other attached drawings can be obtained according to the attached drawing of offer.
Fig. 1 is a kind of structural schematic diagram of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, it illustrates a kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model
Structural schematic diagram may include:
Electric energy meter 1 positioned at electric energy device side and the heat energy measurer 2 positioned at thermal hardware side;
It is connected with dispatching of power netwoks mechanism or power exchange 3, for receiving dispatching of power netwoks mechanism or power exchange 3
The load of transmission cuts down the industrial park complex energy management equipment 4 of index;
It is connected with industrial park complex energy management equipment 4, the operation information for obtaining electric energy device and thermal hardware,
And multiple distributed local monitor terminals 5 that index is decomposed are cut down to load;
It corresponds with distributed local monitor terminal 5 and is connected with distributed local monitor terminal 5, decomposed for receiving
Load afterwards cuts down index, and period and the interactive model that can participate in load reduction are reported to distributed local monitor terminal 5
Human-computer interaction interface 6.
Industrial park comprehensive energy interaction systems may include the work being connected with dispatching of power netwoks mechanism or power exchange 3
Industry garden complex energy management equipment 4, the N being connected with industrial park complex energy management equipment 4 (N is greater than 1 integer) are a
Distributed local monitor terminal 5, positioned at electric energy device side and for obtain electric energy device operation information electric energy meter 1,
The heat energy measurer 2 of operation information positioned at thermal hardware side and for obtaining thermal hardware and distributed local monitor terminal 5
The human-computer interaction interface 6 for corresponding and being connected with corresponding distributed local monitor terminal 5, i.e. industrial park comprehensive energy are mutual
Dynamic system include N number of human-computer interaction interface 6 and this N number of human-computer interaction interface 6 respectively with corresponding distributed local monitor terminal 5
It is connected.Wherein, distributed local monitor terminal 5, electric energy meter 1 and heat energy measurer 2 are respectively positioned on user side, belong to operator
Assets;Human-computer interaction interface 6 returns user all, is specifically as follows APP or website etc..For industrial park integrated energy system
For, user can regard optimized distributionl one by one as, and there may be transformational relations therebetween, therefore, can be to garden
Load is classified and is modeled, wherein electric load can be divided into fixed electric load, can cut down electric load, translatable electric load, heat
Be electrically coupled load, behind three be the controllable resource of user side in industrial park, can specifically pass through electric energy storage, electric heating conversion
Device, orderly the equipment such as production realize load reduction, transfer or conversion, it can electric energy and thermal energy is made to both participate in demand response
In interaction, therefore, then the advantage interactive relationship between electricity, heat can be made full use of to achieve the effect that interaction from operation,
To which the regulating power of demand response then can be improved, the flexibility of adjusting is improved, and improve the effect of interaction.
Dispatching of power netwoks mechanism or power exchange 3 issue load and cut down index to the comprehensive energy in industrial park being attached thereto
Management equipment 4 is measured, certainly, dispatching of power netwoks mechanism or power exchange 3 can also send the other informations such as load to industry
Garden complex energy management equipment 4.Industrial park complex energy management equipment 4 is used for each distributed local for coordinating to be attached thereto
The information exchange of monitor terminal 5, it is ensured that it is all to participate in interconnecting for main information, to improve the effect of interaction.Meanwhile work
Industry garden complex energy management equipment 4 is responsible for the specific formulation of garden internal loading interaction operation plan, between coordinates user, user
Energy stream and information flow interact between power grid, also according to user information that distributed local monitor terminal 5 uploads, to
Family is analyzed with information such as energy preference, electric costs, provides user's suggestiveness production plan for adjustment in conjunction with user's production plan,
And it is open and shared towards all users by human-computer interaction interface 6, it realizes the equity of each hierarchical information, improves user and participate in mutually
Dynamic enthusiasm, and improve the effect of interaction.
