CN105464211A - 一种装配式钢框架铸钢节点及其安装方法 - Google Patents
一种装配式钢框架铸钢节点及其安装方法 Download PDFInfo
- Publication number
- CN105464211A CN105464211A CN201511018064.5A CN201511018064A CN105464211A CN 105464211 A CN105464211 A CN 105464211A CN 201511018064 A CN201511018064 A CN 201511018064A CN 105464211 A CN105464211 A CN 105464211A
- Authority
- CN
- China
- Prior art keywords
- steel
- plate
- cast
- node
- cast steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开了一种装配式钢框架铸钢节点及其安装方法,所述的铸钢节点包括铸造为一体且设置有中空的环板,所述环板的外侧周围均布设置翼缘板,所述翼缘板的内侧设置有耳板,所述环板中空的边缘处设置有预制焊槽。所述的安装方法包括“将铸钢节点采用不焊透的对接焊缝与钢框架柱焊接为一体、将钢框架梁和钢框架支撑连接在铸钢节点上”等步骤。本发明的优点是:可减少钢框架结构连接节点的焊接连接,从而降低焊接热的影响并简化施工工艺,适用于多、高层钢框架结构及钢管混凝土框架结构,便于装配式施工的实现。
Description
技术领域
本发明涉及一种用于钢框架的节点,更具体地说,本发明涉及一种新型的装配式钢框架铸钢节点。
技术背景
钢框架工艺通常要求框架柱与框架梁之间刚性连接并要求支撑与梁柱节点铰接。但是,在目前的钢框架结构中,常用的梁柱节点并没有与支撑进行连接的能力,必需额外设置连接构件,从而导致加工及安装过程复杂,不利于实现装配式施工。而传统的梁柱节点加劲构件则需要通过焊透对接焊缝完成与钢管柱的固定连接且支撑连接构件与梁或柱的连接还需要另外焊接,往往造成连接焊缝与梁柱节点焊缝接近甚至于交汇的现象,从而使节点核心区域受到较大的焊接热影响,不仅导致钢材性能退化,而且在后焊接的焊缝还会影响在先焊接的焊缝性能。
发明内容
本发明的目的就是克服以上现有技术的不足,并为此提供一种新型的装配式钢框架铸钢节点,从而使钢框架结构的连接节点在满足节点力学性能的前提下减少焊接并降低焊接热影响,同时简化施工工艺,便于装配式施工的实现。
本发明的技术方案之一是:
一种装配式钢框架铸钢节点,包括铸造成一体且设置有中空的环板,所述环板的外侧周围均布设置有翼缘板,所述翼缘板的内侧设置有耳板,所述环板中空的边缘处设置有预制焊槽。
所述环板的外侧周围均布设置的翼缘板数量为2—4个。
本发明的技术方案之二是:
一种将装配式钢框架铸钢节点用于钢框架的安装方法,包括以下步骤:
(1)将铸钢节点套装在钢框架柱上,采用不焊透的对接焊缝沿其预制焊槽施焊,使所述的铸钢节点与钢框架柱焊接为一体;
(2)将钢框架梁和钢框架支撑连接在所述的铸钢节点上,其要点是:
A)连接钢框架梁时,需使所述铸钢节点上环板外侧的翼缘板对应于所述钢框架梁翼板的所在位置,并采用焊接连接、螺栓连接或栓-焊混合连接方式将所述钢框架梁的翼板与所述的翼缘板相连接;
B)连接钢框架支撑时,采用螺栓或销轴将所述的钢框架支撑与所述铸钢节点上的耳板铰接。
本发明的有益效果是:可减少钢框架结构连接节点的焊接连接,从而降低焊接热的影响并简化施工工艺,适用于多、高层钢框架结构及钢管混凝土框架结构,便于装配式施工的实现。
附图说明
图1是本发明的结构示意图;
图2是本发明用于钢框架的实施例示意图;
图中标记:1、环板;1-1、焊槽;2、翼缘板;3、耳板;4、钢框架梁;5、钢框架柱;6、钢框架支撑;7、铸钢节点。
具体实施方式
为了使本发明的优点和特征更容易被清楚理解,下面结合附图和实施例对其技术方案作以详细说明。
图1示出了本发明的结构情况。
参照图1,本发明的装配式钢框架铸钢节点,包括铸造成一体且开有中空的环板1,所述环板1的外侧周围均布设置翼缘板2,所述翼缘板2的内侧设置有耳板3,所述环板1中空位置的边缘预制焊槽1-1。
在本发明的设置中:所述环板1外侧四周均布的翼缘板2可以是2—4个,图1所示的实施例中为4个。
