CN109217380A - A kind of abandonment is rationed the power supply method and device - Google Patents

A kind of abandonment is rationed the power supply method and device Download PDF

Info

Publication number
CN109217380A
CN109217380A CN201811306595.8A CN201811306595A CN109217380A CN 109217380 A CN109217380 A CN 109217380A CN 201811306595 A CN201811306595 A CN 201811306595A CN 109217380 A CN109217380 A CN 109217380A
Authority
CN
China
Prior art keywords
wind
electricity generation
powered electricity
power plant
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811306595.8A
Other languages
Chinese (zh)
Other versions
CN109217380B (en
Inventor
李铁
姜枫
苏安龙
尚学伟
徐家慧
王爱华
高凯
葛延峰
金晓明
刘淼
赵军
刘刚
张波
余建明
崔岱
冯占稳
唐俊刺
王钟辉
姜狄
李峰
朱伟峰
孙文涛
张宇时
许小鹏
张连超
邓波
吴鑫
王顺江
崔吉生
佟智波
王涛
谷博
刘姗
王建楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Kedong Electric Power Control System Co Ltd
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Beijing Kedong Electric Power Control System Co Ltd
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Kedong Electric Power Control System Co Ltd, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811306595.8A priority Critical patent/CN109217380B/en
Publication of CN109217380A publication Critical patent/CN109217380A/en
Application granted granted Critical
Publication of CN109217380B publication Critical patent/CN109217380B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/386
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

It rations the power supply method and device the present invention provides a kind of abandonment, is related to the field of rationing the power supply.Abandonment provided by the invention is rationed the power supply method, when progress abandonment is rationed the power supply, corresponding ratio of rationing the power supply is provided with for different wind-powered electricity generation power plant, preferably control the target power output of each wind-powered electricity generation power plant and capacity of rationing the power supply, finally, with reference to always ration the power supply capacity greater than target always ration the power supply capacity when, just according to each wind-powered electricity generation power plant target power output ration the power supply, ensure that the accuracy for the scheme of rationing the power supply.

