CN105465541B - A kind of double end method for repairing and mending of glass steel pipeline - Google Patents

A kind of double end method for repairing and mending of glass steel pipeline Download PDF

Info

Publication number
CN105465541B
CN105465541B CN201610049018.XA CN201610049018A CN105465541B CN 105465541 B CN105465541 B CN 105465541B CN 201610049018 A CN201610049018 A CN 201610049018A CN 105465541 B CN105465541 B CN 105465541B
Authority
CN
China
Prior art keywords
glass steel
steel pipeline
pipe
repairing
glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610049018.XA
Other languages
Chinese (zh)
Other versions
CN105465541A (en
Inventor
贺煜
高锦宏
贺锁堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peak Ansai Hundred Million Industry And Trade Co Ltd
Original Assignee
Peak Ansai Hundred Million Industry And Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peak Ansai Hundred Million Industry And Trade Co Ltd filed Critical Peak Ansai Hundred Million Industry And Trade Co Ltd
Priority to CN201610049018.XA priority Critical patent/CN105465541B/en
Publication of CN105465541A publication Critical patent/CN105465541A/en
Application granted granted Critical
Publication of CN105465541B publication Critical patent/CN105465541B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)
  • Laminated Bodies (AREA)
  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The invention discloses a kind of double end method for repairing and mending of glass steel pipeline, including by the pretreatment of damaged glass steel pipeline, repair the pretreatment and the processing of internal and external screw thread thereon of pipe, then glass fabric and composite solution are used, two incision positions for repairing pipe and glass steel pipeline are connected respectively, standing is normally used for 8~10 hours.The present invention is successively connected by repairing the two ends of pipe and glass steel pipeline, when solving glass reinforced plastic pipe as filling pipe, repairing problem when filling pipe two ends can move;Repair pipe and glass steel wire is connected through a screw thread, in the use that threaded connection place passes through composite solution and glass fabric, when solving glass steel pipeline in the case of high pressure and greater impact power, the problem of cracky after reparation, method is simple, reduces rehabilitation cost.

