CN105468122A - Method and device for off-peak boot of nodes and whole cabinet server - Google Patents
Method and device for off-peak boot of nodes and whole cabinet server Download PDFInfo
- Publication number
- CN105468122A CN105468122A CN201510780353.2A CN201510780353A CN105468122A CN 105468122 A CN105468122 A CN 105468122A CN 201510780353 A CN201510780353 A CN 201510780353A CN 105468122 A CN105468122 A CN 105468122A
- Authority
- CN
- China
- Prior art keywords
- node
- cabinet server
- time interval
- whole machine
- machine cabinet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Power Sources (AREA)
Abstract
The invention discloses a method for off-peak boot of nodes. The method comprises the following steps of receiving a boot command sent by a user; determining a time interval for boot of the adjacent nodes in a whole cabinet server; and sending a boot command to the nodes in sequence according to the time interval and a predetermined order of the nodes in the whole cabinet server in order to boot after the nodes receive the boot command. According to the method, through uniform control of the boot time of the nodes, the nodes can carry out boot and shutdown operations at different times, so that the phenomenon that the power consumption of the whole cabinet server is instantly increased can be prevented. The invention also discloses a device for off-peak boot of the nodes and the whole cabinet server.
Description
Technical field
The present invention relates to server technology field, particularly a kind of node avoid the peak hour start method and device, whole machine cabinet server.
Background technology
Along with user is to the raising of the performance requirement of computing machine, user gets more and more to the quantity required of server.Whole machine cabinet server has very large advantage at node density with on TCO compared with traditional server, and applies more and more extensive in practice.Whole machine cabinet server is a kind of centrally connected power supply, concentrates the high density server of heat radiation, unified management.Interior of equipment cabinet has an electric power source pair of module node to carry out unifying power supply, and interior of equipment cabinet has a RMC module to carry out unified management to node.If RMC module carries out switching on and shutting down operation to node simultaneously, complete machine rack moment power consumption can be caused to rise, and common power module is difficult to meet this requirement.Therefore, how to control the start of whole machine cabinet server node, be the technical issues that need to address.
Summary of the invention
The object of this invention is to provide a kind of node to avoid the peak hour the method for start, device and whole machine cabinet server, by the unified Controlling vertex on time, carry out switching on and shutting down operation when ensureing that node is different, and then prevent the phenomenon that whole machine cabinet server energy consumption improves instantaneously.
For solving the problems of the technologies described above, the invention provides a kind of node avoid the peak hour start method, comprising:
Receive the power-on command that user sends;
Determine the time interval of adjacent node start in whole machine cabinet server;
According to the described time interval, send power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command.
Wherein, determine the time interval of adjacent node start in whole machine cabinet server, comprising:
The time interval of giving tacit consent to adjacent node start in whole machine cabinet server under original state is 3 seconds.
Wherein, determine the time interval of adjacent node start in whole machine cabinet server, comprising:
Receive the modify instruction that user sends;
According to described modify instruction, the time interval of adjacent node start in amendment whole machine cabinet server;
Using the time interval of the amended time interval as adjacent node start in whole machine cabinet server.
Wherein, send power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, comprising:
According to node position in whole machine cabinet server, according to from the first row to last column, and in each row according to order from left to right, send power-on command to node successively.
The invention provides a kind of node avoid the peak hour start device, comprising:
Receiver module, for receiving the power-on command that user sends;
Determination module, for determining the time interval of adjacent node start in whole machine cabinet server;
Sending module, for according to the described time interval, sends power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command.
Wherein, described determination module comprises:
Initial cell is 3 seconds for giving tacit consent to the time interval of adjacent node start in whole machine cabinet server under original state.
Wherein, described determination module comprises:
Receiving element, for receiving the modify instruction that user sends;
Amendment unit, for according to described modify instruction, revises the time interval of adjacent node start in whole machine cabinet server;
Determining unit, for the time interval of being started shooting as adjacent node in whole machine cabinet server in the amended time interval.
Wherein, described sending module comprises:
Sequential cell, for according to node position in whole machine cabinet server, according to from the first row to last column, and in each row according to order from left to right, as predefined procedure;
Transmitting element, for according to the described time interval, sends power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command.
The invention provides a kind of whole machine cabinet server, the node comprised described in above-mentioned any one avoid the peak hour start device.
Wherein, also comprise:
Reminding module, during for failing to start shooting in time when node, sends information.
