CN105458325B - It is a kind of that the method to drill on tube sheet is fixed on using more radial drills - Google Patents

It is a kind of that the method to drill on tube sheet is fixed on using more radial drills Download PDF

Info

Publication number
CN105458325B
CN105458325B CN201510846519.6A CN201510846519A CN105458325B CN 105458325 B CN105458325 B CN 105458325B CN 201510846519 A CN201510846519 A CN 201510846519A CN 105458325 B CN105458325 B CN 105458325B
Authority
CN
China
Prior art keywords
tube sheet
drill
frock
fixed
radial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510846519.6A
Other languages
Chinese (zh)
Other versions
CN105458325A (en
Inventor
郭传东
王春义
周国顺
张树
孙学芹
李桂秋
毕海波
魏光旭
高洪岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin global and creation machinery manufacturing Cleaning Co., Ltd.
Original Assignee
Jilin Global And Creation Machinery Manufacturing Cleaning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Global And Creation Machinery Manufacturing Cleaning Co Ltd filed Critical Jilin Global And Creation Machinery Manufacturing Cleaning Co Ltd
Priority to CN201510846519.6A priority Critical patent/CN105458325B/en
Publication of CN105458325A publication Critical patent/CN105458325A/en
Application granted granted Critical
Publication of CN105458325B publication Critical patent/CN105458325B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B41/00Boring or drilling machines or devices specially adapted for particular work; Accessories specially adapted therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B39/00General-purpose boring or drilling machines or devices; Sets of boring and/or drilling machines
    • B23B39/16Drilling machines with a plurality of working-spindles; Drilling automatons
    • B23B39/161Drilling machines with a plurality of working-spindles; Drilling automatons with parallel work spindles

Abstract

The invention discloses a kind of method for being fixed on using more radial drills and being drilled on tube sheet, in the region for the foundation ground that polylith frock square chest is arranged in compacting, plane on frock square chest is corrected with infrared ray theodolite, tube sheet is placed on frock square chest, is re-calibrated by the flatness of tube sheet detail drawing requirement;Multiple bolts hole coupled with template and connecting plate frock are drilled out on tube sheet, then assembling cope plate and connecting plate frock make it be bonded with tube sheet close integral;In addition radial drill is removed from original mounting seat, be assemblied in the connecting plate frock of tube sheet, and the cooling and lubricating system of each bench drill is transformed;The radial drill subregion of more transformations is fixed on tube sheet, the installation accuracy of drilling machine has been corrected, heat exchange pore is drilled out by the position subregion of machined bottom on bore template.Large-scale tube sheet pore is processed using machine tool scene, its efficiency is higher, and cost is relatively low, and quality is preferable, with strong applicability.