Description

A kind of double end method for repairing and mending of glass steel pipeline
Technical field
The invention belongs to the method for repairing and mending technical field of glass reinforced plastic pipe, and in particular to a kind of double end repairing of glass steel pipeline Method.
Background technology
Glass reinforced plastic pipe, as a kind of new reinforcing material, hardness, high temperature resistant, erosion-resisting property with glass, and With steel it is equally hard not broken the characteristics of, have very broad application market.In recent years, with water filling skill in oil exploitation industry The extensive use of art, in filling pipe selection, glass reinforced plastic pipe turns into a kind of important instrument.
Long-term high pressure and stronger water flow impact pressure, the damaged reparation of glass reinforced plastic pipe need to be met when being used due to filling pipe Mode typically has three kinds:One is smaller leak source, in the case of rule of surface, can using check card son method, this method without Stop production, construct simple and quick, but the scope of application is smaller;Two be its surface damage not usually, wound using glass fabric, use Composite solution carries out viscous benefit, applies man-hour requirement and is thoroughly vented, environmental drying, winds and bond composite solution time solidifying 12 repeatedly small When, but cracky under high pressure after repairing;Three be leak source it is larger in the case of, carry out cutting and change pipe, according to damaged situation, The glass steel pipeline of certain length is cut, frosted is carried out at pipeline two ends, use winding method connecting pipeline, this kind of repairing method connection Leak source is also easy to produce at pipeline, it is necessary to repeatedly repair, cause rehabilitation cost higher.
The content of the invention
It is an object of the invention to provide a kind of double end method for repairing and mending of glass steel pipeline, existing glass steel pipeline is solved Cracky, the higher problem of rehabilitation cost after being repaired in restorative procedure.
The technical scheme that a kind of double end method for repairing and mending of glass steel pipeline of the present invention is used is to comprise the following steps:
Step one:External diameter is the pretreatment of the broken glass steel pipeline of Dmm, and the breakage of broken glass steel pipeline is fallen in interception Place, disconnects glass steel pipeline and forms independent two sections, and two sections of glass steel pipeline outer walls are distinguished from gap to the other end Polish smooth, the polishing length of the two ends outer wall of glass steel pipeline is no less than 2.3 times of its outer diameter D;
The selection and pretreatment of pipe are repaired, selection internal diameter is Dmm~(D+3) mm, wall thickness is the reparation pipe of 8mm~12mm, The two ends for repairing pipe are carried out into boring using boring machine;
Step 2:The processing of pipe is repaired, the cutting of pipe two ends internal thread and external screw thread will be repaired in step one;
Step 3:The outer wall difference uniform application composite solution of the glass steel pipeline that will be polished smooth in step one, then 2~4 layers of glass fabric are wound outside composite solution, the uniform application composite solution again outside glass fabric smears multiple The length of the length and winding glass fabric of closing solution is no less than 1.3 times of broken glass steel pipeline outer diameter D;
Step 4:Reparation pipe in selecting step two, distinguishes uniform application composite solution at its two ends internal thread;
Step 5:Gap one end that the glass steel pipeline in pipe one end and step 3 will be repaired in step 4 socket-connects, 1.4 times of the length for socket-connecting no less than broken glass steel pipeline outer diameter D;
Step 6:The reparation pipe of mutually socket in step 5 is combined with the socket place uniform application of glass steel pipeline molten Liquid, if then winding dried layer glass fabric outside composite solution, the gross thickness of composite solution and glass fabric for 8mm~ 10mm, socket place smears composite solution with the length of winding glass fabric no less than the 2.8 of broken glass steel pipeline outer diameter D Times;
Step 7:By the other end weight of the gap of the glass steel pipeline in step 4 in the reparation pipe other end and step 3 The operation of multiple step 5 and step 6;
Step 8:The reparation pipe and glass steel pipeline that are connected in step 7 are stood 8~10 hours, broken glass steel pipe The repairing of line is completed.
It is of the invention to be further characterized in that,
The preparation method of composite solution is:It is 30% to take epoxy resin that mass fraction is 50%~70% and mass fraction ~50% W93 epoxy curing agents, are stirred at normal temperatures, be well mixed, the mass fraction of combination of the above thing it is total Be 100%.
The nominal diameter of the internal thread in step 2 is (D+4) mm~(D+6) mm, pitch is 1mm~3mm, externally threaded Nominal diameter is (D+9) mm~(D+12) mm, pitch is 1mm~3mm;Internal thread and externally threaded length are not less than damaged glass 1.4 times of glass steel pipeline outer diameter D.
The equal boring of internal diameter to (D+3) mm~(D+4) mm, the boring length that pipe is repaired in step one is no less than broken glass steel 1.6 times of pipeline outer diameter D.
The surface roughness of smooth glass steel pipeline outer wall is 2.5 μm~5 μm in step one.
The beneficial effects of the invention are as follows:A kind of double end method for repairing and mending of glass steel pipeline of the present invention is by repairing pipe and glass The two ends of steel pipeline successively connect, when solving glass reinforced plastic pipe as filling pipe, repairing when filling pipe two ends can move Complementarity problem;Repair pipe and glass steel wire is connected through a screw thread, in threaded connection place making by composite solution and glass fabric With, when solving glass steel pipeline in the case of high pressure and greater impact power, the problem of cracky after reparation, method is simple, Reduce rehabilitation cost.
Specific embodiment
Below by specific embodiment, the present invention is described in detail.
Embodiment 1
The preparation of composite solution:Take the epoxy resin that mass fraction is 50% and the W93 asphalt mixtures modified by epoxy resin that mass fraction is 50% Fat curing agent, is stirred at normal temperatures, is well mixed.
Step one:External diameter is that D is the pretreatment of the broken glass steel pipeline of 100mm, and broken glass steel pipeline is fallen in interception Breakage, disconnects glass steel pipeline and forms independent two sections, by two sections of glass steel pipeline outer walls from gap to the other end Polish smooth respectively, make the roughness of its outer wall for 2.5 μm, the polishing length of the two ends outer wall of glass steel pipeline is its external diameter 2.3 times of D are 230mm, glass steel pipeline after grinding process, it is convenient when in use with composite solution, glass fabric it is tight Closely connected conjunction;
The selection and pretreatment of pipe are repaired, the reparation pipe that selection internal diameter is 100mm, wall thickness is 8mm will be repaired using boring machine The two ends of pipe carry out boring, the equal boring of internal diameter to 103mm, the boring length at reparation pipe two ends is outside broken glass steel pipeline 1.6 times of footpath D are 160mm.
Step 2:The processing of pipe is repaired, the cutting of pipe two ends internal thread and external screw thread, the interior spiral shell of cutting will be repaired in step one The nominal diameter of line is 104mm, pitch is 1mm, and externally threaded nominal diameter is 109mm, pitch is 1mm, internal thread and outer spiral shell The length of line is 1.4 times i.e. 140mm of broken glass steel pipeline outer diameter D, and the processing of internal thread makes the glass of reparation pipe and breakage The firm pipeline of glass can increase frictional force after socket, prevent from slipping.
Step 3:The outer wall difference uniform application composite solution of the glass steel pipeline that will be polished smooth in step one, then 2 layers of glass fabric are wound outside composite solution, the uniform application composite solution again outside glass fabric smears compound molten The length of liquid and the length of winding glass fabric are 1.3 times i.e. 130mm of broken glass steel pipeline outer diameter D, glass fibre The use of cloth and composite solution can promote to repair pipe and the damaged firm pipeline of glass being brought into close contact in socket.
Step 4:Reparation pipe in selecting step two, distinguishes uniform application composite solution at its two ends internal thread.
Step 5:Gap one end that the glass steel pipeline in pipe one end and step 3 will be repaired in step 4 socket-connects, The length for socket-connecting is 1.4 times i.e. 140mm of broken glass steel pipeline outer diameter D.
Step 6:The reparation pipe of mutually socket in step 5 is combined with the socket place uniform application of glass steel pipeline molten Liquid, if then winding dried layer glass fabric outside composite solution, composite solution is 8mm with the gross thickness of glass fabric, It is 2.8 times i.e. 280mm of broken glass steel pipeline outer diameter D that socket place smears composite solution with the length of winding glass fabric; Socket reuses glass fabric and composite solution after terminating in outside, can effectively prevent occurring cunning in use The problems such as taking off, reveal.
Step 7:By the other end weight of the gap of the glass steel pipeline in step 4 in the reparation pipe other end and step 3 The operation of multiple step 5 and step 6.
Step 8:The reparation pipe and glass steel pipeline that are connected in step 7 are stood 8 hours, broken glass steel pipeline Repairing is completed.
Embodiment 2
The preparation of composite solution:Take the epoxy resin that mass fraction is 60% and the W93 asphalt mixtures modified by epoxy resin that mass fraction is 40% Fat curing agent, is stirred at normal temperatures, is well mixed.
Step one:External diameter is that D is the pretreatment of the broken glass steel pipeline of 200mm, and broken glass steel pipeline is fallen in interception Breakage, disconnects glass steel pipeline and forms independent two sections, by two sections of glass steel pipeline outer walls from gap to the other end Polish smooth respectively, make the roughness of its outer wall for 4 μm, the polishing length of the two ends outer wall of glass steel pipeline is its outer diameter D 2.5 times i.e. 500mm;
The selection and pretreatment of pipe are repaired, the reparation pipe that selection internal diameter is 202mm, wall thickness is 10mm will be repaiied using boring machine The two ends of multiple pipe carry out boring, the equal boring of internal diameter to 103.5mm, the boring length at reparation pipe two ends is broken glass steel pipe 1.8 times of line outer diameter D are 360mm.
Step 2:The processing of pipe is repaired, the cutting of pipe two ends internal thread and external screw thread, the interior spiral shell of cutting will be repaired in step one The nominal diameter of line is 205mm, pitch is 2mm, and externally threaded nominal diameter is 210mm, pitch is 2mm, internal thread and outer spiral shell The length of line is 1.6 times i.e. 320mm of broken glass steel pipeline outer diameter D.
Step 3:The outer wall difference uniform application composite solution of the glass steel pipeline that will be polished smooth in step one, then 3 layers of glass fabric are wound outside composite solution, the uniform application composite solution again outside glass fabric smears compound molten The length of liquid and the length of winding glass fabric are 1.5 times i.e. 300mm of broken glass steel pipeline outer diameter D.
Step 4:Reparation pipe in selecting step two, distinguishes uniform application composite solution at its two ends internal thread;
Step 5:Gap one end that the glass steel pipeline in pipe one end and step 3 will be repaired in step 4 socket-connects, The length for socket-connecting is 1.6 times i.e. 320mm of broken glass steel pipeline outer diameter D;
Step 6:The reparation pipe of mutually socket in step 5 is combined with the socket place uniform application of glass steel pipeline molten Liquid, if then winding dried layer glass fabric outside composite solution, composite solution is 9mm with the gross thickness of glass fabric, It is 3 times i.e. 600mm of broken glass steel pipeline outer diameter D that socket place smears composite solution with the length of winding glass fabric;
Step 7:By the other end weight of the gap of the glass steel pipeline in step 4 in the reparation pipe other end and step 3 The operation of multiple step 5 and step 6;
Step 8:The reparation pipe and glass steel pipeline that are connected in step 7 are stood 9 hours, broken glass steel pipeline Repairing is completed.
Embodiment 3
The preparation of composite solution:Take the epoxy resin that mass fraction is 70% and the W93 asphalt mixtures modified by epoxy resin that mass fraction is 30% Fat curing agent, is stirred at normal temperatures, is well mixed.
Step one:External diameter is that D is the pretreatment of the broken glass steel pipeline of 400mm, and broken glass steel pipeline is fallen in interception Breakage, disconnects glass steel pipeline and forms independent two sections, by two sections of glass steel pipeline outer walls from gap to the other end Polish smooth respectively, make the roughness of its outer wall for 5 μm, the polishing length of the two ends outer wall of glass steel pipeline is its outer diameter D 2.7 times i.e. 1080mm;
The selection and pretreatment of pipe are repaired, the reparation pipe that selection internal diameter is 403mm, wall thickness is 12mm will be repaiied using boring machine The two ends of multiple pipe carry out boring, the equal boring of internal diameter to 404mm, the boring length at reparation pipe two ends is broken glass steel pipeline 2 times of outer diameter D are 800mm.
Step 2:The processing of pipe is repaired, the cutting of pipe two ends internal thread and external screw thread, the interior spiral shell of cutting will be repaired in step one The nominal diameter of line is 406mm, pitch is 3mm, and externally threaded nominal diameter is 412mm, pitch is 3mm, internal thread and outer spiral shell The length of line is 1.8 times i.e. 720mm of broken glass steel pipeline outer diameter D.
Step 3:The outer wall difference uniform application composite solution of the glass steel pipeline that will be polished smooth in step one, then 4 layers of glass fabric are wound outside composite solution, the uniform application composite solution again outside glass fabric smears compound molten The length of liquid and the length of winding glass fabric are 1.7 times i.e. 680mm of broken glass steel pipeline outer diameter D.
Step 4:Reparation pipe in selecting step two, distinguishes uniform application composite solution at its two ends internal thread;
Step 5:Gap one end that the glass steel pipeline in pipe one end and step 3 will be repaired in step 4 socket-connects, The length for socket-connecting is 1.8 times i.e. 720mm of broken glass steel pipeline outer diameter D;
Step 6:The reparation pipe of mutually socket in step 5 is combined with the socket place uniform application of glass steel pipeline molten Liquid, if then winding dried layer glass fabric outside composite solution, composite solution is 8mm with the gross thickness of glass fabric, It is 3.2 times i.e. 1280mm of broken glass steel pipeline outer diameter D that socket place smears composite solution with the length of winding glass fabric;
Step 7:By the other end weight of the gap of the glass steel pipeline in step 4 in the reparation pipe other end and step 3 The operation of multiple step 5 and step 6;
Step 8:The reparation pipe and glass steel pipeline that are connected in step 7 are stood 10 hours, broken glass steel pipeline Repairing complete.
The present invention is successively connected by repairing the two ends of pipe and glass steel pipeline, solves glass reinforced plastic pipe as filling pipe When, repairing problem when filling pipe two ends can move;Repair pipe and glass steel wire is connected through a screw thread, in threaded connection place By the use of composite solution and glass fabric, when solving glass steel pipeline in the case of high pressure and greater impact power, The problem of cracky after reparation, method is simple, reduces rehabilitation cost.

Claims (5)

1. the double end method for repairing and mending of a kind of glass steel pipeline, it is characterised in that comprise the following steps:
Step one:External diameter is the pretreatment of the broken glass steel pipeline of Dmm, and interception is fallen the breakage of broken glass steel pipeline, made Glass steel pipeline is disconnected and forms independent two sections, and two sections of glass steel pipeline outer walls are polished light respectively from gap to the other end Sliding, the polishing length of the two ends outer wall of described glass steel pipeline is no less than 2.3 times of its outer diameter D;
The selection and pretreatment of pipe are repaired, the reparation pipe that selection internal diameter is Dmm~(D+3) mm, wall thickness is 8mm~12mm is used The two ends for repairing pipe are carried out boring by boring machine;
Step 2:The processing of pipe is repaired, internal thread and external screw thread are cut into the reparation pipe two ends described in step one;
Step 3:The outer wall of the glass steel pipeline for polishing smooth described in step one is distinguished into uniform application composite solution, so 2~4 layers of glass fabric are wound outside composite solution afterwards, the uniform application composite solution again outside glass fabric is described The length of smearing composite solution and the length of winding glass fabric be no less than 1.3 times of broken glass steel pipeline outer diameter D;
Step 4:Reparation pipe in selecting step two, distinguishes uniform application composite solution at its two ends internal thread;
Step 5:Gap one end of glass steel pipeline in reparation pipe one end described in step 4 and step 3 is nested Connect, 1.4 times described of the length for socket-connecting no less than broken glass steel pipeline outer diameter D;
Step 6:The reparation pipe of the mutual socket described in step 5 is combined with the socket place uniform application of glass steel pipeline molten Liquid, if the then winding dried layer glass fabric outside composite solution, described composite solution and the gross thickness of glass fabric It is 8mm~10mm, described socket place smears composite solution and is no less than broken glass steel pipe with the length of winding glass fabric 2.8 times of line outer diameter D;
Step 7:By the other end of the gap for repairing the glass steel pipeline in the pipe other end and step 3 described in step 4 The operation of repeat step five and step 6;
Step 8:The reparation pipe being connected described in step 7 and glass steel pipeline are stood 8~10 hours, broken glass steel The repairing of pipeline is completed.
2. the double end method for repairing and mending of a kind of glass steel pipeline according to claim 1, it is characterised in that described is compound molten The preparation method of liquid is:Take the epoxy resin that mass fraction is 50%~70% and the W93 rings that mass fraction is 30%~50% Oxygen resin curing agent, is stirred at normal temperatures, is well mixed, and the summation of the mass fraction of described combination of the above thing is 100%.
3. a kind of double end method for repairing and mending of glass steel pipeline according to claim 1, it is characterised in that described step two In internal thread nominal diameter for (D+4) mm~(D+6) mm, pitch be 1mm~3mm, described externally threaded nominal diameter For (D+9) mm~(D+12) mm, pitch are 1mm~3mm;Described internal thread and externally threaded length are not less than broken glass 1.4 times of steel pipeline outer diameter D.
4. a kind of double end method for repairing and mending of glass steel pipeline according to claim 1, it is characterised in that described step one The middle equal boring of internal diameter for repairing pipe is to (D+3) mm~(D+4) mm, boring length no less than the 1.6 of broken glass steel pipeline outer diameter D Times.
5. a kind of double end method for repairing and mending of glass steel pipeline according to claim 1, it is characterised in that described step one The surface roughness of middle smooth glass steel pipeline outer wall is 2.5 μm~5 μm.
CN201610049018.XA 2016-01-25 2016-01-25 A kind of double end method for repairing and mending of glass steel pipeline Expired - Fee Related CN105465541B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610049018.XA CN105465541B (en) 2016-01-25 2016-01-25 A kind of double end method for repairing and mending of glass steel pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610049018.XA CN105465541B (en) 2016-01-25 2016-01-25 A kind of double end method for repairing and mending of glass steel pipeline

Publications (2)

Publication Number Publication Date
CN105465541A CN105465541A (en) 2016-04-06
CN105465541B true CN105465541B (en) 2017-07-04

Family

ID=55603552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610049018.XA Expired - Fee Related CN105465541B (en) 2016-01-25 2016-01-25 A kind of double end method for repairing and mending of glass steel pipeline

Country Status (1)

Country Link
CN (1) CN105465541B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109140101A (en) * 2018-10-18 2019-01-04 中国化学工程第六建设有限公司 Glass reinforced plastic pipe pipe fitting method
CN110645418B (en) * 2019-10-10 2021-07-09 中电建十一局工程有限公司 Connecting method for mounting large-diameter pipeline

