CN105464683A - TBM shoring operation movable shield and application method thereof - Google Patents

TBM shoring operation movable shield and application method thereof Download PDF

Info

Publication number
CN105464683A
CN105464683A CN201510974640.7A CN201510974640A CN105464683A CN 105464683 A CN105464683 A CN 105464683A CN 201510974640 A CN201510974640 A CN 201510974640A CN 105464683 A CN105464683 A CN 105464683A
Authority
CN
China
Prior art keywords
canopy body
protection shield
workbench
tbm
removable protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510974640.7A
Other languages
Chinese (zh)
Inventor
王西奎
马以涛
骆振华
柳同祥
何敏
高敏
帅文众
龚利
张凡
陈恩瑜
白现军
毛彝陵
左文洲
宁光忠
李令
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 3 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 3 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 3 Engineering Co Ltd filed Critical China Gezhouba Group No 3 Engineering Co Ltd
Priority to CN201510974640.7A priority Critical patent/CN105464683A/en
Publication of CN105464683A publication Critical patent/CN105464683A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/155Laggings made of strips, slats, slabs or sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a TBM shoring operation movable shield and an application method thereof. The movable shield comprises a shed body in the same curvature radius with a tunnel, and the shed body is provided with roofbolter holes used for anchor rod construction. The lower part of the shed body is connected with a plurality of supporting columns. The outer side of the supporting column is provided with a column sleeve. The supporting column can slide up and down in the column sleeve. The bottom end of the column sleeve is connected with a workbench. The middle part of the shed body is connected with a hydraulic oil cylinder which can make the shed body move up and down. The bottom end of the hydraulic oil cylinder is connected with a lug base which is fixed above the workbench. The bottom of the workbench is provided with travelling wheels which are cooperated with two tracks, and the tracks are fixed on ground. The workbench is also connected with a horizontal power system used to make the workbench move on the tracks. The movable shield can prevent collapse and rocks falling on a surrounding rock exposing area, and effectively protects safety of shoring construction personnel and mechanical equipment.