Distributed local monitor terminal 5 is responsible for energy management and the Optimizing manufacture of own system, and comprehensive with industrial park
Energy management device 4 carries out information interchange and exchanges with energy, and monitored object generally comprises percentage of batteries energy-storage system, partially may be used
Load, orderly production equipment etc. are adjusted, specific control object needs to determine according to the equipment situation of Practical Project, generally comprises electric energy
Equipment and thermal hardware, i.e., so that electric energy device and thermal hardware can participate in demand response and interaction, to improve
The regulating power of demand response improves the flexibility of adjusting.In actual operation, distributed local monitor terminal 5 passes through industry
Garden complex energy management equipment 4 receives the load transmitted from dispatching of power netwoks mechanism or power exchange 3 and cuts down index, knot
Close the production status of garden user, variable capacity, the response time, with can preference etc., comprehensive utilization include industrial user, energy storage,
All kinds of interaction means including all kinds of resources and load translation, interruption including electric car etc. etc., rationally customize operation reserve,
The reduction of load transmitted by industrial park complex energy management equipment 4 index is decomposed.In information opening and shared base
On plinth, garden integrated energy system operator, can and bottom all ginsengs whole with garden to all interaction main body fair plays
It is optimized with the balance of interest of person for target, determines the specific execution task of each participant, and be distributed to underlying user, with reality
Existing garden overall interests maximize.It is of course also possible to optimized with user intention or operator's wish etc. for target, that is,
It says, only one such implementation is optimized as target using the whole balance of interest with all participants of bottom in garden.
The load that human-computer interaction interface 6 is used to receive after decomposing cuts down instruction, and reports to distributed local monitor terminal 5
It can participate in period and the interactive model of load reduction, wherein interactive model is including but not limited to load rejection, translation and thermoelectricity
Coupling, i.e., human-computer interaction interface 6 can be used to implement the real-time information interaction between operator and user, and user can pass through
Human-computer interaction interface 6 determines whether to participate in interaction.
Wherein, comprehensive energy interaction systems in industrial park are being with the whole balance of interest with all participants of bottom in garden
When target is operated, it is to be operated based on a set of set interaction mechanism, specifically includes following link:
(1) the early-stage preparations stage.Before garden interaction mechanism is formally implemented, grid company, garden operator and bottom
A series of preparations that user etc. does, main includes determining that interactive resources and compensating form, operator and user are signed to energize
Contract, annual prediction etc..These information should be previously entered in industrial park complex energy management equipment 4, and then calculate the current year
(the application assumes the index to be out-of-limit negative more than previous year peak load value 80% to the out-of-limit load index of garden in garden
Lotus).
(2) decision phase a few days ago.Garden operator mention the previous day by load prediction to next day whether start peak clipping interaction,
Next day specifically interacts plan etc. and carries out optimizing decision.The phased mission mainly includes the links such as interaction mechanism entry condition judgement.
If next day has more than the period of out-of-limit load index according to load prediction results, industrial park complex energy management equipment 4 should be incited somebody to action
It totally needs the load cut down to inform user by human-computer interaction interface 6, and user is called to participate in interaction;User can be with
It passes sequentially through human-computer interaction interface 6, distributed local monitor terminal 5 and reports next day to industrial park complex energy management equipment 4
The corresponding period can participate in period, electricity and the expected compensation unit price of interaction;Industrial park complex energy management equipment 4 is according to each
The information of a reporting of user is constantly negotiated with user, until reaching an agreement in price with user, and is met load and is cut request
Until.It should be noted that there is a situation where that no user response or response cost are excessively high, at this point, industry park for objectively
Area's complex energy management equipment 4 should in time by it is final can reduction plans amount be reported to dispatching of power netwoks mechanism or power exchange
3。
Wherein, industrial park complex energy management equipment 4 is constantly negotiated with user according to the information of each reporting of user,
Until reaching an agreement in price with user, and the concrete mode met until load cuts request is as follows:
The benefit function of known users is formula (1):Wherein, PjFor the effectiveness of user j, H
For the set of all interactive response periods in one day, EijIt is used in period i with efficiency for user j, CijIt is user j in period i energy
Cost, BijThe peak clipping economic compensation obtained for user j in period i.