Node provided by the present invention avoid the peak hour start method, device and dress equipment cabinet server, wherein, the method comprises: receive user send power-on command; Determine the time interval of adjacent node start in whole machine cabinet server; According to the described time interval, send power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command;
In the process of node power-on management, according to certain time interval to node sending node power-on command.Wherein time interval user can set flexibly.Namely by the unified Controlling vertex on time, when ensureing that node is different, carry out switching on and shutting down operation, and then prevent the phenomenon that whole machine cabinet server energy consumption improves instantaneously.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
Fig. 1 to avoid the peak hour the process flow diagram of method of start for node that the embodiment of the present invention provides;
Fig. 2 to avoid the peak hour the structured flowchart of device of start for node that the embodiment of the present invention provides.
Embodiment
Core of the present invention is to provide a kind of node and avoids the peak hour the method for start, and device and whole machine cabinet server, by the unified Controlling vertex on time, carry out switching on and shutting down operation when ensureing that node is different, and then prevents the phenomenon that whole machine cabinet server energy consumption improves instantaneously.
For making the object of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Please refer to Fig. 1, Fig. 1 to avoid the peak hour the process flow diagram of method of start for node that the embodiment of the present invention provides; The method can comprise:
S100, receive user send power-on command;
S110, determine time interval of the start of adjacent node in whole machine cabinet server;
Wherein, the time interval here can use cycle in the time interval of system default, such as 3 seconds; Also setting-up time gap periods can be carried out according to the actual demand of user, such as 2 seconds; But in order to ensure that node is avoided the peak hour the effect of start, generally cycle in the time interval here is not less than 1 second.
S120, according to the described time interval, according to whole machine cabinet server interior joint predefined procedure successively to node send power-on command, described node is started shooting after receiving described power-on command.
Wherein, predefined procedure here can need to set according to user, such as, can be in accordance with the order from top to bottom, and wherein every a line is again according to order from left to right; Also can from top to bottom node according to Z-shaped order; Also each Node configuration start priority orders can be given according to user, like this can using the order of priority as predefined procedure.Here predefined procedure is not limited.
Wherein, according to above-mentioned steps 110 and step 120, also can finely tune the time interval according to the order of setting; Generally time interval is here the same, namely defines the cycle that one sends start-up command, also can finely tune the time cycle according to predefined procedure here; Such as, when Z-shaped predefined procedure, in every row process, the time interval can be a such as time interval time is 2 seconds, and when starting the beginning entering into next line, during conversion namely between two row, the time interval can be unified to be set to 3 seconds; Or when predefined procedure sorts according to priority, also can be, according to user's actual need, arranged to priority the corresponding time interval.In a word, the time interval here might not be identical, can be also the corresponding time interval needed according to the requirements set of user.
Wherein, several nodes even can be allowed here to start shooting, but the number of the node of simultaneously starting shooting must make restriction here, prerequisite to ensure to prevent the phenomenon that whole machine cabinet server energy consumption improves instantaneously simultaneously.
Wherein, described node is started shooting after receiving described power-on command, Node B MC end does not do special processing, and BMC receives normal boot-strap after power-on command.
Based on technique scheme, the node that the embodiment of the present invention provides avoid the peak hour start method, in the process of node power-on management, according to certain time interval to node sending node power-on command.Wherein time interval user can set flexibly.Namely by the unified Controlling vertex on time, when ensureing that node is different, carry out switching on and shutting down operation, and then prevent the phenomenon that whole machine cabinet server energy consumption improves instantaneously.
Based on technique scheme, determine that the time interval of adjacent node start in whole machine cabinet server can comprise:
The time interval of giving tacit consent to adjacent node start in whole machine cabinet server under original state is 3 seconds.
Wherein, namely when user does not set, namely think that acquiescence uses the time interval of the setting under original state, the time interval is set as 3 seconds here.
Based on technique scheme, determine that the time interval of adjacent node start in whole machine cabinet server can comprise:
Receive the modify instruction that user sends;
According to described modify instruction, the time interval of adjacent node start in amendment whole machine cabinet server;
Using the time interval of the amended time interval as adjacent node start in whole machine cabinet server.
The time interval under user feels init state can not meet particular requirement, can modify to this time interval, when receiving modify instruction, enters the program at modification time interval, according to the input of user, modifies to the value in the time interval; Using the time interval of the amended time interval as adjacent node start in whole machine cabinet server.The time interval of amendment here can be consistent, also can be the not identical time interval.As long as start shooting when ensureing that two nodes are different.
Based on above-mentioned any technical scheme, sending power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint can comprise:
According to node position in whole machine cabinet server, according to from the first row to last column, and in each row according to order from left to right, send power-on command to node successively.