Description

A kind of TBM removable protection shield of supporting operation and using method thereof
Technical field
The present invention relates to a kind of TBM tunnel support technology, be specifically related to the removable protection shield of a kind of TBM supporting operation and using method thereof.
Background technology
TBM Tunnel Construction, owing to having the advantages such as speed of application is fast, construction environment dust is little, is widely applied in the construction of water power diversion tunnel, public iron traffic tunnel.In TBM work progress, along with cutterhead constantly tunnels forward, excavation face is constantly disclosed from TBM shield rear, now need disclose district at country rock and carry out once supporting operation.And when wall rock condition is poor, when country rock exposure district carries out once supporting operation (anchor pole, linked network), excavation face often has falling rocks even to cave in, and constitutes a serious threat to the safety of constructor and equipment, also have impact on supporting and drivage efficiency.Therefore, be badly in need of a kind of protective device of research and development, to guarantee that country rock discloses the safety of district personnel and plant equipment, and improve once supporting operating efficiency.
Summary of the invention
The object of the present invention is to provide the removable protection shield of a kind of TBM supporting operation and using method thereof, to solve the problem that TBM Wall Rock of Tunnel exposure district's landslide and falling rocks threaten personnel and device security, once supporting efficiency and the low problem of driving speed, the present invention can prevent country rock from disclosing district's landslide and falling rocks, the available protecting safety of supporting construction personnel and plant equipment; Meanwhile, within the scope of canopy body, the pre-splicing work of mesh sheet is carried out with driving simultaneously, significantly improves once supporting and TBM drivage efficiency.
For achieving the above object, the present invention adopts following technical scheme:
The removable protection shield of a kind of TBM supporting operation, comprise the canopy body identical with tunnel radius of curvature, canopy body offers the jumbolter hole for anchor bolt construction, the bottom of canopy body is connected with some support columns, the outside of support column is arranged with column sleeve, and support column can slide up and down in column sleeve, the bottom of column sleeve is connected to workbench, the middle part of canopy body is connected with the hydraulic jack that canopy body can be made to move up and down, hydraulic jack bottom is connected to the ear seat be fixed on column sleeve, ear seat is positioned at the top of workbench, the bottom of workbench is provided with the road wheel coordinated with two tracks being fixed on ground, workbench is also connected with the horizontal power system for making workbench move in orbit.
Further, canopy body is spliced by some curved plates identical with tunnel radius of curvature, and curved plate is provided with preformed hole, interts and be provided with the steel pipe be stitched together by curved plate in preformed hole.
Further, described jumbolter hole has two, is symmetrically distributed in the both sides of canopy body.
Further, horizontal power system comprises the fixed frame be connected with workbench, is provided with motor in fixed frame, and the output of motor is connected with worm-gear speed reducer, and the output of worm-gear speed reducer is connected with driving wheel.
Further, the both sides of workbench are connected with side plate, and the inner side of side plate is provided with for preventing the protection wheel protecting shield to derail in the process of walking.
Further, the steel plate for preventing track deformation is provided with between two tracks.
Further, described support column has four, is evenly distributed on the both sides of canopy body bottom; Described road wheel has four, is evenly distributed on the both sides bottom workbench.
A using method for the removable protection shield of TBM supporting operation, comprises the following steps:
Step 1: removable protection shield is rested in tunnel supporting region, carry out mesh sheet splicing work on canopy body top;
Step 2: after removable protection shield rear country rock discloses, is pushed into country rock by horizontal power system by removable protection shield and discloses district, then, to the pressurization of liquefaction oil cylinder, is promoted canopy body until press close to excavate scar, carry out mesh sheet installation by support column;
Step 3: after mesh sheet installation, keeps removable protection shield motionless, and adopt jumbolter to carry out bolthole construction by the jumbolter hole on canopy body, bolthole carries out rockbolt installation after having constructed.
Further, bolthole is constructed and in rockbolt installation process, after a rockbolt installation completes, is carried out bolthole construction and the rockbolt installation of other position by the position of horizontal power system call interception canopy body.