The benefit function of known operator is formula (2): maxBM=EM-CM, wherein BMFor the profit of operation of operator, EMFor
Operator's income, CMFor the operation cost of operator.
And known constraints condition is formula (3):Wherein, hijIndicate user j in period i
Mean heat flux power, hj,maxIndicate the maximum heating load of user j, lijIndicate user j in the average electric load function of period i
Rate, lj,maxIndicate the maximum electric load of user j, Δ sj,min、Δsj,maxIt is acceptable to be illustrated respectively in user j in interactive process
The translatable electric load of minimum and maximum, Δ sijIndicate the translatable electric load that user j is reported in period i, SjIt indicates primary complete
The set of removable electric load period that user j is reported in whole interactive process, Δ cj,min、Δcj,maxIt is illustrated respectively in and interacted
The acceptable minimum and maximum of user j can cut down electric load, Δ c in journeyijIndicate that user j is born in the electricity of cutting down that period i is reported
Lotus, CjThe electric load period of cutting down for indicating that user j is reported in primary complete interactive process gathers, Δ WijIndicate user j
The total electricity of interactive response, Δ h are participated in period ij,min、Δhj,maxIt is acceptable most to be illustrated respectively in user j in interactive process
It is small and maximum increase thermic load, Δ hijIndicate that user j increases thermic load, A what period i was reportedjIt indicates primary complete
Interactive process in user j report increase the thermic load period set.
Then, above-mentioned function is solved based on the double-deck Distributed Problem Solving Algorithm, wherein upper layer can using differential into
Changing algorithm, lower layer can solve interaction process using optimization algorithm of the yalmip+cplex kit under matlab environment, when
So, it can also be solved using other derivation algorithms.
It should be noted that the benefit function of user, the benefit letter of operator, used in the constraint condition and solution that need to meet
Algorithm be already existing content in the prior art, the application only applies it to industrial park comprehensive energy interaction system
It cuts request in system to meet load.
(3) the interaction stage in day.If the actual load situation on the day of interactive response is consistent with prediction load level, press
Corresponding movement is executed according to set load Reduced measure.Specifically, industrial park complex energy management equipment 4 and user
The load reached an agreement cuts down the period and cuts down electricity is assigned to each distributed local monitor terminal 5, distributed local prison respectively
Control terminal 5, in the corresponding equipment of corresponding period intelligent control, realizes that load is cut down according to the instruction of acquisition.In the interaction on the same day
Cheng Zhong, if biggish difference occur in actual load and prediction load, operator should be (general with a fixed making up price at once
For be higher than interact making up price a few days ago) again to user's issuing interactive demand, call user to participate in urgent interactive response.It needs
It is noted that for objectively, the case where there are no user responses, at this point, industrial park complex energy management equipment 4 answer and
When by it is final can reduction plans amount be reported to dispatching of power netwoks mechanism or power exchange 3, seek other solutions.
(4) the availability deciding stage.Distributed local monitor terminal 5 is by real-time user power consumption data, adjustable resource
Action situation be reported to industrial park complex energy management equipment 4, industrial park 4 intelligent decisions of complex energy management equipment are every
Whether one user according to agreement has carried out actual interactive operation.If being operated by agreement, calculates and need to pay
Reimbursement for expenses, unified settled accounts in per the end of month.If user does not execute interactive operation according to agreement, breaking one's promise for the user is recorded
Number is included in list of breaking one's promise, and interactive response in the future is not if number of breaking one's promise reaches 3 times (or other numbers) automatically
Re-invite user participation.
(5) monthly accounts settling phase.The beginning of each month, operator or sale of electricity company to last month user response peak clipping conditions of demand into
Row statistics and clearing, pay user or CCHP (Combined Cooling Heating and Power, cogeneration)
Subsidize or collect fine.
