CN105464380A - Building construction line bundling, penetrating, guiding and fixing equipment - Google Patents

Building construction line bundling, penetrating, guiding and fixing equipment Download PDF

Info

Publication number
CN105464380A
CN105464380A CN201410816648.6A CN201410816648A CN105464380A CN 105464380 A CN105464380 A CN 105464380A CN 201410816648 A CN201410816648 A CN 201410816648A CN 105464380 A CN105464380 A CN 105464380A
Authority
CN
China
Prior art keywords
central authorities
wall
sleeve
expanding wall
puller bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410816648.6A
Other languages
Chinese (zh)
Other versions
CN105464380B (en
Inventor
王少宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Xirui Automation Equipment Co ltd
Original Assignee
Tianjin Htc Productivity Promotes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Htc Productivity Promotes Co Ltd filed Critical Tianjin Htc Productivity Promotes Co Ltd
Priority to CN201410816648.6A priority Critical patent/CN105464380B/en
Publication of CN105464380A publication Critical patent/CN105464380A/en
Application granted granted Critical
Publication of CN105464380B publication Critical patent/CN105464380B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses building construction line bundling, penetrating, guiding and fixing equipment. A mode of outward expansion of the middle in a sleeve is adopted to clamp and fix a construction line, in other words, a jacking bolt which has certain conicity is screwed in, so that as a middle outward expansion wall is screwed in, a notch with middle outward expansion is gradually stressed and deforms to enable the middle outward expansion wall to expand outwards, and then the construction line is clamped and fixed through clamping effect of the outer wall and the middle outward wall of the sleeve. In actual use, connection can be realized conveniently and reliably by only screwing the jacking bolt in, so that project construction efficiency is improved and convenience is brought to line penetrating.

Description

Building operations line bunchy connects fixed equipment
Technical field
The present invention relates to construction engineering technical field, more specifically, relate to building operations line bunchy and connect fixed equipment.
Background technology
In building operations, often need to carry out threading operation, namely in the duct various line for building or reinforcing bar (line of namely constructing) are connected, in construction, often adopt the external equipment such as hoist engine, strand pulling machine to carry out.Need to clamp in one end of various line to be connected or reinforcing bar, to make various line or reinforcing bar firmly be connected with external equipment, enough external force could be kept in whole threading process to draw.The construction line connected once disposable or number of steel bars more, will produce relative slip between each construction line or reinforcing bar, simple fastening structure very easily causes connection loosely, makes troubles to threading, such as broken string, slippage, upper power inconvenience etc. problem.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of building operations line bunchy is provided to connect fixed equipment, be intended to quickly and easily construction line to be compiled bundle clamping firmly, to realize efficient lashing smoothly, ensure whole bundle construction line in lashing process can all make in order, be not wound around each other.
Building operations line bunchy connects fixed equipment, comprising: traction draw ring, puller bolt, sleeve, sleeve outer wall, the outer expanding wall of central authorities, puller bolt external screw thread, the outer expanding wall internal thread of central authorities, the outer expanding wall gap of central authorities.
One end of described sleeve is provided with traction draw ring, sleeve also comprises expanding wall outside sleeve outer wall and central authorities, outside described central authorities, expanding wall and sleeve outer wall are coaxially fixed, and expanding wall outside central authorities is arranged on the center of barrel bore, outside described central authorities, expanding wall entirety is cylindrical structure, its inner surface is provided with the outer expanding wall internal thread of central authorities, and the outer expanding wall of central authorities is also evenly provided with the outer expanding wall gap of central authorities, described puller bolt is provided with puller bolt external screw thread, and puller bolt is the taper bolt with certain taper, puller bolt extends out in wall construction by being threaded into central authorities, outside the puller bolt external screw thread of puller bolt and central authorities expanding wall inner surface central authorities outside expanding wall internal thread match.
In technique scheme, the quantity of described gap is 3 or 4.
In technique scheme, described gap is isosceles triangular structure, and its drift angle is 2--3 degree, and summit is 6--8 centimetre to the distance (i.e. the height of isosceles triangle) on base.
In technique scheme, outside the inner surface of described sleeve outer wall and central authorities expanding wall external surface between distance be 8--12 centimetre (specifically determining according to the diameter of line of constructing).
In technique scheme, the tapering of described puller bolt is 2--5 degree.
Compared with prior art, technical scheme of the present invention adopts central authorities in sleeve to extend out mode and clamps construction line, namely by screwing in puller bolt, because puller bolt is with certain tapering, so along with screwing in going deep into of the outer expanding wall of central authorities, the opening position that central authorities extend out stress deformation gradually, makes the outer expanding wall of central authorities expand outwardly, thus is fastened by construction wire clamp by the clamping action of expanding wall outside the outer wall of sleeve and central authorities.In actual use, only need to screw in puller bolt and can realize clamping connection easily and reliably, improve engineering construction efficiency, facilitate threading.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of the sleeve used in the present invention;
Fig. 3 is the structural representation of expanding wall outside the central authorities that use in the present invention.
Wherein: 1 is traction draw ring, and 2 is puller bolt, and 3 is sleeve, and 4 is sleeve outer wall, and 5 is the outer expanding walls of central authorities, and 6 is puller bolt external screw thread, 7 is the outer expanding wall internal threads of central authorities, and 8 is the outer expanding wall gap of central authorities.
Detailed description of the invention
Technical scheme of the present invention is further illustrated below in conjunction with accompanying drawing.
As shown in accompanying drawing 1-3, building operations line bunchy connects fixed equipment, comprising: traction draw ring 1, puller bolt 2, sleeve 3, sleeve outer wall 4, the outer expanding wall 5 of central authorities, puller bolt external screw thread 6, the outer expanding wall internal thread 7 of central authorities, the outer expanding wall gap 8 of central authorities.
Wherein:
One end of described sleeve 3 is provided with traction draw ring 1, sleeve 3 also comprises expanding wall 5 outside sleeve outer wall 4 and central authorities, outside described central authorities, expanding wall 5 and sleeve outer wall 4 are coaxially fixed, and expanding wall outside central authorities 5 is arranged on the center of sleeve 3 inner chamber, outside described central authorities, expanding wall 5 entirety is cylindrical structure, its inner surface is provided with the outer expanding wall internal thread 7 of central authorities, and the outer expanding wall 5 of central authorities is also evenly provided with the outer expanding wall gap 8 of central authorities, described puller bolt 2 is provided with puller bolt external screw thread 6, and puller bolt 2 is the taper bolt with certain taper, puller bolt 2 is by being threaded in outer expanding wall 5 structure of central authorities, outside the puller bolt external screw thread 6 of puller bolt 2 and central authorities expanding wall 5 inner surface central authorities outside expanding wall internal thread 7 match.
In technique scheme, the quantity of described gap is 3 or 4.
In technique scheme, described gap is isosceles triangular structure, and its drift angle is 2--3 degree, and summit is 6--8 centimetre to the distance (i.e. the height of isosceles triangle) on base.
In technique scheme, outside the inner surface of described sleeve outer wall and central authorities expanding wall external surface between distance be 8--12 centimetre (specifically determining according to the diameter of line of constructing).
In technique scheme, the tapering of described puller bolt is 2--5 degree.
The course of work of the present invention is as follows:
Line of constructing to insert outside sleeve outer wall and central authorities between expanding wall, again puller bolt is extended out in wall construction by being threaded into central authorities, because puller bolt is with certain tapering, so along with screwing in going deep into of the outer expanding wall of central authorities, the opening position that central authorities extend out stress deformation gradually, the outer expanding wall of central authorities is expanded outwardly, thus by the clamping action of expanding wall outside the outer wall of sleeve and central authorities, construction wire clamp is fastened.Finally, tractor or hoist engine arrive assigned address by traction draw ring traction construction wire harness.
Compared with prior art, technical scheme of the present invention adopts central authorities in sleeve to extend out mode and clamps construction line, namely by screwing in puller bolt, because puller bolt is with certain tapering, so along with screwing in going deep into of the outer expanding wall of central authorities, the opening position that central authorities extend out stress deformation gradually, makes the outer expanding wall of central authorities expand outwardly, thus is fastened by construction wire clamp by the clamping action of expanding wall outside the outer wall of sleeve and central authorities.In actual use, only need to screw in puller bolt and can realize clamping connection easily and reliably, improve engineering construction efficiency, facilitate threading.
Above to invention has been exemplary description; should be noted that; when not departing from core of the present invention, any simple distortion, amendment or other those skilled in the art can not spend the equivalent replacement of creative work all to fall into protection scope of the present invention.

Claims (3)

1. building operations line bunchy connects fixed equipment, it is characterized in that, comprising: traction draw ring, puller bolt, sleeve, sleeve outer wall, the outer expanding wall of central authorities, puller bolt external screw thread, the outer expanding wall internal thread of central authorities, the outer expanding wall gap of central authorities; One end of described sleeve is provided with traction draw ring, sleeve also comprises expanding wall outside sleeve outer wall and central authorities, outside described central authorities, expanding wall and sleeve outer wall are coaxially fixed, and expanding wall outside central authorities is arranged on the center of barrel bore, outside described central authorities, expanding wall entirety is cylindrical structure, and its inner surface arranges the outer expanding wall internal thread of central authorities, and the outer expanding wall of central authorities is also evenly provided with the outer expanding wall gap of central authorities, described puller bolt is provided with puller bolt external screw thread, and puller bolt is the taper bolt with tapering; Outside the inner surface of described sleeve outer wall and central authorities expanding wall external surface between distance be 8--12 centimetre; The tapering of described puller bolt is 2--5 degree.
2. building operations line bunchy according to claim 1 connects fixed equipment, it is characterized in that: the quantity of described gap is 3 or 4.
3. building operations line bunchy according to claim 1 connects fixed equipment, it is characterized in that: described gap is isosceles triangular structure, and its drift angle is 2--3 degree, and summit is 6--8 centimetre to the distance on base.
CN201410816648.6A 2014-12-23 2014-12-23 Construction line bunchy connects fixed equipment Expired - Fee Related CN105464380B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410816648.6A CN105464380B (en) 2014-12-23 2014-12-23 Construction line bunchy connects fixed equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410816648.6A CN105464380B (en) 2014-12-23 2014-12-23 Construction line bunchy connects fixed equipment

Publications (2)

Publication Number Publication Date
CN105464380A true CN105464380A (en) 2016-04-06
CN105464380B CN105464380B (en) 2018-02-16

Family

ID=55602495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410816648.6A Expired - Fee Related CN105464380B (en) 2014-12-23 2014-12-23 Construction line bunchy connects fixed equipment

Country Status (1)

Country Link
CN (1) CN105464380B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0828051A (en) * 1994-07-15 1996-01-30 Mitsui Constr Co Ltd Tension cable member laying device and equipment
CN2447466Y (en) * 2000-08-31 2001-09-12 李祥恩 Strand bundle tractor
CN101660354A (en) * 2009-09-11 2010-03-03 中铁大桥局集团第五工程有限公司 Prestress steel strand penetrating device
CN203247855U (en) * 2013-04-15 2013-10-23 葛洲坝集团第五工程有限公司 Fast tractor for annular prestressed stranded steel wire
CN204370815U (en) * 2014-12-23 2015-06-03 天津宏达生产力促进有限公司 Central authorities' screwing type construction line traction gripping apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0828051A (en) * 1994-07-15 1996-01-30 Mitsui Constr Co Ltd Tension cable member laying device and equipment
CN2447466Y (en) * 2000-08-31 2001-09-12 李祥恩 Strand bundle tractor
CN101660354A (en) * 2009-09-11 2010-03-03 中铁大桥局集团第五工程有限公司 Prestress steel strand penetrating device
CN203247855U (en) * 2013-04-15 2013-10-23 葛洲坝集团第五工程有限公司 Fast tractor for annular prestressed stranded steel wire
CN204370815U (en) * 2014-12-23 2015-06-03 天津宏达生产力促进有限公司 Central authorities' screwing type construction line traction gripping apparatus

Also Published As

Publication number Publication date
CN105464380B (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN203367893U (en) Cable traction head
CN206495423U (en) Line bar connector
CN204370815U (en) Central authorities' screwing type construction line traction gripping apparatus
CN102954079A (en) Rotation-preventing expansion bolt
CN207794070U (en) Symmetrical mechanical connector and prefabricated pile
CN204316035U (en) One is easy to dismantle flexible suspended cable crane span structure
CN204960329U (en) A tumbling barrel for concreting structure
CN105464380A (en) Building construction line bundling, penetrating, guiding and fixing equipment
CN205243545U (en) Novel anti -shearing stock
CN205280475U (en) Bolt tensile test fixes frock
CN202034492U (en) Tension connecting wire clip
CN108689298B (en) Hoisting device for pipe fitting
CN204040316U (en) Reinforcing steel bar connecting device
CN103910279A (en) Stay bar with adjustable length
CN204370697U (en) Jacket type construction line threading fastening devices
CN204357136U (en) Building operations central authorities extend out clamped-in style threading termination erecting device
CN204370816U (en) For the evolute clamping device of building operations line
CN105464379A (en) Combined threading device capable of clamping construction wires
CN205242854U (en) Steel strand connector
CN204492012U (en) A kind of bar connecting device
CN104453246B (en) Construction central authorities extend out clamped-in style threading termination erecting device
CN209323993U (en) A kind of auxiliary tamping equipment
CN105785538A (en) Submarine optical cable wire harness laying, traction, and fixation device
CN203756202U (en) Rapid feeder for vertical anchor cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ren Hongwei

Inventor after: Yan Shan

Inventor after: Xu Guoqiang

Inventor after: Chen Jianwei

Inventor before: Wang Shaohong

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180122

Address after: 063210 Tangshan City Road, Tangshan, Hebei Bay ecological city, Bohai Avenue, No. 21

Applicant after: NORTH CHINA University OF SCIENCE AND TECHNOLOGY

Address before: 301726 in Tianjin Binhai Yat Sen scientific industry park Cui Ming Road 5 service center gate 1 - 138

Applicant before: TIANJIN HONGDA PRODUCTIVITY PROMOTION CO.,LTD.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210819

Address after: 063399 Da Cha He village, Fengnan Town, Fengnan District, Tangshan City, Hebei

Patentee after: TANGSHAN XIRUI AUTOMATION EQUIPMENT Co.,Ltd.

Address before: 063210 Tangshan City Caofeidian District, Hebei Province, Tangshan Bay eco Town, Bohai Road, 21

Patentee before: NORTH CHINA University OF SCIENCE AND TECHNOLOGY

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180216

Termination date: 20211223