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101093043A (en) * 2007-07-13 2007-12-26 天津市巨星防腐检测工程有限公司 Method for repairing and reinforcing corrosive pipeline by using multilaminar high strength composite materials
DE202007015701U1 (en) * 2007-11-10 2008-01-24 Meuth, Michael, Dipl.-Ing. Device for sectionally wrapping elongated objects
CN101413614A (en) * 2008-11-21 2009-04-22 大庆油田有限责任公司 Connecting method for restoring old pipe end head of inner lining glass fiber reinforced plastic by overturn method
CN101684879A (en) * 2008-09-26 2010-03-31 卡尔冈纳阿普尔布莱德 Method and tools for connecting, repairing and maintaining insulated line pipes
CN203336132U (en) * 2013-05-28 2013-12-11 北京管通科技开发有限责任公司 Expansion joint leakage stopping device
CN204717225U (en) * 2015-06-08 2015-10-21 松原市辐基斯工程服务有限公司 A kind of fiber reinforced plastic pipe is damaged and is leaked maintenance unit

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150047768A1 (en) * 2013-08-19 2015-02-19 Christopher Quinn Attachment method for securing elements to one another using repair wrap

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101093043A (en) * 2007-07-13 2007-12-26 天津市巨星防腐检测工程有限公司 Method for repairing and reinforcing corrosive pipeline by using multilaminar high strength composite materials
DE202007015701U1 (en) * 2007-11-10 2008-01-24 Meuth, Michael, Dipl.-Ing. Device for sectionally wrapping elongated objects
CN101684879A (en) * 2008-09-26 2010-03-31 卡尔冈纳阿普尔布莱德 Method and tools for connecting, repairing and maintaining insulated line pipes
CN101413614A (en) * 2008-11-21 2009-04-22 大庆油田有限责任公司 Connecting method for restoring old pipe end head of inner lining glass fiber reinforced plastic by overturn method
CN203336132U (en) * 2013-05-28 2013-12-11 北京管通科技开发有限责任公司 Expansion joint leakage stopping device
CN204717225U (en) * 2015-06-08 2015-10-21 松原市辐基斯工程服务有限公司 A kind of fiber reinforced plastic pipe is damaged and is leaked maintenance unit

Also Published As

Publication number Publication date
CN105465541A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN105465541B (en) A kind of double end method for repairing and mending of glass steel pipeline
CN102464861B (en) Pipeline repairing carbon fiber composite material system and application thereof
CN202660148U (en) Pipeline repaired and reinforced by fiber composite cloth
CN108859171A (en) A kind of preparation method of frp cable protective pipe
CN109058648A (en) A method of with composite material to the continuous pipe reinforcement recovery of surface damage
CN102361280A (en) Composite cable duct made from glass fiber reinforced plastics (GFRP) and modified polypropylene (PP)
CN104234442A (en) Reinforcement method for reinforcing concrete pole by basalt fiber reinforced polymer sheet
KR100718247B1 (en) Close-fit pipes lining system of trenchless technology using means for removing pleat and apparatus thereby
CN105465542B (en) A kind of double end repairing method with welding of glass steel pipeline
CN114440051A (en) Electrothermal repair method for glass steel tube
CN107314189A (en) No-dig technique pipeline rehabilitation use can flatten enhanced internal lining pipe
CN104847977A (en) Glass fiber-reinforced plastic polyurethane TPU composite tube and manufacturing process thereof
CN206504022U (en) A kind of high strength glass fiber plastics clamp sand pipe
CN104879605A (en) New method for stopping leakage of steel wire mesh-framework polyethylene composite pipe
CN106189203B (en) A kind of local route repair process of old cladding sucker rod
CN104179239B (en) A kind of Integral glass fibre reinforced plastic inspection pit
CN109458516A (en) A kind of compound pipeline complex pipeline field repair component and operating method
CN206845141U (en) A kind of repeatable high pressure resistant packer utilized
CN205558822U (en) Glass steel is sleeve pipe in pit
CN110126311B (en) Method for repairing leaked oil of oil delivery pipe of spinning oil pump through online treatment
WO2016010455A1 (en) Universal conical coupling
CN203947839U (en) Cement pole is reinforced anti-corrosive apparatus
CN107314166A (en) Seamless double-layer strengthens cured in place liner pipe
CN107044269B (en) But reuse's high pressure resistant packer
CN112762271A (en) Method for reinforcing and repairing in-service water-permeable metal pipeline by using carbon fiber composite material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170704

Termination date: 20190125

CF01 Termination of patent right due to non-payment of annual fee