Further, also comprise step 4: after canopy body region mesh sheet and anchor bolt construction complete, reduce canopy body by hydraulic jack, make canopy body depart from country rock, then by horizontal power system, canopy body is pulled out supporting position.
Compared with prior art, the present invention has following useful technique effect:
Removable protection shield of the present invention can carry out mesh sheet before country rock discloses on canopy body top assembled in advance, and to improve mesh sheet installation effectiveness, canopy body is connected with support column, and support column can slide up and down under hydraulic jack effect in column sleeve, to adjust the height of canopy body.After protection shield rear country rock discloses, canopy body is promoted to country rock and discloses face, carry out mesh sheet connection and bolt support operation, column sleeve is fixing on the table, and workbench has road wheel, can seesaw in orbit under the driving of horizontal power system, the position keeping shield can be changed, so that repeat mesh sheet in front and back assembled in advance, the present invention can prevent country rock from disclosing district's landslide and falling rocks, the available protecting safety of supporting construction personnel and plant equipment; Meanwhile, within the scope of canopy body, the pre-splicing work of mesh sheet is carried out with driving simultaneously, significantly improves once supporting and TBM drivage efficiency.
Further, canopy body by arc-shaped just and steel pipe form, the radius of curvature of curved plate is identical with tunnel; Mesh sheet can be carried out on canopy body top assembled in advance, to improve mesh sheet installation effectiveness before TBM shield rear country rock discloses.
Further, horizontal power system comprises motor, worm-gear speed reducer, driving wheel, and the rotating speed of motor is decelerated to rotating speed of target by worm-gear speed reducer, drives protection shield advance or retreat under the effect of driving wheel.
Further, the both sides of workbench are connected with side plate, and the inner side of side plate is provided with protection wheel, derail in the process of walking for preventing protection shield.
The inventive method is before report shield rear country rock discloses, and protection shield rests in tunnel supporting region, carries out the pre-splicing work of mesh sheet on canopy body top; After protection shield rear country rock discloses, by horizontal power system, protection shield level is pushed into country rock and discloses district, by hydraulic jack, the act of canopy body is carried out mesh sheet installation to country rock face; After mesh sheet has connected, under the protection of protection shield, carry out anchor bolt construction; After anchor bolt construction completes, shrink hydraulic jack canopy body is regained, tunnel supporting district is again retracted under horizontal power systemic effect, along with TBM constantly tunnels forward, continuous protection shield track to be laid forward, can prevent country rock from disclosing district's landslide and falling rocks, the available protecting safety of supporting construction personnel and plant equipment; Meanwhile, within the scope of canopy body, the pre-splicing work of mesh sheet is carried out with driving simultaneously, significantly improves once supporting and TBM drivage efficiency.
Accompanying drawing explanation
Fig. 1 is overall structure elevation of the present invention;
Fig. 2 is overall structure lateral view of the present invention;
Fig. 3 is canopy body structure schematic diagram of the present invention.
Wherein, 1, canopy body; 2, support column; 3, column sleeve; 4, hydraulic jack; 5, workbench; 6, road wheel; 7, protection wheel; 8, track; 9, horizontal power system; 10, curved plate; 11, steel pipe; 12, motor; 13, worm-gear speed reducer; 14, driving wheel; 15, jumbolter hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail:
See Fig. 1 to Fig. 3, a kind of TBM supporting operation packaged type protection shield, this device comprises canopy body 1, support column 2, column sleeve 3, hydraulic jack 4, workbench 5, road wheel 6, protection wheel 7, track 8, horizontal power system 9.Canopy body 1 is made up of curved plate 10 and steel pipe 11, and curved plate 10 radius of curvature is identical with tunnel excavation face, and is provided with the preformed hole that steel pipe 11 mates, and steel pipe 11 to insert in curved plate 10 preformed hole and carries out weldering ties formation canopy body 1.The weight of canopy body 1 reaches the track 8 on ground by support column 2 and hydraulic jack 4, the top of hydraulic jack 4 is against on canopy body 1, bottom is connected to the ear seat be fixed on column sleeve 3, crossbeam is had to connect between column sleeve 3, ear seat is welded on described crossbeam, the earhole of hydraulic jack 4 and the hole pin shaft joint of ear seat, ear seat is positioned at the top of workbench 5.Under hydraulic jack 4 acts on, support column 2 can be free to slide in column sleeve 3, promotes or reduces canopy body 