图2示出了本发明用于钢框架的实施例之一,其中的标记7为铸钢节点。
参照图2,在该实施例中设置有两个相背安装的铸钢节点7,两个所述的铸钢节点7分别以其环板1套装在钢框架柱5中部的上侧和下侧,并通过所述环板1上的预制焊槽1-1以不焊透对焊方式将所述的环板1与所述的钢框架柱5相连接;在本实施例中,所述环板1外侧四周均布的翼缘板2为4个,故每个所述铸钢节点7上的4个翼缘板2分别与4个钢框架梁4的翼板相连接;且每个所述铸钢节点7上的4个耳板3分别铰接4个带有耳板的钢框架支撑6。
本发明的装配式钢框架铸钢节点,其所述环板1外侧设置的翼缘板2数量需对应于与其相连接的所述钢框架梁4的数量。
本发明的装配式钢框架铸钢节点为铸造成型,其材料性能及加工制作须满足现行中国工程建设标准化协会标准《铸钢节点技术规程》的要求。
当本发明的装配式钢框架铸钢节点被用于钢框架时,其安装方法是:
(3)首先在加工厂将所述的铸钢节点7与所述的钢框架柱5焊接连接,焊接方式是:采用不焊透的对接焊缝沿所述的预制焊槽1-1施焊,从而大幅降低焊接热影响,并省去了焊缝探伤工序;
(4)再到现场将所述的钢框架梁4以及钢框架支撑6连接在所述的铸钢节点7上,连接要点是:
A)连接所述的钢框架梁4时,需使所述铸钢节点7上环板1外侧的翼缘板2对应于所述钢框架梁4翼板的所在位置,然后采用焊接连接、螺栓连接或栓-焊混合连接方式将所述钢框架梁4的翼板与所述的翼缘板2相连接;
B)连接所述的钢框架支撑6时,可采用螺栓或销轴将所述的钢框架支撑6与所述铸钢节点7上的耳板3铰接。
本发明适用于多、高层钢框架结构及钢管混凝土框架结构,应用中要求框架结构采用方形或矩形截面的钢管柱,也可以采用型钢拼接的方形或矩形截面的钢柱或圆钢管柱作为结构柱,并采用轧制的H型钢框架梁4或焊接而成的H形钢框架梁4,与所述铸钢节点7上的耳板3铰接的钢框架支撑6可以是如图2中所示的带有耳板的圆管,也可以是带有耳板的圆钢、拉索、方管、H型钢以及十字形钢等构件,还可以是设置有螺栓孔的钢板、角钢等构件。前者通过耳板与所述铸钢节点7上的耳板3铰接,后者通过其螺栓孔与所述铸钢节点7上的耳板3铰接。
当本发明的装配式钢框架铸钢节点被用于内填混凝土的钢管混凝土柱结构或型钢拼接混凝土柱结构时,其钢管内无需设置加劲构件,以便于钢管内填混凝土浇注施工。
以上参照附图和实施例对本发明的技术方案进行了示意性描述,该描述没有限制性。本领域的技术人员应能理解,在实际应用中,本发明中各个技术特征均可能发生某些变化,而其他人员在其启示下也可能做出相似设计。特别需要指出的是:只要不脱离本发明的设计宗旨,所有显而易见的细节变化或相似设计,均包含在本发明的保护范围之内。
Claims (3)
1.一种装配式钢框架铸钢节点,包括铸造成一体且设置有中空的环板,其特征在于:所述环板的外侧周围均布设置有翼缘板,所述翼缘板的内侧设置有耳板,所述环板中空的边缘处设置有预制焊槽。
2.根据权利要求1所述的装配式钢框架铸钢节点,其特征在于:所述环板外侧周围均布设置的翼缘板数量为2—4个。
3.一种将装配式钢框架铸钢节点用于钢框架的安装方法,其特征在于:该方法包括以下步骤:
(1)将铸钢节点套装在钢框架柱上,采用不焊透的对接焊缝沿其预制焊槽施焊,使所述的铸钢节点与钢框架柱焊接为一体;
(2)将钢框架梁和钢框架支撑连接在所述的铸钢节点上,其要点是:
A)连接钢框架梁时,需使所述铸钢节点上环板外侧的翼缘板对应于所述钢框架梁翼板的所在位置,并采用焊接连接、螺栓连接或栓-焊混合连接方式将所述钢框架梁的翼板与所述的翼缘板相连接;
B)连接钢框架支撑时,采用螺栓或销轴将所述的钢框架支撑与所述铸钢节点上的耳板铰接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511018064.5A CN105464211A (zh) | 2015-12-28 | 2015-12-28 | 一种装配式钢框架铸钢节点及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511018064.5A CN105464211A (zh) | 2015-12-28 | 2015-12-28 | 一种装配式钢框架铸钢节点及其安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105464211A true CN105464211A (zh) | 2016-04-06 |