Description

It is a kind of that the method to drill on tube sheet is fixed on using more radial drills
Technical field
The invention belongs to technical field of mechanical processing, relates to the use of more radial drills and is fixed on the method to drill on tube sheet.
Background technology
The drilling prior art of tube sheet mainly has two kinds:One kind is drilled using separate unit radial drill after marking on slab;It is another Kind is directly drilled using numerical control drilling.
The drilling of tube sheet is generally manufactured using in factory, mainly has two methods, a kind of is to be placed on the good tube sheet of car On the large platform of line, platform pincers worker draws the pore position line by figure and charges and attacks dotting punch with sample and draw planning detection round wires, afterwards will Tube sheet is fixed in the work top of radial drill, using separate unit radial drill by dotting punch position one by one drill, such a method efficiency compared with Low, cost is relatively low;Another kind is to place car good tube sheet on numerical control drilling work top, and numerical control driller is by the programming of drawing hole position Afterwards, numerical control drilling directly drills.Such a method efficiency is higher, and cost is higher.
The maximum specification of radial drill drilling is generally 100mm, and the drilling maximum outreach of its rocking arm is generally 3150mm, for Boring large-scale tube sheet needs multiple clamping centering workpiece, and time-consuming, efficiency are low, and quality is unstable;And numerical control drilling drilling efficiency is high, but number Control brill processing charges is higher, and large-sized numerical control, which bores expense higher, can especially process the numerical control drilling country of more than 5000mm parts It is less, that is, allow to processing due to being influenced by cost of transportation and road overload etc., it is also relatively difficult to achieve.
In recent years, as petrochemical plant maximizes, tubular heat exchanger is promoted to also tend to maximize, tube sheet specification exists More than 5000mm's is also more, and most equipment also needs erecting bed to construct by being limited by traffic condition, and the present invention is just It is to solve the problem of large-scale tube sheet site operation drilling, it is low to solve separate unit radial drill drilling efficiency, ropy problem, Also solve and costly, the problem of transport is limited is drilled to large-sized numerical control.
The content of the invention
The method to drill on tube sheet is fixed on using more radial drills the purpose of the present invention is to propose to a kind of, is solved with general Lead to the problem of machine tooling Large Tube plate efficiency is low, of poor quality, of high cost.Such a method is suitable for site operation processing Large Tube The higher pore of precision on plate, such as the example to drill on the tube sheet of diameter 5000mm, thickness in 90mm had verified that, effect Preferably.
The technical solution adopted in the present invention is, a kind of that the method to drill on tube sheet is fixed on using more radial drills, presses Carried out according to following steps:
Step 1, the foundation ground to site operation are tamped, and polylith frock square chest is arranged in the foundation ground region of compacting It is interior, plane on frock square chest is corrected with infrared ray theodolite and ensures flatness within 2mm;
Tube sheet, be placed on frock square chest by step 2, using instrument and infrared ray theodolite again to plane on tube sheet Being corrected flatness, (planarity requirements of itself should be consistent after this tube sheet Vehicle Processing with drawing requirement, here within 1mm It is exemplified as 1mm);
Step 3, for the not high pore of bridge required precision, directly can rule and beat by hand the side of dotting punch on tube sheet Method, carries out determining for pore position;For the higher pore of bridge required precision (such as the tube head using argonaut welding welding) The method of bore template drilling should be used to drill, i.e., template is fixed on tube sheet with c-type clamp, should accomplished and tube sheet Face paste is closed closely, and template can be fabricated to sectional pattern plate by the ability that miniature numerical control bores, and in advance bore the machined bottom of pore Go out, so as to ensure the positional precision finally to drill;
Step 4, the tube sheet of directly line drilling, fixed more radial drill connecting plate frocks are drilled out using magnetic drill in tube sheet Bolt hole, and using bore template drilling tube sheet in addition to the hole in connecting plate frock is drilled out, should also drill out multiple guarantee moulds The bolt hole that plate is fitted closely with tube sheet, wherein the position to drill should be overlapped with the position of pore, bolt pore size should be less than pipe Pore size, finally fixes bore template and connecting plate frock with corresponding bolt;
Step 5, transform radial drill, i.e., with being fixed on tube sheet after radial drill is removed from original mounting seat On connecting tooling assembling, and the cooling and lubricating system of lathe is subjected to appropriate reconstruction to be adapted to site operation;
Step 6, by more transformation radial drill subregions be fixed on tube sheet, the installation accuracy of drilling machine has been corrected, by punching The bottom outlet position subregion processed on eye position or bore template drills out heat exchange pore, reaches drawing requirement, by fixed rocking arm Bore connecting plate covering pore, after radial drill retighten once afterwards drill out, whole drilling environment temperature is not lower than 5 DEG C, should Ensure that lathe can be lubricated and worked.
The beneficial effects of the invention are as follows large-scale tube sheet pore is processed using machine tool scene, its efficiency is higher, cost compared with Low, quality is preferable, with strong applicability.
Brief description of the drawings
Fig. 1 is the system structure diagram of construction method of the present invention;
Fig. 2 is system for use in carrying structure schematic top plan view of the present invention;
Fig. 3 is the radial drill connection diagram of present system.
In figure, 1. tube sheets, 2. frock square chests, 3. infrared ray theodolites, 4. templates, 5. connecting plates, 6. radial drills, 7. coolings Liquid circulation, 601. bolts, 602. pedestals.
Embodiment
With reference to embodiment, the present invention is described in detail.
The system used as depicted in figs. 1 and 2 for the method for the present invention, tube sheet 1 are placed on some frock square chests 2, frock side The height of case 2 is adjusted to consistent level height by being arranged on the infrared ray theodolite 3 on the side of tube sheet 1, and template 4 is fixed on tube sheet On 1, be bonded with 1 surface of tube sheet it is close and tightly integral with several bolts and tube sheet handle, be fixed with template 44 it is (several to shake Arm bores several connecting plates) connecting plate 5, radial drill 6 is fixed with connecting plate 5, and the rocker arm drilling scope of all radial drills 6 adds up The drilling scope of whole tube sheet 1 should be covered, four radial drills 6 are equipped with this example Fig. 1, is distributed on 1 surrounding of tube sheet, in template 4 The machined bottom of heat exchange pore is drilled out in advance, heat exchange the machining of drilling is carried out to tube sheet 1 with radial drill 6, and cooling is equipped with the side of tube sheet 1 Liquid circulation 7, for drilling when, cool down system.
It is illustrated in figure 3 the connection diagram of radial drill 6.By bolt 601 by the pedestal 602 of radial drill 6, connecting plate 5 Link together with tube sheet and template.
In two large-sized calandria type heat exchangers of Shandong Rizhao enterprise site operation, tube sheet diameter at the beginning of 2014 5640mm, thickness 90mm, pore 24928, apertureBridge spacing 96% allows bridge > 5.64mm, and 4% permits Perhaps minimum bridge >=3.48mm, condition of construction was according in technical solution of the present invention at the installation scene of the enterprise at that time (bore template for being in drilling) for the machining of drilling that step 1~6 are realized with 4 Z50 radial drills, checks aperture ruler after drilling It is very little all qualified, bridge spacing 98% bridge > 5.7mm, 2% minimum bridge >=4.2mm.Comply fully with and wanted better than drawing Ask.Every piece of drilling of tubesheet saves the time more than 1 month compared with separate unit radial drill, saves more than 70,000 yuan of external coordination digital control processing expense.
The present invention is drilled at the same time by fixed 4 radial drills on tube sheet, and makees benchmark bottom outlet, drilling using template With the deformation in infrared ray theodolite monitoring tube sheet face in journey, the method for the present invention is practical and easy to implement, realizes existing The purpose of field processing pore high-efficiency high-quality.A kind of new method of the live large-scale tube sheet of processing has also been created at the same time.
The above is only to the preferable embodiment of the present invention, not makees limit in any form to the present invention System, any simple modification that every technical spirit according to the present invention makes embodiment of above, equivalent variations and modification, Belong in the range of technical solution of the present invention.