Above-mentioned technical proposal disclosed in the present application, the distributed local prison being connected with industrial park complex energy management equipment
Control terminal obtains the operation information of electric energy device and thermal hardware by electric energy meter and heat energy measurer, to allow electric energy and heat
It can both participate in interaction adjusting, to improve the regulating power of demand response, improve the flexibility of adjusting, and set
The multiple distributed local monitor terminals being connected with industrial park complex energy management equipment receive load cut down index it
After index can be cut down to load and decompose, and the human-computer interaction interface being attached thereto is sent to, by human-computer interaction interface
Report can participate in period and the interactive model of load reduction, in order to pass through human-computer interaction interface, distributed local monitor terminal
And industrial park complex energy management equipment realizes interconnecting between user, to improve the effect of interaction.
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model, distributed local monitor terminal
5 module can be connected by wireless communication with human-computer interaction interface 6.
For the ease of the information transmission between distributed local monitor terminal 5 and human-computer interaction interface 6, and in order to reduce ring
Border to influence caused by information transmission is carried out between distributed local monitor terminal 5 and human-computer interaction interface 6, then it is distributed just
Module it can be connected by wireless communication between ground monitor terminal 5 and human-computer interaction interface 6.Wherein, used wireless here
Communication module is specifically as follows WiFi communication module, bluetooth communication etc..
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model, human-computer interaction interface 6 can be with
It is integrated in mobile phone or computer.
Human-computer interaction interface 6 included in the comprehensive energy interaction systems of industrial park specifically can integrate in mobile phone or electricity
In brain, in order to which user can carry out information exchange by human-computer interaction interface 6 and operator whenever and wherever possible.
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model, dispatching of power netwoks mechanism or electric power
Between trade center 3 and industrial park complex energy management equipment 4, industrial park complex energy management equipment 4 and it is distributed just
Module it can be connected by wireless communication between ground monitor terminal 5.
In the comprehensive energy interaction systems of industrial park, dispatching of power netwoks mechanism or power exchange 3 and industrial park are comprehensive
It closes between energy management device 4, between industrial park complex energy management equipment 4 and each distributed local monitor terminal 5
It is connected with module by wireless communication, to reduce the influence that environmental factor transmits data, and saves man power and material.
Wherein, mentioned wireless communication module specifically may be WiFi communication module, bluetooth communication etc. here.
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model, dispatching of power netwoks mechanism or electric power
Between trade center 3 and industrial park complex energy management equipment 4, industrial park complex energy management equipment 4 and it is distributed just
It can be connected by communication cable between ground monitor terminal 5.
Certainly, between dispatching of power netwoks mechanism or power exchange 3 and industrial park complex energy management equipment 4, industry
Also it can be connected by communication cable between garden complex energy management equipment 4 and each distributed local monitor terminal 5, with true
The stability and safety of data transmission are protected, and realizes the high rate data transmission of data.
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model, electric energy meter 1 and thermal energy
Gauge table 2 can integrate in distributed local monitor terminal 5.
Electric energy meter 1 included in the comprehensive energy interaction systems of industrial park and heat energy measurer 2 can integrate
In distributed local monitor terminal 5, in order to which distributed local monitor terminal 5 can directly acquire electric energy device and thermal energy is set
Standby operation information.
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model can also include:
It is connected with distributed local monitor terminal 5, the alarm for being sounded an alarm when emergency case occurs.
In view of there are no user response, user can not the emergency cases such as complete response or feeder fault therefore then may be used
The alarm being connected with distributed local monitor terminal 5 is arranged.When emergency case occurs, in addition to distributed local monitors eventually
End 5 reports to industrial park complex energy management equipment 4 and waits except instruction in next step, with distributed local monitor terminal 5
Connected alarm can be sent out alarm, to play the role of prompt to operator or user, in order to operator or user
It can take appropriate measures in time to cope with emergency case.