1.By locking, will prevent canopy body 1 continuation from gliding and guarantee the safety of personnel and equipment on workbench 5 when support column 2 is down to workbench 5.Workbench 5 bottom is provided with road wheel 6 and protection wheel 7, and top weight is passed to track 8 by road wheel 6, and protection wheel 7 is positioned at track 8 bottom, is mainly used to prevent protection shield from derailing in the process of walking.Plate Welding is adopted to prevent track deformation between two tracks 8.Protection shield horizontal power system 9 is made up of motor 12, worm-gear speed reducer 13, driving wheel 14.The rotating speed of motor 12 is decelerated to rotating speed of target by worm-gear speed reducer 13, drives protection shield advance or retreat under the effect of driving wheel 14.
In TBM work progress, first, protection shield rests in tunnel supporting region, carries out mesh sheet splicing work on canopy body 1 top; After protection shield rear country rock discloses, protection shield is pushed into country rock and discloses district, carry out mesh sheet installation; Under the protection of protection shield, carry out anchor bolt construction by jumbolter hole 15; After anchor bolt construction completes, protection shield is retracted again tunnel supporting district.
Adopt this protection shield, when the once supporting operation of TBM, mesh sheet connection work can be carried out in advance in canopy body 1 top, after excavation face releases protection shield, once completes the connection of mesh sheet within the scope of canopy body, can significantly improve once supporting efficiency.Meanwhile, in anchor bolt construction process, protection shield can prevent country rock face bulk falling rocks, the safety of energy available protecting constructor and equipment.
Below operating process of the present invention is described in detail:
Packaged type protection shield of the present invention comprises canopy body 1, support column 2, column sleeve 3, hydraulic jack 4, workbench 5, road wheel 6, protection wheel 7, track 8, horizontal power system 9.Canopy body 1 is made up of curved plate 10 and steel pipe 11, curved plate 10 has steel pipe preformed hole, and steel pipe 11 inserts in steel pipe preformed hole, carries out weldering knot in insertion point.Support column 2 is limited in column sleeve 3 in horizontal plane, can move up and down under hydraulic jack 4 acts in column sleeve 3.Column sleeve 3 bottom is fixed on workbench 5.Road wheel 6 bottom contacts with track 8, mainly bears top weight.Protection wheel 7 is in order to prevent from derailing in protection shield walking process.
During use, according to the following steps:
1. mesh sheet is assembled in advance: in TBM tunneling process, and when protecting shield rear country rock excavation face not yet to disclose, protection shield is positioned at below supporting region.The radius of curvature of curved plate 10 is identical with tunnel excavation face, and according to the interval of mesh sheet specification determination curved plate 10 and steel pipe 11, it is assembled in advance to carry out mesh sheet on the upside of canopy body 1, connects between mesh sheet.
2. mesh sheet is installed: after protection shield rear country rock excavation face discloses, the motor 12 of fetching boiling water in translation Force system 9, is down to desired value by worm-gear speed reducer 13 by motor 12 rotating speed, and power is passed to driving wheel 14.Protection shield level is pushed into and discloses below scar by driving wheel 14.Then, to liquefaction oil cylinder 4 pressurize, by support column 2 by canopy body 1 vertical lifting until press close to excavate scar, carry out mesh sheet installation.
3. anchor bolt construction: after mesh sheet installation, keep protection shield motionless, adopt jumbolter to carry out bolthole construction by the jumbolter hole 15 in canopy body, bolthole carries out rockbolt installation after having constructed.After a rockbolt installation completes, carried out the construction of other position anchor pole by adjustment canopy body position.
4. protect shield to reset: after canopy body region mesh sheet and anchor bolt construction complete, for convenience of the carrying out of follow-up supporting operation, to need protection shield to retract supporting position.First, shrink hydraulic jack 4 and reduce canopy body 1, make canopy body 1 depart from country rock; Then by starting horizontal power system 9, canopy body 1 is pulled out supporting position.
5., along with TBM constantly tunnels forward, complexity is carried out above-mentioned steps and is constantly carried out initial support operation.
By the utilization of this TBM supporting operation packaged type protection shield, unsupported area mesh sheet and anchor bolt construction can carry out under the protection of canopy body, can effectively prevent unsupported area from caving in and falling rocks, available protecting supporting construction personnel and plant equipment.Meanwhile, within the scope of canopy body, the pre-splicing work of mesh sheet and TBM tunnel and can carry out simultaneously, can improve once supporting efficiency.

Claims (10)

1. the removable protection shield of TBM supporting operation, it is characterized in that, comprise the canopy body (1) identical with tunnel radius of curvature, canopy body (1) offers the jumbolter hole (15) for anchor bolt construction, the bottom of canopy body (1) is connected with some support columns (2), the outside of support column (2) is arranged with column sleeve (3), and support column (2) can slide up and down in column sleeve (3), the bottom of column sleeve (3) is connected to workbench (5), the middle part of canopy body (1) is connected with the hydraulic jack (4) that canopy body (1) can be made to move up and down, hydraulic jack (4) bottom is connected to the ear seat be fixed on column sleeve (3), ear seat is positioned at the top of workbench (5), the bottom of workbench (5) is provided with the road wheel (6) coordinated with two tracks (8) being fixed on ground, workbench (5) is also connected with for making workbench (5) in the horizontal power system (9) of the upper motion of track (8).
2. the removable protection shield of a kind of TBM supporting operation according to claim 1; it is characterized in that; canopy body (1) is spliced by some curved plates identical with tunnel radius of curvature (10); curved plate (10) is provided with preformed hole, interts and be provided with the steel pipe (11) be stitched together by curved plate (10) in preformed hole.
3. the removable protection shield of a kind of TBM supporting operation according to claim 1, is characterized in that, described jumbolter hole (15) has two, is symmetrically distributed in the both sides of canopy body (1).
4. the removable protection shield of a kind of TBM supporting operation according to claim 1; it is characterized in that; horizontal power system (9) comprises the fixed frame be connected with workbench (5); motor (12) is provided with in fixed frame; the output of motor (12) is connected with worm-gear speed reducer (13), and the output of worm-gear speed reducer (13) is connected with driving wheel (14).
5. the removable protection shield of a kind of TBM supporting operation according to claim 1; it is characterized in that; the both sides of workbench (5) are connected with side plate, and the inner side of side plate is provided with for preventing protection wheel (7) protecting shield to derail in the process of walking.
6. the removable protection shield of a kind of TBM supporting operation according to claim 1, is characterized in that, is provided with the steel plate for preventing track (8) to be out of shape between two tracks (8).
7. the removable protection shield of a kind of TBM supporting operation according to claim 1, is characterized in that, described support column (2) has four, is evenly distributed on the both sides of canopy body (1) bottom; Described road wheel (6) has four, is evenly distributed on the both sides of workbench (5) bottom.
8. a using method for the removable protection shield of TBM supporting operation according to claim 1, is characterized in that, comprise the following steps:
Step 1: removable protection shield is rested in tunnel supporting region, carry out mesh sheet splicing work on canopy body top;
Step 2: after removable protection shield rear country rock discloses, by horizontal power system (9), removable protection shield is pushed into country rock and discloses district, then, to liquefaction oil cylinder (4) pressurization, by support column (2), canopy body (1) is promoted until press close to excavate scar, carry out mesh sheet installation;
Step 3: after mesh sheet installation, keeps removable protection shield motionless, and adopt jumbolter to carry out bolthole construction by the jumbolter hole (15) on canopy body (1), bolthole carries out rockbolt installation after having constructed.
9. the using method of the removable protection shield of TBM supporting operation according to claim 8; it is characterized in that; bolthole construction and rockbolt installation process in; after a rockbolt installation completes, carried out bolthole construction and the rockbolt installation of other position by the position of horizontal power system (9) adjustment canopy body (1).
10. the using method of the removable protection shield of TBM supporting operation according to claim 8; it is characterized in that; also comprise step 4: after canopy body region mesh sheet and anchor bolt construction complete; canopy body (1) is reduced by hydraulic jack (4); make canopy body (1) depart from country rock, then by horizontal power system (9), canopy body (1) is pulled out supporting position.
CN201510974640.7A 2015-12-22 2015-12-22 TBM shoring operation movable shield and application method thereof Pending CN105464683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510974640.7A CN105464683A (en) 2015-12-22 2015-12-22 TBM shoring operation movable shield and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510974640.7A CN105464683A (en) 2015-12-22 2015-12-22 TBM shoring operation movable shield and application method thereof

Publications (1)

Publication Number Publication Date
CN105464683A true CN105464683A (en) 2016-04-06

Family

ID=55602788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510974640.7A Pending CN105464683A (en) 2015-12-22 2015-12-22 TBM shoring operation movable shield and application method thereof

Country Status (1)

Country Link
CN (1) CN105464683A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593502A (en) * 2016-12-26 2017-04-26 枣庄联鑫实业有限责任公司 Framework landing self-moving type front telescopic advanced supporting device
CN106640114A (en) * 2017-02-23 2017-05-10 淮南矿业(集团)有限责任公司 Safe temporary supporting device of mining TBM
CN108386219A (en) * 2018-04-18 2018-08-10 招商局重庆交通科研设计院有限公司 A kind of support system and operating method of tunnel support structure
CN109372557A (en) * 2018-11-21 2019-02-22 中铁工程装备集团有限公司 A kind of rock tunnel(ling) machine tunneling arc plate and its method for protecting support