Description

A kind of abandonment is rationed the power supply method and device
Technical field
The present invention relates to the field of rationing the power supply, ration the power supply method and device in particular to a kind of abandonment.
Background technique
Under national energy conservation and emission reduction, the overall background of energy revolution, emerge rapidly by the renewable energy of representative of wind-powered electricity generation, wind Electric project at home get up by multiple province rapid developments.But since new energy station location power grid receives scarce capacity, station Completion time of project mismatches, wind-powered electricity generation climate influences the reasons such as unstable needs reasonably when necessary to guarantee power grid security Abandonment is carried out to ration the power supply.
Currently, ration the power supply for abandonment, the mainstream solution that country proposes is " wind fire replaces transaction ", i.e., when power grid due to When the reasons such as peak regulation or rack constraint are forced abandonment and ration the power supply, the thermoelectricity power plant to participate in business further subtracts on the basis of minimum mode Few power generation, gives way for wind-powered electricity generation, replaces thermoelectricity power plants generating electricity by wind-powered electricity generation power plant.Such solution is directly by the skill of wind-electricity integration Art problem is transformed to the Financial Problem between wind-powered electricity generation and thermoelectricity, and wind-powered electricity generation power plant is allowed to buy Generation Right from thermoelectricity power plant.It is slow Solution abandonment is rationed the power supply problem, National Energy Board's macro adjustments and controls, it is desirable that further strengthen the related work of wind-electricity integration and consumption.
Above-mentioned settling mode is policy, long-term planning control, has positive effect to wind-powered electricity generation normal operation.But with regard to mesh For preceding situation, must abandonment ration the power supply in the case where, from economy and security standpoint, need reasonably ration the power supply strategy solution Certainly current abandonment on a large scale is rationed the power supply phenomenon.
Currently used method of rationing the power supply mainly includes two kinds: dispatcher's manual control mode and software of rationing the power supply automatically control mould Formula.
Dispatcher's MANUAL CONTROL mode refers to when the limited electricity demanding of power grid, is directly led to by phone by dispatching of power netwoks person Know wind power plant or in such a way that system software sets fixed target value to wind power plant.This method manually realized by dispatcher, It is difficult to meet the demand for control after modern power network new energy accesses on a large scale;
Software automatic control mode of rationing the power supply controls software using special new energy, supervises in real time to power grid significant data Depending on calculating each participation automatically and rationing the power supply the target value of wind-powered electricity generation power plant, and pass through main website-substation link when the limited electricity demanding of power grid Control command is issued to wind-powered electricity generation Power Plant Side automatic control system.This method need to preset new energy power distribution strategies, and need According to power grid real-time condition, the control target to each wind power plant is adjusted in time.
Summary of the invention
It rations the power supply method and device the purpose of the present invention is to provide a kind of abandonment.
In a first aspect, rationing the power supply method the embodiment of the invention provides a kind of abandonment, comprising:
According to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant, the second of each wind-powered electricity generation power plant is calculated separately Simultaneity factor;
According to the installed capacity of the second simultaneity factor of each wind-powered electricity generation power plant and each wind-powered electricity generation power plant, each wind-powered electricity generation is calculated separately The capacity of rationing the power supply of power plant;
According to the installed capacity of the ration the power supply capacity and each wind-powered electricity generation power plant of each wind-powered electricity generation power plant, each wind-powered electricity generation power plant is calculated Target power output;
Judge always ration the power supply capacity with reference to whether capacity of always rationing the power supply is greater than target;It is according to multiple wind-powered electricity generations with reference to capacity of always rationing the power supply Power plant rations the power supply what calculation of capacity obtained;
If always rationing the power supply capacity with reference to capacity always is rationed the power supply greater than target, contributes and limited according to the target of each wind-powered electricity generation power plant Electricity.
With reference to first aspect, the embodiment of the invention provides the first possible embodiments of first aspect, wherein also Include:
According to wind-powered electricity generation power plant always in real time power output, demand ration the power supply total amount and wind-powered electricity generation power plant total specified installed capacity calculate it is default The first simultaneity factor.
With reference to first aspect, the embodiment of the invention provides second of possible embodiments of first aspect, wherein root According to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant, the second simultaneity factor of each wind-powered electricity generation power plant is calculated separately, is wrapped It includes:
According to ranking and wind-powered electricity generation power plant opposite ration the power supply ratio of each wind-powered electricity generation power plant in abandonment sequence, calculate separately each The deviation ratio of rationing the power supply of wind-powered electricity generation power plant;The opposite ratio of rationing the power supply of wind-powered electricity generation power plant is for indicating limit corresponding to different rankings in abandonment sequence Electric deviation ratio;
According to ration the power supply deviation ratio and preset first simultaneity factor of each wind-powered electricity generation power plant, each wind-powered electricity generation power plant is calculated separately Second simultaneity factor.
With reference to first aspect, the embodiment of the invention provides the third possible embodiments of first aspect, wherein According to the installed capacity of the ration the power supply capacity and each wind-powered electricity generation power plant of each wind-powered electricity generation power plant, the target power output of each wind-powered electricity generation power plant is calculated Later, further includes:
Judge whether the target power output of target wind-powered electricity generation power plant is greater than the real-time power output of target wind-powered electricity generation power plant;
If the target power output of target wind-powered electricity generation power plant is not more than the real-time power output of target wind-powered electricity generation power plant, judgement ginseng is thened follow the steps It examines capacity of always rationing the power supply and whether is greater than target and always ration the power supply capacity.
With reference to first aspect, the embodiment of the invention provides the 4th kind of possible embodiments of first aspect, wherein side Method further include:
If the target power output of target wind-powered electricity generation power plant is greater than the real-time power output of target wind-powered electricity generation power plant, according to target wind-powered electricity generation power plant Real-time power output and preset first coefficient of reduction recalculate the target power output of target wind-powered electricity generation power plant.
With reference to first aspect, the embodiment of the invention provides the 5th kind of possible embodiments of first aspect, wherein side Method further include:
If always rationing the power supply capacity with reference to capacity always is rationed the power supply less than target, preset first is adjusted together using the second coefficient of reduction When rate, and re-execute the steps according to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant, calculate separately each wind Second simultaneity factor of power plant.
With reference to first aspect, the embodiment of the invention provides the 6th kind of possible embodiments of first aspect, wherein wind Ranking of the power plant in abandonment sequence is calculated according to following parameter: plan yesterday electricity, yesterday actually accomplish electricity Amount, this monthly plan electricity, this month actually accomplish electricity, this month rations the power supply electricity, this month super generating electricity and scheduled punitive parameter.
With reference to first aspect, the embodiment of the invention provides the 7th kind of possible embodiments of first aspect, wherein presses It rations the power supply according to the target power output of each wind-powered electricity generation power plant, comprising:
The target power output of wind-powered electricity generation power plant is sent to each power plant respectively, so that each wind-powered electricity generation power plant is according to corresponding target Processing works.
Second aspect, the embodiment of the invention also provides a kind of abandonment electricity-limiting devices, comprising:
First computing module, for calculating separately according to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant Second simultaneity factor of each wind-powered electricity generation power plant;
Second computing module, for being held according to the second simultaneity factor of each wind-powered electricity generation power plant and the installation of each wind-powered electricity generation power plant Amount, calculates separately the capacity of rationing the power supply of each wind-powered electricity generation power plant;
Third computing module, for the installed capacity according to the ration the power supply capacity and each wind-powered electricity generation power plant of each wind-powered electricity generation power plant, Calculate the target power output of each wind-powered electricity generation power plant;
First judgment module is always rationed the power supply capacity for judging whether to be greater than with reference to capacity of always rationing the power supply target;With reference to always rationing the power supply Capacity is to ration the power supply what calculation of capacity obtained according to multiple wind-powered electricity generation power plant;
Control module is used for if always rationing the power supply capacity with reference to capacity always is rationed the power supply greater than target according to each wind-powered electricity generation power plant Target power output is rationed the power supply.
In conjunction with second aspect, the embodiment of the invention provides the first possible embodiments of second aspect, wherein also Include:
4th computing module, for always power output, demand to be rationed the power supply the total value of total amount and wind-powered electricity generation power plant in real time according to wind-powered electricity generation power plant Determine installed capacity and calculates preset first simultaneity factor.
Abandonment provided in an embodiment of the present invention is rationed the power supply method, when realizing, first according to preset first simultaneity factor and wind The opposite ratio of rationing the power supply of power plant, calculates separately the second simultaneity factor of each wind-powered electricity generation power plant;Then, according to the of each wind-powered electricity generation power plant The installed capacity of two simultaneity factors and each wind-powered electricity generation power plant calculates separately the capacity of rationing the power supply of each wind-powered electricity generation power plant;And then according to every The installed capacity of the ration the power supply capacity and each wind-powered electricity generation power plant of a wind-powered electricity generation power plant calculates the target power output of each wind-powered electricity generation power plant;And sentence It is disconnected always to ration the power supply capacity with reference to whether capacity of always rationing the power supply is greater than target;It is rationing the power supply according to multiple wind-powered electricity generation power plant with reference to capacity of always rationing the power supply What calculation of capacity obtained;Finally, always rationing the power supply capacity if being greater than target with reference to capacity of always rationing the power supply, according to the mesh of each wind-powered electricity generation power plant Power is marked to ration the power supply.It is, scheme provided herein, when progress abandonment is rationed the power supply, for different wind-powered electricity generation electricity Factory is provided with corresponding ratio of rationing the power supply, and preferably controls the target power output of each wind-powered electricity generation power plant and capacity of rationing the power supply, finally, with reference to Capacity of always rationing the power supply be greater than target always ration the power supply capacity when, just according to each wind-powered electricity generation power plant target power output ration the power supply, ensure that limit The accuracy of electric scheme.
To enable objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment is cited below particularly, and appended by cooperation Attached drawing is described in detail below.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 shows abandonment provided by the embodiment of the present invention and rations the power supply the basic flow chart of method;
It rations the power supply first optimized flow chart of method Fig. 2 shows abandonment provided by the embodiment of the present invention;
Fig. 3 show abandonment provided by the embodiment of the present invention ration the power supply method and a optimized flow chart;
Fig. 4 shows the basic module figure that abandonment provided by the embodiment of the present invention is rationed the power supply this.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause This, is not intended to limit claimed invention to the detailed description of the embodiment of the present invention provided in the accompanying drawings below Range, but it is merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
In the related technology, when progress abandonment is rationed the power supply, usually there are two types of ways, the first is using human intervention Mode is rationed the power supply, i.e., when being rationed the power supply, staff tells by telephone specified according to set strategy of rationing the power supply Wind-powered electricity generation power plant rations the power supply;Second is that software automatically controls, i.e. software is automatically right after collecting power grid related data Data are analyzed, and then, generate strategy of rationing the power supply, and control each wind-powered electricity generation power plant according to strategy of rationing the power supply.