Wherein, communication cable or wireless communication module can be passed through between distributed local monitor terminal 5 and alarm
It is connected.
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model, alarm can be acousto-optic report
Alert device.
Set alarm is specifically as follows combined aural and visual alarm in the comprehensive energy interaction systems of industrial park, to operation
Quotient or user play the role of prompt.
It is of course also possible to using buzzer or phonetic alarm etc. as alarm.
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model can also include:
It is connected with industrial park complex energy management equipment 4, for the operation information and human-computer interaction interface 6 to acquisition
The memory that the information of report is stored.
It can also be arranged in the comprehensive energy interaction systems of industrial park and be connected with industrial park complex energy management equipment 4
Memory, the memory is for storing the electric energy device and thermal hardware got from distributed local monitor terminal 5
Operation information, and pass through the information that distributed local monitor terminal 5 is reported for storing human-computer interaction interface 6, in order to rear
It is continuous to check corresponding information.
A kind of industrial park comprehensive energy interaction systems provided by the embodiment of the utility model, memory can be non-volatile
Property memory.
Set memory is specifically as follows Nonvolatile memory memory in the comprehensive energy interaction systems of industrial park,
It still is able to keep data after having the characteristics that high speed, high density, low-power consumption, power-off.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the element that the process, method, article or equipment including a series of elements is intrinsic.?
Do not have in the case where more limiting, the element limited by sentence "including a ...", it is not excluded that including the element
There is also other identical elements in process, method, article or equipment.In addition, provided by the embodiment of the utility model above-mentioned
In technical solution with correspond to the consistent part of technical solution realization principle and unspecified in the prior art, in order to avoid excessive superfluous
It states.
The foregoing description of the disclosed embodiments makes those skilled in the art can be realized or use the utility model.
Various modifications to these embodiments will be apparent for a person skilled in the art, general original as defined herein
Reason can be realized in other embodiments without departing from the spirit or scope of the present utility model.Therefore, this is practical new
Type is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase
Consistent widest scope.
Claims (10)
1. a kind of industrial park comprehensive energy interaction systems characterized by comprising
Heat energy measurer positioned at the electric energy meter of electric energy device side and positioned at thermal hardware side;
It is connected with dispatching of power netwoks mechanism or power exchange, for receiving in the dispatching of power netwoks mechanism or the electricity transaction
The load that the heart is sent cuts down the industrial park complex energy management equipment of index;
It is connected with the industrial park complex energy management equipment, the fortune for obtaining the electric energy device and the thermal hardware
Row information, and multiple distributed local monitor terminals that index is decomposed are cut down to the load;
It corresponds with the distributed local monitor terminal and is connected with the distributed local monitor terminal, divide for receiving
Load after solution cuts down index, and period and the interaction that can participate in load reduction are reported to the distributed local monitor terminal
The human-computer interaction interface of mode.
2. comprehensive energy interaction systems in industrial park according to claim 1, which is characterized in that the distributed local prison
Module is connected control terminal by wireless communication with the human-computer interaction interface.
3. comprehensive energy interaction systems in industrial park according to claim 2, which is characterized in that the human-computer interaction interface
It is integrated in mobile phone or computer.
4. comprehensive energy interaction systems in industrial park according to claim 2, which is characterized in that the dispatching of power netwoks mechanism
Or between the power exchange and the industrial park complex energy management equipment, the industrial park complex energy management
Module is connected by wireless communication between equipment and the distributed local monitor terminal.
5. comprehensive energy interaction systems in industrial park according to claim 2, which is characterized in that the dispatching of power netwoks mechanism
Or between the power exchange and the industrial park complex energy management equipment, the industrial park complex energy management
It is connected by communication cable between equipment and the distributed local monitor terminal.
6. comprehensive energy interaction systems in industrial park according to claim 1, which is characterized in that the electric energy meter and
The heat energy measurer is integrated in the distributed local monitor terminal.