Wherein, generally, just directly as the power-up sequence sent, not only can facilitate but also be convenient to management according to node putting in order in whole machine cabinet server.Therefore, when user does not have special demand, directly according to node position in whole machine cabinet server, namely according to from the first row to last column, and in each row according to order from left to right, power-on command can be sent to node successively.
Based on technique scheme, the node that the embodiment of the present invention provides avoid the peak hour start method, according to the position of node at rack, be sent to node power-on command successively from top to bottom.Time interval node being sent to power-on command is defaulted as 3 seconds, and time interval user can revise voluntarily, and minimum interval can not be less than 1 second.By the method to whole machine cabinet server node off-peak electrification, unification can be realized switching on and shutting down operation is carried out to node.Facilitate the management of user, when ensureing that node is different, carry out switching on and shutting down operation, and then prevent the phenomenon that whole machine cabinet server energy consumption improves instantaneously.
Embodiments provide node to avoid the peak hour the method for start, by the unified Controlling vertex on time, when ensureing that node is different, carry out switching on and shutting down operation, and then prevent the phenomenon that whole machine cabinet server energy consumption improves instantaneously.
The node below embodiment of the present invention provided avoid the peak hour start device and whole machine cabinet server be introduced, node described below avoid the peak hour start device and whole machine cabinet server avoid the peak hour the method for starting shooting with above-described node can mutual corresponding reference.
Please refer to Fig. 2, Fig. 2 to avoid the peak hour the structured flowchart of device of start for node that the embodiment of the present invention provides; This device can comprise:
Receiver module 100, for receiving the power-on command that user sends;
Wherein, node is avoided the peak hour start device and RMC module be connected with node by I2C bus or netting twine;
Determination module 200, for determining the time interval of adjacent node start in whole machine cabinet server;
Sending module 300, for according to the described time interval, sends power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command.
Wherein, accept the power-on command of user, according to the position of node at rack, be sent to node power-on command successively according to predefined procedure.The time interval of two node power-on command transmissions is the setup times of user.
Optionally, described determination module 200 comprises:
Initial cell is 3 seconds for giving tacit consent to the time interval of adjacent node start in whole machine cabinet server under original state.
Optionally, described determination module 200 can also comprise:
Receiving element, for receiving the modify instruction that user sends;
Amendment unit, for according to described modify instruction, revises the time interval of adjacent node start in whole machine cabinet server;
Determining unit, for the time interval of being started shooting as adjacent node in whole machine cabinet server in the amended time interval.
Optionally, based on technique scheme, described sending module 300 comprises:
Sequential cell, for according to node position in whole machine cabinet server, according to from the first row to last column, and in each row according to order from left to right, as predefined procedure;
Transmitting element, for according to the described time interval, sends power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command.
Based on technique scheme, the node that the embodiment of the present invention provides avoid the peak hour start device, according to the position of node at rack, be sent to node power-on command successively from top to bottom.Time interval node being sent to power-on command is defaulted as 3 seconds, and time interval user can revise voluntarily, and minimum interval can not be less than 1 second.By the method to whole machine cabinet server node off-peak electrification, unification can be realized switching on and shutting down operation is carried out to node.Facilitate the management of user, when ensureing that node is different, carry out switching on and shutting down operation, and then prevent the phenomenon that whole machine cabinet server energy consumption improves instantaneously.
The invention provides a kind of whole machine cabinet server, the node comprised described in above-mentioned any one avoid the peak hour start device.
Wherein, whole machine cabinet server externally provides unified switching on and shutting down interface, node avoid the peak hour start device receive user's start-up command after, according to the position of node at rack, be sent to node power-on command successively according to predefined procedure.Time interval node being sent to power-on command is the cycle that user is arranged.
Optionally, this whole machine cabinet server can also comprise:
Reminding module, during for failing to start shooting in time when node, sends information.
Wherein, each node whether normal boot-strap can be clear that by reminding module.When there are abnormal conditions, can process in time.Improve the reliability of dress equipment cabinet server.
In instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.For device disclosed in embodiment, because it corresponds to the method disclosed in Example, so description is fairly simple, relevant part illustrates see method part.
Professional can also recognize further, in conjunction with unit and the algorithm steps of each example of embodiment disclosed herein description, can realize with electronic hardware, computer software or the combination of the two, in order to the interchangeability of hardware and software is clearly described, generally describe composition and the step of each example in the above description according to function.These functions perform with hardware or software mode actually, depend on application-specific and the design constraint of technical scheme.Professional and technical personnel can use distinct methods to realize described function to each specifically should being used for, but this realization should not thought and exceeds scope of the present invention.
The software module that the method described in conjunction with embodiment disclosed herein or the step of algorithm can directly use hardware, processor to perform, or the combination of the two is implemented.Software module can be placed in the storage medium of other form any known in random access memory (RAM), internal memory, ROM (read-only memory) (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technical field.
Above to node provided by the present invention avoid the peak hour start method, device and dress equipment cabinet server be described in detail.Apply specific case herein to set forth principle of the present invention and embodiment, the explanation of above embodiment just understands method of the present invention and core concept thereof for helping.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also carry out some improvement and modification to the present invention, these improve and modify and also fall in the protection domain of the claims in the present invention.
Claims (10)
1. node avoid the peak hour start a method, it is characterized in that, comprising:
Receive the power-on command that user sends;
Determine the time interval of adjacent node start in whole machine cabinet server;
According to the described time interval, send power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command.
2. the method for claim 1, is characterized in that, determines the time interval of adjacent node start in whole machine cabinet server, comprising:
The time interval of giving tacit consent to adjacent node start in whole machine cabinet server under original state is 3 seconds.
3. method as claimed in claim 2, is characterized in that, determines the time interval of adjacent node start in whole machine cabinet server, comprising:
Receive the modify instruction that user sends;
According to described modify instruction, the time interval of adjacent node start in amendment whole machine cabinet server;
Using the time interval of the amended time interval as adjacent node start in whole machine cabinet server.
4. the method as described in any one of claims 1 to 3, is characterized in that, sends power-on command successively, comprising according to the predefined procedure of whole machine cabinet server interior joint to node:
According to node position in whole machine cabinet server, according to from the first row to last column, and in each row according to order from left to right, send power-on command to node successively.
5. node avoid the peak hour start a device, it is characterized in that, comprising:
Receiver module, for receiving the power-on command that user sends;
Determination module, for determining the time interval of adjacent node start in whole machine cabinet server;
Sending module, for according to the described time interval, sends power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command.
6. device as claimed in claim 5, it is characterized in that, described determination module comprises:
Initial cell is 3 seconds for giving tacit consent to the time interval of adjacent node start in whole machine cabinet server under original state.
7. device as claimed in claim 6, it is characterized in that, described determination module comprises:
Receiving element, for receiving the modify instruction that user sends;
Amendment unit, for according to described modify instruction, revises the time interval of adjacent node start in whole machine cabinet server;
Determining unit, for the time interval of being started shooting as adjacent node in whole machine cabinet server in the amended time interval.
8. device as claimed in claim 5, it is characterized in that, described sending module comprises:
Sequential cell, for according to node position in whole machine cabinet server, according to from the first row to last column, and in each row according to order from left to right, as predefined procedure;
Transmitting element, for according to the described time interval, sends power-on command to node successively according to the predefined procedure of whole machine cabinet server interior joint, described node is started shooting after receiving described power-on command.
9. a whole machine cabinet server, is characterized in that, the node comprised as described in any one of claim 5 to 8 avoid the peak hour start device.
10. whole machine cabinet server as claimed in claim 9, is characterized in that, also comprise:
Reminding module, during for failing to start shooting in time when node, sends information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510780353.2A CN105468122A (en) | 2015-11-13 | 2015-11-13 | Method and device for off-peak boot of nodes and whole cabinet server |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510780353.2A CN105468122A (en) | 2015-11-13 | 2015-11-13 | Method and device for off-peak boot of nodes and whole cabinet server |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105468122A true CN105468122A (en) | 2016-04-06 |
Family
ID=55605912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510780353.2A Pending CN105468122A (en) | 2015-11-13 | 2015-11-13 | Method and device for off-peak boot of nodes and whole cabinet server |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105468122A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106817413A (en) * | 2017-01-11 | 2017-06-09 | 郑州云海信息技术有限公司 | A kind of control node method for start-up and shutdown, system and RMC |