Whether which kind of above-mentioned mode, core are all to determine strategy of rationing the power supply, i.e., which kind of each wind-powered electricity generation power plant should use Working method works, but present inventor has found, determines that the mode for strategy of rationing the power supply is not reasonable at present.
In turn, as shown in Figure 1, rationing the power supply method this application provides a kind of abandonment, comprising:
S101 calculates separately each wind-powered electricity generation power plant according to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant The second simultaneity factor;
S102 is calculated separately every according to the installed capacity of the second simultaneity factor of each wind-powered electricity generation power plant and each wind-powered electricity generation power plant The capacity of rationing the power supply of a wind-powered electricity generation power plant;
S103 calculates each wind-powered electricity generation according to the installed capacity of the ration the power supply capacity and each wind-powered electricity generation power plant of each wind-powered electricity generation power plant The target of power plant is contributed;
S104 judges always ration the power supply capacity with reference to whether capacity of always rationing the power supply is greater than target;It is according to more with reference to capacity of always rationing the power supply A wind-powered electricity generation power plant rations the power supply what calculation of capacity obtained;
S105, if always rationing the power supply capacity with reference to capacity always is rationed the power supply greater than target, according to the target power output of each wind-powered electricity generation power plant It rations the power supply.
In step S101, simultaneity factor is referred to: in the power system, maximum of the sum of the maximum value of load always greater than sum Value, this is because each user is unlikely while reflecting this relationship such as not in the maximum value that a moment reaches electricity consumption A coefficient be thus referred to as simultaneity factor, also referred to as simultaneously rate of load condensate.The first simultaneity factor herein is one pre-set Reference value, in specific implementation, user can adjust the size of first simultaneity factor according to specific circumstances.
The opposite ratio of rationing the power supply of wind-powered electricity generation power plant, refers in general, the strategy of rationing the power supply of different wind-powered electricity generation power plant is different, root For be different wind-powered electricity generation power plant ration the power supply capacity and target power output is usually to have certain difference.Opposite ratio of rationing the power supply herein Example, can should reflect this difference to a certain extent, also, the opposite ratio of rationing the power supply should be the different power plant of a reaction it Between ration the power supply capacity relative value, or between different power plant target processing relative value parameter.In general, the opposite limit of wind-powered electricity generation power plant Electric ratio is with the history working condition of wind-powered electricity generation power plant related, for example the generated energy completed of last monthly plan and is actually accomplished Generated energy, the previous day wind-powered electricity generation power plant can codetermine the opposite ratio of rationing the power supply to the implementation deviation situation for target power output of rationing the power supply Example, it is herein, opposite to ration the power supply ratio it can be appreciated that deviation ratio of rationing the power supply.
In step S101, the second simultaneity factor is obtained after increasing and decreasing scheduled deviation ratio of rationing the power supply on the basis of the first simultaneity factor It arrives, the result which is reflected.
In step S102, the capacity of rationing the power supply of wind-powered electricity generation power plant is usually according to the installed capacity of the wind-powered electricity generation power plant and wind-powered electricity generation electricity What the difference of the target power output of factory determined.In the case of certain, the numerical value of the capacity of rationing the power supply of wind-powered electricity generation power plant can be exactly installed capacity- Target power output.
In step S103, the target power output of wind-powered electricity generation power plant is usually according to the installed capacity of the wind-powered electricity generation power plant and wind-powered electricity generation electricity What the second simultaneity factor of factory determined.In the case of certain, the numerical value of the target power output of wind-powered electricity generation power plant can be exactly the wind-powered electricity generation power plant Second simultaneity factor * installed capacity.
In step S104, judges whether to be greater than with reference to capacity of always rationing the power supply target and always ration the power supply the purpose of capacity, mainly determine Whether final purpose of rationing the power supply can achieve using this mode of rationing the power supply, if can achieve, i.e., with reference to always ration the power supply capacity whether Always rationing the power supply greater than target, (target capacity of always rationing the power supply is predetermined a target value to capacity, and target capacity of always rationing the power supply is equal to The active power total amount of downward needed for making regional power grid frequency retrieval to 50Hz), then can using allow each wind-powered electricity generation power plant according to The target power output of calculated each wind-powered electricity generation power plant carrys out work in step S103, and then completes abandonment and ration the power supply.The calculated mesh Mark power i.e. strategy that abandonment is rationed the power supply.
The target of wind-powered electricity generation power plant can be contributed and be sent respectively to each power plant when specific implementation by step S105, It works so that each wind-powered electricity generation power plant is handled according to corresponding target.
More specifically, when realizing, the target of wind-powered electricity generation electric field can be contributed after carrying out Security Checking, is instructed as AGC Each wind-powered electricity generation electric field is issued to by power dispatch data network to execute.The wherein Security Checking of the target power output of each wind-powered electricity generation electric field, packet Contain: the verification of control command dead zone, the verification of maximal regulated increment and unit adjust limit value verification.Only these three verifications pass through, Target can just be contributed and be sent to each wind-powered electricity generation electric field.
When specific implementation, the first simultaneity factor can be an empirical value (at this point, when executing step S101 every time, the The numerical value of one simultaneity factor is all constant), be also possible to be calculated according to certain parameters (at this point, executing step every time When S101, the numerical value of the first simultaneity factor is possible changed).
Specifically, being side provided herein the case where being calculated according to certain parameters for the first simultaneity factor Method calculates by the way of following, i.e., as shown in figure 3, method provided herein, further includes before step S101 Following steps:
S301, according to wind-powered electricity generation power plant, always power output, demand are rationed the power supply total specified installed capacity meter of total amount and wind-powered electricity generation power plant in real time Calculate preset first simultaneity factor.
Specifically, the first simultaneity factor can be calculated according to following formula:
Wherein, fxFor the first simultaneity factor, PIt is realFor wind-powered electricity generation power plant always in real time contribute (active power), by power plant it is real-time on send to Power dispatch data network, PxIt rations the power supply total amount for demand, even if active power total amount needed for frequency retrieval to 50Hz, by regional power grid Frequency characteristic coefficient is converted to obtain, PFaceFor total specified installed capacity.Wherein, total specified installed capacity is the volume of each wind-powered electricity generation power plant Determine the sum of installed capacity.
In order to improve the order of accuarcy of calculating, abandonment sequence can be introduced, abandonment sequence is according to each wind-powered electricity generation power plant What generated energy performance determined, generated energy performance is better, then ranking is more forward, conversely, then more rearward.It is more specific next It says, the position that the higher wind-powered electricity generation power plant of electricity completion rate should be forward in abandonment sequence;According to electricity and the super generating electricity of rationing the power supply Situation responds the position that poor wind-powered electricity generation power plant should be forward in abandonment sequence to instruction when rationing the power supply;According to station environmental protection, wind Store up the position that the various factors such as joint, electricity price should be forward in abandonment sequence by the poor wind-powered electricity generation power plant of economy.
The deviation ratio of rationing the power supply of the more forward wind-powered electricity generation power plant of ranking is smaller, and the deviation ratio of rationing the power supply of ranking more rearward is bigger.In general, Ranking is 0 in the first wind-powered electricity generation electric field deviation ratio of rationing the power supply, and ranking is 20% in the wind-powered electricity generation electric field of last bit deviation ratio of rationing the power supply.It is preferred that , in abandonment sequence, according to sequence (by ranking the first to the last sequence) again front to back, the limit of each wind-powered electricity generation power plant Electric deviation ratio can form arithmetic progression.It is, the adjacent wind-powered electricity generation power plant of any two ranking rations the power supply partially in abandonment sequence The difference of poor ratio is equal.
Specifically, ranking of the wind-powered electricity generation power plant in abandonment sequence is calculated according to following parameter: plan yesterday Electricity, yesterday actually accomplish electricity, this monthly plan electricity, this month actually accomplish electricity, this month rations the power supply electricity, this month super generating electricity With scheduled punitive parameter.Punitive parameter herein can be according to whether wind-powered electricity generation power plant completes groundwork amount, if There is violation operation to determine.
When specific implementation, the electricity performance on the day before each wind-powered electricity generation power plant can be counted after daily 0 point, obtains new one The abandonment of wheel is sorted.
In turn, it when execution determines and rations the power supply deviation ratio step, can be realized according to following formula:
In formula, Kn is deviation ratio of rationing the power supply, and n is ranking of the specified wind-powered electricity generation electric field in abandonment sequence, and N is wind power plant Sum.K is coefficient (usually adjustable), and by taking K=0.2 as an example, using above-mentioned formula, ranking can be obtained in the first wind-powered electricity generation electricity Field ration the power supply deviation ratio be 0, ranking the wind-powered electricity generation electric field of last bit ration the power supply deviation ratio be 20%.
It rations the power supply partially corresponding to different rankings it is, wind-powered electricity generation power plant should represent in abandonment sequence with respect to the ratio of rationing the power supply Poor ratio.
After the deviation ratio of rationing the power supply that each wind-powered electricity generation power plant has been determined, so that it may according to the deviation ratio of rationing the power supply of each wind-powered electricity generation power plant With preset first simultaneity factor, the second simultaneity factor of each wind-powered electricity generation power plant is calculated separately, particularly for a specified wind-powered electricity generation For power plant, the second simultaneity factor can be equal to the first simultaneity factor and the sum of deviation ratio of rationing the power supply.
It is, as shown in Fig. 2, step S101, according to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant, Calculate separately the second simultaneity factor of each wind-powered electricity generation power plant, comprising:
S1011 is counted respectively according to the opposite ratio of rationing the power supply of ranking and wind-powered electricity generation power plant of each wind-powered electricity generation power plant in abandonment sequence Calculate the deviation ratio of rationing the power supply of each wind-powered electricity generation power plant;The opposite ratio of rationing the power supply of wind-powered electricity generation power plant is for indicating that different ranking institutes are right in abandonment sequence The deviation ratio of rationing the power supply answered;
S1012 calculates separately each wind-powered electricity generation according to ration the power supply deviation ratio and preset first simultaneity factor of each wind-powered electricity generation power plant Second simultaneity factor of power plant.
In some cases, after having calculated target power output, subsequent meter directly can't be carried out using target processing It calculates, mainly to guarantee fairness of rationing the power supply, avoids the occurrence of part wind-powered electricity generation power plant and ration the power supply and (subtract power output instruction), part wind-powered electricity generation power plant is not The situation rationed the power supply and (increase power output instruction).
In turn, in scheme provided herein, after target power output has been calculated, it is also necessary to judge wind-powered electricity generation power plant Target power output (carry out abandonment ration the power supply after processing) whether be greater than target wind-powered electricity generation power plant real-time power output, then determine again it is subsequent such as Where reason.
Specifically, method provided herein, in ration the power supply capacity and each wind-powered electricity generation electricity according to each wind-powered electricity generation power plant The installed capacity of factory, calculate each wind-powered electricity generation power plant target power output after, further includes:
Judge whether the target power output of target wind-powered electricity generation power plant is greater than the real-time power output of target wind-powered electricity generation power plant;
If the target power output of target wind-powered electricity generation power plant is not more than the real-time power output of target wind-powered electricity generation power plant, judgement ginseng is thened follow the steps It examines capacity of always rationing the power supply and whether is greater than target and always ration the power supply capacity.
And if the target power output of target wind-powered electricity generation power plant is greater than the real-time power output of target wind-powered electricity generation power plant, according to target wind The real-time power output of power plant and preset first coefficient of reduction recalculate the target power output of target wind-powered electricity generation power plant.
By the deterministic process, participates in whole wind-powered electricity generation power plant during power grid rations the power supply, guarantee the fairness rationed the power supply, and protect That contributes that lesser wind-powered electricity generation power plant will not occur contributing after its wind-force is sufficient when confirmation sharp rises, and leads to mains frequency It is out-of-limit again.
Wherein, the first coefficient of reduction is usually the constant pre-set, and step is according to target wind-powered electricity generation power plant Real-time power output and preset first coefficient of reduction recalculate the target power output of target wind-powered electricity generation power plant, refer to continuing after execution Before step S105, need to say that the numerical value of target wind-powered electricity generation power plant contributed in real time is turned down.For example, can be according to certain drawdown ratio Example is contributed to reduce the real-time power output of target wind-powered electricity generation power plant as the target of the target wind-powered electricity generation power plant.
Specifically such as, the target power output of new calculated target wind-powered electricity generation power plant can be equal to the real-time power output of target wind-powered electricity generation power plant Multiplied by 0.9.I.e. this 0.9 be exactly target wind-powered electricity generation power plant the first coefficient of reduction contributed in real time.
In general, first coefficient of reduction can choose 0.9 or 0.8 in this way less than 1, and it is greater than 0 number.
The execution condition of step S105 is always to ration the power supply capacity with reference to capacity always is rationed the power supply greater than target, but when referring to appearance of always rationing the power supply Amount is less than target and always rations the power supply capacity, just illustrates that the current scheme of rationing the power supply is non-serviceable.At this time, it may be necessary to the first simultaneity factor into Row adjustment, then re-execute the steps S101.
It is, method provided herein further include:
If always rationing the power supply capacity with reference to capacity always is rationed the power supply less than target, preset first is adjusted together using the second coefficient of reduction When rate, and re-execute the steps according to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant, calculate separately each wind Second simultaneity factor of power plant.
Similar with the first coefficient of reduction, the purpose of the second coefficient of reduction is also to reduce numerical value, the second coefficient of reduction institute The object of diminution is the first simultaneity factor, for example, the first simultaneity factor can be reduced 1%-2% or so every time.
Method provided by the present invention can be in the case where not being transformed existing wind-powered electricity generation point field device, according to the opposite of setting Ratio of rationing the power supply and total amount of rationing the power supply improve ration the power supply stability and fairness by introducing abandonment sequence.Specifically, mainly from The characteristics of lower aspect embodies this programme:
1) individual difference (electricity performance, economy, Performance Assessment etc.) for considering wind-powered electricity generation field of points, by each wind power plant Abandonment sequence is carried out, the more forward wind-powered electricity generation power plant of tagmeme rations the power supply, and higher (tagmeme is more forward, and deviation ratio of rationing the power supply is smaller, and target goes out for rate Power is smaller, and it is big to represent its amount of rationing the power supply, that is, rate height of rationing the power supply), the ratio of rationing the power supply accordingly undertaken is bigger.
2) abandonment sequence in, the difference of the deviation ratio of rationing the power supply of the adjacent wind-powered electricity generation power plant of any two ranking be it is equal, So that wind-powered electricity generation power plant can stablize, quickly complete task of always rationing the power supply when progress abandonment is rationed the power supply.
3) when with reference to always ration the power supply capacity less than target always ration the power supply capacity when, with certain amplitude the first simultaneity factor of adjustment so that Scheme takes into account economy and safety.
It corresponds to the above method, present invention also provides a kind of abandonment electricity-limiting devices, as shown in Figure 4, comprising:
First computing module 401, for being counted respectively according to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant Calculate the second simultaneity factor of each wind-powered electricity generation power plant;
Second computing module 402, for according to the second simultaneity factor of each wind-powered electricity generation power plant and the installation of each wind-powered electricity generation power plant Capacity calculates separately the capacity of rationing the power supply of each wind-powered electricity generation power plant;
Third computing module 403, the installation for ration the power supply capacity and each wind-powered electricity generation power plant according to each wind-powered electricity generation power plant are held Amount calculates the target power output of each wind-powered electricity generation power plant;
First judgment module 404 is always rationed the power supply capacity for judging whether to be greater than with reference to capacity of always rationing the power supply target;With reference to total limit Capacitance is to ration the power supply what calculation of capacity obtained according to multiple wind-powered electricity generation power plant;
Control module 405 is used for if always rationing the power supply capacity with reference to capacity always is rationed the power supply greater than target according to each wind-powered electricity generation power plant Target power output ration the power supply.
Preferably, further includes:
4th computing module, for always power output, demand to be rationed the power supply the total value of total amount and wind-powered electricity generation power plant in real time according to wind-powered electricity generation power plant Determine installed capacity and calculates preset first simultaneity factor.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of the description, The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods, it can be with It realizes by another way.The apparatus embodiments described above are merely exemplary, for example, the division of the unit, Only a kind of logical function partition, there may be another division manner in actual implementation, in another example, multiple units or components can To combine or be desirably integrated into another system, or some features can be ignored or not executed.Another point, it is shown or beg for The mutual coupling, direct-coupling or communication connection of opinion can be through some communication interfaces, device or unit it is indirect Coupling or communication connection can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.
It, can be with if the function is realized in the form of SFU software functional unit and when sold or used as an independent product It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention. And storage medium above-mentioned includes: that USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic or disk.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