Claims (1)

1. a kind of be fixed on the method to drill on tube sheet using more radial drills, it is characterised in that follows the steps below:
Step 1, the foundation ground to site operation are tamped, and polylith frock square chest is arranged in the foundation ground region of compacting, Plane on frock square chest, which is corrected, with infrared ray theodolite ensures flatness within 2mm;
Tube sheet, be placed on frock square chest by step 2, and plane on tube sheet is carried out again using instrument and infrared ray theodolite The control of correcting plane degree fixes within 1mm, and with parallels;
Bore template, be fixed on tube sheet by step 3 with c-type clamp, should accomplish to close close, central alignment with tube sheet face paste; Template is fabricated to sectional pattern plate by the ability that miniature numerical control bores, and in advance drills out the machined bottom of pore;
Step 4, drill out on tube sheet multiple guarantee templates with magnetic drill the bolt hole being connected fitted closely with tube sheet, and drills out The bolt hole of fixed more radial drill connecting plate frocks, reaches and fixes bore template and the mesh of connecting plate frock with corresponding bolt 's;
Step 5, transform radial drill, i.e., with being fixed on tube sheet after radial drill is removed from original mounting seat Connecting plate frock is assembled, and the cooling and lubricating system of lathe is carried out appropriate reconstruction to be adapted to site operation;
Step 6, by more transformation radial drill subregions be fixed on tube sheet, the installation accuracy of drilling machine has been corrected, by drilling die Machined bottom position subregion on plate drills out heat exchange pore, reaches or the borehole accuracy better than drawing requirement.
CN201510846519.6A 2015-11-27 2015-11-27 It is a kind of that the method to drill on tube sheet is fixed on using more radial drills Expired - Fee Related CN105458325B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510846519.6A CN105458325B (en) 2015-11-27 2015-11-27 It is a kind of that the method to drill on tube sheet is fixed on using more radial drills

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510846519.6A CN105458325B (en) 2015-11-27 2015-11-27 It is a kind of that the method to drill on tube sheet is fixed on using more radial drills

Publications (2)

Publication Number Publication Date
CN105458325A CN105458325A (en) 2016-04-06
CN105458325B true CN105458325B (en) 2018-04-24

Family

ID=55596727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510846519.6A Expired - Fee Related CN105458325B (en) 2015-11-27 2015-11-27 It is a kind of that the method to drill on tube sheet is fixed on using more radial drills

Country Status (1)