Family
ID=55602327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511018064.5A Pending CN105464211A (zh) | 2015-12-28 | 2015-12-28 | 一种装配式钢框架铸钢节点及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105464211A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013467A (zh) * | 2016-06-15 | 2016-10-12 | 哈尔滨工业大学 | 一种可更换组合钢板耗能钢结构梁柱节点 |
CN107620500A (zh) * | 2017-10-26 | 2018-01-23 | 哈尔滨工业大学 | 一种应用于单层钢结构冷却塔的h‑c型装配式节点 |
CN107620501A (zh) * | 2017-10-26 | 2018-01-23 | 哈尔滨工业大学 | 一种应用于双层钢结构冷却塔的装配式节点 |
CN108708460A (zh) * | 2018-07-27 | 2018-10-26 | 南京林业大学 | 一种木框架结构梁柱铰接装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000336774A (ja) * | 1999-05-25 | 2000-12-05 | Hitachi Metals Ltd | 外ダイアフラム |
CN101892708A (zh) * | 2010-07-07 | 2010-11-24 | 浙江精工钢结构有限公司 | 插板式焊接相贯节点 |
CN202359665U (zh) * | 2011-10-02 | 2012-08-01 | 广州市城市规划勘测设计研究院 | 拉索、钢梁和钢管柱混合节点 |
CN103696499A (zh) * | 2013-12-20 | 2014-04-02 | 天津大学 | 钢结构梁柱连接用铸钢节点 |
CN103711200A (zh) * | 2014-01-14 | 2014-04-09 | 中国建筑第七工程局有限公司 | 一种装配式劲性组合框撑结构 |
CN205382561U (zh) * | 2015-12-28 | 2016-07-13 | 天津大学 | 一种装配式钢框架铸钢节点 |
-
2015
- 2015-12-28 CN CN201511018064.5A patent/CN105464211A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000336774A (ja) * | 1999-05-25 | 2000-12-05 | Hitachi Metals Ltd | 外ダイアフラム |
CN101892708A (zh) * | 2010-07-07 | 2010-11-24 | 浙江精工钢结构有限公司 | 插板式焊接相贯节点 |
CN202359665U (zh) * | 2011-10-02 | 2012-08-01 | 广州市城市规划勘测设计研究院 | 拉索、钢梁和钢管柱混合节点 |
CN103696499A (zh) * | 2013-12-20 | 2014-04-02 | 天津大学 | 钢结构梁柱连接用铸钢节点 |
CN103711200A (zh) * | 2014-01-14 | 2014-04-09 | 中国建筑第七工程局有限公司 | 一种装配式劲性组合框撑结构 |
CN205382561U (zh) * | 2015-12-28 | 2016-07-13 | 天津大学 | 一种装配式钢框架铸钢节点 |
Non-Patent Citations (2)
Title |
---|
韩庆华等: "方钢管柱_H形钢梁铸钢连接节点力学性能分析", 《天津大学学报(自然科学与工程技术版)》 * |
韩庆华等: "方钢管柱_H形钢梁铸钢连接节点静力性能试验研究", 《建筑结构学报》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013467A (zh) * | 2016-06-15 | 2016-10-12 | 哈尔滨工业大学 | 一种可更换组合钢板耗能钢结构梁柱节点 |
CN106013467B (zh) * | 2016-06-15 | 2018-06-19 | 哈尔滨工业大学 | 一种可更换组合钢板耗能钢结构梁柱节点 |
CN107620500A (zh) * | 2017-10-26 | 2018-01-23 | 哈尔滨工业大学 | 一种应用于单层钢结构冷却塔的h‑c型装配式节点 |
CN107620501A (zh) * | 2017-10-26 | 2018-01-23 | 哈尔滨工业大学 | 一种应用于双层钢结构冷却塔的装配式节点 |
CN107620501B (zh) * | 2017-10-26 | 2023-11-07 | 哈尔滨工业大学 | 一种应用于双层钢结构冷却塔的装配式节点 |
CN107620500B (zh) * | 2017-10-26 | 2024-02-09 | 哈尔滨工业大学 | 一种应用于单层钢结构冷却塔的h-c型装配式节点 |
CN108708460A (zh) * | 2018-07-27 | 2018-10-26 | 南京林业大学 | 一种木框架结构梁柱铰接装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105604187B (zh) | 一种装配式钢结构梁柱节点连接装置 | |
CN105464211A (zh) | 一种装配式钢框架铸钢节点及其安装方法 | |
CN106836489B (zh) | 一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法 | |
CN105888060A (zh) | 一种装配式带盖板双法兰梁柱螺栓节点连接装置 | |
CN102677779B (zh) | 装配式建筑钢筋砼构件 | |
CN108533045A (zh) | 可复位的形状记忆合金耗能组合柱及安装方法 | |
CN103015536B (zh) | 一种多高层装配式钢结构体系的梁柱节点连接装置 | |
CN103334499B (zh) | 一种梁柱节点连接装置 | |
CN107489197A (zh) | 一种带斜撑的装配式钢结构h型钢柱梁柱节点连接装置 | |
CN104652615A (zh) | 一种装配式钢结构体系的梁柱节点连接装置 | |
CN105804246A (zh) | 无焊接的装配式钢管混凝土梁柱节点及其施工方法 | |
CN105155687A (zh) | 一种h型钢柱翼缘板侧预制双拼槽型钢组合刚性连接节点 | |
WO2016187800A1 (zh) | 一种金属架装置 | |
CN105672494A (zh) | 钢管混凝土柱和钢梁之间灌浆连接节点及连接方法 | |
CN107806180A (zh) | 一种装配式钢结构方钢管柱梁柱节点t型盖板连接装置 | |
CN202718239U (zh) | 装配式建筑钢筋砼构件 | |
CN110359556A (zh) | 装配式钢结构内插板方钢管柱端板连接的梁柱节点 | |
CN203361354U (zh) | 一种梁柱节点连接装置 | |
CN104652617A (zh) | 一种多高层装配式钢结构体系的梁柱节点连接装置 | |
CN107859171A (zh) | 一种装配式钢结构方钢管柱梁柱节点l型盖板连接装置 | |
CN104652616A (zh) | 一种装配式钢结构体系的半焊半螺栓梁柱节点连接装置 | |
CN107761952A (zh) | 一种装配式钢结构方钢管柱梁柱节点t型盖板夹腹板连接装置 | |
CN104060700A (zh) | 一种组装式铸钢外套筒-t型件梁与柱连接装置 | |
CN203947596U (zh) | 一种组装式铸钢外套筒-t型件梁与柱连接装置 | |
CN103696499A (zh) | 钢结构梁柱连接用铸钢节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160406 |
|
WD01 | Invention patent application deemed withdrawn after publication |