  1. A kind of method 1. abandonment is rationed the power supply characterized by comprising
    According to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant, the second of each wind-powered electricity generation power plant is calculated separately simultaneously Rate;
    According to the installed capacity of the second simultaneity factor of each wind-powered electricity generation power plant and each wind-powered electricity generation power plant, each wind-powered electricity generation power plant is calculated separately Capacity of rationing the power supply;
    According to the installed capacity of the ration the power supply capacity and each wind-powered electricity generation power plant of each wind-powered electricity generation power plant, the target of each wind-powered electricity generation power plant is calculated Power output;
    Judge always ration the power supply capacity with reference to whether capacity of always rationing the power supply is greater than target;It is according to multiple wind-powered electricity generation power plant with reference to capacity of always rationing the power supply Ration the power supply what calculation of capacity obtained;
    If described always ration the power supply capacity with reference to capacity always is rationed the power supply greater than target, contributes and limited according to the target of each wind-powered electricity generation power plant Electricity.
  2. 2. the method according to claim 1, wherein further include:
    According to wind-powered electricity generation power plant always in real time power output, demand ration the power supply total amount and wind-powered electricity generation power plant total specified installed capacity calculate it is described default The first simultaneity factor.
  3. 3. the method according to claim 1, wherein being limited according to preset first simultaneity factor and wind-powered electricity generation power plant are opposite Electric ratio calculates separately the second simultaneity factor of each wind-powered electricity generation power plant, comprising:
    According to ranking and wind-powered electricity generation power plant opposite ration the power supply ratio of each wind-powered electricity generation power plant in abandonment sequence, each wind-powered electricity generation is calculated separately The deviation ratio of rationing the power supply of power plant;The opposite ratio of rationing the power supply of wind-powered electricity generation power plant is rationed the power supply partially corresponding to different rankings in abandonment sequence for indicating Poor ratio;
    According to ration the power supply deviation ratio and preset first simultaneity factor of each wind-powered electricity generation power plant, the second of each wind-powered electricity generation power plant is calculated separately Simultaneity factor.
  4. 4. the method according to claim 1, wherein in ration the power supply capacity and each wind according to each wind-powered electricity generation power plant The installed capacity of power plant, calculate each wind-powered electricity generation power plant target power output after, further includes:
    Judge whether the target power output of target wind-powered electricity generation power plant is greater than the real-time power output of target wind-powered electricity generation power plant;
    If the target power output of target wind-powered electricity generation power plant is not more than the real-time power output of target wind-powered electricity generation power plant, judgement is thened follow the steps with reference to total Whether capacity of rationing the power supply, which is greater than target, is always rationed the power supply capacity.
  5. 5. according to the method described in claim 4, it is characterized in that, the method also includes:
    If the target power output of target wind-powered electricity generation power plant is greater than the real-time power output of target wind-powered electricity generation power plant, according to the reality of target wind-powered electricity generation power plant When power output and preset first coefficient of reduction recalculate target wind-powered electricity generation power plant target power output.
  6. 6. the method according to claim 1, wherein the method also includes:
    If described always ration the power supply capacity with reference to capacity always is rationed the power supply less than target, preset first is adjusted together using the second coefficient of reduction When rate, and re-execute the steps according to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant, calculate separately each wind Second simultaneity factor of power plant.
  7. 7. the method according to claim 1, wherein ranking of the wind-powered electricity generation power plant in abandonment sequence is according to following What parameter was calculated: yesterday plan electricity, yesterday actually accomplishes electricity, this monthly plan electricity, this month actually accomplish electricity, this The moon rations the power supply electricity, this month super generating electricity and scheduled punitive parameter.
  8. 8. it rations the power supply the method according to claim 1, wherein contributing according to the target of each wind-powered electricity generation power plant, Include:
    The target power output of wind-powered electricity generation power plant is sent to each power plant respectively, so that each wind-powered electricity generation power plant is handled according to corresponding target It works.
  9. 9. a kind of abandonment electricity-limiting device characterized by comprising
    First computing module, for calculating separately each according to the opposite ratio of rationing the power supply of preset first simultaneity factor and wind-powered electricity generation power plant Second simultaneity factor of wind-powered electricity generation power plant;
    Second computing module, for dividing according to the second simultaneity factor of each wind-powered electricity generation power plant and the installed capacity of each wind-powered electricity generation power plant The capacity of rationing the power supply of each wind-powered electricity generation power plant is not calculated;
    Third computing module is calculated for the installed capacity according to the ration the power supply capacity and each wind-powered electricity generation power plant of each wind-powered electricity generation power plant The target of each wind-powered electricity generation power plant is contributed;
    First judgment module is always rationed the power supply capacity for judging whether to be greater than with reference to capacity of always rationing the power supply target;With reference to capacity of always rationing the power supply It is to ration the power supply what calculation of capacity obtained according to multiple wind-powered electricity generation power plant;
    Control module is used for if described always ration the power supply capacity with reference to capacity always is rationed the power supply greater than target according to each wind-powered electricity generation power plant Target power output is rationed the power supply.
  10. 10. device according to claim 9, which is characterized in that further include:
    4th computing module, for always power output, demand to be rationed the power supply total specified dress of total amount and wind-powered electricity generation power plant in real time according to wind-powered electricity generation power plant Preset first simultaneity factor described in machine calculation of capacity.
CN201811306595.8A 2018-11-05 2018-11-05 Wind-abandoning and electricity-limiting method and device Expired - Fee Related CN109217380B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811306595.8A CN109217380B (en) 2018-11-05 2018-11-05 Wind-abandoning and electricity-limiting method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811306595.8A CN109217380B (en) 2018-11-05 2018-11-05 Wind-abandoning and electricity-limiting method and device