7. comprehensive energy interaction systems in industrial park according to claim 1, which is characterized in that further include:
It is connected with the distributed local monitor terminal, the alarm for being sounded an alarm when emergency case occurs.
8. comprehensive energy interaction systems in industrial park according to claim 7, which is characterized in that the alarm is acousto-optic
Alarm.
9. comprehensive energy interaction systems in industrial park according to claim 1, which is characterized in that further include:
It is connected with the industrial park complex energy management equipment, for the operation information and the human-computer interaction interface to acquisition
The memory that the information reported is stored.
10. comprehensive energy interaction systems in industrial park according to claim 9, which is characterized in that the memory is non-
Volatile memory.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920469318.2U CN209357108U (en) | 2019-04-08 | 2019-04-08 | A kind of industrial park comprehensive energy interaction systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920469318.2U CN209357108U (en) | 2019-04-08 | 2019-04-08 | A kind of industrial park comprehensive energy interaction systems |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209357108U true CN209357108U (en) | 2019-09-06 |
Family
ID=67804661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920469318.2U Active CN209357108U (en) | 2019-04-08 | 2019-04-08 | A kind of industrial park comprehensive energy interaction systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209357108U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111240255A (en) * | 2020-01-14 | 2020-06-05 | 中国华能集团清洁能源技术研究院有限公司 | Multi-energy complementary comprehensive energy service management system suitable for park |
-
2019
- 2019-04-08 CN CN201920469318.2U patent/CN209357108U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111240255A (en) * | 2020-01-14 | 2020-06-05 | 中国华能集团清洁能源技术研究院有限公司 | Multi-energy complementary comprehensive energy service management system suitable for park |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110163578A (en) | A kind of batch carries out the virtual plant system of peak load shifting business | |
CN109256792A (en) | A kind of the energy storage stacking system and its optimization method of Based on Distributed energy storage demand | |
CN109409702A (en) | A kind of operation of power networks index analysing system | |
CN103793794B (en) | The automatic demand response of dsm evaluates system and method | |
CN103400205B (en) | A kind of power distribution network energy efficiency management system and method for coordinating control based on idle work optimization | |
CN102611127A (en) | Control method for unifying self-balancing and self-smoothing of micro-grid | |
CN112116492B (en) | Data sharing management system and method based on ubiquitous power Internet of things | |
CN108448567B (en) | Intelligent control system for electric vehicle agent participating in energy and frequency modulation market | |
CN114079285B (en) | Power grid dispatching optimization system and method based on multiple time scales | |
CN206294207U (en) | Grid power blackout proposed figures for the plan Optimization Platform based on " big operation " multi-constraint condition | |
CN108196494A (en) | A kind of building control platform | |
WO2022016782A1 (en) | Intelligent supervision and reservation system for large-scale fixed scientific research device and usage method therefor | |
CN209357108U (en) | A kind of industrial park comprehensive energy interaction systems | |
CN109685287A (en) | Increment power distribution network power supply capacity multiple-objection optimization configuration method | |
CN115619439A (en) | Power load operation management system, device and method | |
CN105471107B (en) | A kind of timesharing task acquisition method of electric power over power network metering system | |
Gu et al. | Interruptible power estimation and auxiliary service allocation using contract theory and dynamic game for demand response in aggregator business model | |
CN114362238A (en) | Photovoltaic control device, photovoltaic control system and method | |
CN113595090A (en) | Multi-element load data processing method and system across safety zones | |
CN117332937A (en) | Multi-energy complementary virtual power plant economic dispatching method considering demand response | |
KR20180075273A (en) | Microgrid electric power management method and system thereof | |
CN110429657A (en) | Distributed flexible grid-connected power generation system based on the more substation cluster-coordinators of distribution | |
CN102930404A (en) | Very important person (VIP) service management platform of customer service center | |
CN114069700B (en) | Regional comprehensive energy scheduling control system based on energy Internet | |
CN116231692A (en) | Urban distributed energy storage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |