CN204370816U - For the evolute clamping device of building operations line - Google Patents

For the evolute clamping device of building operations line Download PDF

Info

Publication number
CN204370816U
CN204370816U CN201420828029.4U CN201420828029U CN204370816U CN 204370816 U CN204370816 U CN 204370816U CN 201420828029 U CN201420828029 U CN 201420828029U CN 204370816 U CN204370816 U CN 204370816U
Authority
CN
China
Prior art keywords
barrel
cylindrical shell
screw thread
evolute
clamping device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420828029.4U
Other languages
Chinese (zh)
Inventor
王少宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Htc Productivity Promotes Co Ltd
Original Assignee
Tianjin Htc Productivity Promotes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Htc Productivity Promotes Co Ltd filed Critical Tianjin Htc Productivity Promotes Co Ltd
Priority to CN201420828029.4U priority Critical patent/CN204370816U/en
Application granted granted Critical
Publication of CN204370816U publication Critical patent/CN204370816U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)
  • Clamps And Clips (AREA)

Abstract

The open evolute clamping device for building operations line of the utility model, one end of cylindrical shell is closed and is fixedly installed draw ring in middle position, and other end opening is also fixedly installed central clamping column at central coaxial, at barrel arranged outside second screw thread; The barrel arranged outside closing one end at cylindrical shell screws parts, described in screw parts inner side the first screw thread is set, the first screw thread and the second screw thread match; From cylindrical shell blind end to cartridge openings end, the thickness of barrel increases gradually, and on the barrel of cartridge openings end, evenly arranges gap along barrel circumferencial direction.The technical solution of the utility model adopts clamping mode outside sleeve, in actual use, only needs to screw parts and can realize easily and reliably connecting, improve engineering construction efficiency, facilitate threading.

Description

For the evolute clamping device of building operations line
Technical field
The utility model relates to construction engineering technical field, more specifically, relates to the evolute clamping device for building operations line.
Background technology
In building operations, often need to carry out threading operation, namely in the duct various line for building or reinforcing bar (line of namely constructing) are connected, in construction, often adopt the external equipment such as hoist engine, strand pulling machine to carry out.Need to clamp in one end of various line to be connected or reinforcing bar, to make various line or reinforcing bar firmly be connected with external equipment, enough external force could be kept in whole threading process to draw.The construction line connected once disposable or number of steel bars more, will produce relative slip between each construction line or reinforcing bar, simple fastening structure very easily causes connection loosely, makes troubles to threading, such as broken string, slippage, upper power inconvenience etc. problem.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, is provided for the evolute clamping device of building operations line, is intended to quickly and easily construction line to be compiled bundle, and can convenient connection and running through.
Technical purpose of the present utility model is achieved by following technical proposals:
For the evolute clamping device of building operations line, comprise draw ring, cylindrical shell and screw parts, wherein:
One end of described cylindrical shell is closed and is fixedly installed draw ring in middle position, and the other end opening of described cylindrical shell is also fixedly installed central clamping column at central coaxial, at barrel arranged outside second screw thread; The barrel arranged outside closing one end at cylindrical shell screws parts, described in screw parts inner side the first screw thread is set, described first screw thread and the second screw thread match;
From cylindrical shell blind end to cartridge openings end, described barrel inner surface surrounds the cylindrical lumens of equal diameter, and the thickness of barrel increases gradually, and on the barrel of cartridge openings end, evenly arranges gap along barrel circumferencial direction.
In technique scheme, the quantity of described gap is 3 or 4.
In technique scheme, the drift angle of described gap is 10-15 degree.
In technique scheme, described in screw parts be hex nut.
Compared with prior art, the technical solution of the utility model adopts clamping mode outside sleeve, utilization screws parts and implements to screw along barrel, space between barrel and central clamping column is reduced gradually, to realize the fixing of line of constructing in sleeve, namely by screwing parts, container wall inwardly shrinks, owing to arranging gap at the barrel of cartridge openings end, the barrel receiving extruding will radially inwardly shrink, clamp the construction line be arranged between barrel and central clamping column, to realize the fixing of connection.In actual use, only need to screw parts and can realize easily and reliably connecting, improve engineering construction efficiency, facilitate threading.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model (1);
Fig. 2 is structural representation of the present utility model (2);
Fig. 3 is structural representation of the present utility model (3).
Wherein 1 is draw ring, and 2 is cylindrical shell, and 3 is the first screw thread, and 4 for screwing parts, and 5 is barrel, and 6 is the second screw thread, and 7 is central clamping column, and 8 is gap.
Detailed description of the invention
The technical solution of the utility model is further illustrated below in conjunction with specific embodiment.
Three figure as shown in accompanying drawing 1-3 are respectively sectional view of the present utility model, lateral view and elevation, and the utility model externally screwed construction wire harness sleeve, comprises draw ring, cylindrical shell and screw parts, wherein:
One end of described cylindrical shell is closed and is fixedly installed draw ring in middle position, and the other end opening of described cylindrical shell is also fixedly installed central clamping column at central coaxial, at barrel arranged outside second screw thread; The barrel arranged outside closing one end at cylindrical shell screws parts, described in screw parts inner side the first screw thread is set, described first screw thread and the second screw thread match;
From cylindrical shell blind end to cartridge openings end, described barrel inner surface surrounds the cylindrical lumens of equal diameter, and the thickness of barrel increases gradually, and on the barrel of cartridge openings end, evenly arranges gap along barrel circumferencial direction.
In technique scheme, the quantity of described gap is 3 or 4, is shown as four in figure.
In technique scheme, the drift angle of described gap is 10-15 degree.
In technique scheme, described in screw parts be hex nut.
Compared with prior art, the technical solution of the utility model adopts clamping mode outside sleeve, utilization screws parts and implements to screw along barrel, space between barrel and central clamping column is reduced gradually, to realize the fixing of line of constructing in sleeve, namely by screwing parts, container wall inwardly shrinks, owing to arranging gap at the barrel of cartridge openings end, the barrel receiving extruding will radially inwardly shrink, clamp the construction line be arranged between barrel and central clamping column, to realize the fixing of connection.In actual use, only need to screw parts and can realize easily and reliably connecting, improve engineering construction efficiency, facilitate threading.
Above exemplary description is done to the utility model; should be noted that; when not departing from core of the present utility model, any simple distortion, amendment or other those skilled in the art can not spend the equivalent replacement of creative work all to fall into protection domain of the present utility model.

Claims (4)

1. for the evolute clamping device of building operations line, it is characterized in that, comprise draw ring, cylindrical shell and screw parts, wherein: one end of described cylindrical shell is closed and is fixedly installed draw ring in middle position, the other end opening of described cylindrical shell is also fixedly installed central clamping column at central coaxial, at barrel arranged outside second screw thread; The barrel arranged outside closing one end at cylindrical shell screws parts, described in screw parts inner side the first screw thread is set, described first screw thread and the second screw thread match; From cylindrical shell blind end to cartridge openings end, described barrel inner surface surrounds the cylindrical lumens of equal diameter, and the thickness of barrel increases gradually, and on the barrel of cartridge openings end, evenly arranges gap along barrel circumferencial direction.
2. the evolute clamping device for building operations line according to claim 1, is characterized in that, the quantity of described gap is 3 or 4.
3. the evolute clamping device for building operations line according to claim 1, is characterized in that, the drift angle of described gap is 10-15 degree.
4. the evolute clamping device for building operations line according to claim 1, is characterized in that, described in screw parts be hex nut.
CN201420828029.4U 2014-12-23 2014-12-23 For the evolute clamping device of building operations line Withdrawn - After Issue CN204370816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420828029.4U CN204370816U (en) 2014-12-23 2014-12-23 For the evolute clamping device of building operations line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420828029.4U CN204370816U (en) 2014-12-23 2014-12-23 For the evolute clamping device of building operations line

Publications (1)

Publication Number Publication Date
CN204370816U true CN204370816U (en) 2015-06-03

Family

ID=53327047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420828029.4U Withdrawn - After Issue CN204370816U (en) 2014-12-23 2014-12-23 For the evolute clamping device of building operations line

Country Status (1)

Country Link
CN (1) CN204370816U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464378A (en) * 2014-12-23 2016-04-06 天津宏达生产力促进有限公司 Portable traction and reinforcing device for construction wires

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464378A (en) * 2014-12-23 2016-04-06 天津宏达生产力促进有限公司 Portable traction and reinforcing device for construction wires
CN105464378B (en) * 2014-12-23 2017-12-26 天津宏达生产力促进有限公司 Portable construction line draws bracing means

Similar Documents

Publication Publication Date Title
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN203367893U (en) Cable traction head
CN204370816U (en) For the evolute clamping device of building operations line
CN204370697U (en) Jacket type construction line threading fastening devices
CN206707312U (en) A kind of wallboard clamps locker
CN206495423U (en) Line bar connector
CN204040316U (en) Reinforcing steel bar connecting device
CN204370815U (en) Central authorities' screwing type construction line traction gripping apparatus
CN204221605U (en) Ceramic target pipe external diameter grinding tool
CN203034804U (en) Three-section type water-sealing screw for basement exterior wall
CN204898889U (en) Novel locking combination casing
CN204960329U (en) A tumbling barrel for concreting structure
CN204357136U (en) Building operations central authorities extend out clamped-in style threading termination erecting device
CN204001980U (en) The steel structure enclosure wall that a kind of building site is special
CN105464379A (en) Combined threading device capable of clamping construction wires
CN106129644A (en) Graphite bonded earth electrode speed connects cartridge type and continues part and application thereof
CN105464378B (en) Portable construction line draws bracing means
CN206289874U (en) New adjustable reinforced straight thread connecting sleeve structure
CN105785538A (en) Submarine optical cable wire harness laying, traction, and fixation device
CN103723582A (en) Cable winding roller
CN204061585U (en) For connecting the connecting sleeve of live axle and output shaft
CN201170393Y (en) Connecting apparatus for grouting conduit pipe
CN209025325U (en) Bridge construction reinforced bar connection structure
CN203348796U (en) Quick connector for plastic coated metal hose
CN104453246B (en) Central expansion clamping type threading terminal installation device for building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150603

Effective date of abandoning: 20171226