Country Link
CN (1) CN105458325B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105772784A (en) * 2016-05-18 2016-07-20 中车唐山机车车辆有限公司 Drilling system for workpiece
CN110548889B (en) * 2019-07-30 2021-01-12 高邮市永发机械有限公司 Stable and efficient magnetic drill press of driling
CN111069919B (en) * 2019-12-31 2021-10-15 哈电集团(秦皇岛)重型装备有限公司 High-temperature gas cooled reactor tube plate weld thread machining equipment and machining process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2892336Y (en) * 2006-05-22 2007-04-25 梁锦星 Full automatic dual-end multibit drill lathe
CN202137410U (en) * 2011-06-29 2012-02-08 天津赛瑞机器设备有限公司 Drilling tool for end face of externally-arranged water ring guide vane hole of hydroturbine generator set
CN104259767A (en) * 2014-08-20 2015-01-07 云南大为化工装备制造有限公司 Machining method of group of holes in large-sized metal tube plate
CN104959640A (en) * 2015-05-29 2015-10-07 刘海明 Precise hole forming drilling machine

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6719502B2 (en) * 2002-04-16 2004-04-13 Amsted Industries Inc. Boring riser holes in a graphite mold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2892336Y (en) * 2006-05-22 2007-04-25 梁锦星 Full automatic dual-end multibit drill lathe
CN202137410U (en) * 2011-06-29 2012-02-08 天津赛瑞机器设备有限公司 Drilling tool for end face of externally-arranged water ring guide vane hole of hydroturbine generator set
CN104259767A (en) * 2014-08-20 2015-01-07 云南大为化工装备制造有限公司 Machining method of group of holes in large-sized metal tube plate
CN104959640A (en) * 2015-05-29 2015-10-07 刘海明 Precise hole forming drilling machine

Also Published As

Publication number Publication date
CN105458325A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN201529784U (en) Floor-type vertical-horizontal combined boring-milling numerical control machine tool
CN105458325B (en) It is a kind of that the method to drill on tube sheet is fixed on using more radial drills
CN101786246A (en) Drilling jig for speed reducer connecting cover
CN101758372A (en) Method for forming mold for drilling high-strength bolt holes for coke dry quenching body frame structure
CN104368831A (en) Numerical control lathe multi-cutter-position device
CN102862032B (en) Once-clamping machining method of large-negative-angle bolt-sphere bolt hole
CN203843600U (en) Machining device for cylinder cover cooling inclined water hole
CN207103920U (en) A kind of boring positioning mould
CN205147382U (en) Many rocking arms bore drilling system on tube sheet of fixing
CN104439989A (en) Oblique crankshaft oil hole machining method
CN204248032U (en) A kind of piston head non-static fields slant hole processing device
CN215747492U (en) Sieve case chassis welding frock with adjustable
CN206305491U (en) A kind of porous series chord member process equipment
CN218252994U (en) Be applied to frock that many pipe brackets punched
CN103433770B (en) Multistation special purpose machine tool coupling positioner
CN102284798A (en) Method for processing large beam member with connecting seats
CN206981813U (en) A kind of tensioning wheel drilling tool
CN211489780U (en) Universal tool for drilling of upright post supporting top cover workpiece
CN205254581U (en) Processingequipment based on a preparation is examined to car glass normal direction
CN104259767A (en) Machining method of group of holes in large-sized metal tube plate
CN211136240U (en) Novel tower machine base section automatic processing device
CN105149653B (en) A kind of processing unit (plant) and method of spatial hole
CN218533577U (en) Auxiliary tool for machining heat exchanger fins
CN212761308U (en) Combined type drill jig
CN108500343A (en) Drill jig and its processing method for yoke inclined hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180315

Address after: 132000 Zunyi East Road, Longtan District, Jilin, Jilin Province, No. 9

Applicant after: Jilin global and creation machinery manufacturing Cleaning Co., Ltd.

Address before: No. 9, Zunyi Road, Longtan District, Jilin, Jilin

Applicant before: JILIN MACHINERY MANUFACTURING BRANCH, CNPC NORTHEAST REFINING & CHEMICAL ENGINEERING CO., LTD.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180321

Address after: 132000 Zunyi East Road, Longtan District, Jilin, Jilin Province, No. 9

Applicant after: Jilin global and creation machinery manufacturing Cleaning Co., Ltd.

Address before: 132000 Zunyi East Road, Longtan District, Jilin, Jilin Province, No. 9

Applicant before: JILIN MACHINERY MANUFACTURING BRANCH, CNPC NORTHEAST REFINING & CHEMICAL ENGINEERING CO., LTD.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180424

Termination date: 20181127