CN101684879A - Method and tools for connecting, repairing and maintaining insulated line pipes - Google Patents

Method and tools for connecting, repairing and maintaining insulated line pipes Download PDF

Info

Publication number
CN101684879A
CN101684879A CN200810168316A CN200810168316A CN101684879A CN 101684879 A CN101684879 A CN 101684879A CN 200810168316 A CN200810168316 A CN 200810168316A CN 200810168316 A CN200810168316 A CN 200810168316A CN 101684879 A CN101684879 A CN 101684879A
Authority
CN
China
Prior art keywords
sleeve pipe
band
pipe
otch
instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200810168316A
Other languages
Chinese (zh)
Other versions
CN101684879B (en
Inventor
卡尔冈纳阿普尔布莱德
拉斯冈纳森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2008101683166A priority Critical patent/CN101684879B/en
Publication of CN101684879A publication Critical patent/CN101684879A/en
Application granted granted Critical
Publication of CN101684879B publication Critical patent/CN101684879B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method and tools for repairing and connecting insulated line pipes. The line pipe comprises weldable plastic casings surrounding inner pipes which are surrounded by an insulating layer.

Description

Be used to connect, the method and the instrument of maintenance and maintaining insulated line pipes
Technical field
The present invention relates to be used to keep in repair and method that is connected the thermal insulation line pipe and instrument, but this line pipe comprises the outside welding plastic sleeve pipe that surrounds the interior pipe that is centered on by isolation layer.This method is disclosed among disclosed German patent: the DK162 588.
Background technique
The thermal insulation line pipe is generally used for transmitting heat-conducting liquid, for example, and the line pipe in local heating or distant heating system and the cooling system.This pipe also comprises the steel pipe of fluid transfer heat transfer medium.But steel pipe is to be surrounded and surrounded by the outside waterproof welding plastic sleeve pipe of polyethylene and so-called PEHD normally by insulating material such as polyurethane foam.
Therefore it is underground to consider that this pipe can be embedded in, and can be corroded and stands high stress and pressure by being continued to be penetrated into water in the pipe and moisture.This can cause leakage over the long term, causes continuous maintenance.Pipe is embedded in sometimes as pipe arrangement below road or the expressway, makes to be difficult to the approaching pipe that damages, because must lift this pipe from ground, therefore this picking and placeing needs high cost.
Therefore, maintenance cost is very high, and it is also high particularly to have a cost of special area heating pipe of alarm circuit, because the leakage level must be remained on high relatively validity.Alarm circuit will be provided with in the mode that it can be embedded between outside pipe arrangement and the steel pipe.Therefore, pipe connects and to have best quality and mechanical strength is very important.Two kinds of situations of maintenance to new equipment and existing line pipe have proposed requirement.
Under the worst situation, makeing mistakes during installation of the system of different quality or system install can cause the economic loss of relevant heating system for a long time.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide a kind of method and instrument that connects and keep in repair insulation tube.
In order to reach the foregoing invention purpose, of the present invention is that maintenance may further comprise the steps with the method that is connected electric welding damage pipe:
One sleeve pipe is provided, and sleeve pipe has can cover the otch of offering on waiting to keep in repair the length in territory, area under control and having vertically;
At first use belt (strap) fixed sleeving;
With band (band) fixed sleeving, upwards draw this band and fixing to strain sleeve pipe fully; With
The sleeve pipe otch of in 230 ℃ of welding vertically, offering.
According to the present invention, of the present inventionly be used for electric welding and take over and to comprise with the instrument that keeps in repair them and to be used to clamp the anchor clamps of subsidiary sleeve pipe that described anchor clamps comprise with the maintenance pipe:
One can insert the insulating electrode moving up and down in the otch of sleeve pipe;
Crank on the one anchor clamps top is used to strain band, and this roll of strip is had mercy in jacket exterior, shifts to instrument in order to strain sleeve pipe then, and this crank is by dentation unit running shaft, and this axle is by rotating wound strips along any one direction;
One has the buffer cell of circular perimeter, is used for changing the angle that band forms when to anchor clamps tie rod band, and this buffer cell can move up and down.
Description of drawings
With reference to accompanying drawing, by the following detailed description of illustrative its preferred implementation, it is obvious that the features and advantages of the present invention will become.Wherein:
Fig. 1 a-Figure 11 illustration according to welding process of the present invention;
Fig. 2 has shown according to soldering appliance of the present invention; With
Fig. 3, Fig. 4, Fig. 5 and Fig. 6 have shown according to welding of the present invention.
Embodiment
Hereinafter the present invention is described in detail with reference to accompanying drawing.
Fig. 1 a-Figure 11 has schematically shown according to whole welding process of the present invention.Fig. 1 a-Figure 11 schematically shows welding process.As shown in the figure, when in exposing, managing, with between the supporter insertion tube.In this case, the downside of supporter can be connected with bolt, and its right side and left side can be connected on the crank that is connected in two pipe ends.
Shown in Fig. 1 b, connect welded mesh, and reload temperature sensor, adapter sleeve then.Fig. 1 c illustration the state of sleeve pipe after connecting, in this case, an end longitudinal cut of sleeve pipe is also fixing as restricting with belt.Fig. 1 d has shown that the belt that instrument of the present invention is arranged on the outside of welded mesh and will be used for fixing sleeve pipe is arranged on the inside of welded mesh.Apply moment of torsion to be fixedly attached to the band on the anchor clamps with spanner along radial direction.As shown in FIG., be connected on the welding machine.Fig. 1 e illustration one embodiment of welding machine.As shown in Fig. 1 f, weld connection at about 230 ℃, and begin to reach 110 ℃ from temperature and just should determine the time.Fig. 1 g illustration the welding machine that separates of the back that is cooled.Fig. 1 h illustration offering of otch, secondary welding process from the outside is presented among Fig. 1 i.Shown in Fig. 1 j, tested the pressure of jointing.Interface has been full of PUR foamed material (being presented among Fig. 1 k).Behind the foamed material closed hole, all processes (being presented among Fig. 1 l) have just been finished.
Fig. 2 illustration how to install welding machine of the present invention additional.Fig. 3 illustration part to be welded.Fig. 4 illustration the state of the installing welding machine that is used to weld.As shown in Figure 4, be provided with crank, so that can obtain enough pressure in the electric fusion welding zone that light beam acts on the pipe on the caliber.Removably be connected with spanner 33 with removable crank 32.
In addition, fixed projection is set so that can only move in one direction and fix when pulled by crank pulling and the band that holds sleeve pipe.
Welding is undertaken by electric power.The thickness of the pipe of welding can change.Because welding can not be carried out in the place that welding machine is set, insulate and the electrode 26 that is movable to sleeve pipe upper cut inside will go down to prevent welding in otch.
Fig. 6 in more detail illustration welding process.Fig. 6 has shown the workpiece part that is equiped with welding machine.When with band fixed muffle sleeve pipe peripheral, be different according to the different surfaces of the cross section of adapter to be welded.For this reason, band will twine along the periphery of pipe, upwards draws then.Buffer cell 42 is set so that can keep stress, band can not broken owing to putting on this stress that upwards pulls to welding machine.Buffer cell can move up and down by last/mobile down guide element 43, so that the band 23 that is upwards drawn can be adjusted according to the size or the surface state of pipe.
Fig. 5 illustration surround the state of pipe with sleeve pipe.
But finish welding aforesaid the present invention's zero defect.
It should be noted that the above embodiments are examples rather than limit the present invention, those skilled in the art can design many alternate embodiments, but the scope of the present invention that does not break away from claims and limited.Generally speaking, word " comprises " and its synonym is not got rid of parts or steps beyond cited those in any claim or the specification.

Claims (2)

1, a kind of with maintenance with is connected the method for electric welding adapter, it is characterized in that, may further comprise the steps:
One sleeve pipe is provided, and sleeve pipe has can cover the otch of offering on waiting to keep in repair the length in territory, area under control and having vertically;
At first use the belt fixed sleeving;
Use the band fixed sleeving, upwards spur this band and fixing to strain sleeve pipe fully; With
The sleeve pipe otch of in 230 ℃ of welding vertically, offering.
2, a kind of with maintenance with is connected the instrument that electric welding is taken over, it is characterized in that comprise being used to clamp subsidiary sleeve pipe to keep in repair the anchor clamps of pipe, described anchor clamps comprise:
One can insert the insulating electrode moving up and down in the otch of sleeve pipe;
Crank on the one instrument top, it is used to strain band, and this roll of strip is had mercy in jacket exterior, shifts to instrument in order to strain sleeve pipe then, and described crank is by dentation unit running shaft, and this axle is by rotating wound strips along any one direction;
One has the buffer cell of circular perimeter, is used for changing the angle that band forms when to anchor clamps tie rod band, and this buffer cell can move up and down.
CN2008101683166A 2008-09-26 2008-09-26 Method and tool for connecting, repairing and maintaining insulated line pipes Expired - Fee Related CN101684879B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101683166A CN101684879B (en) 2008-09-26 2008-09-26 Method and tool for connecting, repairing and maintaining insulated line pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101683166A CN101684879B (en) 2008-09-26 2008-09-26 Method and tool for connecting, repairing and maintaining insulated line pipes

Publications (2)

Publication Number Publication Date
CN101684879A true CN101684879A (en) 2010-03-31
CN101684879B CN101684879B (en) 2012-11-28

Family

ID=42048174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101683166A Expired - Fee Related CN101684879B (en) 2008-09-26 2008-09-26 Method and tool for connecting, repairing and maintaining insulated line pipes

Country Status (1)

Country Link
CN (1) CN101684879B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105465541A (en) * 2016-01-25 2016-04-06 安塞亿峰工贸有限责任公司 Double-headed repairing method of glass steel pipeline
WO2019149926A1 (en) 2018-02-05 2019-08-08 Tsc Innovation Ab The method for joining or repairing a pipe system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1254723B (en) * 1992-03-18 1995-10-09 Snam Spa PROCEDURE FINALIZED FOR THE INTERVENTIONS OF REPAIR OF DAMAGES LOCATED TO THE CONDUCT THROUGH THE APPLICATION OF ARMOR WITH AN INTERPOSED PROTECTIVE SHEATH
US7037043B1 (en) * 2005-02-14 2006-05-02 Pipe Liners, Inc. Methods for lining pipes and connecting the lined pipe with adjacent or lateral pipes
CN201083310Y (en) * 2007-09-21 2008-07-09 诸水仙 Large pipeline network emergency repair junction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105465541A (en) * 2016-01-25 2016-04-06 安塞亿峰工贸有限责任公司 Double-headed repairing method of glass steel pipeline
CN105465541B (en) * 2016-01-25 2017-07-04 安塞亿峰工贸有限责任公司 A kind of double end method for repairing and mending of glass steel pipeline
WO2019149926A1 (en) 2018-02-05 2019-08-08 Tsc Innovation Ab The method for joining or repairing a pipe system
CN110118289A (en) * 2018-02-05 2019-08-13 Tsc创新有限公司 Method for engaging or repairing pipe-line system

Also Published As

Publication number Publication date
CN101684879B (en) 2012-11-28

Similar Documents

Publication Publication Date Title
US20180017463A1 (en) Method for forming pressure-testable field joint between pre-insulated pipe sections, and piping system with pressure-testable field joint
US7673655B1 (en) Composite wrap repair of internal defects
US20150204475A1 (en) Bare Sleeve Pipe Repair Method And Apparatus
RU2635943C2 (en) Pipeline, method for forming pipeline, method of cathodic pipeline protection, method for forming and laying underwater pipeline
CA2985172C (en) Joining lined pipe sections
CN101684879B (en) Method and tool for connecting, repairing and maintaining insulated line pipes
CN105307839B (en) The method and apparatus installed for pipe-line system and repaired
US20080150277A1 (en) Method and assembly for repairing, joining or strengthening pipes made of plastics
CN105351673A (en) Polyurethane thermal insulation pipe straight pipe plate type field joint device and field joint thermal insulation method
US20130292936A1 (en) Pipe Arrangement and Process
JP5842303B2 (en) Pipe inner peripheral side structure and pipe inner peripheral surface lining method
CN116792607A (en) Interface heat preservation construction process under low-temperature high-water-level environment
CN103470913A (en) Connecting structure and manufacturing and connecting method of metal glass steel FRP (Fiber-glass Reinforced Plastics) lining rubber and plastic subsea pipeline
JP6367681B2 (en) Piping residual stress improvement method, antifreeze liquid supply method between ice plugs, and piping residual stress improvement device
KR101048176B1 (en) Apparatus and method for connecting, repairing and maintaining insulated line pipes
DK178155B1 (en) A process for producing a branch on a pre-insulated pipe
EP2096347B1 (en) Method for joining together steel pipes for conveying fluids under pressure
CN210950245U (en) Waterproof direct-burried insulating tube
US20070145737A1 (en) Pipeline assembly with thermal shielding
CN114216001A (en) Heat insulation construction process suitable for directional drilling crossing section heat insulation pipeline interface in high and cold area
KR20170031876A (en) Method for constru cting repair of connection in double insulation pipe using outer jacket
CN108332001A (en) A kind of thermal insulation pipe joint structure and processing method of built-in fiber
CN117450352B (en) Composite pipeline pressurized perforating method
CN112460380B (en) Clamping plate type on-site joint coating method for heat-insulating pipeline
CN216843641U (en) Prefabricated direct-burried electric tracing insulating tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20150926

EXPY Termination of patent right or utility model