Publications (2)

Publication Number Publication Date
CN109217380A true CN109217380A (en) 2019-01-15
CN109217380B CN109217380B (en) 2021-09-07

Family

ID=64994957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811306595.8A Expired - Fee Related CN109217380B (en) 2018-11-05 2018-11-05 Wind-abandoning and electricity-limiting method and device

Country Status (1)

Country Link
CN (1) CN109217380B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115051419A (en) * 2022-08-15 2022-09-13 国能日新科技股份有限公司 Power generation limitation judgment method and device, electronic equipment and storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1828645A (en) * 2006-04-07 2006-09-06 上海电力学院 Town power distribution network simultaneity factor load prediction method
CN102820676A (en) * 2012-08-17 2012-12-12 华北电力大学 Electricity-limiting control method for wind farm
CN105160602A (en) * 2015-09-29 2015-12-16 国网甘肃省电力公司 Marker post wind power plant based method for calculating wind curtailment electric quantity of wind power cluster
CN105354637A (en) * 2015-10-29 2016-02-24 中国电力科学研究院 Method for making operation plan of electrical heating heat storage using wind curtailment electricity for heating
CN105703395A (en) * 2016-03-15 2016-06-22 国家电网公司 Wind power consumption ability analysis method
CN107276127A (en) * 2017-08-18 2017-10-20 西安交通大学 Consider the wind electricity digestion optimization method of the multi-area Interconnected Power System of interconnection electricity transaction plan
US20170335824A1 (en) * 2014-11-03 2017-11-23 Vestas Wind Systems A/S Method of controlling active power generation of a wind power plant and wind power plant
WO2018029662A1 (en) * 2016-08-12 2018-02-15 Centro De Investigação Em Energia Ren - State Grid S.A Method and device for wind power curtailment optimization for day-ahead operational planning of a power network

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1828645A (en) * 2006-04-07 2006-09-06 上海电力学院 Town power distribution network simultaneity factor load prediction method
CN102820676A (en) * 2012-08-17 2012-12-12 华北电力大学 Electricity-limiting control method for wind farm
US20170335824A1 (en) * 2014-11-03 2017-11-23 Vestas Wind Systems A/S Method of controlling active power generation of a wind power plant and wind power plant
CN105160602A (en) * 2015-09-29 2015-12-16 国网甘肃省电力公司 Marker post wind power plant based method for calculating wind curtailment electric quantity of wind power cluster
CN105354637A (en) * 2015-10-29 2016-02-24 中国电力科学研究院 Method for making operation plan of electrical heating heat storage using wind curtailment electricity for heating
CN105703395A (en) * 2016-03-15 2016-06-22 国家电网公司 Wind power consumption ability analysis method
WO2018029662A1 (en) * 2016-08-12 2018-02-15 Centro De Investigação Em Energia Ren - State Grid S.A Method and device for wind power curtailment optimization for day-ahead operational planning of a power network
CN107276127A (en) * 2017-08-18 2017-10-20 西安交通大学 Consider the wind electricity digestion optimization method of the multi-area Interconnected Power System of interconnection electricity transaction plan

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
崔杨等: "出力受限风电场群有功分配多目标优化策略", 《可再生能源》 *
王世谦等: "限出力条件下风电场集群有功功率优化分配方法", 《中国电力》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115051419A (en) * 2022-08-15 2022-09-13 国能日新科技股份有限公司 Power generation limitation judgment method and device, electronic equipment and storage medium
CN115051419B (en) * 2022-08-15 2022-11-11 国能日新科技股份有限公司 Power generation limitation judgment method and device, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN109217380B (en) 2021-09-07

Similar Documents

Publication Publication Date Title
CN105046395B (en) Method for compiling day-by-day rolling plan of power system containing multiple types of new energy
CN104933516A (en) Multi-time-scale power system robustness scheduling system design method
CN109615427A (en) A kind of energy interactive system and method based on chain structure
CN113452020A (en) Electric hydrogen energy system scheduling method considering flexible hydrogen demand
US12015275B2 (en) Hybrid power plant
CN101478157B (en) Automatic electricity generation control system and load prediction automatic integrated optimization method
US20130138468A1 (en) Power demand plan coordination device, power demand plan coordination method, and program
CN108281989B (en) Economic dispatching method and device for wind power system
CN102567815A (en) Posterior ideal plane analyzing method based on actual power grid operation data
CN112909933B (en) Intraday rolling optimization scheduling method containing pumped storage unit under spot market environment
CN107612045A (en) A kind of Power Plant generated energy intelligent dispensing system and method
CN107887932A (en) Virtual power plant is bidded method for organizing in the production of ahead market
CN111130149B (en) Power grid power generation active control method and system considering performance distribution characteristics
CN111769599A (en) New energy active control method and device in electric power spot market
CN110889540A (en) Method and device for optimizing system standby requirement in power market environment
CN110061525A (en) Wind-powered electricity generation real power control method and system based on grid power transmission profile constraints
CN109217380A (en) A kind of abandonment is rationed the power supply method and device
CN106485605A (en) Clean energy resource electricity step price forward purchasing platform and control method
CN107967528A (en) The price display methods that charges and device
CN109167350B (en) Construction method of industrial load response model
CN111539086A (en) Energy storage power station multi-point layout method and system
CN114069613B (en) Method and system for regulating and controlling participation peak shaving of self-contained power plant based on enterprise energy consumption characteristics
CN113328474B (en) New energy AGC substation test system, method, equipment and medium
CN101764411B (en) Reactive power compensation optimizing configuration calculator for transformer substation and optimizing configuration method thereof
CN115660204A (en) Power grid congestion relief regulation and control method considering service type virtual power plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210907