WO2017177776A1 (en) * | 2016-04-13 | 2017-10-19 | 浪潮电子信息产业股份有限公司 | Power-on and power-off management method for nodes of whole smartrack rack |
CN107463238A (en) * | 2017-08-17 | 2017-12-12 | 济南浪潮高新科技投资发展有限公司 | A kind of method and system for controlling blade server electrifying timing sequence |
CN108319469A (en) * | 2018-02-28 | 2018-07-24 | 郑州云海信息技术有限公司 | A kind of machine open/close control method and device of each node of Cabinet-type server |
CN108829225A (en) * | 2018-05-29 | 2018-11-16 | 郑州云海信息技术有限公司 | A kind of method that more hardware unify switching on and shutting down |
CN111064624A (en) * | 2019-12-29 | 2020-04-24 | 苏州浪潮智能科技有限公司 | Whole cabinet node positioning method, device, equipment and readable storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1466029A (en) * | 2002-06-10 | 2004-01-07 | 联想(北京)有限公司 | Sequence electric system and method for clauster system |
CN101441506A (en) * | 2007-11-20 | 2009-05-27 | 中兴通讯股份有限公司 | Blade server system and power consumption management method thereof |
CN102833083A (en) * | 2011-06-13 | 2012-12-19 | 鸿富锦精密工业(深圳)有限公司 | Data center power supply device control system and method |
CN103513741A (en) * | 2012-06-29 | 2014-01-15 | 鸿富锦精密工业(深圳)有限公司 | Startup control circuit |
CN103984400A (en) * | 2014-05-28 | 2014-08-13 | 浪潮电子信息产业股份有限公司 | Staggering peak electricity supplying method of server systems |
-
2015
- 2015-11-13 CN CN201510780353.2A patent/CN105468122A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1466029A (en) * | 2002-06-10 | 2004-01-07 | 联想(北京)有限公司 | Sequence electric system and method for clauster system |
CN101441506A (en) * | 2007-11-20 | 2009-05-27 | 中兴通讯股份有限公司 | Blade server system and power consumption management method thereof |
CN102833083A (en) * | 2011-06-13 | 2012-12-19 | 鸿富锦精密工业(深圳)有限公司 | Data center power supply device control system and method |
CN103513741A (en) * | 2012-06-29 | 2014-01-15 | 鸿富锦精密工业(深圳)有限公司 | Startup control circuit |
CN103984400A (en) * | 2014-05-28 | 2014-08-13 | 浪潮电子信息产业股份有限公司 | Staggering peak electricity supplying method of server systems |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017177776A1 (en) * | 2016-04-13 | 2017-10-19 | 浪潮电子信息产业股份有限公司 | Power-on and power-off management method for nodes of whole smartrack rack |
CN106817413A (en) * | 2017-01-11 | 2017-06-09 | 郑州云海信息技术有限公司 | A kind of control node method for start-up and shutdown, system and RMC |
CN107463238A (en) * | 2017-08-17 | 2017-12-12 | 济南浪潮高新科技投资发展有限公司 | A kind of method and system for controlling blade server electrifying timing sequence |
CN108319469A (en) * | 2018-02-28 | 2018-07-24 | 郑州云海信息技术有限公司 | A kind of machine open/close control method and device of each node of Cabinet-type server |
CN108829225A (en) * | 2018-05-29 | 2018-11-16 | 郑州云海信息技术有限公司 | A kind of method that more hardware unify switching on and shutting down |
CN111064624A (en) * | 2019-12-29 | 2020-04-24 | 苏州浪潮智能科技有限公司 | Whole cabinet node positioning method, device, equipment and readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105468122A (en) | Method and device for off-peak boot of nodes and whole cabinet server | |
US10042583B2 (en) | Device management method, device, and device management controller | |
CN103809724A (en) | Equipment cabinet and power source control method thereof | |
US8996850B2 (en) | Server system and auto-reset method of the same | |
US10614011B2 (en) | Apparatus, method, and electronic device for implementing solid-state drive data interaction | |
CA3176930A1 (en) | Method and apparatus for controlling voltage of power supply of data processing device, data provessing device, and storage medium | |
CN107132904B (en) | Control system and control method of DDR system | |
CN103701707A (en) | Network equipment | |
CN103576819B (en) | Server starts control system, method and device on a large scale | |
CN103809723A (en) | Equipment cabinet and power source control method thereof | |
CN111142644A (en) | Hard disk operation control method and device and related components | |
CN103403689A (en) | Resource failure management method, device and system | |
CN103631353A (en) | Starting current control system and method | |
CN111984557A (en) | Data processing method, device and system | |
CN103890713B (en) | Device and method for managing the register information in processing system | |
CN109491491A (en) | A kind of server timing control and signal monitoring board | |
US20130238871A1 (en) | Data processing method and apparatus, pci-e bus system, and server | |
CN110083532B (en) | Method and device for positioning operation errors in fusion mode based on deep learning framework | |
CN102841634A (en) | Server mainboard | |
CN105634635A (en) | Real-time clock (RTC) sharing method, device and system | |
CN116339479A (en) | Control method and device of server power supply, storage medium and electronic device | |
CN105446654A (en) | Server control method and rack controller | |
CN108762455A (en) | A kind of chip power-on reset circuit | |
CN110704198A (en) | Data operation method, device, storage medium and processor | |
CN108549279A (en) | A kind of method and apparatus for preventing server master board core voltage from leaking electricity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160406 |