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103557013A (en) * 2013-11-06 2014-02-05 王静 Annular steel structure supporting construction method with open type TBM (tunnel boring machine)
CN103573270A (en) * 2013-08-02 2014-02-12 石家庄铁道大学 TBM (Tunnel Boring Machine) arc-shaped top shield and method for carrying out surrounding rock supporting by using top shield
CN203783620U (en) * 2014-04-18 2014-08-20 李明 Self-moving type arch-shield-support and anchor-net spraying and dust-preventing all-in-one machine
CN105065048A (en) * 2015-08-23 2015-11-18 河南理工大学 Temporary support for driving working face under coal mine
CN205349374U (en) * 2015-12-22 2016-06-29 中国葛洲坝集团第三工程有限公司 TBM struts portable protection shield of operation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103573270A (en) * 2013-08-02 2014-02-12 石家庄铁道大学 TBM (Tunnel Boring Machine) arc-shaped top shield and method for carrying out surrounding rock supporting by using top shield
CN103557013A (en) * 2013-11-06 2014-02-05 王静 Annular steel structure supporting construction method with open type TBM (tunnel boring machine)
CN203783620U (en) * 2014-04-18 2014-08-20 李明 Self-moving type arch-shield-support and anchor-net spraying and dust-preventing all-in-one machine
CN105065048A (en) * 2015-08-23 2015-11-18 河南理工大学 Temporary support for driving working face under coal mine
CN205349374U (en) * 2015-12-22 2016-06-29 中国葛洲坝集团第三工程有限公司 TBM struts portable protection shield of operation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593502A (en) * 2016-12-26 2017-04-26 枣庄联鑫实业有限责任公司 Framework landing self-moving type front telescopic advanced supporting device
CN106640114A (en) * 2017-02-23 2017-05-10 淮南矿业(集团)有限责任公司 Safe temporary supporting device of mining TBM
CN108386219A (en) * 2018-04-18 2018-08-10 招商局重庆交通科研设计院有限公司 A kind of support system and operating method of tunnel support structure
CN108386219B (en) * 2018-04-18 2023-08-11 招商局重庆交通科研设计院有限公司 Supporting system of tunnel supporting structure and operation method
CN109372557A (en) * 2018-11-21 2019-02-22 中铁工程装备集团有限公司 A kind of rock tunnel(ling) machine tunneling arc plate and its method for protecting support

Similar Documents

Publication Publication Date Title
CN105464683A (en) TBM shoring operation movable shield and application method thereof
CN103382844B (en) A kind of tracked hydraulic sectional shelf-unit temporary lining and permanent support parallel operations piercing technique and equipment
CN104747199B (en) A kind of open type TBM with section of jurisdiction installation function
CN109026025B (en) Pipe jacking supporting and jacking system for construction tunnel connection channel
CN103643979A (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN104373147B (en) Folding extension type roadway hydraulic bracket
CN107060857B (en) Advanced support device of tunneling and anchoring integrated comprehensive tunneling machine
CN113338969B (en) Open type TBM suitable for strong rock burst stratum
US4687375A (en) Circular heading machine
CN204113319U (en) A kind of folding telescopic alley hydraulic support
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN108691553B (en) Rectangular-like pipe jacking machine for construction of connecting channel
CN205349374U (en) TBM struts portable protection shield of operation
CN208441848U (en) Freezing Method for Cross-passage Construction class rectangle push-bench
CN207944984U (en) A kind of self-propelled tunnel pipe for escaping
CN203097920U (en) Track-type fully hydraulic leading shoring equipment
CN207109857U (en) A kind of piping lane Operation Van
CN107503374A (en) A kind of piping lane Operation Van
JP3864377B2 (en) Existing tunnel widening method
CN110130963A (en) It is a kind of can systemic circulation from move erosion control excavation support
CA1235150A (en) Circular heading machine
CN104405425A (en) Self-moving advanced supporting equipment of heading machine
CN209434853U (en) It is a kind of to move the arragement construction for changing rear electric power pipe trench
CN113653524A (en) Broken roof is synthesized and is adopted face hydraulic support withdrawal triangular space temporary support device
CN109538215B (en) Tunnel expanding excavation multifunctional rack and tunnel expanding excavation method using same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160406